SL G3 - Fuel Conversion to Natural Gas (LP to NG) P-Kit 301

Similar documents
SL G3 - Fuel Conversion to Propane (NG to LP) P-Kit 302

SL G3. Warning

DANGER WARNING IMPORTANT

Propane Conversion Kit Instruction

Propane Conversion Kit Instruction

Propane Conversion Kit Instruction

/2004 US/CA

INSTALLATION INSTRUCTIONS

Propane Conversion Kit Instructions

ACCESSORY KIT INSTALLATION INSTRUCTIONS

Instructions for High Altitude Conversion

Your safety and the safety of others are very important.

Natural Gas Conversion Kit

36E DSI, HSI & Proven Pilot Two-Stage Combination Gas Valve INSTALLATION INSTRUCTIONS

INSTRUCTIONS FOR CONVERTING CONDENSING GAS MOBILE HOME FURNACES MODEL SERIES: CMA3*, CMC1*, VMA3*, VMC1*

Gas Valve Replacement Kit

Conversion instructions from natural gas to propane

Natural Gas to L.P. Gas Conversion Kit

Natural Gas High-Altitude Conversion Kit For Installations in the United States (2,001 10,000 Feet)

Gas Conversion Kits CERAMIC HEATER SERIES (1, 2, 3, 4 Burner Units)

Installation Instructions For Natural Gas Conversion

installation instructions

Installation Instructions

ACCESSORY KIT INSTALLATION MANUAL

Installation Instructions

36E DSI and HSI Two-Stage Combination Gas Valve INSTALLATION INSTRUCTIONS

ACCESSORY KIT INSTALLATION INSTRUCTIONS

Operator: Save these instructions for future use!

ACCESSORY KIT INSTALLATION INSTRUCTIONS

Natural Gas to L.P. Gas Conversion Kit

WARNING: Installation Instructions. Natural Gas High Altitude Conversion Kit United States Installations Only

The conversion of new certified central heating gas appliances must conform to directions outlined in this instruction.

GAS VALVE RETROFIT KIT Pull Through Tube Heater Models

WARNING: Gas Conversion Kit Instructions Applies to: Model UDAP, UDAS, UDBP, and UDBS Unit Heaters. General and Warnings FOR YOUR SAFETY

36H SERIES Combination Gas Valve

Installation Instructions For Propane Gas Conversion (Kit Part No ) This kit is designed for conversion to Propane Gas

INSTALLATION INSTRUCTIONS FOR HIGH ALTITUDE KITS: RXGY-F13, RXGY-F27 AND RXGY-F28

Gas Conversion Kits Push Through (Positive Pressure) Tube Heater Models

GAS KITS & ACCESSORIES 504,986M 11/2004 HIGH ALTITUDE KIT

INSTALLATION INSTRUCTIONS MANUAL ON/OFF SAFETY VALVE/PILOT KIT MODEL GA9050A-1 (F0235)

36E03 and 36E38 DSI and HSI Step Opening Combination Gas Valve INSTALLATION INSTRUCTIONS

Installation Instructions WARNING: WARNING: WARNING: LP AND HIGH ALTITUDE LP GAS CONVERSION KIT FOR UNITED STATES INSTALLATIONS

36G22, 36G23, 36G24 & 36G52 36J22, 36J23, 36J24 & 36J52 DSI and HSI Single Stage Combination Gas Valve

ACCESSORY KIT INSTALLATION INSTRUCTIONS

LNVx Gas Conversion Kit Instructions

INSTALLATION INSTRUCTIONS FOR HIGH ALTITUDE KITS: RXGY-F29, F30, F31, F32 & F33

INSTALLATION INSTRUCTIONS

GAS CONVERSION KIT Installation Instructions Range/Rangetop

INSTALLATION INSTRUCTIONS FOR HIGH ALTITUDE KITS: RXGY-F23, F24, F25, F26, F38, F39, F40 & F41

36C/36D HSI, DSI Proven Pilot Gas Valves INSTALLATION INSTRUCTIONS

ACCESSORY KIT INSTALLATION INSTRUCTIONS PROPANE CONVERSION - INDUCED COMBUSTION FURNACES 1NP0347

INSTALLATION & MAINTENANCE MANUAL FOR RIVERSIDE HYDRONICS BG400 GAS BURNER 140,000 thru 1,400,000 Btu/h

V5197A. Firing Rate Gas Valve APPLICATION FEATURES PRODUCT HANDBOOK

Instruction Manual VCG-6

Operator: Save these instructions for future use!

G196 Series BASOTROL Redundant Combination Gas Valve with Manual Shutoff Valve

G196 Series BASOTROL Redundant Combination Gas Valve with Manual Shutoff Valve

WARNING: AVERTISSEMENT. LP & HIGH ALTITUDE LP CONVERSION KIT FOR INSTALLATIONS IN the United STATES (0-10,000 Ft)

Installation Instructions

Natural Gas Conversion Kit

INSTALLATION INSTRUCTIONS

TB132. Gas Conversion Kits for NV & NVS Heaters. Issue 1.0 May Applies to models: NV & NVS

USER S INFORMATION MANUAL

ACCESSORY KIT INSTALLATION INSTRUCTIONS PROPANE CONVERSION - INDUCED COMBUSTION FURNACES 1NP0347

VR8305 Direct Ignition Combination Gas Control

SERVICE MANUAL SALAMANDER BROILERS RADIANT AND INFRARED 36RB 36IRB VULCAN C36RB C36IRB WOLF

INSTALLATION INSTRUCTIONS

GM Series Dual-Block Multi-Function Gas Control Valves

UL Listed GM-20/25 and GM-40/45 Series Dual-block Multi-function Gas Control Valves

Operator: Save these instructions for future use!

iheat SYSTEM CSA CERTIFICATE NUMBER:

V8200A,C,H,M and VR8200A,C,H,M Continuous Pilot Combination Gas Controls

IPG IGNITION GAS PILOTS BACK-LOADED GAS

VR8200A Continuous Pilot Combination Gas Controls

JACKSON GRILLS PATIO FIRE

Hot Compressed Air Lance Operation Manual. LAB Manufacturing 9483 Reading Road Cincinnati, OH (800)

GEN-1e CO2 Generator OVERVIEW INSTALLATION PROPANE GENERATORS ONLY NATURAL GAS GENERATORS ONLY

Installation and Operation Instructions

G96 Series BASOTROL Dual Operator Valve

Unipower VA Series. OEM Installation & Start Up Instructions. Variable Air Gas Burners OEM Start Up IHEA U L. Quality Designed for Proven Performance

GM-7000 Series CE Approved Gas Control Valve

VR8105, VR8205, and VR8305 Direct Ignition Combination Gas Controls

INSTALLATION & MAINTENANCE MANUAL FOR PVI FIREPOWER BG600 GAS BURNER 1,200,000 thru 2,400,000 Btu/h

INSTALLATION AND OPERATION INSTRUCTIONS

GAS SUPPLY APPLICATION GUIDE

GS-20/25 and GS-40/45 Series Single-block Multi-function Gas Control Valves

Operator: Save these instructions for future use!

RS 28/1-38/1 On - Off Operation

VR8205S,T Direct Ignition Combination Gas Controls

Technical

Operator: Save these instructions for future use!

FLOMIXERS SELECTION DATA ALL GASES

GAS SUPPLY DESIGN GUIDE

Gas Fired Residential Heating Boilers

WARNING: FOR OUTDOOR USE ONLY

SPECIFICATIONS ATTENTION

C645A-E Pressure Switches

Module 6. Tightness Testing

G92 Series BASOTROL Automatic Pilot Gas Valve

Operator: Save these instructions for future use!

Transcription:

SL 26-260 G3 - Fuel Conversion to Natural Gas (LP to NG) P-Kit 301 Note If converting from Natural Gas to Propane, order the Natural Gas Conversion Parts Kit (IBC Part # P-300) from your authorized IBC Distributor. Use the Natural Gas conversion parts kit if the fuel source at the site uses Natural Gas and the modulating boiler has been set up (factory fire-tested) to operate with Propane. Check the rating plate on the boiler to see which fuel source the particular boiler has been set up with. Using this conversion kit, a qualified technician will need to: 1. Perform a fuel conversion. 2. Perform a combustion test. 3. Fill in the information required on the fuel conversion labels, and affix them to the boiler after the conversion is completed. Warning This conversion kit shall be installed by a qualified service agency in accordance with the manufacturer s instructions and all applicable codes and requirements of the authority having jurisdiction. If the information in these instructions is not followed exactly, a fire, an explosion or production of carbon monoxide may result causing property damage, personal injury or loss of life. The qualified service agency is responsible for the proper installation of this kit. The installation is not proper and complete until the operation of the converted appliance is checked as specified in the manufacturer s instructions supplied with the kit. The boiler will automatically de-rate the maximum input at a rate of approximately 2% per 1,000 above 4,500. The gas valves zero governor will ensure that the gas:air mixture is not affected at altitude. Included with the Conversion Kit: 1 x NG Mixer, 260 G3 - IBC Part # 180-161 1 x Mixing Device O-ring - IBC Part # 150-073 1 x Rating Plate Fuel Overlay - IBC Part # 080-241 1 x Gas Valve Conversion Label - IBC Part # 080-107B 1 x Installer Identifier Label - IBC Part # 080-245 120-272 R3 1

Combustion Test Target Ranges Figure 1 Gas valve and fan The Low Fire (Zero-offset) valve adjustment cap on the gas valve has been factory set. Do not tamper with or adjust this screw in the field. Contact the factory for written instructions if considering field adjustment of the Low Fire (zero offset) adjustment. The High Fire (Gas:Air) ratio adjustment screw is a slotted brass screw to the left of the long brass protrusion on the front of the gas valve. It will have to be adjusted to attain optimum combustion results whenever fuel conversion is undertaken; however, no mixture adjustment shall be performed unless done by a qualified technician using properly functioning and calibrated combustion analyzing equipment. Fuel High Fire Low Fire Co Max PPM Range Target Range Target Natural Gas 9.0 10.0 9.5 8.2 9.2 8.7 < 150 Propane 10.3 11.3 10.8 9.3 10.3 9.8 < 250 Table 1 Combustion test target ranges - CO 2 / Maximum CO Note: Low Fire CO 2 should be at least 0.5% lower than High Fire CO 2. 2

Fuel Conversion Instructions The following procedure must be carried out by a qualified technician. Caution Before you disconnect the electrical power, you must shut off the gas supply. To perform a fuel conversion: 1. Ensure that the gas supply is turned off at the gas shut-off valve. 2. Undo the brass coupling nut between the gas valve and the venturi mixing device. 3. Move the gas valve to the side. 4. Note the orientation and the screw positions of the venturi mixing device. 5. Remove the venturi mixing device from the base of the fan by unscrewing the Phillips Head screws. 6. Install the new fuel-appropriate venturi mixing device using the Phillips Head screws. 7. Check that the gasket is in place between the gas valve and the venturi mixing device. 8. Connect the gas valve to the venturi mixing device using the brass coupler nut attached to the gas valve. Now, carefully follow the procedures on combustion testing and the correct adjustment. SL 26-260 G3 - Convert to NG fuel (P-Kit 301) 3

Combustion testing and adjustment Danger A combustion test checks that the gas valve is operating properly in the field. To perform a combustion test, you must be a qualified, trained and licensed gas fitter. Making adjustments to the IBC gas valve without a properly calibrated gas combustion analyzer and by people who are not trained and experienced in its use is forbidden. Failure to use an analyzer can result in an immediate hazard. Model Number SL 26-260 G3 High Fire Input 260 MBH Table 2 Rated input of a converted boiler Normal ignition system sequence of operation: The boiler control, upon a call for heat or DHW, turns on the combustion fan for a 20-second pre-purge, then energizes the spark electrode and gas valve for a 4-second trial for ignition. If the burner does not light, the process is repeated until the burner lights and flame is detected. After 3 trials for ignition, the boiler locks out and will need to be manually reset by clearing the error on the touchscreen controller (Diagnostics > Advanced Diagnostics > Clear Errors). The boiler automatically resets after 60 minutes, if no action is taken. To perform a combustion test and adjustment: 1. Turn off the boiler s gas shut-off valve. 2. With a small (1/8" or 3 mm) flat screwdriver, open the inlet gas supply pressure test port by turning its centerscrew 1 full turn counterclockwise. 3. Attach a manometer to the inlet pressure test port and turn on gas to appliance. Static manometer reading should be ideally 7" w.c. for Natural Gas and 11" w.c. for Propane. Minimum and maximum static pressure should be between 5" and 14" w.c. Monitor pressure throughout the commissioning (start-up) procedure. Pressure may drop up to 1" to 2" w.c. at high fire. 4. Before you change the load to manual control, note the load setting. 5. Set the load to manual control, and set the heat-out value to the maximum MBH for the boiler. This load should be large enough to allow the boiler to operate at high fire for over 10 minutes. 4

6. With a combustion analyzer probe in the flue gas test port, check the flue gas reading and adjust the gas:air ratio screw to bring the flue gas to within the parameters indicated in Table 1. 7. Adjust slowly (clockwise) the High Fire (Gas : Air Ratio Adjustment) screw to obtain the correct CO 2 value (see Table 1 ). 8. Make tiny adjustments (may require several turns). Turning the High Fire (Gas : Air Ratio Adjustment) screw clockwise will lean out the flame. Note Clock the gas meter (see instructions on Page 6) to confirm full maximum rating plate input. Check the measured results with Table 2. 9. Set the heat-out value in manual mode to the minimum MBH for the boiler (see Table 1 ). 10. While the boiler is at Low Fire, compare the combustion reading against the reading in Table 2. The reading should be within the range listed. 11. Restore the load to the previous load type. All the programmed settings will be restored and the load will operate as before. Confirm a smooth ignition sequence. 12. Turn off the gas supply at the gas shut-off valve. 13. Disconnect the power to the boiler. 14. Disconnect the manometer. 15. Close the gas supply test port screw by turning clockwise. 16. Turn on the gas supply shut off valve and test for gas leaks. 17. Restore power to the boiler. Next you must fill in the information and affix the included fuel conversion labels to the boiler in the positions indicated after the conversion is completed. Completing and Affixing the Conversion Labels 1. Fill in the conversion labels (included in the kit) associated with the new fuel type. 2. Place the conversion labels onto the boiler at the positions indicated on Where to Place Conversion Labels on the Boiler on page 7. SL 26-260 G3 - Convert to NG fuel (P-Kit 301) 5

Clocking the Meter (Natural Gas) 1. Turn off all other appliances and pilots. 2. Turn on the boiler and set the boiler to high fire. 3. Ensure the boiler has a large load to heat, so that the boiler will not shut off. 4. With a Stop-Watch, record the number of seconds for the smallest dial to make 1 full revolution. 5. CFH = (3600 x Dial Size) / Seconds. 6. CFH x 1000 (check local Btu content) = Input Btu s. Note For 2 PSI meters multiply CFH x 1.097 For Metric meters multiply CFH x 35.3 For 2 PSI metric meters multiply CFH x 1.097 x 35.3 For Altitude above 4,500 deduct 2% per 1,000 of altitude from the Input Btu s. 6

Where to Place Conversion Labels on the Boiler SL 26-260 G3 - Convert to NG fuel (P-Kit 301) 7