indoor / outdoor INSTALLATION GUIDE

Similar documents
KERSPLASH POOL CLIMBING WALL INSTALLATION INSTRUCTIONS

Disassembling and assembling APP and APP 16-22

PRODUCT CARD WALL MOUNTED FIXED BASKETBALL CONSTRUCTION PROJECTION: FROM 1,00 TO 2,25 M

PoolLock Easy Pool Cover

APP pumps APP and APP Disassembling and assembling

PRODUCT CARD WALL MOUNTED SIDE FOLDED BASKETBALL CONSTRUCTION PROJECTION: FROM 1,2 TO 2,45 M

TorqBolt Wedge Anchors Torque Controlled Expansion Anchor

Safety System Installation Guide for ARE Wind Poles

BACKSTROKE START DEVICE

ASSEMBLY INSTRUCTIONS S-Dome system

Precision Liquid Settlement Array Manual

RATCHET RELEASE SHACKLE

USER MANUAL. Beach volleyball posts BEACH CHAMP ID:

Operating instruction for the quick-change tap holders type:

TECHNICAL INFORMATION

Highbond anchor FHB II-A S

Low Wind High Yields Series

DE8410 FIVB Official Beach Volleyball Net

Manual winch MANISTOR 100 and 200

MANUAL. Sesame. Thermoplastic Tank Technologies

Moai Bike Rack Heavy Duty Submittal Sheet. Materials: 2.0 Schedule 40 Pipe (2.375 OD) Finishes: Capacity: Mount Options: Setbacks: 2 Bikes

MANUAL SEALLESS STEEL STRAPPING TOOL MODEL A

SCOUT DECK ANCHOR 3 1/4" BONDING SCREW

-- SGP (NOVA TEAM SQUARE)

Operating Instructions

// ADapters GUIDelines

1 SafeClaw Anchorage Connectors

Engineering Data Sheet

INSTRUCTIONS & MAINTENANCE SHEET PORTABLE HYDRAULIC PUNCHING HEAD PH045

BRAKE WINCH RUP 503-[T/BT] EQUIPMENT FOR LIFTING LOADS. AT 053-[T/BT] xx

Trampoline & Enclosure Assembly Instructions

Made in U.S.A. Narrow-U Bike Rack Heavy Duty Submittal Sheet. Materials: Finishes: Mount Options: Setbacks:

Materials : Dichromate zinc plated steel flanges or AISI 316

Maintenance manual. Flight helmet LA100 PP

Dynamic Cone Penetrometer SL970. Impact Test Equipment Ltd & User Guide. User Guide

RAUBIOXON PLUS Pipe Aerator

Trampoline & Enclosure Assembly Instructions

Spilt body Flange ball valve. TC-205MFF-PN1640 User Manual English Version. Document No: TC-205MFF-PN1640.Ur-manual. Date: 2007/04/2617. Version: 1.

Installation and Training Manual

Utility Anchor System

with self-sealing gas valve system

Deluxe Gourd Racks I D E G A. Parts List. Shown above are parts for the two-level, Deluxe Gourd Rack (DGR 12V)with 12 arms for vertically hung gourds.

CRANKSET 1 - TECHNICAL SPECIFICATIONS. 44,5 mm 8 mm

Installation Instructions and valve Maintenance Rev. 0 of 21/09/15

K13.12 FACE FIXED PANIC EXIT DEVICE K13 DOORS

PHOENIX, ARIZONA USA

The cost-efficient fixing for flexible use in non-cracked concrete VERSIONS. zinc-plated steel stainless steel hot-dip galvanised steel

Operating manual Mobile Man Anchor IM-200 Reference No. IM 200

Mechanical Anchoring Systems HDA Undercut Anchor Product description. HDA-P Undercut Anchor Pre-Set Type

3/4 SafeClaw Anchorage Connectors

STATIONARY TRUCK INTERNAL HALYARD V-CLEAT FLAGPOLES FOR QUICK AND PROFESSIONAL INSTALLATION READ ALL INSTRUCTIONS BEFORE PROCEEDING

Front Hub/Freehub (Standard type)

TANDEM MODULATOR FOR OUTLET GAS FLOW: STEPPED (836 TANDEM) - CONTINUOUS (837 TANDEM) SERVO-CONTROLLED PRESSURE REGULATOR

12S 1st Stage. -Maintenance Procedure-

TECHNICAL MANUAL. COPRA Anchoring Coupler. For Smart Bolted Connections

Safe Installation Procedures and Care Manual Meyco Safety Pool Covers

Size : Ends : Min Temperature : Max Temperature : Materials : Cast iron EN GJL 250 body. Reinforced lug for DN200 :

MODEL SWH10 1,000 LB CAPACITY SWIVEL HOIST

Fiber Optic Cable Installation 3 in 1 SLIDE, BLOW, LUBRICATE

Technical Manual. Stand 05/2011

Owner s Manual. for. NaturCut. Model CLASSIC HD

INSTRUCTIONS: Tension Pulley 200 (LBD-200) Date: Check: 05 TENSION PULLEY 200

Further technical information is available on

NICROS-GRANITPANELS INSTALLATION MANUAL

INSTRUCTIONS FOR THE 7FT REVOLVER 3-IN-1 MULTIGAMES TABLE

Cantilever Brake. Dealer's Manual. ROAD MTB Trekking. City Touring/ Comfort Bike

Air screwdrivers & nutrunners. Accessories. Bits and sockets. Compressed air system accessories. Balancers and balancing arms INDUSTRIAL AIR TOOLS

POP UP ANCHOR. Part Number Spectrum Lane ~ Missoula MT ~

VSL MINING & TUNNELING SYSTEMS VSL. mining and tunneling

fischer Epoxy Mortar FIS EB The basic epoxy mortar for applications in concrete

Gym Dandy TEETER TOTTER TT-360. Model TT-360. Retain This Manual for Reference OWNER'S MANUAL

Supplementary instructions. Rod and cable components. for VEGAFLEX series 80. Document ID: 44968

DELUXE LOW PROFILE 18 & 30 STARTING PLATFORMS

Halsey Taylor Owners Manual STOP!

Wafer Check Valve. Contents. User s Manual. (1) Be sure to read the following description of our product warranty 1

L.Ph. Bolander & Sons 1355 Evans Ave. 800/

15ME-014 INSTRUCTION MANUAL OF STERN TUBE SEALING TYPE EVK2RV. URL

Declaration of Conformity as per Directive 97/23/EC

E Manual Self tacking system 30

Marine 6-Boat Free-Standing Racks SKU: Updated November 2011

W A S T E W A T E R T R E A T M E N T S Y S T E M S

Cost effective. Smooth. Reliable. LOG Internal Hole Gripper

Unit 1, Fullerton Road Rotherham S60 1DJ. Tele: Fax:

Installation Instructions

ROCKSOLID SINGLE POST ANCHOR

HEAVY DUTY SIT-UP BENCH SF-BH6502 USER MANUAL

Installation, commissioning and servicing instructions

Supratec AERATION TECHNOLOGY. von-drais-straße 7 D Simmern / Hunsrück. tel.: / fax: /

First Team Sports, Inc. Blast Recreational Volleyball System

The installation of this kit must be performed by an authorized Honda riding mower dealer. These instructions are provided for dealer use.

20 mm thickness. Through body porcelain. Made in Italy by

INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS TYPE BV2-LD

European Handball Federation TM EHF Beach Handball Commission

AVK SERIES 601, 602, 603 & 605 UNIVERSAL COUPLINGS, ADAPTORS & END CAPS INSTALLATION, OPERATION & MAINTENANCE MANUAL

Tripod Setup Guide (M-TPx)

CFSW. Hinges with built-in safety multiple switch

TECHNICAL INFORMATION

Manual for the. Installation. Use and Maintenance. "Söll-GlideLoc" fall arrest system. Ho-Ver turn table

INSTALLATION GUIDELINES

CAISSON SHAFT SYSTEM

Transcription:

indoor / outdoor INSTALLATION GUIDE

TEQBALL ONE INSTALLATION GUIDE This document contains a description of the Teqball One multifunctional sports equipment installation. This guide recommends using specific types of screws (defined below) compatible for concrete substructure. It is optional to use other types of screws not listed in this guide, but Teqball strictly recommends using the screws mentioned below. In the case of using other types of screws, Teqball recommends installing the table with the help of a substructure specialist/technician. LIST OF TOOLS REQUIRED FOR INSTALLATION 2 pieces HILTI M12x35 galvanized hexagon screws (DIN 933; ISO 4017) 2 pieces HILTI HKD-SR M12x50 drop-in (flush) anchors 1 piece HILTI HSD-G M12 setting tool 2 pieces HILTI HUS3-C 10x90 countersunk carbon steel screw anchors Rotary hammer Impact wrench POWER REQUIREMENTS OF INSTALLATION TOOLS Rotary hammer Voltage: 22 V Chuck: ½ square drive Maximum Torque: 450 Nm Impact wrench Voltage: 22 V Single impact energy: 2 Joule Full hammering frequency: 5200 impacts/minute 1. INSTALLATION CONDITIONS The table should always be assembled on a level surface. On uneven surfaces the screws can tighten and may be difficult or even impossible to screw in. The table empty weight is 161 kg. Please follow the steps in the Assembly Instructions document and assemble the table to the 3 rd step to reduce the potential risk of injury and to facilitate the handling and positioning of the leg structure when you screw in the anchors. Open the package, then lay down the 2 tabletops on the floor until assembly (1. Figure). The leg structure of the table is equipped with adjustable plastic foot. The soil below must be at least 7 N/mm 2 tight. Hereinafter you can read the Teqball recommendation in case of installation of various ground covers. 1. Figure: The position of the tabletop during installation

2. INSTALLATION IN CASE OF DIFFERENT SOIL COVER The recommended size of the Teqball court in each case is 10 m long, 8 m wide and 4 m high. The table is positioned symmetrically in the middle of this 10 m x 8 m rectangular area. In the case of the table being located outdoors, a 1,5 m x 1 m x minimum 0,1 m deep concrete base is required (in 2. Figure). For the different types of soil cover follow the steps below. 4 m 8 m 10 m 1 m 1,5 m 2. Figure: Standard-size Teqball court, in the middle of which is placed the Teqball table. If outdoors the table is fixed on a 1,5 x 1 x 0,1 m concrete base 2.1 NATURAL SOIL 1. 2. 3. 4. The recommended size of the Teqball court is 10 m x 8 m. Make sure to have at least this size of area available with a level surface and then select a 1,5 m x 1 m section in the middle of it! Dig-out the selected part to a depth of 0,1 m! Make sure that the soil quality is good enough! Recommended value for the tightness of 7 N/mm 2. In case of insufficient density, a vibratory rammer can easily be configured to prepare the ground. Stir in as much concrete as the 1,5 m x 1 m x 0,1 m excavation needs to be sufficiently filled out! Fill the cavity with the mixed concrete! Please note that by the end of the process the newly installed concrete base needs to be flush with the natural ground level and the newly laid concrete base. Wait until the concrete dries and hardens completely! Select the location of the holes on the surface of the concrete base according to 5. Figure and then depending on what type of screw you use, follow the recommended steps in section 2.7 or 2.8! 2.2 EXISTING CONCRETE OR ASPHALT PAVEMENT 1. 2. 3. The recommended size of the Teqball court is 10 m x 8 m. Make sure to have at least this area of size available with a level surface and then select a 1,5 m x 1 m section in the middle of it! Check that the concrete or asphalt layer thickness is at least 0,1 m! If it is less than that, then the cover must be excavated to a minimum of 0,1 m and the cavity filled with concrete and made flush with the existing paving. Wait until the concrete dries and hardens completely! Select the location of the holes on the surface of the concrete base or the pavement according to 5. Figure5. Figure and then depending on what type of screw you use, follow the recommended steps in section 2.7 or 2.8! 3

2.3 ARTIFICIAL TURF 1. 2. 3. 4. The recommended size of the Teqball court is 10 m x 8 m. Make sure to have at least this size of area available with a level surface and then select a 1,5 m x 1 m section in the middle of it! In the designated area, gather up the artificial turf covering to a depth of 0,1 m. If the covering is less than 0,1 m, then the layer underneath must be excavated as well to achieve the level required. If it is a concrete base underneath, this must be excavated so that the total layer thickness of the excavated covering and concrete is a minimum 0,1 m. If it is less, the concrete has to be excavated so that the depth of the cavity is minimum 0,1 m. If you wish to re-lay the artificial grass, the thickness of the grass should be included in the required depth of excavation. Fill up the cavity with a minimum of 0,1 m thick concrete layer and wait until it dries and hardens completely! Select the location of the holes on the surface of the concrete base according to 5. Figure and then depending on what type of screw you use, follow the recommended steps in section 2.7 or 2.8! 60 mm artificial turf Rubber granulate, silica sand Backing layer with weep holes Shock-absorbing layer Shock-absorbing layer Balancing filter layer, antifreeze crushed stone, compression 85-95% Geotextile Compressed natural soil Polyurethane Matte Layer Polyurethane Layer Polyurethane Layer Pore Filler Pre-Fabric Elastic Layer Adhesive Concrete 3. Figure: Average artificial turf layer structure

2.4 SYNTHETIC COVER 1. 2. 3. 4. The recommended size of the Teqball court is 10 m x 8 m. Make sure to have at least this size of area available with a level surface and then select a 1,5 m x 1 m section in the middle of it! In the selected area, remove the synthetic covering to the natural soil layer! If there is an asphalt base beneath, the total layer thickness of the removed covering and asphalt has to be a minimum of 0,1 m. If it is less, the asphalt has to be excavated so that the depth of the cavity is minimum 0,1 m. If you wish to re-lay the synthetic covering, the thickness of the synthetic covering must be included in the required depth of excavation. Fill up the cavity with a minimum of 0,1 m thick concrete layer and then wait until it dries and hardens completely! Select the location of the holes on the surface of the concrete base according to 5. Figure and then depending on what type of screw you use, follow the recommended steps in section 2.7 or 2.8! EPDM Layer Polyurethane Layer Elastic Layer Primer Asphalt Layer 4. Figure: Average synthetic cover layer structure. 2.5 OUTDOOR STONE 1. 2. 3. The recommended size of the court is 10 m x 8 m. Make sure to have at least this size of area available with level surface and then select a 1,5 m x 1 m section in the middle of it! Inspect the thickness of the paving. The minimum thickness required is 0,1 m. Drilling is required to fix the table in position, and the thickness of the paving is important to avoid breaking it up. If the paving thickness is less than 0,1 m then the outdoor stone must be excavated to an area of 1,5m x 1m x 0,1 m deep and filled with concrete. Wait until it hardens and dries completely! Select the location of the holes on the surface of the concrete or the paving according to 5. Figure and depending on what type of screw you use, follow the recommended steps in section 2.7 or 2.8! 2.6 OTHER TYPES OF GROUND COVERING The recommended size of a Teqball court is 10 m x 8 m. For all other types of ground covering, fill an 1,5 m x 1 m and 0,1 m deep cavity with concrete in the middle of the selected area and select the location of the holes on the surface of the concrete base according to 5. Figure and then depending on what type of screw you use, follow the recommended steps in section 2.7 or 2.8! 5. Figure: Position of the holes (left), enlarged rhombus with the holes (right)

2.7 FASTENING PROCESS WITH DETACHABLE STANDARD NUT For temporary installation, use the HSA-type of galvanized hexagon screw and the HKD-SR drop-in (flush) anchor, which are illustrated in 6. Figure. 6. Figure: HSA galvanized hexagon screw (left) and HKD-SR drop in anchor. THE INSTALLATION PROCESS IS AS FOLLOWS Remove the Q-lid from the leg structure (if it is in the proper position)! With the rotary hammer drill two 15 mm diameter and 55 mm deep holes! Blow out the generated dust from the holes! Strike the anchors into the holes with a hammer so that the top of the anchors are flush with the surface of the concrete! Use the HILTI HSD-G M12x50 or HSD-M M12x50 setting tool to widen the bottom of the anchors as shown in 7. Figure! Position the table right over the holes and then screw in the galvanized hexagon screws. Adjust the impact wrench to the value of 30 Nm and begin to insert the screws. We advise to insert the screws gradually, making sure the table is positioned correctly before tightening them. Put the Q-lid back to its proper place! 22.5 mm M12 4 HSD-G M12x50 HSD-M M12x50 1 5 ø 15 mm 55 mm 2 6 3 7 T inst = 30 Nm T inst 7. Figure: The temporary installation steps.

2.8 FASTENING PROCESS WITH A SPECIAL TORX SCREWS WITH LIMITED ADJUSTABILITY For reducing the risk of theft at the installation, use the type-c universal HUS3 concrete screw, which is shown in 8. Figure. Attention! The manufacturer can only guarantee the screws until unscrewing them twice. 8. Figure: Countersunk carbon steel screw anchor. THE INSTALLATION PROCESS IS AS FOLLOWS Remove the Q-lid from the leg structure (if it is in the proper position)! With the rotary hammer drill two 10 mm diameter and 95 mm deep holes! Blow out the generated dust from the holes! Position the table right over the holes! With the appropriate torx adapter and impact wrench, screw the carbon steel screw anchors! Put the Q-lid back to its proper place! A Max 2x Max 10 mm A3 d f 14 mm T50 A4 h 1 = 65 mm t fix1 d 0 Ø 10 mm 10 mm h nom = 55 mm A1 A5 d 0 A6 Max 10 mm A2 Max 2x 9. Figure: Theft-proof installation process.

Further information www.teqball.com info@teqball.com

ARE YOU TEQ? INDOOR/OUTDOOR

GENERAL Thank you for choosing a Teqball One table. We would like to give you some advice for the assembly. Please read and follow these intructions carefully. SAFETY ATTENTION Any person handling or using this table must follow the intructions as described in this document. The person in charge of assembling and using this table must ensure that the recommendations for use given in this document, and in the Owner's Manual are seen by all users. In communal use, it is strongly recommended that the instructions and diagrams are displayed. Only use this table after is has been fully assembled, and after checking that the screws are tightened properly. Later, depending on frequency of use (but at least once a month) check all screws, bolts etc. regularly to ensure that their conditions are good. Assembly must be carried out by two adults during all stages. ASSEMBLY The table must be assembled by at least two adults following the numerical order of the assembly instructions. Before assembling, please ckeck that all the proper parts are contained in the packages. The indicated quantities of parts make it possible to go through the assembly stages. Use the tools recommended on page 5. IMPORTANT: Assembly should be carried out on a clean, dry, level floor. Please ensure there is nothing on the floor that could scratch the table tops.

ASSEMBLY REQUIRES AT LEAST 2 ADULTS! TIGHTENING TORQUE BE CAREFUL TO AVOID INJURIES! KEEP THE TABLE HORIZONTAL TIGHTEN COMPLETELY STOP HALFWAY IF STUCK, TRY MOVING THE PARTS GENTLY!

PLAYING SURFACE 160 5 320 1630 3000 mm 125 kg 2218 685 290 86 kg 1500 mm 161 kg

6x 6x A 3x B 1x 8x C 12x D E M8x85 M8x75 M10x35 M10x25 M8 6 1x 2x 2x 2x 1x 2x 2x 1x 1x

1 2 8x D (M10x25) 3! 4 USE IT TO LEVEL THE TABLE!!

5 7 6! 8 step 1 step 2 3x 3x A E (M8x85) B E (M8x75)

9! 10 step 1 3x step 2 B (M8x75) 3x A E (M8x85) E 11 12 3x C (M10x35)

13 3x 6x A E (M8x85) B E (M8x75) 3x A E 14 CHECK (M8x85)

15 DONE!

Further information www.teqball.com info@teqball.com