Aransas Pass: Channel

Similar documents
Information for File #MVP MVM

City of Port Aransas Shoreline Analysis and Improvements

DRAFT. October 17, 2014 File No Mr. Brendhan Zubricki Town Administrator Essex Town Hall 30 Martin Street Essex, MA.

New Orleans Municipal Yacht Harbor

Hydrologic Feasibility of Storm Surge Barriers

Ketchikan Harbors Thomas Basin and Bar Point Harbor

Eelgrass Survey Reporting Form 2222 Channel Road Newport Beach, CA Eelgrass (Zostera marina) Survey

Nearshore Dredged Material Placement Pilot Study at Noyo Harbor, CA

APPENDIX C. Fluvial and Tidal Hydraulics Report

MEAN LOW TIDE (MLT) to MEAN LOWER LOW WATER (MLLW)

CORPS FACTS. Harbor Dredging U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG

Juneau Douglas Harbor

Eelgrass and Macroalgae Presence/Absence Preliminary Surveys BHP Proposed Grays Harbor Potash Export Facility A Task 400

TechnicalNotes. Application Criteria for the Automated Real-Time Tidal Elevation System (ARTI ES)

Texas Department of Transportation s Gulf Intracoastal Waterway Capacity Study. GICA 112 th Annual Seminar July 28, 2017

UNITED NEW YORK SANDY HOOK PILOTS BENEVOLENT ASSOCIATION AND UNITED NEW JERSEY SANDY HOOK PILOTS BENEVOLENT ASSOCIATION

Ninilchik Harbor Page 2 of 11

Redondo Beach Boat Launch Ramp Facility

Homework 2 Bathymetric Charts [based on the Chauffe & Jefferies (2007)]

OYSTER REEF RESTORATION; RESTORING ECOLOGICAL FUNCTION

FY-16 Ongoing Contracts FY-16 Scheduled Contracts

DEPARTMENT OF THE ARMY GALVESTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1229 GALVESTON, TEXAS CESWG-CDR (1145)

La Quinta Channel Extension Port of Corpus Christi Ingleside, Texas. Mark Coyle

Coastal Sediment Transport Modeling Ocean Beach & San Francisco Bight, CA

APPENDIX M DREDGED MATERIAL MANAGEMENT PLAN (DMMP) FINAL INTEGRATED FEASIBILITY REPORT AND ENVIRONMENTAL ASSESSMENT

SACO RIVER AND CAMP ELLIS BEACH SACO, MAINE SECTION 111 SHORE DAMAGE MITIGATION PROJECT APPENDIX F ECONOMIC ASSESSMENT

Boothbay Harbor Rotary Club May 12, 2016

LOCATION: At the Port of Everett Marina in Port Gardner at Everett, Snohomish County, Washington

TITLE: The Importance of Model Validation: Two Case Studies. AUTHOR:Julie Thomas. Scripps Institution of Oceanography, La Jolla, CA.

International Trade Trends 2010 Review and 2011 Outlook

NWP Page 1 of 9 Enclosure

SEA LEVEL RISE IMPACT ASSESSMENT AND MITIGATION ALTERNATIVES DEVELOPMENT FOR BALBOA ISLANDS, CITY OF NEWPORT BEACH, CALIFORNIA

Homework 2a Bathymetric Charts [based on the Chauffe & Jefferies (2007)]

V. HARBOR DEPTHS, CHANNEL DESIGN AND PROPOSED CONSTRUCTION AND DREDGING

Information for File # SEW

INTRACOASTAL WATERWAY DEEPENING BROWARD COUNTY, FLORIDA HARD CORAL RELOCATION SUMMARY REPORT

Nome Harbor Page 2 of 12

CALCASIEU SALINITY STRUCTURES. HYDRODYNAMIC MODELING (To Support Design of Salinity Barriers)

NAVIGATION STUDY FOR LAKE WORTH INLET, FLORIDA DRAFT INTEGRATED FEASIBILITY REPORT AND ENVIRONMENTAL IMPACT STATEMENT APPENDIX A ENGINEERING

Chapter 11 Applications in Trigonometry

National Oceanic and Atmospheric Administration (NOAA)/ Mulberry Phosphate Trustee Council September 12, 2013

U.S. Army Engineer Institute for Water Resources

Data Collection and Processing: Elwha Estuary Survey, February 2013

Evaluation of June 9, 2014 Federal Emergency Management Agency Flood Insurance Study for Town of Weymouth, Norfolk, Co, MA

} to. Identifying or categorizing characteristics (shape, dimensions, total relief, least depth, steepness, etc.): Shown with name on chart No.

LOCAL COASTAL PROGRAM UPDATE

THE EFFECTS OF RAINFALL INTENSITY, PAVEMENT CROSS SLOPE, SURFACE TEXTURE, AND DRAINAGE LENGTH ON PAVEMENT WATER DEPTHS

Engineering Surveying - II CE313. Hydrographic Survey Lecture 06 Muhammad Noman

Admiralty Leisure Folio SC5601 East Devon and Dorset Coast, Exmouth to Christchurch

STUDY REPORT W&AR-03 RESERVOIR TEMPERATURE MODEL ATTACHMENT B DON PEDRO RESERVOIR BATHYMETRIC STUDY REPORT

PLANNING AND CONSTRUCTION OF SHORE PROTECTION AT SHAMROCK ISLAND, TEXAS: PROJECT UPDATE ABSTRACT

Coastal Engineering Technical Note

Cline s Point Marina Ship Wave Analysis

Paper for Consideration by HSSC8 Development of an Additional Bathymetry Layer standard based on S-57/S-52

CHART IN262 EAST OF 79 E: POSITIONS To agree with the adjoining chart IN262 which is referred to WGS84 Datum, in the area east

SHORE PROTECTION AND HABITAT CREATION AT SHAMROCK ISLAND, TEXAS ABSTRACT

Utilizing Vessel Based Mobile LiDAR & Bathymetry Survey Techniques for Survey of Four Southern California Breakwaters

SHOOTING ISLAND RESTORATION: LIVING SHORELINE AND HABITAT CONSTRUCTION

MOREHEAD CITY HARBOR, NC. Dredged Material Management Plan (DMMP)

SECTION II NM 26/10 NAVIGATION PUBLICATIONS ALMANACS CORRECTIONS

Lesson five. Clearance. Terminal Objective

Beacon Lakes NW 122nd Ave

Lesson one. Linear Motion. Terminal Objective. Lesson 1. Linear Motion

Streetscape Report Streetscape Report FALL 2017

Evaluation of the Klein HydroChart 3500 Interferometric Bathymetry Sonar for NOAA Sea Floor Mapping

COAST GUARD ADVISORY NOTICE (CGAN ) To: Distribution Date: September 1, 2017

1 HAT and MLLW are referenced to the station datum for each NOAA tide station.

Mooring Fields - From Concept to Construction

St. George Harbor Feasibility Study. Appendix A - Hydraulic Design. St. George, Alaska. Tentatively Selected Plan August 17, 2018

Marine Renewables Industry Association. Marine Renewables Industry: Requirements for Oceanographic Measurements, Data Processing and Modelling

Hydrographic Surveying Methods, Applications and Uses

Bahía Blanca port Terminals

1-22. KETCHIKAN, ALASKA (Thomas and Bar Point Basins) (CWIS NOS & 87071) Condition of Improvement 30 September 2007

Forth Ports Limited. Port of Dundee. Marine Guidelines and Port Information

TOWN OF DENNIS 10 YR COMPREHENSIVE DREDGE PERMIT SEPTEMBER 10, 2013

Techniques for Measuring and Analyzing Inlet Ebb-Shoal Evolution

Impact of Dredging the Lower Narrow River on Circulation and Flushing

COFFS HARBOUR SEDIMENT MODELLING AND INVESTIGATION

Mouth of the Columbia River Jetties Three-Phase Construction Plan

GENERAL GUIDELINES FOR VESSELS TRANSITING RESTRICTED WATERWAYS OR PORTS

Miles PROJECT LOCATION EOP, MP STATION BOP, MP 379 STATION

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE 8-FOOT CHANNEL OF THE FEDERAL NAVIGATION PROJECT IN KENNEBUNK RIVER KENNEBUNK & KENNEBUNKPORT, ME

Cordova Harbor Page 2 of 9

APPENDIX D-2. Sea Level Rise Technical Memo

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, 12270, & 10422) Condition of Improvement 30 September 2012

Geospatial Positioning Accuracy Standards Part 5: Standards for Nautical Charting Hydrographic Surveys - Public Review Draft

Refraction and shoaling analysis Using diffraction graphs Case studies Homer Spit RCPWAVE analysis Nikiski STWAVE analysis

State of Texas Operations and Maintenance

PENNDRAIN.rep. HEC-RAS Version May 2005 U.S. Army Corp of Engineers Hydrologic Engineering Center 609 Second Street Davis, California

Condition of Improvements 30 December 2014 Wrangell Harbors, Alaska (CWIS No , )

Evaluation of Placement Alternatives for Matagorda Ship Channel Bottleneck Removal

January 2012 (Revised July 2012) US Army Corps of Engineers Savannah District South Atlantic Division

[09/18] Admiralty Charts affected by the Publication List. denotes chart available in the Admiralty Raster Chart Service series. 1.

Preliminary Design of an Artificial Surfing Reef for Cocoa Beach, Florida

L Jll111I.6 3 = MICROCOPy RESOLUTION TEST CHART L40. NATIONAt TIRFAII nlf qtanpar[os IQ64 A

Figure 1 Example feature overview.

Developing Back Bay. Pre-Handout. Scope and Background

HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX D SBEACH MODELING

Nautical Chart Challenge

[43/17] ADMIRALTY Charts affected by the Publication List

Transcription:

3 4 5 5'N Print Date: 3// Side Slope Ratio: (Rise : Run Authorized Depth: -ft. 4 4 43 44 45 4 4 4 4 4 3'3 33 3 3 3 4 43 45 44 3 3 33 35 35 3 5 Survey Date(s: March 3 4 5 4'3 - -5 3'3-4 -ft.ft PORT ARAN S A S 5 5'3N 4' -ft.ft -4ft.ft -4ft.ft TO PORT PORT - ATERAY 3 MARTIN MIDSTREAM PARTNERS LP, HARBOR ISLAND HARF Tesoro Marine Services, Harbor Island Barge harf No. 3. Tesoro Marine Services, Harbor Island Barge harf No.. NOAA Bathymetry (DREDGING REACH ETENT - - - - 5 5-3 3-5. ELEVATIONS ARE REFERENCED TO MEAN LOER LO TIDE (MLL DATUM. 3. THIS PROJECT AS DESIGNED BY THE GALVESTON DIST RICT OF THE U.S. ARMY DESIGNATIONS OF INDIVIDUALS APPEAR ON THESE PROJECT DOCUMENTS ITHIN THE SCOPE OF THEIR EMPLOYMENT AS REQUIRED BY ER--. INFORMATION PROVIDED HERE. REQUIRED BY 33 CFR.35 5. FOR THE MOST UP TO DATE INFORMATION PLEASE CHECK OUR EBSIT E AT: HTTP://.SG.USACE.ARMY.MIL/MISSIONS/NAVIGATION/HYDROGRAPHICSURVEYS/. NOAA BATHYMETRY CONTOURS PRODUCED FROM HISTORIC BAT HYMETRIC (HYDROGRAPHIC Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong, swisstopo, 5'3N Coordinate System: NAD 3 StatePlane Texas South FIPS 45 Projection: Lambert Conformal Conic /Datum: North American 3.5 5,4 Mapped by: M3AOPAC Scale: :3, PORT, TEAS 4' Station: to 344 < - - Station Lines - - Center Line. HORIZ ONTAL COORDINATES ARE REFERENCED TO TEAS STATE PLANE COORDINATE SYSTEM, SOUT H CENTRAL ZONE NAD3 US SURVEY FEET. - - MLL 5- -5 Features 5'N 4'3 5'3N PORT OF, HARBOR ISLAND DOCK NO. GALVESTON, TEAS 5'3N 4 of PORT OF, HARBOR ISLAND TERMINAL, SHIP DOCK Tesoro Marine Services, Harbor Island harf.

3 4 5 -ft.ft PORT 5'N Print Date: 3// NOAA Bathymetry (DREDGING REACH ETENT - - - - 5 5-3 3-5 3. THIS PROJECT AS DESIGNED BY THE GALVESTON DIST RICT OF THE U.S. ARMY DESIGNATIONS OF INDIVIDUALS APPEAR ON THESE PROJECT DOCUMENTS ITHIN THE SCOPE OF THEIR EMPLOYMENT AS REQUIRED BY ER--. 5. FOR THE MOST UP TO DATE INFORMATION PLEASE CHECK OUR EBSIT E AT: HTTP://.SG.USACE.ARMY.MIL/MISSIONS/NAVIGATION/HYDROGRAPHICSURVEYS/. NOAA BATHYMETRY CONTOURS PRODUCED FROM HISTORIC BAT HYMETRIC (HYDROGRAPHIC Coordinate System: NAD 3 StatePlane Texas South FIPS 45 Projection: Lambert Conformal Conic /Datum: North American 3.5 5,4 Mapped by: M3AOPAC Scale: :3, of PORT, TEAS Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong, swisstopo, Station: to 344. ELEVATIONS ARE REFERENCED TO MEAN LOER LO TIDE (MLL DATUM. INFORMATION PROVIDED HERE. REQUIRED BY 33 CFR.35 5'3N GALVESTON, TEAS < - - - Station Lines -. HORIZ ONTAL COORDINATES ARE REFERENCED TO TEAS STATE PLANE COORDINATE SYSTEM, SOUT H CENTRAL ZONE NAD3 US SURVEY FEET. - Center Line 5' - MLL 5- -5 Features 5'N 5'3 4'3 5'3 Side Slope Ratio: (Rise : Run Authorized Depth: -ft. Survey Date(s: March 5'3N 5'3N 4'3 5'3N 4-4ft.ft -ft.ft 5' 3 3 TO PORT PORT ATERAY

4 5 5 -ft.ft A R A N S A S 5' 5'3N 5'3 NOAA Bathymetry (DREDGING REACH ETENT - - - - 5 5-3 3-5 3. THIS PROJECT AS DESIGNED BY THE GALVESTON DIST RICT OF THE U.S. ARMY DESIGNATIONS OF INDIVIDUALS APPEAR ON THESE PROJECT DOCUMENTS ITHIN THE SCOPE OF THEIR EMPLOYMENT AS REQUIRED BY ER--. INFORMATION PROVIDED HERE. REQUIRED BY 33 CFR.35 5. FOR THE MOST UP TO DATE INFORMATION PLEASE CHECK OUR EBSIT E AT: HTTP://.SG.USACE.ARMY.MIL/MISSIONS/NAVIGATION/HYDROGRAPHICSURVEYS/. NOAA BATHYMETRY CONTOURS PRODUCED FROM HISTORIC BAT HYMETRIC (HYDROGRAPHIC Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong, swisstopo, Coordinate System: NAD 3 StatePlane Texas South FIPS 45 Projection: Lambert Conformal Conic /Datum: North American 3.5 5,4 Print Date: 3// Mapped by: M3AOPAC Scale: :3, 3 of PORT, TEAS 5'3 Station: to 344. ELEVATIONS ARE REFERENCED TO MEAN LOER LO TIDE (MLL DATUM. 5'3N GALVESTON, TEAS < - - - - Station Lines -. HORIZ ONTAL COORDINATES ARE REFERENCED TO TEAS STATE PLANE COORDINATE SYSTEM, SOUT H CENTRAL ZONE NAD3 US SURVEY FEET. - Center Line 5- MLL -5 ' '3 Features Side Slope Ratio: (Rise : Run Authorized Depth: -ft. 55 '3 Survey Date(s: March 5' ' PORT PORT 4 ATERAY

ATERAY 4 5 3 3 3. '3 ' 53'3N ' TO PORT 4 AR AN SA S PAS S -ft.ft 5 55 ' NOAA Bathymetry (DREDGING REACH ETENT - - - - 5 5-3 < - - - Station Lines -. HORIZ ONTAL COORDINATES ARE REFERENCED TO TEAS STATE PLANE COORDINATE SYSTEM, SOUT H CENTRAL ZONE NAD3 US SURVEY FEET. - Center Line - MLL 5- -5 Features 3-5. ELEVATIONS ARE REFERENCED TO MEAN LOER LO TIDE (MLL DATUM. 3. THIS PROJECT AS DESIGNED BY THE GALVESTON DIST RICT OF THE U.S. ARMY DESIGNATIONS OF INDIVIDUALS APPEAR ON THESE PROJECT DOCUMENTS ITHIN THE SCOPE OF THEIR EMPLOYMENT AS REQUIRED BY ER--. '3 INFORMATION PROVIDED HERE. REQUIRED BY 33 CFR.35 5. FOR THE MOST UP TO DATE INFORMATION PLEASE CHECK OUR EBSIT E AT: HTTP://.SG.USACE.ARMY.MIL/MISSIONS/NAVIGATION/HYDROGRAPHICSURVEYS/. NOAA BATHYMETRY CONTOURS PRODUCED FROM HISTORIC BAT HYMETRIC (HYDROGRAPHIC Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong, swisstopo, Coordinate System: NAD 3 StatePlane Texas South FIPS 45 Projection: Lambert Conformal Conic /Datum: North American 3.5 5,4 53'N PORT, TEAS Mapped by: M3AOPAC 53'3N Print Date: 3// Station: to 344 Scale: :3, Side Slope Ratio: (Rise : Run 4 of GALVESTON, TEAS 55 Authorized Depth: -ft. 4 5 Survey Date(s: March

4 5 ' SHRIMP CO. HARVES. 3 4 CORP US PORT -ft.ft 3 ATERAY '3 ' G & S MARINE DOCK Aransas Shrimp Co., South Pier and Mooring harf. 34 4. 4 COASTLINE RESOURCES, DOCKS NOAA Bathymetry (DREDGING REACH ETENT - - - - 5 5-3 3-5. ELEVATIONS ARE REFERENCED TO MEAN LOER LO TIDE (MLL DATUM. 3. THIS PROJECT AS DESIGNED BY THE GALVESTON DIST RICT OF THE U.S. ARMY DESIGNATIONS OF INDIVIDUALS APPEAR ON THESE PROJECT DOCUMENTS ITHIN THE SCOPE OF THEIR EMPLOYMENT AS REQUIRED BY ER--. 5. FOR THE MOST UP TO DATE INFORMATION PLEASE CHECK OUR EBSIT E AT: HTTP://.SG.USACE.ARMY.MIL/MISSIONS/NAVIGATION/HYDROGRAPHICSURVEYS/. NOAA BATHYMETRY CONTOURS PRODUCED FROM HISTORIC BAT HYMETRIC (HYDROGRAPHIC Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong, swisstopo, Coordinate System: NAD 3 StatePlane Texas South FIPS 45 Projection: Lambert Conformal Conic /Datum: North American 3.5 5,4 Mapped by: M3AOPAC Scale: :3, 5 of PORT, TEAS INFORMATION PROVIDED HERE. REQUIRED BY 33 CFR.35 '3 Station: to 344 < - - - Station Lines -. HORIZ ONTAL COORDINATES ARE REFERENCED TO TEAS STATE PLANE COORDINATE SYSTEM, SOUT H CENTRAL ZONE NAD3 US SURVEY FEET. - Center Line - MLL 5- -5 Features ' GALVESTON, TEAS '3 3 53'3N Side Slope Ratio: (Rise : Run 3 3 54'N 4 4 4.. GARRETT OIL CO. 4 HARF 3 HARBOR SHRIMP CO. HARF Authorized Depth: -ft. J. B. S. PACKING CO., EAST SIDE MOORING DOCK Survey Date(s: March Tetra Technologies, Aransas Pass Cargo Dock. Print Date: 3//