Belvedere Heights Streetlights & Sidewalks Improvements Project

Similar documents
Westgate/Belvedere Homes Community Redevelopment Agency. Belvedere Heights. Streetlights & Sidewalks Improvements Project.

2018 Transportation Alternatives Program (TAP) Application Presentation to Palm Beach TPA BRANT BRIDGE CONNECTION LOOP EXTENSION ON CARL BOLTER DR

DALLAS MIDTOWN REDEVELOPMENT PLAN FOCUS NORTH TEXAS Peer Chacko, AICP, Assistant Director, City of Dallas

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

Roosevelt Estates Neighborhood Improvements

CITY MANUALS AND STANDARDS REVIEW

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Stakeholder Update. Agenda. Project update Needs Identification Strategy Proposed needs Safety Collectors/Arterials Greenways Local roads

SUMMARY OF TRANSPORTATION INVESTMENTS

City of Birmingham Draft Multi-modal Transportation Plan

May 12, 2016 Metro Potential Ballot Measure Issue Brief: Local Return

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

COMPLETE STREETS A STEP FORWARD ITE District 10/FSITE Annual Meeting November 3, 2015

Non-Motorized Transportation 7-1

A Matter of Fairness: ROCOG s Environmental Justice Protocol. What is Mobility Limitation?

Project Status Update

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Summaries from the Concentric Circle Exercises 10 Neighborhood Forums held in April and May 2018 Various locations around Town

City of Jacksonville Mobility Fee Update

Pinellas County Safety Initiatives

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

NJDOT Complete Streets Checklist

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

MOBILITY WORKSHOP. Joint City Council and Transportation Commission May 5, 2014

SAFE STREETS FOR ALL. A Report to Land Use Committee on Street widths in Hunters Point Shipyard and Candlestick Point Developments

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

Environment and Public Works Committee Presentation

Building Great Neighbourhoods QUEEN ALEXANDRA

Omaha s Complete Streets Policy

Complete Streets. presented by Active Transportation Alliance. Chicagoland s voice for better biking, walking and transit.

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014

IMPLEMENTATION STRATEGIES

City of Novi Non-Motorized Master Plan 2011 Executive Summary

Chapter 4: Funding and Implementation

NEWMARKET UPHAM S CORNER

LIST OF PRIORITY PROJECTS FY TPA Committee Meetings & Board Review September 2018

Appendix C 3. Bicycle / Pedestrian Planning

Y O R K R O A D. Baltimore, Maryland. ULI Technical Assistance Panel June 18 & 19, York Road Technical Assistance Panel

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012

S T A T I O N A R E A P L A N

Bicycle and Pedestrian Plans and Improvements

City Avenue Projects

Downtown BRT Corridor Alternatives Review: 1 st, 2 nd, 3 rd and 4 th Avenue. Bus Rapid and Conventional Transit Planning and Design Services

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Complete Streets Workshop Follow-up. April 27, 2011 Rockledge City Hall

CITY OF PORTSMOUTH PLANNING DEPARTMENT

Building Great Neighbourhoods LANSDOWNE

Lawrence Avenue Streetscape Concepts August 30, 2011

Goal 3: Foster an environment of partnerships and collaboration to connect our communities and regions to one another.

Agenda. US-1 Corridor Study and HIA Update. Pathway Diagram / Primary Indicators. Research Questions. Linking Multimodal Improvements to Indicators

Building Great Neighbourhoods BONNIE DOON

Roadway Classification Design Standards and Policies. Pueblo, Colorado November, 2004

APPENDIX D: Southwest Volusia Regional Transportation Study. Evaluation Criteria FINAL

Bicycle-Pedestrian Master Plan Update

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

FMATS Transportation Improvement Program Non-Motorized Project Nomination Form

2. TRANSPORTATION ELEMENT.

Enhancing Downtown

Polk Streetscape Project

TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN

Typical Rush Hour Commute. PennyforTransportation.com

Morristown, NJ Complete Streets Policy

::~-~ w ANNUAL LIST OF PALM BEACH MPO PRIORITY PROJECTS FY Adopted July 20, '"',, - ==~"'c;;f'";~":?:'!""

Public Meeting #1 January 30, 2018

CHAPTER 7.0 IMPLEMENTATION

UDC Street Cross Sections

AMATS Complete Streets Policy

SR 693 (Pasadena Avenue) Corridor Study from Shore Drive South to 66 th Street

Safety & Convenience for All Users, in All Modes. Barbara McCann NCSL December 3, 2013

Land Use Bicycle Spaces Required Type Residential

PRESS RELEASE San Joaquin Council of Governments

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.

Transit-Driven Complete Streets

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

Promoting Active Communities Award Application

5. RUNNINGWAY GUIDELINES

Madison Urban Area and Dane County. Bicycle Transportation Plan Summary. September Introduction. Bicycle Plan Scope and Planning Process

MASTER BICYCLE AND PEDESTRIAN PLAN

Route 7 Corridor Study

BD RESOLUTION NO RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE 1

Broward Boulevard Gateway Implementation Project, Downtown Walkability Analysis, & Joint Development Initiative (JDI)

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

Chapter 14 PARLIER RELATIONSHIP TO CITY PLANS AND POLICIES. Recommendations to Improve Pedestrian Safety in the City of Parlier (2014)

Preliminary Engineering Study

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

COMPLETE STREETS POLICY Exhibit A to Ordinance

PEDESTRIAN ACTION PLAN

IBI Group November 5, 2012

Transcription:

Westgate/Belvedere Homes Community Redevelopment Agency Belvedere Heights Streetlights & Sidewalks Improvements Project Phase I MPO 2017 Transportation Alternatives Program (TAP) BTPAC Special Workshop Thursday, April 6, 2017

WESTGATE CRA AREA Approx. 1,300 acres or 2 square miles Area bounded by Okeechobee Blvd., N. Military Trail, Belvedere Rd., and N. Florida Mango Rd.

WESTGATE CRA BACKGROUND Westgate CRA created in May 1989 by the BCC pursuant to FS 163 Part III With the primary objective of improving public infrastructure and promoting social and economic development Agency receives tax increment revenue (TIF) based on property improvement values from PBC annually Used to implement goals of Redevelopment Plan Leverage TIF dollars with State and Federal grant funding Completed over $30 million in sanitary sewer, drainage, roadway, and flood mitigation improvements in residential neighborhoods from 1992-2012

SUCCESSFUL CRA INFRASTRUCTURE PROJECTS Streetlight Programs Belvedere Homes Ongoing since 1999 CRA funded Cherry Road 40 decorative light standards CRA funded CHERRY ROAD STREETLIGHTS

SUCCESSFUL CRA INFRASTRUCTURE PROJECTS Public Infrastructure South Westgate 1992-1996 $3.3 million bond secured for sanitary sewer, drainage & roadway improvements North Westgate 2004-2011 Multi-phase (6) sanitary sewer, drainage & roadway improvement project spanning 7 years $7 million in grant funding leveraged with CRA TIF funds BEFORE AFTER

PROJECT BACKGROUND Improvements to infrastructure continue to be a CRA focus Above-ground streetscape improvements and development of walkable public spaces Many pockets throughout CRA without adequate streetlighting or a connected sidewalk network Belvedere Heights is a small residential neighborhood accessed only from N. Florida Mango Road No existing streetlights or sidewalks Worthington Road Florida Mango

GENERAL PROJECT LOCATION

PHASE I LOCATION UPLAND ROAD TO WORTHINGTON ROAD

PROJECT DESCRIPTION Intended to increase walkability, pedestrian safety, and neighborhood security by improving basic infrastructure +/- 4,350 linear feet of new 5 wide concrete sidewalks on 5 local streets Total of 35 decorative pedestrian-scale streetlights All planned improvements are in County R-O-W Phase II remainder of Belvedere Heights neighborhood from Wellington Rd. to Bridgeman Drive Future phases roadway improvements & bike lanes throughout neighborhood and N. Florida Mango

EXISTING CONDITIONS Kenwood Rd Upland Rd Ardmore Rd N. Florida Mango at Ardmore Rd

EXISTING 50 R-O-W BELVEDERE HEIGHTS STREETLIGHTS & SIDEWALKS PHASE I TYPICAL SECTION EXISTING 50 ROW (STREETMIX) Upland Rd. Ardmore Rd. Whitney Rd. Worthington Rd 50 ROW

EXISTING 60 R-O-W BELVEDERE HEIGHTS STREETLIGHTS & SIDEWALKS PHASE I TYPICAL SECTION EXISTING 60 ROW (STREETMIX) Kenwood Rd. 60 ROW

PROPOSED 50 R-O-W BELVEDERE HEIGHTS STREETLIGHTS & SIDEWALKS PHASE I TYPICAL SECTION PROPOSED 50 ROW (STREETMIX) Upland Rd. Whitney Rd. Ardmore Rd. Worthington Rd. Scope of Work Phase 1

PROPOSED 60 R-O-W BELVEDERE HEIGHTS STREETLIGHTS & SIDEWALKS PHASE I TYPICAL SECTION PROPOSED 60 ROW (STREETMIX) Kenwood Rd. Scope of Work Phase 1

PROPOSED STREETLIGHT LOCATIONS

FUNDING ELIGIBILITY CRITERIA 1. Safety, Security and Complete Streets Project designed to consider future roadway improvements Allow for a future 6 paved shoulder/bike lane on both sides of street and reduced 10 drive lanes Addition of sidewalks furthers ADA compliance by providing crosswalk striping and by connecting to existing sidewalks on N. Florida Mango Road Provides safer route for children to access school bus drop off/pick up times Improves non-motorized safety by providing 4,000 points for new sidewalks A planned lane reduction from 12 to 10 and the addition of 6 bike lanes increases non-motorized points to +/- 8,000

FUNDING ELIGIBILITY CRITERIA 2. Maximizing MPO Funds Estimated total project costs $1,484,206.18 Requesting $935,581.93 in TAP grant funding Utilizing local funds (CRA TIF and/ or grant funding from alternate sources) for design, contingency, and CEI activities LAP agreement with PBC Engineering & Public Works

FUNDING ELIGIBILITY CRITERIA 3. Equity Median HH Income 2014 population of 11,433 2,939 households in 2014 57% of CRA households in lower income ranges 28% are considered very low

FUNDING ELIGIBILITY CRITERIA 3. Equity Traditionally Underserved Population PBC Jurisdictions Low Income & Ethnic Minority Concentrations (DES Consolidated Plan 2015-2020)

FUNDING ELIGIBILITY CRITERIA 4. Local Support & Environmental Impacts Improved sidewalk network and streetlights identified by community at 2015 Forum As well as continuing concern over crime and safety 2010-2015 PBSO data shows an overall increase in crime in the CRA area Addition of streetlights act as a deterrent to criminal activity Increases security and visibility for law enforcement project is supported by PBSO community policing deputies No anticipated negative environmental impacts

FUNDING ELIGIBILITY CRITERIA 4. Non-Motorized Connectors & Efficient Transit Belvedere Road identified as a 110 R-O-W thoroughfare Provision to add 6 bike lane in future neighborhood roadway design improving connectivity to Belvedere Road Belvedere Heights neighborhood has access to Palm Tran Routes 42 and 44 to downtown WPB, multi-modal transit station Sidewalks and streetlights provide secure passage and walkability to transit points on N. Florida Mango Road and Belvedere Road

5. Proximity Benefit FUNDING ELIGIBILITY CRITERIA Project is within 0.6 miles of Westgate Elementary School Project is within 1.8 miles of Cross County Shopping Plaza Project is within 1.15 miles of Westgate Recreation Center

Questions? and Thank you! Westgate/Belvedere Homes Community Redevelopment Agency 1280 N Congress Ave. Suite 215 561-640-8181 www.westgatecra.org