5th International Symposium on RCC Dams General Introduction

Similar documents
Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page

STRUCTURAL STABILITY ASSESSMENT

UPDATE OF ICOLD BULLETIN 126 ON RCC DAMS

MANERI DAM D/S VIEW. Er. SANDEEP SINGHAL Director (Projects) UJVN Limited, Dehradun, (UK)

DAIVÕES DAM SPILLWAY: A NOVEL SOLUTION FOR THE STILLING BASIN

Design and Construction of Cerro Del Águila Gravity Dam in Peru

Unique Challenges Influencing the Design and Construction Of Three Recent Australian RCC Dams

SEMINAR ON RCC DAMS Organized by VNCOLD Hanoi, xx September RCC DAMS WORLDWIDE AND IN VIETNAM M. Ho Ta Khanh (VNCOLD)

Ermenek Dam and HEPP: Spillway Test & 3D Numeric-Hydraulic Analysis of Jet Collision

NUMERICAL AND PHYSICAL MODELING

Huntington District. For More Information Contact (304)

6 TH INTERNATIONAL SYMPOSIUM ON ROLLER COMPACTED CONCRETE (RCC) DAMS Zaragoza, October Invited Lecture

Greenup Lock Filling and Emptying System Study

Earthen Embankments. turning into larger, more costly repairs. The following. The State Dam Safety Program has inspection

6 TH INTERNATIONAL SYMPOSIUM ON ROLLER COMPACTED CONCRETE (RCC) DAMS Zaragoza, October 2012

JAP Additional Information Sheet

Masoneilan * DSH * Series Desuperheater

OECS Regional Engineering Workshop September 29 October 3, 2014

LESSONS LEARNED AT THE TAUM SAUK REBUILD. Paul C. Rizzo, Ph.D., P.E. 1 Carl Rizzo 2 John Bowen 3 ABSTRACT INTRODUCTION

Historic dam failures and recent incidents. Tracey Williamson Associate Director Water (Dams & Reservoirs) British Dam Society Chairman

RECENT ADVANCES AND USES OF ROLLER COMPACTED CONCRETE PAVEMENTS IN THE UNITED STATES

OTC MS. Free Span Rectification by Pipeline Lowering (PL) Method N. I. Thusyanthan, K. Sivanesan & G. Murphy

LESOTHO HIGHLANDS DEVELOPMENT AUTHORITY

TABLE OF CONTENTS LEGAL NOTICE

FACING SYSTEMS FOR ROLLER-COMPACTED CONCRETE DAMS &SPILLWAYS. Prepared by Gannett Fleming, Inc.

SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA

Design of Spillway Upgrades

COST EFFECTIVE STORAGE CAPACITY INCREASE FOR ALUMINA TAILINGS DISPOSAL AREA THROUGH SPILLWAY OPTIMISATION

TABLE OF CONTENTS LEGAL NOTICE

Plan B Dam Breach Assessment

Annex E Bridge Pier Protection Plan

FP McCann Tunnels and Shafts 1

Components of a Barrage

HEC 26 Aquatic Organism Passage Design Manual Evolution & Application

Sediment Basin 7E-12. Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures BENEFITS.

RESISTANCE OF COMPACTED ASPHALT MIXTURE TO MOISTURE INDUCED DAMAGE (Kansas Test Method KT-56)

Construction Dewatering

TABLE OF CONTENTS LEGAL NOTICE

Application of pushover analysis in estimating seismic demands for large-span spatial structure

3D NUMERICAL MODELLING OF THE CAPACITY FOR A PARTIALLY PRESSURIZED SPILLWAY

Khosla's theory. After studying a lot of dam failure constructed based on Bligh s theory, Khosla came out with the following;

TOPICS TO BE COVERED

DESIGN OF BELL-MOUTH SPILLWAY AT BARVI DAM

S-CO 2 Brayton Recompression Loop Design and Control

REVETMENTS. Purposes and Operational Constraints. Purposes Erosion control o o. Revetment Design 4/5/2016. CE A676 Coastal Engineering

ARTIFICIAL GRASS PITCH INTRODUCTORY GUIDE

HISTORY OF CONSTRUCTION

Hoover Dam. Hoover Dam A Reading A Z Level M Leveled Book Word Count: 527 LEVELED BOOK M

AN EXPERIMENTAL STUDY ON BUBBLE DECK SLAB SYSTEM WITH ELLIPTICAL BALLS

[Barve, 4(7): July, 2015] ISSN: (I2OR), Publication Impact Factor: 3.785

Attached as Exhibit B-2 is BC Hydro's presentation from the Stave Falls Spillway Gates Project Workshop held on January 18, 2010.

Low-crested offshore breakwaters: a functional tool for beach management

SECTION [ ] [02730] STABILIZED DECOMPOSED GRANITE SURFACING

BACK PRESSURE / SUSTAINING

Use of Roller Compacted Concrete By GDOT. Presented By: Joe W. Sheffield, PE Georgia Department of Transportation District Engineer, Tifton, GA

BACK PRESSURE / SUSTAINING

Processing instructions V 3.6 REFRAJET Nanobond

Demography Series: China

SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA

Culvert Design An Overview of the NYS Highway Design Manual Chapter 8

Transitional Steps Zone in Steeply Sloping Stepped Spillways

Bisnode predicts the winner of the world cup 2018 will be...

Winter Ice Manufacture by Snowmaking: A Novel Approach for Massive Ice Production for a Variety of Industrial and recreational Applications

Appalachian Adventure Unguided Tour #5

upvc MANHOLES APPLICATIONS Sewerage applications: Vacuum sewerage applications: Landfill applications: Valve boxes:

PKWeir and flap gate spillway for the Gage II Dam

IMPROVING THE SAFETY OF AN OLD AUSTRIAN DAM ABSTRACT

Study by numerical simulations on the breathing effect in a semi-underground highway with beams and a roof above it

AIRFLOW GENERATION IN A TUNNEL USING A SACCARDO VENTILATION SYSTEM AGAINST THE BUOYANCY EFFECT PRODUCED BY A FIRE

CLOSURE PLAN. CCR (b) GERS East and West Bottom Ash Ponds. Pirkey Power Plant Hallsville, Texas. October, 2016

Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop San Antonio, Texas Project No

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]

BEST PRACTICE FOR COMPACTING WARM AND HOT MIX ASPHALT NEAUPG OCTOBER 7,2009

LoneStar Fiberglass Pools. Do-It-Yourself. Installation Manual

HON C210 Series Control Valves. High Pressure Control valves

RESILIENT CITIES 2011

Notice of Intent to Close Inactive CCR Surface Impoundments

Cost reduction for conveyor systems through self-adjusting chain wheel

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)

Developments in Longwall Ventilation

TECHNICAL INFORMATION ROPE ATTACHMENTS

Dry Hydrants. The installation of a non-pressurized pipe system into local water sources provides a ready means of supplying water to fire engines.

Confidence through experience. Track record as of 30 June 2012

Port of Zeebrugge: Upgrading the Brittannia Dock

Specifier Note: Retain or delete material(s) below to conform to project requirements.

Step 1. PLANNING FOR THE INSTALLATION TOOLS REQUIRED

+)) Lower Churchill Project RIPRAP DESIGN FOR WIND-GENERATED WAVES SNC LAVALIN. SLI Document No HER

IN-PLACE DENSITY OF BITUMINOUS MIXES USING THE NUCLEAR MOISTURE-DENSITY GAUGE FOP FOR WAQTC TM 8

Development of TEU Type Mega Container Carrier

HTR Systems and Components

Desalination From theory to practice People, Papers, Publications. Miriam Balaban EDS Secretary General

Large-scale Field Test

Global Construction Outlook: Laura Hanlon Product Manager, Global Construction Outlook May 21, 2009

Pre-Application Document Kaweah Project (FERC Project No. 298)

Culvert Design for Low and High Gradient Streams in the Midwest. Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest

Evaluating Surge Potential in CSO Tunnels

STRUCTURE S-65 PURPOSE SPILLWAY OPERATION

FIRE PREVENTION METHOD FOR 275KV OIL-FILLED CABLE IN TEPCO

CLOSURE PLAN. CFR (b) Bottom Ash Pond Complex Cardinal Plant Brilliant, Ohio. September, 2016

Technical Report Culvert A Hydraulic Analysis

Transcription:

OVERVIEW OF THE DESIGN, CONSTRUCTION, MATERIALS AND INNOVATIVE INSTRUMENTATION FOR ROLLER COMPACTED CONCRETE DAMS By Engr. Ch. Foad Hussain 1 Introduction to the Author Engr. Chaudhry Foad Hussain has earned his Master s in Water Resources & Environmental Engineering from Saint Anthony Falls Laboratory at University of Minnesota, Twin-cities, USA. He worked with HDR Incorporation which is among the leading Civil Engineering consulting companies in United States. He was involved in multi-disciplinary Civil Engineering projects with United States Army Corps of Engineers (USACE) & United States Environmental Protection Agency (USEPA) during his 3 year tenure at HDR. He has also earned his Professional Engineer certification for Sediment & Erosion Control (CPESC) in 2005-2006. He became a member of Society of American Military Engineers (SAME) in 2006. He has joined the Diamer Basha Consultants team as Sediment and Hydraulic Design Expert in 2007. Recently, he had the opportunity of visiting Longtan Hydropower Project as study tour visit component of 5 th International Symposium on RCC Dams held in China on November 5-7, 2007 at Guiyang Town in China. During his visit, he was profoundly impressed by the Innovative Design and Construction Methodologies used in Longtan Hydropower Project, China and evinced keen interest in all of its aspects. The current article is his humble effort to hoard some basic design and construction methodologies employed at the Longtan Hydropower Project. 5th International Symposium on RCC Dams General Introduction During past three decades, great progress and innovation have been made on the design, construction, materials and instrumentation of roller compacted concrete dams. Fifth international symposium on roller compacted concrete dams was held in Guiyang China from November 2nd to 8th, 2007 to promote the construction and development of RCC dams. The engineers and experts from more than 20 countries including, America, England, Germany, France, Spain, Switzerland, Australia, Canada, South Africa, Mexico, Morocco, Malaysia, 1 Sediment & Hydraulic Design Expert Diamer Basha Dam, Associate Partner, National Development Consultants, 62 M, Gulberg 3 rd, Lahore, Pakistan. Fax: 92-42-5862033, e-mail: foadhussain@ndcpak.com 1

India, Pakistan, Iran, Iraq, Vietnam, Burma and China, participated in the conference. The 450 participants (170 foreigners), produced 127 papers and exchanged construction experience and study achievements which will help to promote innovative technology in the design and construction of the roller compacted concrete dams across the world. International Milestone RCC Projects There are number of RCC dams constructed in last three decades around the globe. Eight RCC projects are recognized as International Milestone RCC Projects at the symposium based on the engineering design accomplishment and innovative instrumentation. There names are as follow: Longtan Dam China ( 216.5 m, 6300 MW ) Miel I Dam Colombia ( 188m, 375 MW ) Miyagese Dam Japan ( 156m ) Olivenhein Dam USA ( 97.1m ) Ralco Dam Chile ( 155m, 690 MW ) Rible Dam, -- Spain ( 101m ) Salto Caxias Dam Brazil ( 67m, 1240 MW ) Wolwedans Dam South Africa ( 70m ) Introduction of Longtan Hydropower Project The Longtan RCC Dam is erected on Hongshui (Red) River, 15 km from the Tian-e county of Guangxi Autonomous Region. It is one of the strategic projects in the China s western development and Power Transmission from West to the East. The Longtan Hydropower Project is also a pivot point in the cascade development of the Hongshui River as shown in Figure 1. It is primarily a power generation project along with the flood prevention, navigation and other comprehensive benefits. 2

Figure 1: The Longitudinal Profile of Hongshui River Cascade Development Description of Longtan Hydropower Project The hydraulic complex of Longtan Hydropower Project is composed of the water retaining structure, the flood release structure, the headrace, power generation structure and navigation structure. The Spillway is situated in the riverbed dam section, consisting of 7 surface bays and 2 bottom outlets. The underground headrace tunnels and power house is located on the left bank and accommodates 9 hydro-generator units. The navigation structure is located on the right bank and adopts world s tallest double-step vertical ship elevator system as shown in Figure 2. The diversion arrangement during construction consisted of one diversion tunnel one each bank. The Longtan Hydropower project was started in July 2001. The river closure was done successfully in late 2003 and impoundment was finished by September 2006. The power generation of the first unit was achieved in May 2007 about 1 year in advance. The project completion date is December 2009 and total construction period as per schedule is 9 years. The underground power house comprises of 9 head race tunnels having a diameter of 10m. The dimensions of the powerhouse are 388.5m 30.3m 74.4m (L W H). The head race tunnels leads to the machine hall chamber & main 3

transformer chamber. The three tail race surge shafts are located downstream of transformer chamber. A single tail race tunnel originates from each surge shaft having a diameter of 21m. The excavation of the main powerhouse had been completed in 32 months, with a maximum monthly excavation as high as 116 103m3, a yearly maximum excavation of 1,247 103m3. Figure 2: General Layout Plan of Longtan Hydropower Project Configuration Optimization & Stability and Stress Analysis The min. normal stress on the dam foundation face of Longtan Dam is 0.02MPa and -1.07MPa in seismic case. The maximum normal stresses on the dam foundation face and in seismic case are 4.9MPa and 5.83MPa, respectively. The anti-sliding stability safety factor along the dam foundation face is larger than 3.0 for the basic case, larger than 2.83 for special case and larger than 2.43 for seismic case. Table 1 indicate the downstream dam slope in the water retaining dam section and spillway dam section to be 1:0.73 and 1:0.68, respectively. The upstream dam slope for water retaining dam section and spillway dam section is 1:0.25. 4

Table 1: Configuration of Longtan RCC Dam Typical dam section Downstream dam slope Upstream dam slope Dam bottom width/dam height Water retaining dam section Spillway section dam 10.73 10.25 0.8 10.68 10.25 0.78 Mix Design On the basis of a lot of laboratory and field test and research, finally the mix proportions for the three RCC zones of Longtan dam were determined. In order to meet the requirement of all-year-around construction of Longtan dam under high temperature, high effective retarding water reducer and aeration agent suiting Longtan RCC were selected. The maximum length of a single drilled RCC core is 15.03m as shown in Figure 3. The core has smooth surface, compact structure and evenly-distributed aggregates. Figure 3: The RCC Cores of Longtan Dam 5

Rapid RCC Construction Technology Limestone artificial aggregates are used in preparation of the roller compacted concrete at Longtan Hydropower Project. The topographical conditions are made full use for application of 4 km long (1.2 m wide, 4 m/sec belt velocity, design carrying capacity of 3000 t/h) tunneled conveyer to realize efficient and low cost aggregate transportation. Mixing plant is equipped with three sets of 2 6m 3 force batching plants and one set of 4 3 m 3 gravity type batching plant with total capability of 1080m 3 /h. Three high speed belt conveyer concrete supply lines and two tower belt cranes have been used for horizontal and vertical concrete transportation and pouring system. The total concrete volume for Longtan dam is up to 6.6 million m 3, of which RCC accounts for 4.48 million m 3 and conventional concrete is 2.12 million m 3. Total product aggregate required is up to 14.12 million tons. The aggregate is made of limestone and the capability of sand and stone processing system is 2500t/h. Figure 4: The High Speed Conveyer Belt & Tower Belt Cranes System at Longtan RCC Dam In the high temperature season, i.e. June, July & August of 2005, 480,000m 3 RCC was placed, and in the same year 3,160,000m 3 concrete was placed, including 2,500,000 m 3 RCC, accounting for about 48% of the total quantity. The monthly highest concrete pouring target of 342,700 m 3 and highest daily concrete 3 of 15,816 m is set using rapid RCC construction technology. 6

The rapid RCC construction technology features the Horizontally-proceeding slope placement method adopted at the Longtan Hydropower Project. The placement proceeds from the downstream side to the upstream side and compaction for the gentle sloped section is done along the water flow direction while the compaction for ending section is done along the direction vertical to the water flow. Seepage Control Technology Systematic studies and comparison had been for Longtan RCC dam among five dam seepage control schemes: Conventional concrete seepage control (3~5m thick) Precast board pasted in the inner side with PVC film Asphalt mix seepage control Surface reinforced GEVR (1m thick) and Reinforced concrete facing for seepage control. In the early design stage, the dam uses a seepage control combining reinforced concrete facing and gradation II RCC. Extensive research was conducted on impermeability of gradation II RCC and GEVR at Jiangya dam laboratory, including 102 specimens for laboratory seepage test of RCC cores. It is determined, based on the research, that the upstream seepage control of all RCC sections of Longtan Dam are built with Grout Enriched Vibrated RCC (GEVR) and gradation II RCC. Figure 5: Pouring and Vibrating Process of GEVR The seepage control scheme developed at for Longtan RCC Dam combines GEVR and gradation II RCC. The GEVR Thickness varies between 0.5 m 2m from top to bottom and the thickness of Gradation II RCC varies from 8m - 15m. 7

An Anti-crack reinforcement mesh is also set on the upstream section of Longtan dam and three (3) layers of Copper Water stops are also installed on the upstream dam section and two (2) layers on the downstream dam section. The 2 6 m thick conventional concrete was poured for Foundation Cushion and the spillway structure (overflow surfaces, pier heads and guide walls) at the overflow dam sections were built with conventional concrete. RCC Thermal Analysis & Temperature Control The thermal stress analysis of Longtan RCC gravity dam was carried out by means of a complete set of calculation methods such as zoned variable step length resolution method with simulation compound element, dam block joint element, thermal field and stress field, as well as consideration of post cooling, which greatly improves the efficiency of the calculation and analysis. The thermal control criteria had been put forward as follows: controlling temperature of RCC at the outlet of the batching plant reducing temperature rising during handling and spreading water spraying in the placing area thermal insulation at the lift surfaces rational arrangement of construction schedule provision of cooling pipes in the dam The temperature control at Longtan Hydropower Project was carried out using evaporative cooling of stockpiles as shown in Figure 4.1. The aggregates were pre-cooled by utilizing a double stage (primary and secondary) wind cooling mechanism. The rise in temperature of concrete during the conveyance and placing was found to be significant. In order to overcome this problem, the Ice Plant and cooling tower of concrete batching system were installed to mix the ice with concrete. In general, filling 10 kg ice for 1 m 3 can lower temp upto 1.2 degree C. Since the ice mixing with concrete did not bring the temperature down to the desirable placing temperature specifications, post cooling phenomenon was ultimately adopted which reduces the concrete temperature significantly. The roller compacted section of the dam were covered with the sheets in the summer season to reduce the amount of heat absorbed the concrete. The curing of RCC at later stages has been found to effective in controlling the cracks at Longtan RCC dam. 8

Figure 6: Evaporative Cooling of Stockpiles Figure 7: The Ice Plant and Cooling Tower at Longtan RCC Dam 9

Recommendations & Conclusions The RCC Dams are growing at high rate both in terms of the numbers being constructed and also in terms of height of the dam. A significant number of RCC Dams in Pakistan are either in design phase or underconstruction, particularly Diamer Basha Dam. The knowledge gained from the innovative instrumentation at Longtan Dam such as for thermal stress & thermal control, seepage control technology and rapid RCC technology can be used as a comparative technical data base for the smooth design and rapid construction of Diamer Basha RCC Dam. The GEVR along-with the RCC can be used as seepage control measure for the upstream facing. However replacement of GEVR with Geomembranes and reinforcement mesh should also be considered. The Ice plant and wind cooling tower should be installed at the dam site for controlling the RCC temperature. Moreover, the use of post-cooling technology is also recommended. Since flyash is unavailable locally, the Pozzolan mix can be developed utilizing the locally available materials. The in-situ stress testing must be carried out in order to avoid any structural failures in the Power house caverns. 10