Manual PT1000/1500/2000 personnel/material elevator printdate: versie 1.1 INTRODUCTION... 2

Similar documents
BRAKE WINCH RUP 503-[T/BT] EQUIPMENT FOR LIFTING LOADS. AT 053-[T/BT] xx

Hand winch MANIBOX GR

The purpose of this training is to give field technicians awareness training and guidelines on potential hazards they may encounter in the field.

Contents MAX CLIMBER 1000 RACK & PINION HOIST 1

RIDE Inc. Rigscape Drilling Rig Procedures

OPERATOR S MANUAL SPREADER. CSS, VNQ [For Combine Harvester AW82V] Original instructions

Table of Contents Documentation for PIT TROLLEY A4

S-60-TO : 1 ton tower system INSTRUCTION MANUAL

Repair instructions. Pivot bushing replacement. XL-AS10001RM-en-DE Rev B

Hand winch MANIBOX VS

OPERATION MANUAL DMI 16-LIGHT LIGHT TOWER ALSO AVAILABLE ONLINE AT DMI-LT.COM

USER GUIDE TO POWER ASSISTED BIKES

USE AND MAINTENANCE LIGHT TOWER

RIDE Inc. Rigscape Service Rig Procedures

SERIES 2 RAMP OWNER S MANUAL TOOLS REQUIRED: BEFORE YOU BEGIN... Read and understand these instructions before beginning a ramp setup.

Your after-sales service contact:

SpanSet Gotcha CRD User Instructions. SpanSet Certified Safety

Versie Date: USAGE AND SAFETY MANUAL SPREADERBEAMS

RESCUE LIFTING DEVICE RUP 503-[...] AT 053-[...] xx

Wellhead Mast. Installation and Operation Guide. Nanometrics Inc. Kanata, Ontario Canada

MAN-MCM-101 HEK MCM APCM

Specialists Window Cleaning Induction

USE, ASSEMBLING AND MAINTEINANCE INSTRUCTIONS FOR CLIMBING LADDER

MEWP - Boom Note: It is recommended that you read the Supporting Information page before you read this factsheet.

Assembly, Installation and operating. instructions for. Söll-Xenon anchorage device

Fiber Cable Puller with Tuf-Lugger lite

Manual winch MANISTOR 100 and 200

Instructions for Use Wire Rope Hoist SAT 08 / SAT 16 / SAT 32

Operating manual for descender and rescue lifting devicesafescape

Instruction Manual: VelectriX Urban 2.0

POWER ASSISTED BICYCLES OWNERS MANUAL

PHOENIX, ARIZONA USA

Installation and Training Manual

OPERATIONS MANUAL IMPORTANT SAFETY INFORMATION

MoveRoll Conveyor Operating and Maintenance Manual

OPERATING INSTRUCTIONS (Translation) Rope Winch Type , , ,75

GOTCHA CRD. Rescue, hoisting and abseiling equipment EN341 / EN1496 CE0158 TECHNICAL DATA

User manual. Velo-Plus². Van Raam BV Aaltenseweg CM Varsseveld The Netherlands 06.13

Quattrocycle BV. Quattrocycle. User Manual. Last update February Quattrocycle BV Bremkant EJ Middelbeers. User Manual Quattrocycle 1

ROLLGLISS TOP/R350. Safety and rescue system. Operating and Maintenance Instructions

Height Safety Lifting Load Control Safety Management GOTCHA Rescue Range TECHNICAL DATA

Instruction Manual: VelectriX Ascent 29 MTB

TOYOTA TACOMA 2005 TOW HITCH Preparation. Part Number: PT

Metham Aviation Design Limited, Station Approach, Four Marks, Alton. Hants. GU34 5HN Tel +44 (0) Fax +44 (0)

Wildcat LB Winch Kit. Operator s Manual Installation Instructions Replacement Parts List. With Wireless Control System.

Instruction Manual: VelectriX Foldaway

Operating manual Mobile Man Anchor IM-200 Reference No. IM 200

Manual Actuated Boiler Blowdown Valves

Chapter 2 Rigging. Cutting Wire Rope. Anchoring Wire Rope to Drum. Winding Wire Rope Onto Drum

Ventam 85 Installation & Commissioning Instructions

LOAD CHARTS RT890E METRIC DIN / ISO / 75%

BR-2444 ROWING MACHINE

Zip-Line Kit Instructions

User Instructions 1790 Rail Anchor

Tube-Line Accelerator Spinner Kit

DISASSEMBLY AND ASSEMBLY INSTRUCTIONS FOR LIQUID RING COMPRESSORS

1ml] ARROWQUIP COM-CATCH 61 SERIES MANUAL SQUEEZE CHUTE PRODUCT MANUAL arrowquip.com

Squeegee Unit for MRS Multi-Recovery System

Instruction Manual: VelectriX Urban 2.0+

USER MANUAL. JET TST and JET TST S.

Operation Manual Air Saver Unit ASV5000 Series

OPERATIONS MANUAL RIGHT ANGLE CAPSTAN

2,500/4,000 LB Easy Riser Vertical Cable Feighner Lift

TrekMill USER'S MANUAL MM5050

Instructions for assembly and use ZAP telescopic platform ladder Z600

USER MANUAL. MACMAG magnetic separator MHK MHF

CLARKES ERO FEEDER MANUAL

Operator s Manual. 2010, 2015, 2020, 2025 Material Lifts

Magnetic Bike. Model No: AENERGISER BODY WORX. Retain this owner s manual for future reference Read and follow all instructions in this owner s manual

INSTALLATION, OPERATION AND SERVICE MANUAL ABS AIR BAG LIFT

WINCH USER GUIDE WARN 3000ACI Utility Winch Part Number: 93000

Installation, operation & maintenance manual - original version

Operator s Manual. Series 2100 Contractor Lifts

Mounting and Operating Instructions EB 2558 EN. Self-operated Pressure Regulators. Type Pressure Build-up Regulator

Name of product: Gripper for vertical façade FTV panels Types: PVF (60, 80, 100, 120, 133, 150, 172, 200 and 240 mm) INSTRUCTIONS FOR USE

Product Manual B-Safety ClassicLine & PremiumLine Emergency Eyewash and Eye/Face Wash Equipment

Mini. Monkey Tower. Monkey Tower Mini User Manual. Scaffolding in Seconds Version 1.1 EN 1298 IM en 01/02/2012

BIG TBS-LBIP MANUAL Lifeboat Inspection Platform

Operator s Manual Series 2400 Material Lift

Side-of-Pole Mount for 1 Module (SPM1) For Module Types A & B

INSTALLATION COMMISSIONING, OPERATION & MAINTENANCE MANUAL

3 Post Pressure Fit System Owner s Manual

AutoChanger Installation & User Guide Issue 2

OPERATIONS/PARTS MANUAL FOR PATTERSON'S WWP75H-10 HYDRAULIC WINCH.

Two-stage valve type NE

MANITOWOC MODEL TON CAPACITY

PFC Lightweight Composite Push Up Mast. Operating Manual

SG-7R46 SG-7R45 BR-IM41-R CJ-7S40 WARNING CAUTION SERVICE INSTRUCTIONS. Inter-7 Hub. Inter-M Brake Cassette joint NOTE:

User Guide for. UTR Turbo Air Lappers Pneumatic Air Grinders & Lappers UTR-30, UTR-70, UR , ,

OPERATING INSTRUCTIONS (Translation) Rope winch Type KWE 250 KWV 300 KWE 650 KWV 650 KWE 1000 KWV 1250

Chair Topper. Autoadapt. Hoisting and stowing. User manual

VERTICAL AIR COMPRESSORS

Model 130M Pneumatic Controller

MSA Latchways Ladder System

Cranes and Hoists. Elevating Work Platforms ASSESSMENT

User Manual 1792 Standing Seam Metal Roof Retractable Swivel Anchor

SETUP INSTRUCTIONS SX-F EU 250 SX-F USA

VERTICAL AIR COMPRESSORS

WINCH USER GUIDE WARN 3700 Utility Winch Part Number: 93700

MANUAL. Sesame. Thermoplastic Tank Technologies

Transcription:

INDEX INTRODUCTION... 2 1. DESCRIPTIONS... 3 1.1 INTRODUCTION... 3 1.2 TECHNICAL SPECIFICATIONS... 5 1.3 SAFETY FEATURES... 8 2. SAFETY REGULATIONS... 9 2.1 GENERAL... 9 2.2 REGULATIONS... 9 2.2.1 MOUNTING... 9 2.2.2 OPERATION... 12 2.2.3 DISMOUNTING... 12 2.2.4 ELEVATOR INSPECTIONS... 13 3. MOUNTING/DISMOUNTING OF THE ELEVATOR... 15 3.1 MOUNTING... 16 4. CONTROLS... 23 4.1 USE AS A PERSONNEL ELEVATOR... 23 4.2 USE A MATERIAL ELEVATOR... 25 5. ANCHORING THE ELEVATOR... 28 5.1 ANCHORING DISTANCES AND FORCES... 28 5.2 GENERAL ANCHORING... 30 5.3 GENERAL REGULATIONS CONCERNING ANCHORING MATERIALS... 32 5.3 FORCES ONTO THE LANDINGS DUE LOADING AND UNLOADING FORCES... 32 6. MAINTENANCE... 33 6.1 GENERAL... 33 6.2 MECHANICAL MAINTENANCE... 33 7. OPTIONALS... 36 7.1 STANDARD/OPTIONAL EQUIPMENT... 36 appendix A. CHECKLIST ELEVATOR... 39 appendix B. ANNUAL INSPECTION FORM... 41 appendix C. PROBLEM SOLVING... 46 appendix D. ELECTRICAL SCHEMATICS... 47 appendix E. SPECIFICATIONS BRAKEREDUCER MOTOR... 48 De Jong s liften b.v. Constructiestraat 6, postbus 25, 4140 AA Leerdam 1

INTRODUCTION Installation, operation and maintenance manual for the PT-series personnel/material platform. Manual code: version 1.1 PT1000/1500/2000 MACHINE NUMBER: Manufacturer: DE JONG s liften b.v. Constructiestraat 6 Postbus 25 4140 AA Leerdam Telephone: + 31 (0)345-636000 Facsimile: + 31 (0)345-636005 WARNING Do not use the elevator before carefully reading this manual. The majority of accidents that happen are due to not respecting or not knowing how to use the equipment properly. Most accidents can be avoided by strictly following the warnings and guidelines. You are then in a better position to avoid incidents that can cause bodily harm. Thank you for choosing the PT1000/1500/2000 personnel/material elevator designed for transporting materials with a vertically driven elevator. The equipment you have bought is a Dutch-made product, resulting from a long research programme and in complete compliance with the highest quality guidelines. Both operating and safety features use the newest available technology for this type of equipment. During the design and production of these elevators the most stringent safety regulations have been followed which guarantee a maximum of safety to the people maintaining, operating or travelling with the elevator. We hope that you will be fully satisfied with the elevator and we advise you to first read this manual carefully before using the elevator. The part concerning safety is of particular interest and importance. The lift should only be operated and maintained by properly qualified staff. It is strictly forbidden to allow operation or maintenance by non-qualified staff at any time. De PT1000/1500/2000 series has been designed to transport materials conform the maximum weight restrictions. It is therefore of great importance to be fully aware of these regulations and of the safety-norm pertaining to the safe operation of the elevator. Regular maintenance intervals are also of great importance to avoid accidents. Our technicians are at your disposal to answer any questions in the case of problems. Before assembling the elevator please read carefully the relevant chapters of this manual as it contains important information concerning mounting, maintenance and operation of the elevator. Take care that this manual is available at all times to you staff. In the case of the elevator being sold-on it is of great importance that the manual is also provided. The manufacturer does not take any responsibility for incidents arising due to nonconformation of the regulations. DE JONG s liften b.v. De Jong s liften b.v. Constructiestraat 6, postbus 25, 4140 AA Leerdam 2

1. DESCRIPTIONS 1.1 Introduction The PT1000/1500/2000 is an elevator installation that can be used for two types of application: 1. Use as a personnel elevator The personnel elevator is an installation used for transporting people or large volume materials to one or multiple landings. 2. Use as a material elevator The elevator is an installation set up for the transport of materials (transport of people is strictly forbidden) to one or multiple landings. figure 1 view of PT1000/1500/2000 De Jong s liften b.v. Constructiestraat 6, postbus 25, 4140 AA Leerdam 3

We can differentiate the elevator by maximum load capacity or platform measurements: Type PT1000: type Platform measurements (lxw) Max. allowed passengers Max. legal loading capacity PT1000 (2 speed) 2200x1500 mm 12 1000 PT1000 (2 speed) 3200x1500 mm 12 1000 PT1000 (2 speed) 4200x1500 mm 12 1000 Type PT1500: type Platform measurements (lxw) Max. allowed passengers Max. legal loading capacity PT1500 (2 speed) 2200x1500 mm 15 1500 PT1500 (2 speed) 3200x1500 mm 18 1500 PT1500 (2 speed) 4200x1500 mm 18 1500 Type PT2000: type Platform measurements (lxw) Max. allowed passengers Max. legal loading capacity PT2000 (2 speed) 2200x1500 mm 15 2000 PT2000 (2 speed) 3200x1500 mm 22 2000 Rack and pinion, module 8. Low maintenance as the unit is mostly galvanised. Temperature range 25 to 50 C Landing control through landing-stops and stop button on landing. Unit equipped with a build-up platform De Jong s liften b.v. Constructiestraat 6, postbus 25, 4140 AA Leerdam 4

1.2 Technical specifications Basic specifications type Platform size Measurement base unit Weight base unit Elevation speed (BxL) mm (XxYxH) mm kg PT1000-2,2 1500x2200 2330x2790x2480 1842 0,4 m/s PT 1000-3,2 1500x3200 3330x2790x2480 2007 0,4 m/s PT 1000-4,2 1500x4200 4330x2790x2480 2078 0,4 m/s PT 1500-2,2 1500x2200 2330x2790x2480 1842 0,4 m/s PT 1500-3,2 1500x3200 3330x2790x2480 2007 0,4 m/s PT 1500-4,2 1500x4200 4330x2790x2480 2078 0,4 m/s PT 2000-2,2 1500x2200 2330x2790x2480 1842 0,4 m/s PT 2000-3,2 1500x3200 3330x2790x2480 2007 0,4 m/s Figure 1: base unit measurements De Jong s liften b.v. Constructiestraat 6, postbus 25, 4140 AA Leerdam 5

Anchoring specifications type Max. mast length freestanding (w/o Max. mast length (anchored) =L total Distance between anchor points L1= 1 e anchor point at =L6 Free mast height above last anchor point =L2 anchors) PT1000 0 m 150 m 12 m 6 m 4 m PT 1500 0 m 150 m 12 m 6 m 4 m PT 2000 0 m 150 m 12 m 6 m 4 m Figure 2 anchor point distances De Jong s liften b.v. Constructiestraat 6, postbus 25, 4140 AA Leerdam 6

Electrical specifications PT1000 2-speed PT1500 2-speed PT2000 2-speed Capacity KW 2/3 5,5/7,5 5,5/7,5 Control current/frequency V/Hz 400/50 400/50 400/50 Electrical connection Amp 63 slow 63 slow 63 slow Connection cable 5x10 2 Socket current (platform) V 230 Accessories (either delivered as part of the base unit or as an optional) - Cable guides - Landing slide doors - Landing stops - End stop (standard with base unit) - Anchoring supplies - Lifting eye for loading/unloading/positioning with a crane - Auxiliary crane with manual winch for mast assembly - Extension mast of 1, 5 m. - Electrical cable - Landing control units extension leads - Landing call and send buttons with extension leads - Drop-test control-unit (See chapter 8 for more extensive description and article number) De Jong s liften b.v. Constructiestraat 6, postbus 25, 4140 AA Leerdam 7

1.3 Safety features EMERGENCY STOPS ELECTRICALLY SECURED RAMPS, TURNSTILES AND SLIDING DOORS END STOP DIRECTION OF ROTATION ELECTRICAL OVERLOAD (MAINS) ELECTRICAL OVERLOAD (CONTROL CURRENT) MECHANICAL LIMITATION OF DESCENT VELOCITY DESCENDING MOVEMENT PROTECTION Platform movement is stopped and blocked. The platform can not be activated or remain active if a ramp or sliding door is not completely closed in position. Safety through mechanical stop-skates and emergency upper limit-switch. Mechanically forced stop by missing rack part. Lower stop limit is secured by a mechanical stop-skate and emergency lower limit-switch. By means of a phase protector the correct rotation direction is guaranteed. Furthermore, the controls of the personnel elevator/ transport platform are switched off if one or more phases are missing. The thermal protection ensures the motor switches off if electrically overloaded. If control current is overloaded it will automatically switch-off. If the max. descent velocity is superseded; the safety brake will activate thus forcing the platform to stop and to hold its position. Furthermore the elevator controls are blocked after activation of the safety brake. The platform will, when reaching a 2 meter height above ground-level, stop for 3 seconds before continuing its descent. Moving parts are secured and protected conform the regulations in force. De Jong s liften b.v. Constructiestraat 6, postbus 25, 4140 AA Leerdam 8

2. SAFETY REGULATIONS 2.1 General A DE JONG elevator guarantees complete safety with either mounting or dismounting under normal conditions of use. All components have been designed following stringent in-house and external rules and regulations. This notwithstanding dangerous situations can arise while operating a transport platform/personnel elevator. This is why anybody concerned with mounting, dismounting, operating, maintenance and reparation of the elevator should read and understand this users manual. The personnel/material elevator may only be used if there is no danger of items dropping off the platform. A personnel/material elevator should at all times be well maintained (including galvanised areas). Repairs should only be affected with proper materials and equipment. Maintenance and repairs are only allowed to be made by specialised personnel while the personnel/material elevator is at a complete stop. The personnel/material elevator may only be operated by personnel accustomed to operate the elevator. These personnel should, by strength of law, be at least 18 years of age. 2.2 Regulations 2.2.1 MOUNTING Please ensure that: 1. All guide-rollers, brackets, etc. which ensure the platform keeps it correct position in correspondence to the mast are fitted properly without any deformations. 2. The safety brake has been checked for proper operation. ( 3. All rack-elements are correctly fixed to the mast 4. All the material used with anchoring (bolts, nuts and other anchoring materials) have the correct measurements and quality as specified by the manufacturer. 5. Ensure all extension masts are correctly installed before use. 6. The platform does not move higher on an anchored mast element as described in this manual. 7. That after the mounting of all extension-elements the mast-end is fitted which activates all the end-switches. 8. The rear elevator protective panel and roof are mounted. 9. At storm conditions (windforce 8 or higher) all mouding and dismounting activitas are prohibited De Jong s liften b.v. Constructiestraat 6, postbus 25, 4140 AA Leerdam 9

The personnel/material elevator should be assembled conform the regulations. Important points are: The elevator should be positioned as vertical and stable as possible. The carriage should be supported sufficiently against subsiding. The supporting material should not consist of stone-like materials. The platform should have sufficient free space (minimal 500mm) around the unit. This to avoid any obstructions. figure 2 Around the assembly point there should be sufficient space for people to safely walk around the unit. Please note that the unit should never be positioned in front of openings, doors or other places where there is a continuous flow of people. Please note that fencing of the unit with construction-site fences is recommended. The controls at the landings and ground floor should be positioned in such a way that a view on the trajectory of the platform is guaranteed. The unit should be anchored according to the rules provided by the manufacturer (see chapter 6) Alongside all landing-stops shut-offs should be positioned at a minimum of 0, 5 m form the platform trajectory. The unit should be assembled in such a way that there is never any danger to the personnel. THE ELEVATOR SHOULD BE INSPECTED 6 MONTHS AFTER FIRST ACTIVATION. AFTER THAT THE UNIT SHOULD BE INSPECTED AT LEAST EVERY 6 MONTHS BY AN ACCREDITED INSTITUTION APPOINTED BY THE MINISTRY OF SOCIAL AFFAIRS AND EMPOLYMENT FOR THE INSPECTION OF LIFTING EQUIPMENT WHICH CAN BE USED FOR TRANSPORTING PEOPLE AND WHERE THERE IS THE POSSIBILTY OF A FREE-FALL OF MORE THAN 3 METRES. (APPENDIX IV, A16, GUIDELINE NR. 98/37/EG) De Jong s liften b.v. Constructiestraat 6, postbus 25, 4140 AA Leerdam 10

De Jong s liften b.v. Constructiestraat 6, postbus 25, 4140 AA Leerdam 11

2.2.2 OPERATION The locker with the electrical switchboard should always be locked after working hours with mains-switch de-activated. This is also mandatory during work interruptions (i.e. breaks) when the unit is operating in a residential area and is out of the line of sight. The platform should not be made larger than the specifications made by the manufacturer. Loads should be placed carefully on the platform to ensure the loads, or parts of it, shift position or fall off. Small or loose material should always be transported in boxes or in other types of containers. When there is a storm (wind force 8 or higher) the unit should be deactivated. This means that the platform should be brought back to the lowest stop (ground floor) and the current should be cut. The user should ensure proper illumination of the platform trajectory taking special care with the shaft entrances and ground floor base. 2.2.3 DISMOUNTING When disassembling the unit special care should be taken with the following: 1. Have all safety components been checked for proper operation? 2. Are the rack-elements fixed properly to the extensions masts? 3. Has the unit been properly anchored? 4. The mast bolts and anchors should never be removed before the platform has descended beyond that point. De Jong s liften b.v. Constructiestraat 6, postbus 25, 4140 AA Leerdam 12

2.2.4 ELEVATOR INSPECTIONS 1. Daily inspections VISUAL: - No oil leakage. - The trajectory is free of obstacles. - The rack and pinions are in good conditions. - The bolts of the extension masts are in good condition. - The anchoring of the unit is in order. - The towing cable is in good condition are winds correctly on the drum. - The unit may not be used in very adverse weather conditions (wind force 8 or higher). DURING OPERATION: - The motor and the electro-magnetic brakes operate correctly. - The electro-magnetic locks of the platform ramps work properly. - The landing/upper/lower stops function correctly - The maintenance and greasing intervals have been executed. Never allow personnel to work with the unit before reading this instruction manual. Never allow material to be transported larger than the platform. Never allow the unit to be overloaded. 2. WEEKLY INSPECTIONS If a transport platform/ personnel elevator is used intensively, the unit should be revised once a week taking into special consideration the greasing of moving parts and rack and to the correct functioning of the brake and end-switches. 3. AFTER MOUNTING AND HALF YEARLY INSPECTION THE ELEVATOR SHOULD BE INSPECTED 6 MONTHS AFTER FIRST ACTIVATION. AFTER THAT THE UNIT SHOULD BE INSPECTED AT LEAST EVERY 6 MONTHS BY AN ACCREDITED INSTITUTION APPOINTED BY THE MINISTRY OF SOCIAL AFFAIRS AND EMPOLYMENT FOR THE INSPECTION OF LIFTING EQUIPMENT WHICH CAN BE USED FOR TRANSPORTING PEOPLE AND WHERE THERE IS THE POSSIBILTY OF A FREE-FALL OF MORE THAN 3 METRES. (APPENDIX IV, A16, GUIDELINE NR. 98/37/EG) 4. ANNUAL INSPECTION The PT elevator must be subjected to an expert inspection at least once a year. In accordance with this inspection the testing-form (appendix B) should be compiled. This inspection should be made by an accredited technical engineer of the owner, user, manufacturer or supplier. This inspection can also be made by an external independent institution. If the unit passes this annual inspection the year, month and day should be struck into the plate affixed to the chassis. A copy of the forms, used according to appendix A and B should be archived together with any notes taken and placed in the technical dossier of the revised unit. De Jong s liften b.v. Constructiestraat 6, postbus 25, 4140 AA Leerdam 13

De Jong s liften b.v. Constructiestraat 6, postbus 25, 4140 AA Leerdam 14

3. MOUNTING/DISMOUNTING OF THE ELEVATOR THE INSTRUCTIONS SHOULD BE READ CAREFULLY BEFORE STARTING ANY WORK. For mounting and dismounting the following regulations are in force: 1. Mounting/dismounting of the unit should only be done by expert personnel who are at least 18 years of age. 2. The engineers should be protected against falling by means of a safety-harness. 3. While using a build-up platform a safety-harness should be used at all times. 4. In adverse weather conditions (wind force 8 or higher) no mounting or dismounting may take place. De Jong s liften b.v. Constructiestraat 6, postbus 25, 4140 AA Leerdam 15

3.1 MOUNTING MOVING THE ELEVATOR TO THE SITE OR SCAFFOLD AND SUBSEQUENT PLACEMENT The erection site should be flat and sufficiently strong to carry the unit (including any load) with reference to figure 1 and table 1 for the occurring stabilisation forces at different mast heights. PT1000 PT1500 PT2000 Mast height (m) Area A jack B Area A Jack B Area A Jack B 10 3018 323 3543 380 4018 431 20 3531 378 4056 435 4532 486 30 4045 433 4570 490 5045 541 40 4558 488 5083 545 5558 596 50 5071 543 5596 600 6072 651 60 5585 598 6110 655 6585 706 70 6098 653 6623 710 7098 761 80 6611 708 7136 765 7612 816 90 7125 763 7650 820 8125 871 100 7638 818 8163 875 8638 926 110 8151 873 8676 930 9152 981 120 8665 928 9190 985 9665 1036 130 9178 983 9703 1040 10178 1091 140 9691 1038 10216 1095 10692 1146 150 10205 1093 10730 1150 11205 1201 note: all weights are in kilogrammes figure 3 De Jong s liften b.v. Constructiestraat 6, postbus 25, 4140 AA Leerdam 16

APPLYING SUPPORT MATERIAL Stone-like materials are prohibited. The support material should have the correct measurements to withstand the stabilisation pressures. The spindles should been extended until the unit is level. LEVELLING THE ELEVATOR Measurements should be taken along the mast. It should be mounted completely perpendicular to the ground. DISMOUNTING THE LIFTING-EYE (if supplied) figure 4 PLACING THE DAVIT (if no use is made of an external crane) The davit should be placed in the pre-existing slots and in such a way no obstruction can occur. PLEASE NOTE: the davit connection-point is fitted with a limit-switch which ensures the elevator can not move unless the davit is in its neutral position (out of the mast trajectory) MOUNTING CONTROLS During the mounting of the elevator the controls on the platform can be used. To achieve this, the unit has to be set into personnel -mode. (See chapter 4) PLACING THE MAST SECTIONS ON THE PLATFORM PLEASE NOTE: One mast section weighs about 110 kg. and should be moved by 2 persons and if possible by using a trolley. If the sections have not been assembled they should be (figure 5a and 6.) Figure 3a Figure 4 De Jong s liften b.v. Constructiestraat 6, postbus 25, 4140 AA Leerdam 17

BRING THE PLATFORM TO WORKING HEIGHT The platform is at working height if the top of the (emergency) upper limit-switches and the initiator are approx. 5 cm from the top of the uppermost mounted mast section. ATTENTION As there is not upper stop-skate installed during mounting as well as no emergency stop-skate, the platform trajectory is not controlled by a mechanical switch. The only safety present is the initiator. This should be seen as an aid and not as a definitive guarantee. Be aware at all times not to let the platform run off the mast. This is why the controls are fitted with hold buttons and, as an extra precaution, an emergency blocking switch (emergency stop). BLOCKING THE PLATFORM AUTOMATICALLY Due to security concerns, the emergency button should be pressed and the control-switch should be set to 0 before mounting the mast sections, when there is a risk that body parts could be caught between the mast and the platform. PLACING AND SECURING THE MAST SECTION LIFTING AID ON THE PLATFORM Carefully check that the mast section can not accidentally drop out of the lifting aid. PLACING AND BOLTING THE MASTSECTION To achieve this, the build-up platform can be used to tighten all the bolts of the mast. ATTENTION: Always wear a safety harness and connect this to the hook of the platform Figure 5 Use only the following bolts and nuts: -Bolt DIN 931 M 16 kw. 8.8 length 170 mm -Nylocnut DIN 982 M 16 kw 10 -Torque max. 195 N.M. ALWAYS FIX THE MAST SECTIONS BEFORE DISCONNECTING THEM FROM THE CRANE. TURN DAVIT AWAY AND PLACE IT ITS NEUTRAL POSITION. ATTENTION: The davit described above is electronically secured. DISENGAGING THE BLOCKING SWITCH The blocking switch should be disengaged by turning it in the direction of the arrows and by placing the control switch in position 1. De Jong s liften b.v. Constructiestraat 6, postbus 25, 4140 AA Leerdam 18

ANCHORING The mast should be anchored at the specified intervals as indicated in chapter 6. MAST SECTIONS AND ANCHOR POINTS SHOULD BE PLACED UNTIL THE DESIRED MASTLENGTH IS REACHED. Repeat above actions until not further necessary. ATTENTION: Due to safety concerns the platform should have a free run up to the top of the last mast section of 0, 5 meter. PLACING THE SAFETY MAST TOP On the uppermost mast section the safety mast top should be mounted using: -Bolts DIN 931 M 16kw 8.8 length 170 mm. -Nylocnut DIN 982 M 16 kw 8 The emergency stop skate is integrated into the safety mast top. Figure 6 topmast MOUNTING LANDING STOP-SKATES AND UPPER STOP-SKATES. The landing stop-skates and upper stop-skates should be mounted: Figure 7 landing stop-skates Figure 8 upper stop-skates De Jong s liften b.v. Constructiestraat 6, postbus 25, 4140 AA Leerdam 19

MOUNTING CABLE GUIDES The cable guides should be mounted at intervals of 4, 5 meters and in the manner according to figure 11. Figure 9 tow-cable guide PLACING LANDING SLIDE-DOORS At each landing sliding doors should be placed. The type of slide-door is dependant on the laws and regulations of the country where the unit is in operation. As a standard the slide-doors depicted in the figure below are supplied. Please ensure that the extended plug is placed in the upper slide-door. Figure 10 slide-door CLOSE-OFF GROUND AREA Be advised to close-off the ground area REMOVING DAVIT MOUNTING REAR ELEVATOR PANELS AND ROOF FILLING OUT CHECKLIST (SEE APPENDIX A) SET THE ELEVATOR EITHER AS A MATERIAL OR PERSONNEL ELEVATOR AND TEST THE UNIT FOR PROPER FUNCTIONING. COMMISSIONING THE ELEVATOR De Jong s liften b.v. Constructiestraat 6, postbus 25, 4140 AA Leerdam 20

DELIVER THE MANUAL AND KEYS TO THE PERSON RESPONSABILE FOR THE UNIT WHEN IN OPERATION. De Jong s liften b.v. Constructiestraat 6, postbus 25, 4140 AA Leerdam 21

3.2 DISMOUNTING MOUNTING CONTROLS During the mounting of the elevator the controls on the platform can be used. To achieve this, the unit has to be set into transport platform -mode. (See chapter 4) PLACING THE DAVIT (if no use is made of an external crane) The davit should be placed in the pre-existing slots and in such a way no obstruction can occur. PLEASE NOTE: the davit connection-point is fitted with a limit-switch which ensures the elevator can not move unless the davit is in its neutral position (out of the mast trajectory) DISMOUNT THE SAFETY TOP MAST BRING PLATFORM TO WORKING HEIGHT TO DISMOUNT MAST SECTION Working height is approx. 5 cm below the upper mast connection. Attention! The mast bolts and anchors should never be removed before the platform has moved below that specific anchor-point. BLOCKING THE PLATFORM ELECTRICALLY For all work taking place from the platform the emergency stop button should be engaged at all times and the control-switch S2 should be deactivated. PLACING AND SECURING THE LIFTING AID IN THE UPPER MAST SECTION DISMOUNTING THE MASTSECTIONS. After removing the mast bolts the now loose mast section can be placed on the platform by using the davit. DISMOUNT THE MAST UNTIL THE BASE MAST SECTION BRING PLATFORM TO THE LOWEST POSITION REMOVE SUPPORTING MATERIAL AND (if supplied) WIND IN THE SPINDLES The elevator is now ready for transport MOUNT LIFTING EYE Mount the lifting eye with M16x240 bolts allowing the unit to be loaded on a truck. De Jong s liften b.v. Constructiestraat 6, postbus 25, 4140 AA Leerdam 22

4. CONTROLS We can distinguish two types of elevator usage with the PT1000/1500/2000: 1. Use as a personnel/material elevator 2. Use as a material elevator 4.1 Use as a personnel elevator Figure 11: switchboard platform - Figure 12: switchboard base unit The personnel/material elevator should be connected to pre-described current after which the mains switch (M) should be switched on (position 1 ). If the current is correct the LED of the phase protector will light up (K). If not, the direction of the current can easily be changed by turning the phase sequence switch (L) positioned on the switchboard of the carriage. De Jong s liften b.v. Constructiestraat 6, postbus 25, 4140 AA Leerdam 23

Figure 13 example (max. amount of people depends on country) When used as a personnel/material elevator the unit should be fitted with notices denoting the maximum allowable load and the maximum number of people (see figure 16 as an example). By using a switch the unit can be set to either material elevator or personnel elevator. After setting the unit to one or the other mode take out the key so that other user cannot change it. ASCENDING: Press and hold the button platform UP (A) and press this button twice (2 clicks) and the unit will move upwards If you want to stop at a certain landing the same button should be released slightly (the button has to settings). The unit will now stop at the next platform. DESCENDING: Press and hold the button platform DOWN (B). By pressing this button fully the unit will start to descend. If you want to stop at a certain landing the same button should be released slightly (the button has to settings). The unit will now stop at the next platform. If you want to descend to the ground floor the button platform DOWN should be pressed and held. When the unit is approx. 2 meters above the ground floor the unit will stop approx. 4 seconds and acoustic signal will start to sound. After this the unit will descend further to the ground floor. EMERGENCY STOP (D): If an emergency stop becomes necessary the button marked EMERGENCY STOP should be pressed after which the unit will come to an immediate and complete halt. RESTART AFTER AN EMERGENCY STOP: Check for any possible malfunctions, disengage the emergency brake and press the buttons platform UP or platform DOWN depending on the direction desired. BUTTON TO ACTIVATE THE ALARMSIGNAL (C) De Jong s liften b.v. Constructiestraat 6, postbus 25, 4140 AA Leerdam 24