Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Similar documents
Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Florida Department of Transportation Daniels Parkway Fort Myers, FL 33913

Department of Transportation 1500 Monroe Street. FortMyers,FL (239) (239) Fax ROAD WATCH UPDATE. July 19 - July 25, 2018

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax. ROAD WATCH UPDATE June 15, 2018

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE

^ Lee County So^mst <T:[oV1]^ Lee County

^Lee County Jt Sotft^West T:foH^a Lee County

^ Lee County ^OU fewest T:foH^ Lee County

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE

Update January 4, 2016

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE

Lee County Department of Transportation

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

FDOT Treasure Coast Traffic Impact Report

FDOT Broward County Traffic Impact Report November 24 through December 1, 2017

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,

FDOT Treasure Coast Traffic Impact Report

Route 1 and Harrison Road Intersection Improvements

Pinellas County Traffic Advisory

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

Important Lane Closures for Jan , 2012

FDOT Broward County Traffic Report April 20 through April 27, 2018

IL Route 71 Construction Update

Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission

I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT

FDOT Broward County Traffic Report April 27 through May 4, 2018

FDOT Broward County Traffic Report August 31, 2018 through September 7, Interstate 95

Rio Intersection Traffic Restrictions Begin Monday

FDOT Broward County Traffic Report March 2 through March 9, 2018

FDOT Broward County Traffic Report May 11 through May 18, Interstate 95

Legislative Update Williamsburg Residency

FDOT Broward County Traffic Report June 29, 2018 through July 6, 2018

FDOT Broward County Traffic Report September 14, 2018 through September 21, Interstate 95

Replacement of N. Carlin Springs Road Bridge over George Mason Dr.

Florida Department of Transportation MIKE DEW SECRETARY

New shared use paths (SUP)**

February 11, 2016 TPO Board Presentation

Pinellas County Traffic Advisory

El Dorado County / Tahoe Roadwork Schedule

FDOT Broward County Traffic Report August 10, 2018 through August 17, 2018

CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES

DOUG s CORNER CONTRACTOR S WEEKLY UPDATE COURTEOUS RESPONSIVE DEPENDABLE IN THIS ISSUE. February 2nd, 2015 Volume 2, Issue 107.

I 595 Express Corridor Improvements Project. February 2014 Update

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

APPENDIX D COST SUMMARY TABLES

Palm Beach County Traffic Report November 16 through November 23, 2018

PERFORMANCE ACTIVITY 405 LIMB MANAGEMENT

DOUG s CORNER CONTRACTOR S WEEKLY UPDATE NORTHWEST EXTENSION-19TH AVENUE-BETHANY HOME TO DUNLAP COURTEOUS RESPONSIVE DEPENDABLE IN THIS ISSUE

MILEGROUND - AIRPORT ROAD. Fall 2018/ Spring Fall 2020 TBD. US 119 Monongalia County HOW WILL TRAFFIC CONTROL BE HANDLED: KNOW BEFORE YOU GO

Access Routes from US 101 to the Richmond San Rafael Bridge

Hospital Link Project Project Update September 2017

TRAFFIC ALERT FOR FEBRUARY 26 to MARCH 2, 2018 Highway Work Zones in the Staunton District

DOUG s CORNER CONTRACTOR S WEEKLY UPDATE NORTHWEST EXTENSION-19TH AVENUE-BETHANY HOME TO DUNLAP COURTEOUS RESPONSIVE DEPENDABLE IN THIS ISSUE

Highway Construction

Hospital Link Project Project Update November 2017

2017 Temporary traffic control guidelines for pedestrians. v.2

PRESENTATION OUTLINE

SD Highway 50 in Yankton (4 TH Street) Reconstruction Project NH 0050(99)381 PCN By Josh Larson McLaury Engineering Inc.

PERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 4

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

Information on display. Inside this handout. Triangle Area revisions. Project need displays. Preferred alternative on aerial maps

Weymouth - Abington Route 18 Widening and Reconstruction Project File No

MASSACHUSETTS AVENUE BRIDGE REPLACEMENT PROJECT APRIL 25, 2018

Palm Beach County Traffic Report January 11 through January 18, 2019

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

Palm Beach County Traffic Report October 26 through November 2, 2018

Meadow Woods Elementary School

Design Criteria. Design Criteria

Downtown Redevelopment Project Update

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities

PERFORMANCE ACTIVITY 613 IMPACT ATTENUATOR WORK DESCRIPTION 3

Swamp Road Residents Study

FACT SHEET VirginiaDOT.org

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

CHAPTER 8 STAKING SIGNALS AND LIGHTING FIELD GUIDE. 8.1 Staking Traffic Control Signal Systems

AGENDA REQUEST. Unfinished Business BY Neighborhood and Development Services. November 1, 2010 SUBJECT:

09/28/2011 NEW/UPDATED ROAD CONSTRUCTION AND RESTRICTIONS:

Deck Rehabilitation and Steel Repairs Maurice J. Tobin Memorial Bridge

DRAFT FY 2017-FY 2021 FLORIDA-ALABAMA NON-SIS PROJECT PRIORITIES PROPOSED CHANGES BY ESCAMBIA AND SANTA ROSA COUNTIES

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

WELCOME. FM 2818 (Harvey Mitchell Parkway) Open House. Tuesday, Nov. 14, 2017

Blair/Williamson Intersection Expressed Needs

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

STAKING TRAFFIC CONTROL SIGNAL SYSTEMS

SCHOOL ROUTE PLAN. For HUNTER S CREEK ELEMENTARY SCHOOL LOCATION 14 ORANGE COUNTY. Prepared for:

Cincinnati Dayton Rd Widening

Proposed Grant Funding

Transcription:

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE August 30 September 5, 2018 Buckingham Road: Florida Power and Light will be replacing power poles on Buckingham Road starting September 4 through September 7, 2018 between the hours of 7 p.m. to 6 a.m. Motorists should use caution as a section of Buckingham Road will be closed and traffic will be rerouted around the work zone with detours. For further questions, please call Eric Suarez at 863-444-2399. Ortiz Avenue & SR 82 Martin Luther King Boulevard: Contractors for Lee County DOT will begin milling and paving Ortiz Avenue and SR 82 (MLK) during the nighttime hours of 7 p.m. to 6 a.m. starting September 5 th and finish by 6 a.m. September 7 th. Motorists should use caution due to uneven road pavement and crews working in the roadway. For more information, please contact Dirk Danley 533-9305. Ortiz Avenue Nighttime Closure: Clary s Sitework and Development, Inc. will be installing turn lanes and will close Ortiz Avenue from Martin Luther King Boulevard/SR 82 to Colonial Center Drive during the nighttime hours from 8 p.m. to 5 a.m. starting September 9, 2018. Emergency access for the Lee County EOC (Emergency Operations Center) as well as anyone for SalusCare will be permitted. The Lee County Sheriff s Office will be present at each end of the road closing. This roadwork project will be completed by 5 a.m., September 14, 2018. For further information, please call Jeff Clary at 239-770-3659 or Department of Transportation/Engineering at 239-533-9300. Summerlin Road & College Parkway: Lee County DOT will be performing repairs to a traffic camera on September 5, 2018. The Left Lane of the Northbound Summerlin Road Overpass will be closed from approximately 8 am to 12 pm. If you have any questions, please call Jed Mason at 239-533-9543.

RPM Replacement Project (raised pavement markers) - Contractors for Lee County will be performing a moving operation with traffic delays (weather permitting) beginning August 30, 2018 thru September 5, 2018 between the hours of 7 p.m. to 6 a.m. on the following roadways: Summerlin Road from McGregor Blvd to Colonial Blvd Bonita Beach Road from County Line (Radio Tower Rd) to Hickory Blvd Pondella Road from Pine Island Road to Moody Rd Hancock Bridge Parkway from Del Prado Blvd to N Cleveland Avenue Sanibel Causeway from Causeway Blvd (End of Last Bridge) to Sanibel Toll Plaza Pine Island Road from Stringfellow Road to Burnt Store Road Captiva Drive from Blind Pass Bridge to North End Beach Access For further questions, please call Dan Vasiloff at 239-533-9500. Striping Maintenance: Lee County DOT will be performing a moving operation with traffic delays on 8-30-18 through 9-5-18 between the hours of 9:00 a.m. to 4:00 p.m. (weather permitting) on the following roadways: Boca Grande Drive Hickory Boulevard Imperial Parkway Intersection Markings: Intermittent lane closures and delays are possible on 8-30-18 through 9-5-18 between the hours of 9:00 a.m. to 4:00 p.m. (weather permitting) on the following roadways: Ben Hill Griffin Parkway Gladiolus Drive Treeline Avenue (excluding section from Colonial Blvd to Pelican Preserve) If you have any questions, please call Randy Hart at 239-533-9500. 1. Road Work/Maintenance/Improvements: ATMS Phase 2 Project Advanced Traffic Management System: SICE/Y-COM/C&E (Systems Integration Technology Company) will be working in different locations doing directional bores, forming and pouring concrete for boxes, for the ATMS System.

9/4/18 through 9/7/18 SICE/Y-COM will be working on Palm Beach Blvd. and Bayshore doing directional bores, setting boxes and proofing conduit. SICE/Y-COM/Dynastar will continue the directional bores and setting boxes in the NW area, at Chiquita Blvd. SICE/Y-COM/Underground Pros will continue working on McGregor Blvd. and will be working on aboveground conduit on Palm Beach. The work will start at 7:30 am and continue until 5:00 pm approximately through the week (NO WORK ON MONDAY the holiday). For further questions, please call Keith Lightner 786-682-2999. Burnt Store Road from Diplomat Parkway to Tropicana Parkway: Construction Project: This project consists of the initial widening of Burnt Store Road to four lanes. The project also includes installation of conduits under the road for the City of Cape Coral. Motorists should expect intermittent northbound and southbound lane closures during nighttime/overnight hours, weather permitting. This middle segment from Diplomat Parkway to Tropicana Parkway costs $6.7 million and the City of Cape Coral s utility conduits are $550,000. The contractor is Wright Construction. The project is expected to be completed in fall 2019. For further questions, please contact Lisa Macias at 239-337-1071. Lee County RWA Week of September 4, 2018 Estero Boulevard Construction refresh Estero Boulevard/Waterlines Lovers Lane to Albatross Street. Contractors for Fort Myers Beach and Lee County are installing new water main, and sanitary sewer force main, storm drainage, sidewalk and rebuilding roadway on Estero Boulevard from Lovers Lane to Albatross Street. Motorists may experience daytime and nighttime intermittent one-lane traffic on Estero Boulevard. Flaggers will alternate traffic frequently, but motorists should expect delays. Crews are expected to work Monday through Friday and most Saturdays. Segment 2 - Lovers Lane to Strandview Avenue:

Lovers Lane to just south of Donora Boulevard - Northbound traffic is shifted to the center lane. South of Donora Boulevard to Bay Mar Drive Northbound traffic has been shifted to the bay side from south of Donora Boulevard to Bay Mar Drive. The barrier wall has been installed in the center lane while crew s mill, excavate, and install the center lane drainage system. Barrier wall separates the northbound and southbound lanes. Motorists should expect to make U-turns when accessing properties on the opposite side of the road from the travel lane. Motorists exiting side streets between Voorhis Street and Bay Mar Drive must make right turns onto Estero Boulevard and then make a U-turn. Bay Mar Drive to Strandview Avenue - Northbound traffic is shifted to the center lane. Segment 3 and 4 Strandview Avenue to Albatross Street: Strandview Avenue to Flamingo Street Northbound traffic is shifted to the center lane. For further questions, please contact Cella Molnar & Associates at 239-337-1071. Homestead Road from south of Sunrise Boulevard to north of Alabama Road: Construction Project: This project consists of widening Homestead Road to four lanes. This work will also improve drainage and install new underground utilities. A six-foot sidewalk will be constructed on both sides of the roadway. Motorists should expect lane closures during daytime hours. Project cost is $14.4 million. The contractor is Stevens and Layton, Inc. The project is expected to be complete by the end of 2019. Sidewalk access in front of Veterans Park is closed to pedestrians and bicyclists. For further questions, contact Lisa Macias, Cella Molnar & Associates at 239-337-1071. SR 82 from Alabama Road to the Lee/Hendry County line: Florida Department of Transportation Construction Project: Crews will be widening SR 82 to four lanes from Alabama Road to the Lee/Hendry County line.

Motorists should expect intermittent eastbound and westbound lane closures on SR 82 during nighttime/overnight hours from 7 p.m. to 6 a.m., Monday through Friday throughout the duration of the project, weather permitting. Additional work includes construction of a median separating two 12-foot travel lanes in each direction, 6.5-foot inside paved shoulders, bike lanes, a 5-foot sidewalk on the north side and a 10-foot shared-use path on the south side. The project will also add a grass median and LED lighting throughout this segment. The expected completion date is end of 2020. The Contractor is Sacyr Construction. Kalamar Drive will be closed TEMPORARILY from Wednesday, August 8 to Friday, September 7. SR 82 from Lee Boulevard/Colonial Boulevard to Shawnee Road: Florida Department of Transportation Construction Project: Crews will be widening SR 82 to six lanes from east of Lee Boulevard to Shawnee Road. Motorists should expect intermittent eastbound and westbound lane closures on SR 82 during nighttime/overnight hours from 7 p.m. to 6 a.m., Monday through Friday throughout the duration of the project, weather permitting. Griffin Drive at SR 82 will be closed TEMPORARILY from 2 a.m. Monday, September 10 to 5 a.m. Monday, September 24. Wallace Avenue will be closed TEMPORARILY from Wednesday, August 8 to Friday, December 28. Meadow Road at the Haddock Canal will closed TEMPORARILY from Wednesday, August 22 to Friday, August 31. Meadow Road from Haviland Avenue South to Hightower Avenue South will be closed TEMPORARILY from Monday, July 2 to Friday, August 31. Ray Avenue will be closed TEMPORARILY from Wednesday, June 27 to Monday, September 17. Meadow Road at Gunnery Road is PERMANENTLY closed. A temporary traffic signal has been installed at the intersection of Ray Avenue South and Griffin Drive. Motorists should use caution while driving in this area.

Additional work includes construction of a median separating three 12-foot travel lanes in each direction, 6.5-foot inside paved shoulders, bike lanes, a 5-foot sidewalk on the north side and a 10-foot shared-use path on the south side. The project will also add a grass median and LED lighting throughout this segment. The project also includes constructing Florida s first Continuous Flow Intersection (CFI) at the intersection of SR 82 at Daniels Parkway/Gunnery Road. The CFI will ease traffic congestion at the intersection and include multiple signals to reduce turning delays. The expected completion date is end of summer of 2019. The Contractor is Ajax Paving Industries of Florida, LLC. 2. Bridge Maintenance: Big Carlos Bridge #120028: Lee County DOT Operations will be performing bridge maintenance at Big Carlos Bridge. The work will start July 30 and finish September 28, 2018, weather permitting. There will be lane closures controlled by flagging operation from 9:00 a.m. to 3:30 p.m. For further information, please call Carlos Hernandez at 239-533- 9400. Big Carlos Pass Bridge Sidewalk Maintenance: Lee County DOT will perform sidewalk maintenance on the west side of the Big Carlos Pass Bridge starting August 27 through January 18, 2019. During this project, there will be sidewalk closures on the west side of the bridge and possible road closures. For further information, please contact Lee County DOT at 239-533-9400.