Proposed Strategic Housing Development at the Former Doyle s Nursery and Garden Centre and Benoni, Brennanstown Road, Cabinteely, Dublin 18

Similar documents
Final Plan 20 December 2016

PERSONALISED TRAVEL PLANNING IN MIDLETON, COUNTY CORK

North West Non-Technical Summary of the Transport Assessment September 2011

EIS - National Maternity Hospital

Report on trends in mode share of vehicles and people crossing the Canal Cordon to 2013

CONTENTS PREFACE 1.0 INTRODUCTION AND SCOPE 2.0 POLICY AND GOVERNANCE 3.0 SUMMARY OF PROGRESS 4.0 NATURE OF DEMAND 5.0 TRAVEL AND PARKING INITIATIVES

Appendix N(b): Portishead Station Outline Travel Plan

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016

Active Travel Towns Funding Scheme Project Proposal. Sligo. Sligo Local Authorities

CPC Parking Lot Riverside Drive. Transportation Rationale

Sandwell General Hospital Travel Plan 2014

Dún Laoghaire Rathdown County Council. Luas to Dart via UCD Cycle and Pedestrian Route

University of Leeds Travel Plan

Travel Plan Monitoring Report. Bourton View, Wellingborough - Residential

9. Parking Supporting Statement

Travel Planning WC & NWCD Cycling Group. Thursday 2 nd July Amanda Holden

Determining bicycle infrastructure preferences A case study of Dublin

Integrated Regional Traffic Management. Michael Aherne Technical Director POLIS Conference 2009

Active Travel Strategy Dumfries and Galloway

May Canal Cordon Report 2017

Travel Plan Monitoring Report. Buttercross Park, Whittlesey - Residential

Amendments to Essex Highway Maintenance Strategy Maintenance Policy and Standards April 2008

EUROPEAN MOBILITY WEEK September 2015

Loughborough University Travel Planning

BELFAST RAPID TRANSIT. Ciarán de Búrca Director, Transport Projects Division Department for Regional Development

Developing a Birmingham Transport Space Allocation policy. David Harris Transport Policy Manager Economy Directorate Birmingham City Council

ATTACHMENT 4 - TDM Checklist. TDM Checklist Overview

MILTON ROAD LLF PROJECT UPDATE

Frascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation

Contents Location Map Welcome and Introduction Travel Plan Management Science Park Accessibility Walking Cycling Bus Rail Car Sharing Contact Details

Smart Network Smarter Choices

TRANSPORT AND MOVEMENT

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

HISTON ROAD Have your say on better public transport, cycling and walking journeys

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

Harriet Fraser Traffic Engineering & Transportation Planning

Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR. Consultation open from 24 September to 5 November 2018 SAY

Strategy for Walking & Cycling Action Plan

Chelmsford City Growth Package

Walking and Cycling Action Plan Summary. A Catalyst for Change The Regional Transport Strategy for the west of Scotland

EIAR: UCD Student Accommodation UCD Campus, Belfield, Dublin 4

Dún Laoghaire Rathdown Joint Policing Committee

LEEDS BECKETT UNIVERSITY. Transport Strategy

Speed Limit Policy Isle of Wight Council

Frome Street Bicycle Route

AIRPORT ROAD ENVIRONMENTAL ASSESSMENT

Part 3: Active travel and public transport planning in new housing developments

Douglas Land Use and Transportation Strategy (DLUTS) Summary. August 2013

Proposed Amendment to Grangegorman Planning Scheme Prussia Street Addendum Traffic and Transport Assessment

GD 0043/18 ACTIVE TRAVEL STRATEGY

THE UNIVERSITY COLLEGE LONDON TRAVEL PLAN

City of Perth Cycle Plan 2029

IMPACT OF THE BERMUDA CONNECTIVITY PROJECT ON CYCLING

ONE SIZE DOESN T FIT ALL RECONCILING OVERLAPPING TRANSPORT NETWORKS IN A CONSTRAINED URBAN ENVIRONMENT

Technical note. 1. Introduction

Policy factsheet 2 MOBILITY MANAGEMENT MEASURES FOR SCHOOLS.

WEST HATCH HIGH SCHOOL THE BEST THAT I CAN BE. School Travel Plan

High frequency bus services operating to Little Island; Creation of a new Park and Ride site and train station at North Esk;

Navan Cycle Network (Athlumney to Trim Road Cycle and Pedestrian Scheme) Part 8 Report

UNIVERSITY HOSPITALS OF NORTH MIDLANDS NHS TRUST TRAVEL PLAN COUNTY HOSPITAL

1.5 On this basis it is fundamental that the Transport Strategy for the site focuses on the following key criteria,

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document

Your views are important. Please fill in a form before you leave. Or alternatively

C.A.R.S. Project Design Report.

TS 109 DURHAM ROAD QTC PHASE 4 PROJECT PROPOSAL. Page 1

MARKHOUSE ROAD IMPROVEMENTS

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21

Welcome! Public Open House on UBC s Transportation Plan

City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015

BICYCLE INFRASTRUCTURE PREFERENCES A CASE STUDY OF DUBLIN

CONNECTING PEOPLE TO PLACES

Launceston's Transport Futures. Greater travel options for the people of Launceston

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Living Streets response to the Draft London Plan

Cycle network linking Wolverhampton city centre and Bilston town centre with employment sites and residential areas:

Appendix 7.2 Staff Mobility Management Plan

Agenda Item 34. N11 - Brewery Road Improvement Scheme

Sandyford Cycle Route (Kilgobbin / Drummartin Link Road)

21.07 TRANSPORT CONNECTIVITY AND INFRASTRUCTURE

DRAFT for a State Policy for Healthy Spaces and Places

GETTING WHERE WE WANT TO BE

London Cycle Network Annual Report 2000

Green Travel Strategy & Action Plan

High 2010 Medium 2010/11. PCT NHS Darlington Primary Care Trust HPC DBC DBC. High HPC. Med to High

APPELLANT S STATEMENT OF CASE

Travel Costs...in more ways than one! Sara Brook: West Yorkshire Travel Plan Network (WYTPN)

Phone: Ref No: 06/2018/0884

Cork City Council Morrison s Island Public Realm and Flood Defence Project Transport Assessment

DE MONTFORT UNIVERSITY TRAVEL PLAN PROGRESS REPORT

4.1 Introduction. 4.2 Aspects of walkable communities

Easter Bush Campus Travel Plan

Report to Cabinet. 18 May 2016

5 Highways and Transport Assessment

Transportation Master Plan Advisory Task Force

To: The results of these surveys have been analysed and are summarised within this Technical Note.

BYRES ROAD: PUBLIC REALM Public Consultation

SLOUGH Stage 3 Road Safety Audit of A4 London Road, M4 J5 to Sutton Lane

Green Travel Strategy & Action Plan

Design Workshops Summary of all Feedback January 2017

Transcription:

Proposed Strategic Housing Development at the Former Doyle s Nursery and Garden Centre and Benoni, Brennanstown Road, Cabinteely, Mobility Management Plan

Quality information Prepared by Checked by Approved by Aoife Mannion Consultant Shaun Grima Principal Consultant Cormac O Brien Director Revision History Revision Revision date Details Authorized Name Position 01 08.11.2017 Pre-Planning Issue to DLRCC & ABP CO B Cormac O Brien Director 02 26.02.2018 Final Issue to ABP CO B Cormac O Brien Director

Prepared for: Vimovo Doyles Limited 7 th Floor College House Townsend Street Dublin 2 Ireland Prepared by: Ireland Limited 4th Floor Adelphi Plaza Georges Street Upper Co. Dublin Ireland T: +353 1 238 3100 aecom.com 2018 Ireland Limited. All Rights Reserved. This document has been prepared by Ireland Limited ( ) for sole use of our client (the Client ) in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between and the Client. Any information provided by third parties and referred to herein has not been checked or verified by, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of.

Table of Contents 1. Introduction... 5 1.1 Background... 5 1.2 Overview... 5 2. Methodology... 6 2.1 Introduction... 6 2.2 Aims... 6 2.3 Benefits... 6 2.4 Policy Guidance... 6 3. Receiving Environment... 7 3.1 Introduction... 7 3.2 Existing Access... 7 3.3 Brennanstown Road... 7 3.4 Lambourne Wood... 8 3.5 Base Traffic Flows... 8 3.6 Public Transport... 9 3.6.1 Bus Facilities... 9 3.6.2 Rail Services... 10 3.7 Pedestrian/Cycle Facilities... 10 3.8 Accident Analysis... 11 4. Mobility Management Plan Objectives... 12 4.1 General... 12 4.2 Objectives... 12 5. Monitoring... 16 5.1 Monitoring... 16 6. Conclusions... 17 6.1 Summary... 17

1. Introduction 1.1 Background have been commissioned by Vimovo Doyles Limited to prepare a Mobility Management Plan (MMP) to accompany a planning application to Dun Laoghaire Rathdown County Council (DLRCC) for a proposed strategic housing development at the former Doyle s nursery site on Brennanstown Road, Cabinteely,. The site currently comprises of Doyle s Nursery and Garden Centre and is accessed via an existing uncontrolled junction off Brennanstown Road. The proposed development will comprise of the construction of 115 no. residential units. Figure 1.1 below indicates the site location. Site Figure 1.1 Site Location Brennanstown Road (Source: Google Maps) 1.2 Overview have prepared this MMP for the subject development in accordance with the Dun Laoghaire Rathdown County Council (DLRCC) Development Plan (2016 2022). Objective 8.2.4.3 of the Plan notes that planning applications for new and significantly extended developments shall include a Travel Plan Statement for the following circumstances: a) The proposed development has the potential to employ more than 100 employees; b) The proposed development is a school; and/or c) The proposed development has 100 dwellings or more. The aim will be for reducing car use and the need for car use where possible. This MMP will set targets into the future which will be flexible of maximum achievable modal split at any time dependent on actual public transport provision and other facilities available. The measures compiled within this MMP will focus on residents of the development. The initiatives set out within this report are predominately for residents of the site; however there is also reference made to the visitors of the development and staff associated with the interlinked apartment blocks. 5

2. Methodology 2.1 Introduction The environmental and congestion impacts of road transport have led to policy changes by officials of the industry. These changes have led to increasing the priority of more sustainable modes of transport. The aim of a MMP is to encourage modes of travel other than the car, whilst recognising that some residents, visitors and staff (of the apartment blocks) to the development would still need to use the car. 2.2 Aims A MMP will help reduce motorised journeys, which in turn help to reduce the environmental impact of the car. In order to achieve these aims a two-stage approach has been adopted. These stages are summarised below: - Stage 1: To provide a number of measures from the outset as part of the development to provide residents and visitors with safe and viable transport alternatives to the car for accessing the site; and - Stage 2: To continually monitor the travel patterns of the residents of the site to ensure that the most sustainable travel patterns to and from the development are encouraged. 2.3 Benefits Mobility Management Plans are intended to bring the following benefits: - A partnership approach between residents to influence travel behaviour; - Widen accessibility of the site and buildings; - Encourage safe and viable alternatives for accessing the site; - Pragmatic initiatives based on a continual appraisal of resident travel patterns; - A benchmark from which future developments can be assessed; - Improvement to the amenity of the area around their buildings; - Reduction in overall vehicle mileage; - Reduction in congestion and air pollution; - Fewer vehicular trips than would otherwise be the case; - Improved road safety on and near the site; - Accommodate those journeys, which need to be made by car; - Preserve valuable land and avoiding the costs of providing too much parking; 2.4 Policy Guidance Fundamentally a MMP is a suitable mechanism by which new developments can support the objectives of sustainability and the achievement of reduced car dependency. The following documents have been taken into account when considering accessibility options for the proposed development: - The DLRCC Development Plan (2016 2022); - Smarter Travel, A Sustainable Transport Future (2009 2020); and - Achieving Effective Workplace Travel Plans Guidance for Local Authorities (2012). 6

3. Receiving Environment 3.1 Introduction This chapter includes a review of the existing baseline conditions of the site including public transport, walking and cycling facilities and the current operation of the surrounding public road network. undertook numerous sit audits in 2017 and 2018 to identify the existing conditions in the vicinity of the site. The findings from s analysis are presented within this chapter. 3.2 Existing Access An existing vehicular access is available to the site off Brennanstown Road. The access road is approximately 6.5m wide which permits two-way vehicular traffic. Access onto Brennanstown Road is via an uncontrolled priority based junction as shown on Figure 3.1 below. Figure 3.1 Existing Entrance 3.3 Brennanstown Road Figure 3.2 Existing Access Lane Brennanstown Road connects Glenamuck Road to the west, with Bray Road (Cabinteely Village) to the north east. The road is approx. 5.5-6.5m wide, and is single lane in both directions. Existing residential units situated off both sides of the carriageway. A solid white line marking is situated along the majority of the road to restrict vehicles overtaking. On the opposite site of the site entrance, an existing public footway is situated on the western side of Brennanstown Road. The footway is approximately 1.3 1.5m wide, with lighting columns situated along the footway. The speed limit along Brennanstown Road is 50km/h, which is denoted by traffic signs. SLOW markings are situated on the carriageway on approach to the site access, as illustrated in the figures overleaf. A large grass verge is situated on the western side of Brennanstown Road, immediately opposite the site entrance. 7

Figure 3.3 Slow Road Markings 3.4 Lambourne Wood Figure 3.4 Existing Footpath Lambourne Wood is an existing residential road, which serves approximately 130 existing residential houses. Lambourne Wood connects onto Brennanstown Road via a priority controlled junction. The access road is approximately 7m wide, with footways situated on either side of the carriageway. Double yellow lines are situated along Lambourne Wood for a distance of approximately 20m from Brennanstown Road. During s site visit on a weekday morning, approximately 10 commuter cars arrived to park along Lambourne Wood, and walk towards Cabinteely Village. 3.5 Base Traffic Flows Traffic surveys were undertaken on Wednesday 3rd May 2017 during the morning (07:00hrs 10:00hrs) and evening (16:00hrs 19:00hrs) peak periods to understand the existing conditions at the following junctions in the vicinity of the site. The following three junctions were surveyed: - Junction 1 Site Access / Lambourne Wood / Brennanstown Road; - Junction 2 Bray Road / Johnstown Road / Brennanstown Road; and - Junction 3 Glenamuck Road / Cournelscourt Road / Brighton Road / Brennanstown Road. Figure 3.5 illustrates the count locations in the context of the development site. 8

Junction 3 Glenamuck Rd/Cournelscourt Hill Rd/Brighton Rd/Brennanstown Rd Junction 2 Bray Rd/Johnstown Rd/Brennanstown Rd Junction 1 Site Access/Lambourne Wood/Brennanstown Rd Site Figure 3.5 Location of Survey Junctions The review of the traffic survey results identified the AM and PM peak hours as being 08:00 09:00hrs and 17:00 18:00hrs respectively, when base traffic volumes were greatest along Brennanstown Road, Bray Road and Glenamuck Road. 3.6 Public Transport 3.6.1 Bus Facilities An existing footpath situated along Brennanstown Road from the site entrance to Cabinteely village provides access to a number of bus stops located along Old Bray Road (Cabinteely Village), Johnstown Road and the N11 (Quality Bus Corridor), which are served by Dublin Bus. The stops at Cabinteely Village are situated approximately 400m from the proposed site (approximately 5 minute walk), whilst the stop along the N11 is approximately 550m from the site entrance (approximately 7 minute walk). The IHTs Guidelines for providing Journeys on Foot identify that acceptable walking distance for commuting purposes is 1,000m, as illustrated in Figure 3.6 below. The bus stops situated along Old Bray Road, Johnstown Road and the N11 are within an acceptable walking distance. Figure 3.6 Acceptable Walking Distances (IHT, Guidelines for Providing Journeys on Foot ) The services available from bus stops along Old Bray Road (Cabinteely Village), Johnstown Road and the N11 are illustrated in Table 3.1. The services provide a good level of bus service linking the development to the surrounding area and also interconnecting with various radial bus routes, and rail/light rail stops in Dublin City. 9

Table 3.1 Dublin Bus Services Service No. Route Typical Service Frequency Peak Off-Peak 145 Ballywaltrim Bray Cabinteely Donnybrook City Centre Heuston Station 10 mins 15 mins 84A Blackrock Deans Grange Cabinteely Bray - Newcastle 30 mins 60 mins 63 Dun Laoghaire Baker s Corner Cabinteely Old Bray Road - Kilternan 30 mins 45 mins The available facilities at the N11 stops include road markings, raised kerbs, shelter and real time information. The bus stop also provides express coach services from Greystones/Bray to Dublin Airport. 3.6.2 Rail Services The Luas Green Line passes the subject site at Laughanstown Luas Station, approx. 1.2 km south of the site (approximately 5 minutes drive), whilst Killiney DART Station is also located 5.4 km (11 minute drive) east of the subject site. Both stations provide access to commuter rail services within Dublin City Centre. 3.7 Pedestrian/Cycle Facilities At present, pedestrian facility is situated on the western side of Brennanstown Road along the proposed site frontage, which connects into Lambourne Wood and continues north towards Bray Road, linking pedestrian movement from Brennanstown Road to Cabinteely Village and the N11. There is currently however, no crossing facilities from the subject site access to the Brennanstown Road footpath or the neighbouring private property accesses adjacent to the site. Cycle markings, dropped kerbs and cycle lanes are provided along Bray Road, Glenamuck Road and the N11 to support two-way traffic and cycle flows. Figure 3.7 illustrates the NTA Cycle Network Plan within the immediate vicinity Site Figure 3.7 NTA Cycle Network Plan (Source: National Transport Authority GDA Cycle Network Plan) 10

3.8 Accident Analysis A review of the Road Safety Authority (RSA) traffic collision database has been undertaken for the road network in the vicinity of the proposed site to identify any collision trends. This review will assist to identify any potential safety concerns in relation to the existing road network. Traffic collision data was obtained for the period 2005 2013, which is the most recent data available from the RSA website. The incidents are categorised into class of severity, which includes minor, serious or fatal collisions. The analysis is shown in Figure 3.8. Site Figure 3.8 Road Collisions (Source: RSA website) The results of the analysis identify several minor incidents recorded along Brennanstown Road within the vicinity of the site. Only one minor collision was recorded at the site access during the period examined. Only 1 minor incident is recorded within the immediate vicinity of the site entrance, which involved a single motorcycle vehicle only during the time period of 19:00 and 23:00 PM. 11

4. Mobility Management Plan Objectives 4.1 General This section will present an overview of the Mobility Management Measures for the proposed development. A review of the key measures and policies outlined in the existing DLRCC Development Plan (2016 2022) has been undertaken. Upon completion of the development, when the scheme is occupied it is recommended that an updated Mobility Management Plan is undertaken in unison with travel surveys for residents, staff and visitors, which will inform travel targets for site users. 4.2 Objectives The objectives of this section are as follows: - To discourage private car as a means of travel to and from the development; - To increase and facilitate the number of people choosing to walk, cycle or travel by public transport to the development; - To work with DLRCC, the National Transport Authority and public transport providers to support and encourage resident and staff up take; - To develop an integrated and unified public transport, private vehicle, business fleet management and suppliers of commercial services to the development; and - To liaise and co-operate with adjacent developments in relation to a coordinated approach to Mobility Management between the various employment areas. - To achieve the above targets, measures have been proposed for the specific modes of transport. These are based on existing infrastructure and public transport systems. These objectives are preliminary and will be further developed in the light of ongoing monitoring as the proposed development is occupied and information becomes available on future travel behaviour of residents and staff. It is recommended that an Action Plan Coordinator is appointed, as someone who will take ownership of implementing the measures. Table 4.1 overleaf presents a list of recommended measures and actions. 12

Table 4.1 Recommended Mobility Management Measures and Actions Walking Initiatives Responsibility / Ownership Timescale Provision of details on how to access the site on foot. Details would include safe walking routes and location of the nearest bus stops/rail station. Promote walking events / lunchtime walks for residents Annual Team Walking Events for residents i.e. Pedometer Challenge Provide umbrella for employees of development on wet days Offer in house health checks for staff of development interested in getting more active The Action Plan Co-ordinator This will be established within 3 months of occupation. Cycling Initiatives Responsibility / Ownership Timescale Establish a Resident Bicycle User Group Advertising the Bike to Work scheme Encourage establishment of a cycling club / society Provision for cyclist equipment i.e. pump, allen keys, lights, puncture repairs Display maps of local cycle network on notice boards Participate in national cycle week Survey and monitor cycle parking occupancy Install and or upgrade cycle lockers, showers and drying rooms for staff of the apartment blocks Promote the use of changing facilities for cyclists The Action Plan Co-ordinator This will be established within 3 months of occupation. 13

Public Transport Initiatives Responsibility / Ownership Timescale Provision of public transport maps and timetables in prominent locations on site. Information should be kept up to date. This information could also be available online. Provision of information to residents on savings that can be made by using Leap Card and details on where Leap Cards can be purchased. Re-advertise and promote the Tax saver monthly and annual commuter tickets for public transport to staff of the development. Include a one month trial ticket for public transport and timetable information. Display a local area map with public transport stops / route numbers marked. Publicise real time passenger information apps and websites where relevant. Discuss with public transport operators fare structures and ticketing options. Publicise door-to-door multi modal journey planner website Liaise with public transport operators regarding service frequencies to the residential development. Provide attractive, good quality waiting areas. The Action Plan Co-ordinator This will be established within 3 months of occupation. Car Sharing Initiatives Responsibility / Ownership Timescale Encouragement of residents and visitors of the development to use other modes of travel other than private car. Where it is necessary for car use to travel to and from work, residents and staff (of the apartment blocks) should be made aware of other people who are either within close proximity of their homes (for staff) or on their route into work (for residents). Hold a coffee morning / launch event for potential car sharers Offer a guaranteed ride home in emergencies The Action Plan Co-ordinator This will be established within 3 months of occupation. 14

Construction Phase Initiatives Responsibility / Ownership Timescale Provide a preliminary Construction Traffic Management Plan to provide detailed mitigation of construction traffic associated with the proposed development. The Contractor / DLRCC Roads & Traffic Department This will be established and agreed prior to construction. Other Measures Initiatives Responsibility / Ownership Timescale Residents to be informed of the health and fitness benefits of cycling and walking through posters and notice boards. Include travel information to employee induction packs. Hold a launch event of the travel plan. Develop a marketing and communication plan. Distribute travel maps, leaflets and timetables, ensuring consistent accessible formats, health information for walking routes, signposting to website / apps. Provide quarterly How to Travel newsletter via email to residents. Example parking policies to ensure access to parking for those most in need, and for those who could use alternative modes The Action Plan Co-ordinator This will be established within 3 months occupation. 15

5. Monitoring 5.1 Monitoring A critical part of any MMP is ongoing monitoring. It is proposed that an initial evaluation of the operation of the plan will take place one year into the operation. On occupation of the development it would be proposed to undertake travel attitude surveys to establish baseline modal split of residents and staff. This would assist considerably in the setting of appropriate trip rate and modal share targets for the development. An after study should then be undertaken following the operation of the MMP for a reasonable period of time. The two datasets could then be compared to review what changes are necessary after implementation of the various infrastructural measures and initiatives. Campaigns and promotions would be run throughout the year to maintain public awareness of modes of travel other than the car and the benefits accrued to both the individual and the environment. The occupiers of the proposed development will be encouraged to continually monitor the MMP initiatives in order to maximise on their success. Monitoring results could be included in the annual report or a separate environmental report. The results will also be forwarded to DLRCC at intervals to be determined by agreement. 16

6. Conclusions 6.1 Summary The development forming the subject of this application accords with the principles of sustainable development as it utilises pragmatic measures that encourage safe and viable alternatives for accessing and availing of the proposed development. Measures and opportunities have been presented within this MMP to promote sustainable travel associated with the proposed development from the onset. The opportunity exists to monitor and update measures and initiatives in accordance with residents/staff feedback. 17

aecom.com 18