Service Bulletin 70. Subject: Vertical fin cracks. Applicability: All Sportsman aircraft

Similar documents
Pre-Paint>Fuselage>Empennage>Fit vertical tail fin. Objectives of this task: Materials and equipment required: Fit the spar extender

REPLACING THE AFT RUDDER CABLES

Fibreglass, Resin, 5min Araldite, flock. The Strobe mounting point may have to be moved forward.

ANATOMY OF FUSELAGE REPAIRS

Pitts Model 12 Wing Leading edge Installation

F-1279-R UPPER RIGHT SKIN F-1280-R RIGHT SIDE SKIN F-1281-R LOWER RIGHT SKIN F-1208-R FUSELAGE FRAME

SECTION 23iS/U: SIDE SKINS

1/10 th Scale 1956 Ted Jones Classic Hydroplane

SECTION 10iS: TAILCONE

WHITE WOLF. X-ray View MID POWER MODEL ROCKET KIT BUILDING INSTRUCTIONS KIT SPECIFICATIONS:

Grain Surfboards Frequently Asked Questions

CIRRUS AIRPLANE MAINTENANCE MANUAL MODELS SR22 AND SR22T CHAPTER 55-40: RUDDER GENERAL. Rudder 55-40: RUDDER. 1. General

Surfboard Repairs Chapter 7

FlyingFoam Nurf. General Assembly Instructions

Trogear Bowsprit Through Hull Installation Manual

18. Tailplane torque-tube

Dornier Do R 4 Super-Wal

AGM 33 PIKE ALL FIBERGLASS. Specifications Length: 92 Diameter 5.5 Weight: 24 lbs Motor Mount: 75mm Fins: 6-3/16 G10 CP: 68 from nose tip Parts List

CIRRUS AIRPLANE MAINTENANCE MANUAL

Exxtacy. Repair and Tuning Manual. Exxtacy Construction Basics


Aeris Activity. Product Manual

PAY N PAK, 1/12 th Scale, Limited Sport Hydro P Sport Hydro

CONSTRUCTION OF A GUNBOAT A CLASS YACHT by Brian Dill

INSTALLATION INSTRUCTIONS FOR EXHAUST CUFF MODIFICATION

Bike-Shell Model 301P

Building Instructions ME 163 B 1a M 1:5 Turbine

Report of works Bavaria 36

Steps for W17, W14,W07, Wing Assembly Sonex #815

Horizontal Fuselage. Top Vertical Fuselage 1. Lay out the Top Vertical Fuse Front(1), Top Vertical Fuse Back(2), and Vertical Stabilizer(3).

Tugster. Tug Boat. Competition or Sport Tug Kit. A Zippkits R/C Boat. Building Instructions

14. Ai le ron quick-connect system

ANGEL 2000 glider ARF ASSEMBLY MANUAL. Specifications: MS: 129

INSTALLING YOUR CLC RUDDER

Akcent-2 - Building Instructions

Outbound Progress Report

General Build Instructions for Mach 1 BT50 and BT55 Single Fin Kits. Needed Items for Assembly

32M. Sternpost, rudder & tailwheel

The slots for 7V4-5 have two predrilled holes. Locate them and connect them with a line. These will be at rib #1,3,4,6.

Tailplane retention. All Europa Classic, XS and Motor-glider aircraft

NOTE. 1. SUBJECT: Inspection of Tailcone Skins, Flanges, and Longerons

INSTALLATION INSTRUCTIONS AT-SERIES ANCHOR ASSEMBLY PART NUMBER: F-04CAJP 450 LB. [204kg] MAXIMUM CAPACITY (PRO POOL LIFT)

Moose Flutter Incident

Soling Building Tips II

EPP Version Building Notes Updated

REPAIR MANUAL. Materials

Hat s off to you for choosing a kit from Port Townsend Watercraft.

1 General. 1.1 Introduction

AUSTRALIAN ARROW AND ARAFURA CADET ASSOCIATION ARROW CATAMARAN RESTRICTIONS AND MEASUREMENT CERTIFICATE

C75-RA-2 Rudder Skin

Personal Fall Arrest System. User s. Manual. Part Number January 2014 (Replaces July 2013)

Model Aero AT-6 Texan Introduction

LoneStar Fiberglass Pools. Do-It-Yourself. Installation Manual

Aegea Assembly Notes:

ICE PROTECTION - PROPELLER

Vacuum Bagging Wings Instruction Manual Purdue University

Trim Tab Wind Vane for boats with transom mounted rudders

We hope you ll enjoy the Drifter as much as we have! Scott DeTray Model Aero Specifications:

AIR LIFTINGBAG OPERATIONGUIDE. BasicSafelVPrecautions Equipment Description OperatingInstructions - Applications.

Construction Chapters Index

STOL CH rd Edition Drawings, dated April 16, 2012 Summary of changes from Edition 2 Revision 1 to Edition 3.

SERVICE INSTRUCTION SI Revision 2

Making Spars for the Schooner Jeanette

CLIMBING STEEL POLES INSTRUCTOR GENERAL LESSON OUTLINE ONLINE/CLASSROOM SESSION

BUILDING INSTRUCTIONS

Instructions for Fun Foam Critter 4/25/2007 BP Hobbies LLC 140 Ethel Road W Suite J Piscataway NJ,

Log Balance Beam. Product: (4 ), (6 )

AllPro Foot. Product Manual

BEECH 18 INSPECTION PROCEDURES

Max Bee. Part II: Building Max Bee Stunt News 8. lighter: the building of Max. all published.

Carving a Custom Seat

POP UP ANCHOR. Part Number Spectrum Lane ~ Missoula MT ~

GLIDING NEW ZEALAND ADVISORY CIRCULAR MYLAR SEALS. This is an Uncontrolled Document. Issued September 2004

MIL-STD-883H METHOD EXTERNAL VISUAL

Your kit contains the following items. Additional Items You May Need. Pre- cut parts Propeller rigging and rubber Sandpaper Covering sheet

BASIC AIRCRAFT STRUCTURES

Dear Skier, Thank you for choosing GOODE! GOODE SKI TECHNOLOGIES. Dave Goode Founder/President

OWNERS MANUAL. Model Shown with optional Primary Mooring Cleats. Portable Mooring System SAFETY OPERATION MAINTENANCE PARTS

STOL CH 701. STOL CH 701 Bubble doors Rear view. Front view Right door. Revision 1.0 (10/03/2003) 2003 Zenith Aircraft Co

34. Aft view of the boat at it s highest point.

Hip Block Installation Instructions:

Model Aero Sportster Indroduction

Below are the instructions to build a roller-furling unit for under $10. Read the entire process before beginning the project.

Gluing Guide QCS Oval & Quick Cuff

Cc: Bridget Bero, Ph.D., P.E., Wilbert Odem, Ph.D., P.E., and Alarick Reiboldt, EIT, CENE 486 Instructors

IN-PLACE DENSITY AND MOISTURE CONTENT OF SOIL AND SOIL- AGGREGATE BY NUCLEAR METHODS (SHALLOW DEPTH) FOP FOR AASHTO T 310

Bob's Card Models and [Resources]

8MAY15 US RACK, Inc Falcon Drive, Madera, CA

Glass Steel, Inc. Fiberglass Composite Troughs

ODOM CLASS SPECIFICATIONS

Riviera Draft Shaft Hole Boring

EZ Set Ice Rink- 200 & 400 Owner s Manual

SailTrack Installation Instructions. CMPE Track

(PLEASE CONTACT YOUR LOCAL DEALER or CUSTOMER SERVICE FOR WARRANTY INFORMATION)

LITTLE TRI construction

Welded Aluminum Fuel Tank Inspection for Pinhole Leaks. Fuel Tanks Delivered After 4/12/05 and before 2/06/06 on both Sportsman and GlaStar Aircraft

Inspection & Maintenance

Plans and Instructions to build a folding reflector oven

AMYA SeaWind Class Rules

Depth transducer TH 52

Transcription:

Subject: Vertical fin cracks Applicability: All aircraft Issue: Inspection of the vertical fin and aft fuselage bulkheads B and C, repair of vertical fin and bulkheads and reinforcement of vertical fin spar attach to bulkhead C. Compliance Time: If exterior cracks are evident, an internal inspection should be completed prior to the next flight. If internal cracks or separation are evident between bulkhead B or C and the fuselage, repairs should be completed prior to the next flight. For aircraft with only cosmetic external cracks or no evidence of cracking, the aluminum reinforcement doubler should be installed no later than the next annual inspection. Discussion and Background Information: A few owners of aircraft have reported cracks showing up at the aft base of the vertical fin and in some instances have reported cracking of the laminates and adhesion bond between bulkheads B and C and the vertical fin. Exterior cracking is most commonly found on the righthand side where the vertical fin meets the aft fuselage at its base. The lefthand vertical fin is molded as a part of the fuselage, whereas the righthand vertical fin half is bonded to the fuselage and vertical fin as a separate piece during fuselage assembly. The exterior cracks are commonly showing up along the bonding joint. Minor cracking may simply indicate separation of the cosmetic filler used in paint preparation. Some movement of the vertical fin occurs when the rudder is actuated in flight. The degree of movement is dependent upon the speed of the plane and the force exerted on the rudder controls. A lack of evidence of cracking on the exterior does not necessarily mean that disbonding between the bulkheads and the vertical fin on the inside is not occurring. A simple test of the integrity of the vertical fin is to take hold of it near the top and firmly pull it sidetoside, watching the movement and listening for any sound of separation inside. Ultimately, a visual inspection of the bulkheads will determine the action required. Bulkhead B can be inspected by crawling into the aft fuselage. Bulkhead C can also be inspected from the inside, but is best inspected by removal of the rudder base fairing. If cracking or separation is evident in the bonding laminates between the upper portion of bulkhead C and the vertical fin, then deeper inspection will be necessary through the lower inspection hole or removal of the stabilizer. 2007 Copyright Glasair Aviation LLC, Arlington, Washington All rights reserved 1

Required Action: 1) An inspection is to be completed prior to the next flight. 2) Repairs to interior cracks and separation are to be completed as outlined below prior to the next flight. 3) Reinforcement of the attachment of the vertical fin spar to bulkhead C with part # 1010001901 should be completed after all composite repairs are accomplished. Installation should be completed prior to or during the next annual inspection. Note: we found that while repairs to the existing structure are important, the reinforcement doubler by far is the most significant component to prevent future cracking issues in this area. INSPECTION: CRACKS TYPICALLY OCCUR IN THIS LOCATION 2007 Copyright Glasair Aviation LLC, Arlington, Washington All rights reserved 2

BULKHEAD C INSPECT FOR CRACKS/DELAMINATION IN CORNERS BETWEEN BULKHEAD C AND FUSELAGE. INSPECT BOND INTEGRITY BETWEEN BULKHEAD B AND FUSELAGE IN THESE AREAS. BULKHEAD B 2007 Copyright Glasair Aviation LLC, Arlington, Washington All rights reserved 3

REPAIRS: 1.01.5 Scarf sand exterior laminates to an area surrounding the crack. External cracks: Sand through the paint and filler in the areas of external cracks to determine if the cracks are deep enough to be in the laminates. If so, scarf (taper) sand the external laminates down to a level where the cracks disappear (do not exceed a depth of 1/16 deep). The tapersanded area should extend approximately 1.01.5 beyond the crack. Cut some plies of 7781 fiberglass cloth on a 45 degree bias to fill the area sanded. You will need to use 2 or 3 plies depending on the depth of your scarf joint at the deepest point. The pieces of cloth will need to increase in size from approximately 1.0 wide to 2.0 wide so that the edges do not stack directly on top of each other. Clean the area with acetone and laminate the cloth layers in place followed by a piece of peel ply. (Do not add extra resin with the peel ply. Wipe any excess resin from the brush and allow 2007 Copyright Glasair Aviation LLC, Arlington, Washington All rights reserved 4

resin from the laminates to saturate the peel ply.) Once the resin has fully cured, remove the peel ply and prepare the surface for paint. Internal delamination or cracks: Sand or carefully grind away any loose laminates in the corners between the fuselage sides and bulkheads B and C. Prep sand the surrounding laminates on the fuselage sides or bulkhead face with 3680 grit sand paper and wipe with acetone to clean the area. If there are large voids to fill (this will be rare), mix up a small structural adhesive batch of resin, milled fibers and cabosil (for thickening) and fill the voids. Once cured, sand the surface flat and clean wipe with acetone. Cut and fit two strips of 7781 fiberglass cloth 2.5 3.0 wide so that the cloth will adequately cover both the bulkhead face and the fuselage side by 1.25 1.50. Laminate these strips in place with resin and cover with a layer of peel ply. Remove the peel ply once the resin has fully cured. The most challenging repair we have conducted was to the aft face of bulkhead B. Crawling into the fuselage and poking one s head through the bulkhead and laminating to the aft side of this bulkhead was a lesson in patience and yoga. If possible, find a young person who you can coach to perform this task. REINFORCEMENT OF VERTICAL FIN SPAR: 2007 Copyright Glasair Aviation LLC, Arlington, Washington All rights reserved 5

To add an extra degree of stiffness to the attachment of the vertical fin spar to bulkhead C for prevention of future cracking, an aluminum doubler (shaped like an inverted slingshot) is placed beneath the lower rudder hinge flush against the spar and bulkhead. It is fastened with AAPQ42 pull rivets to the vertical fin spar. It uses the four AN3 rudder hinge bolts and forward shearweb bracket bolts to tie the doubler to bulkhead C as well as additional AAPQ42 rivets. A part drawing has been included for reference, should you wish to fabricate the part yourself. The part will also be available for purchase from Glasair Aviation; contact customer service by phone (3604358533 EXT. 232) or email (harry.delong@glasairaviation.com) for details. Note: Locating the holes in the doubler for the rudder hinge and shearweb brackets can be a bit tricky, as this task needs to be accomplished without enlarging the existing holes or drilling them crooked. After positioning the bracket and drilling/clecoing it to the base of the vertical fin spar and bulkhead C, take a cordless drill into the aft fuselage with a new, sharp #10 bit and pass drill through the reinforcement doubler through the four existing holes used to attach the lower rudder hinge fitting. It is imperative that the holes be drilled straight and perpendicular to the face of bulkhead C in order for them to match up to the rudder hinge pattern. As a minimum, drill two opposing corner holes from inside the fuselage; bolt the hinge in place, then drill the opposite holes using the hinge as a guide. The result of adding the.063 thick doubler beneath the hinge and brackets will be to shift the rudder and shearweb brackets back by 1/16. Simply file the holes in the forward shearweb oblong by this amount to accommodate alignment of the bolts to the nutplates. 2007 Copyright Glasair Aviation LLC, Arlington, Washington All rights reserved 6

2007 Copyright Glasair Aviation LLC, Arlington, Washington All rights reserved 7

2007 Copyright Glasair Aviation LLC, Arlington, Washington All rights reserved 8