COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS. Prepared for:

Similar documents
COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS. Prepared for:

CCR Fugitive Dust Control Plan

COAL COMBUSTION RESIDUALS FUGITIVE DUST CONTROL PLAN

CCR Fugitive Dust Control Plan

FUGITIVE DUST CONTROL PLAN

COAL COMBUSTION RESIDUAL (CCR) FUGITIVE DUST CONTROL PLAN

COAL COMBUSTION RESIDUAL (CCR) FUGITIVE DUST CONTROL PLAN

Big Rivers Electric Corporation - D.B. Wilson Generating Station. Fugitive Dust Control Plan for Coal Combustion Residuals

FUGITIVE DUST CONTROL PLAN

Big Rivers Electric Corporation - Sebree Generating Station (R. A. Reid, R. D. Green and HMPL Station Two)

CCR Certification: Fugitive Dust Control Plan (b) for the. West Ash Pond. at the. F. B. Culley Generating Station.

Coal Combustion Residuals Annual Fugitive Dust Control Report. Prepared for Montana-Dakota Utilities Company R.M. Heskett Station.

Annual CCR Landfill Inspection. Lansing Landfill. Interstate Power and Light Company. Prepared for:

Initial Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1

Written Closure Plan. Pawnee Station - Active CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016

CCR CLOSURE PLAN Sibley Slag Settling Impoundment Sibley Generating Station East Johnson Rd Sibley, Missouri

Written Closure Plan. Pawnee Station - North CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016

Closure Plan for CCR Surface Impoundments

TABLE OF CONTENTS 1.0 INTRODUCTION PLAN CERTIFICATION (B)(4) 1

2018 Annual Inspection Report

TABLE OF CONTENTS LEGAL NOTICE

TABLE OF CONTENTS LEGAL NOTICE

CCR Closure Plan Ash Impoundment

D.B. Wilson Station CCR Landfill

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

TABLE OF CONTENTS LEGAL NOTICE

Written Closure Plan. Comanche Station - Active CCR Surface Impoundment Public Service Company of Colorado Denver, Colorado

Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop San Antonio, Texas Project No

Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1

CCR Landfill 2018 Annual Inspection Report North Omaha Ash Landfill

CCR Landfill 2015 Annual Inspection Report NC1 Ash Disposal Area

2016 Annual Inspection Report

2017 Annual Inspection Report

CCR Landfill 2017 Annual Inspection Report NC1 Ash Disposal Area

CCR Closure Plan. CCR Certification: Written Closure Plan (b) & (c) for the. Landfill Sedimentation Pond. A. B. Brown Generating Station

Notice of Intent to Close Inactive CCR Surface Impoundments

2016 Annual Inspection Report

IDEM Indiana Department of Environmental Management Office of Land Quality P.O. Box 6015 Indianapolis, IN OLQ PH: (317)

October 16, GRDA CCR Landfill Compliance Report Grand River Dam Energy Center 8142 Hwy 412B PO Box 609 Chouteau, OK Dear Mr.

Coal Combustion Residuals Closure Plan

FOUR CORNERS POWER PLANT CLOSURE PLAN (b) UPPER RETENTION SUMP FC_ClosPlan_011_

Written Closure Plan. Cherokee Station - Active CCR Impoundments Public Service Company of Colorado Denver, Colorado.

CHOLLA POWER PLANT CLOSURE PLAN (b) SEDIMENTATION POND CH_ClosPlan_004_

ENGINEER S CERTIFICATION OF AQUIFER SEPARATION DEMONSTRATION (40 CFR )

LEGAL NOTICE. Report No. SL Revision: 0 Page No. i. Ottumwa Generating Station Notification of Intent to Initiate Closure

SPILL CONTINGENCY AND EMERGENCY RESPONSE PLAN

FOUR CORNERS POWER PLANT CLOSURE PLAN (b) COMBINED WASTE TREATMENT POND (CWTP) FC_ClosPlan_012_

Whitewater Valley Station Surface Impoundment Coal Combustion Residual Annual Report

SCHEDULE 08 Public Safety Plan

CCR Unit Closure and Post-Closure Plan. The business of sustainability. Texas Municipal Power Agency Gibbons Creek Steam Electric Station

2016 Annual Landfill Inspection Report. SCE&G Wateree Station Class III Landfill

THE CITADEL The Military College of South Carolina 171 Moultrie Street Charleston, SC MEMORANDUM 30 June 2017 NUMBER (X)-(Y) CONFINED SPACE

Holding Pond Annual Inspection Report

Amended Written Closure Plan

Consulting Engineers and Scientists Annual Landfill Inspection Report. for the. Williams Station Highway 52 Class III Landfill

WHS PROCEDURE P Confined Spaces. Approved by: Ruth Hampton Review Date: 6 th December 2015

General Inspection Guidance for Waste Management Units Requiring Air Emission Controls Under RCRA Air Standard Subpart CC

Silica Exposure Control Plan. University of Maryland, Baltimore

Asbestos Operations and Maintenance Plan

Hazardous Waste Training Plan. Supersedes: 02/15/16 (Rev.02) Preparer: Owner: Approver: EHS Team Member EHS Team Member EHS Manager

Holding Pond Annual Inspection Report

Northern Indiana Public Service Company (NIPSCO) 2723 East 1500 North, Wheatfield, Indiana, USA Golder Associates Inc.

SILICA WEBINAR. Chris Chipponeri Chief Operations Officer Hazard Management Services, Inc.

Start-up, Shutdown and Malfunction Plans. Norman L. Morrow Fresh Air Consulting

Secondary Aluminum NESHAP 40 CFR Part 63 Subpart RRR. Example Malfunction Plan for Plant ABC

2018 INSPECTION REPORT

INADVERTENT RETURN PLAN FOR HORIZONTAL DIRECTIONAL DRILLING (HDD)

TEMPLE UNIVERSITY ENVIRONMENTAL HEALTH AND RADIATION SAFETY

Hazard Communication Program. San José State University

CARRIAGE OF DIRECT REDUCED IRON (DRI) BY SEA CHANGES TO THE IMO CODE OF SAFE PRACTICE FOR SOLID BULK CARGO

Hazardous Materials Management Guidelines

Respirable Crystalline Silica

SILICA EXPOSURE CONTROL PLAN

Title: Abrasive Blasting Effective Date: 11/17/2014 Control Number: THG_0034 Revision Number: 1 Date: 10/22/2015 Annual Review Completed: 5/13/2015

Are you ready for WorkSafe BC s new crystalline silica regulations?

Palm Beach State College. Florida s First Public Community College SILICA EXPOSURE CONTROL PLAN

Northern Indiana Public Service Company Michigan City Generating Station Primary Settling Pond Number Annual RCRA CCR Unit Inspection Report

Explosive gas migration monitoring for a sanitary landfill facility.

Removal of Lead-Based Paint

First Annual RCRA CCR Unit Inspection Report January 2016 RESTRICTED WASTE TYPE I LANDFILL OPERATING PERMIT NUMBER 37-01

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL

Newport News Shipbuilding Contractor Environmental, Health and Safety Resource Manual Sewage

EM Section 12. Control of Hazardous Energy (Lockout/Tagout)

Silica Dust Safety Program

ENFIELD BOARD OF EDUCATION ENFIELD, CONNECTICUT

: Rice Hulls. SECTION 1: Identification of the substance/mixture and of the company/undertaking. SECTION 2: Hazards identification

Risk Assessment for Stone Quarry Mining is among the most hazardous activities all around the world, being always accompanied with different

Confined Space Entry Program

! Subpart D - Contingency Plans and Emergency Procedures (40 CFR to ) (EPA regulations adopted by NJDEP); and

Scope: This plan applies to all personnel, including contractors, who enter or work in confined spaces, or supervise such activities.

CLOSURE PLAN. CFR (b) Bottom Ash Pond Complex Cardinal Plant Brilliant, Ohio. September, 2016

QUALITY ASSURANCE SPECIFICATION NONDESTRUCTIVE EXAMINATION PAGE 1 OF 7

Title: Benzene Awareness Effective Date: 11/14/2014 Control Number: THG_0037 Revision Number: 1 Date: 10/22/2015 Annual Review Completed: 5/13/2015

New Castle County Guidelines for the Certified Construction Reviewer, Owner/Developer, Site Contractor and Professional Engineer

Mine Dust Management Plan

WILL NOT DISTURB ASBESTOS CONTAINING MATERIAL!

1995 Metric CSJ SPECIAL PROVISION ITEM 7. Legal Relations And Responsibilities To The Public

REMOVE BARRIERS TO, ENCOURAGE CREATION OF AND PROVIDE GUIDELINES FOR SAFE ROUTES (ALL DISTRICTS)

Transcription:

COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS Prepared for: SANDY CREEK SERVICES, LLC P.O. Box 370 Riesel, Texas 76682 Prepared by: SCS ENGINEERS TBPE Registration No. F-3407 1901 Central Drive, Suite 550 Bedford, Texas 76021 (817) 571-2288 October 2015 Revision 1 December 2016 SCS File No. 16215106.00 Offices Nationwide www.scsengineers.com

TABLE OF CONTENTS Section Page 1.0 INTRODUCTION REQUIREMENTS AND FACILITY BACKGROUND... 1 1.1 Facility Background... 1 2.0 ENGINEER S CERTIFICATION... 3 3.0 RECORDKEEPING AND NOTIFICATION REQUIREMENTS... 4 3.1 Annual CCR Fugitive Dust Control Report... 4 4.0 FUGITIVE DUST CONTROL MEASURES ( 257.80)(b)(1)... 5 4.1 Bottom Ash Fugitive Dust Control Measures... 5 4.2 Fly Ash Fugitive Dust Control Measures... 5 4.3 Ash Transport Fugitive Dust Control Measures... 6 4.4 CCR Landfill Fugitive Dust Control Measures... 7 5.0 LANDFILLING CCR AS CONDITIONED CCR ( 257.80)(b)(2)... 8 6.0 TRACKING CITIZEN COMPLAINTS ( 257.80)(b)(3)... 9 7.0 ASSESSMENT OF EFFECTIVENESS ( 257.80)(b)(4)... 10 M:\Projects\Sandy Creek\16215106.00 CCR Rule Implementation\2018 Annual Dust Report\Dust Control Plan - Revision 2\R121818 Dust Control Plan Rev 2.docx i CCR Fugitive Dust Control Plan

1.0 INTRODUCTION REQUIREMENTS AND FACILITY BACKGROUND This coal combustion residuals (CCR) fugitive dust control plan (Plan) has been prepared for the Sandy Creek Energy Station (Facility), a coal-fired power plant located in Riesel, McLennan County, Texas. This Plan is required by federal rules which establish standards for the disposal of CCR in landfills and surface impoundments. The Facility is subject to this rule since it includes a CCR landfill. 40 CFR 257.80(a) states that, The owner/operator of a CCR landfill must adopt measures that will effectively minimize CCR from becoming airborne at the facility, including CCR fugitive dust originating from CCR units, roads, and other CCR management and material handling activities. Specifically, 40 CFR 257.80(b) requires that the owner or operator of a CCR unit prepare and operate under a CCR fugitive dust control plan as specified in 40 CFR 257.80(b)(1) through (7). This Plan has been prepared to meet these requirements. 1.1 Facility Background The Facility is a coal-fired power station. Non-combustible residues (bottom ash) fall from the boiler into quench water and are continuously removed using an enclosed conveyor system, and conveyed from a chute onto a concrete pad with a concrete three-sided enclosure outside of the power house. Ash from the boiler s economizer is mixed with this bottom ash. Combustible residues from the boiler, as well as residues from various pollution control measures, are referred to as fly ash in this Plan. The fly ash is conveyed via a closed system to a silo, where a pin mixer adds moisture, and the moistened ash is dropped from two silo chutes and loaded into trucks which transfer it to the Facility s on-site CCR landfill. For the purposes of this Plan, the CCR landfill means the CCR landfill located on the Facility s site. Alternately, the fly ash, if sold, may be loaded dry from the silo via an enclosed, telescoping system, into enclosed trucks for transport off of the Facility property. A small portion of pre-conditioned fly ash also drops out through a Spray Dry Absorber (SDA) into a three-sided enclosed area and is also periodically loaded into trucks via a backhoe for disposal at the CCR landfill. In summary, bottom ash, fly ash which is not sold, as well as other Facility-generated waste types (including cooling water screenings, waste coal, and coal mill rejects) are landfilled at the CCR landfill. An unpaved road leads from the main Facility grounds to the CCR landfill. At this landfill, the fly ash and bottom ash is compacted and landfilled for disposal. The Facility uses a sweeper to clean paved areas and a water truck to suppress dust generation on unpaved areas including roads. Based on the areas where CCR materials are generated and then disposed of, the operations described above are divided into four main operational groupings for the purposes of this Plan as follows: Bottom Ash Fugitive Dust Control Measures - Bottom ash conveyance into storage area and storage area management/housekeeping; M:\Projects\Sandy Creek\16215106.00 CCR Rule Implementation\2018 Annual Dust Report\Dust Control Plan - Revision 2\R121818 Dust Control Plan Rev 2.docx 1 CCR Fugitive Dust Control Plan

Fly Ash Fugitive Dust Control Measures - Fly ash conveyance from the spray-dry absorber (SDA) and fly ash silo into either open transfer trucks for disposal at the Facility s landfill; or fly ash that is sold, directly into enclosed tank trucks from the silo; Ash Transport Fugitive Dust Control Measures - Conveyance of CCR materials in trucks to the CCR landfill and measures to prevent fugitive dust from enclosed tank trucks when the fly ash is being sold; and CCR Landfill Fugitive Dust Control Measures - Ash disposal (landfilling process), as well as consideration of wind erosion impacts from the landfill. M:\Projects\Sandy Creek\16215106.00 CCR Rule Implementation\2018 Annual Dust Report\Dust Control Plan - Revision 2\R121818 Dust Control Plan Rev 2.docx 2 CCR Fugitive Dust Control Plan

3.0 RECORDKEEPING AND NOTIFICATION REQUIREMENTS Per 257.80(b)(5), this Plan was originally completed by October 19, 2015. It is our understanding that this Plan will continue to be placed in the Facility s operating records as required by 257.105(g)(1) and on the owner/operator publically accessible website (online) per 257.107(g). If there are any material changes in the Facility s operating conditions that would substantially affect this Plan, this Plan will be amended to address such conditions. Per 257.80(b)(6), the Plan may be amended at any time provided the revised Plan (recertified by a qualified professional engineer) is placed in the Facility s operating record per the requirements of 257.105(g)(1) and at the Facility s CCR website per 257.107(g). Per 257.105(g), at all times, the most recent, full version of the Plan and any amendments will be contained in the Facility s operating records and at the Facility s CCR website. Lastly, per the notification requirements in 257.106(g), the State Director will be notified when information has been placed in the Facility s operating records and at the Facility s CCR website. At this time, the Texas Commission on Environmental Quality (TCEQ), the State director for the Facility has indicated that the notifications required under 257.106(g) should be in the form of emails to the following address: ccrnotify@tceq.texas.gov. TCEQ has also advised that this email address will need to be verified prior to use. 3.1 Annual CCR Fugitive Dust Control Report Per 257.80(c), although not a direct part of this Plan, an annual CCR fugitive dust control report must be prepared that includes: A description of the actions taken by the owner or operator to control CCR fugitive dust; A record of all citizen complaints; and A summary of any corrective measures taken. The initial annual CCR fugitive dust control report was completed within 14 months of the original Plan s being placed into the Facility s operating records, as required by ( 257.105(g)(2)). The deadline for completing a subsequent reports remains one year after the date of completing the previous report. M:\Projects\Sandy Creek\16215106.00 CCR Rule Implementation\2018 Annual Dust Report\Dust Control Plan - Revision 2\R121818 Dust Control Plan Rev 2.docx 4 CCR Fugitive Dust Control Plan

4.0 FUGITIVE DUST CONTROL MEASURES ( 257.80)(b)(1) This Plan describes the CCR fugitive dust control measures the owner or operator will use to minimize CCR from becoming airborne at the Facility, as required by 257.80(b)(1). Four main operational groupings at this Facility identified in Section 1.1 of this Plan are included below in different subsections. 4.1 Bottom Ash Fugitive Dust Control Measures Bottom ash includes the conveyance of bottom ash (including a small portion of ash from the economizer) into the storage area adjacent to the power house and storage area management/housekeeping. Dust control measures that may be used for this portion of the Facility s operation are as follows: Bottom ash residues are inside the power house/enclosed system prior to being dropped from a chute into the storage area; Bottom ash is wetted from the quench water and effectively pre-conditioned prior to being dropped into the storage area; The character of the bottom ash is that it consists of larger particles and is less prone to creating fugitive dust; The wetted bottom ash is deposited onto a concrete pad and into an area surrounded by tall concrete walls on three sides, thereby creating a wind shield; Bottom ash is routinely removed before it dries from the enclosure thereby minimizing concerns with dust at this location; and The enclosure area is periodically cleaned with water, thereby further minimizing concerns with CCR dust becoming airborne. 4.2 Fly Ash Fugitive Dust Control Measures As noted previously, fly ash operations for this Plan include fly ash conveyance through the SDA and fly ash silo. The fly ash from the SDA is discharged out the bottom of the SDA onto a concrete pad. The fly ash from the baghouse is discharged out of the bottom of the storage silo into transfer trucks (either Facility open trucks to be brought to the on-site landfill or into enclosed tank trucks if sold for conveyance off of the Facility property). Dust control measures used for this portion of the Facility s operation include the following: Ash from the SDA is discharged on a concrete pad inside of an area comprised of several perimeter barriers. The ash as it is loaded into a front end loader and then onto an awaiting transfer truck. This area is periodically sprayed with water and cleaned to control dust that may accumulate in the immediate drop area. Equipment from the boiler and other equipment through to the storage silo is completely enclosed; Fly ash conveyed to open trucks for landfilling from the silo has moisture added via a pug M:\Projects\Sandy Creek\16215106.00 CCR Rule Implementation\2018 Annual Dust Report\Dust Control Plan - Revision 2\R121818 Dust Control Plan Rev 2.docx 5 CCR Fugitive Dust Control Plan

mill prior to dropping the fly ash into the transfer trucks when the ash is to be landfilled; A chute at the bottom of the silo also decreases the fall distance of the fly ash into the transfer trucks; Trucks are loaded from the bottom of the silo in a tunnel (partially enclosed); As noted in the next section, an enclosed system is used at the silo to convey dry fly ash into enclosed trucks when the ash is sold for transport from the Facility; and The area around the silo and silo interior are sprayed with water periodically and cleaned to control dust from ash that may accumulate around the immediate silo area. 4.3 Ash Transport Fugitive Dust Control Measures Both bottom ash and fly ash are conveyed to either the CCR landfill via open trucks; or fly ash may be sold for beneficial reuse into enclosed tank trucks for transport off-site. This subsection of the Plan encompasses this operation from placing these types of ash into the trucks through the material arriving at the CCR landfill or leaving the Facility. Dust control measures used for this portion of the Facility s operation include the following: Conveyance into Trucks for Disposal at the Facility Bottom ash is placed into the trucks while still wet so that dust control will not be an issue; Fly ash from the silo falls from a chute into the transfer trucks to lower the fall distance; Fly ash from the silo is conditioned with water in the pug mill prior to dropping it into the transfer truck; All open transfer trucks are high-walled and are not overfilled to minimize dust emissions; The size and moisture content of the bottom ash particles, when loaded into transfer trucks for hauling to the CCR landfill, reduces the potential for creating fugitive dust; The road to the CCR landfill is graded periodically; A maximum 10 mile-per-hour speed limit is observed on the road to the CCR landfill (signage is currently in-place); and The road to the CCR landfill is periodically watered, as needed, to control dust. Conveyance into Enclosed Tank Trucks to be Hauled Off-Site Where fly ash is to be sold, it is dropped dry through a telescoping chute from the silo (does not go through the pug mill) into an enclosed tank truck; Excess fly ash is re-entrained by an outer chute and transported back into the silo. To minimize accumulation within the chute, the operator terminates the ash drop cycle and allows the excess ash to be re-entrained into the other chute and sent back to the silo; and For any small amounts of ash that accumulate around the seal of the tank truck, this is managed through the use of a gantry on-site that the driver of the tank truck can use to sweep off the top of the truck. In mid 2019, a fly ash wash pad will be installed that will allow drivers to wash down the tanks prior to leaving the site. M:\Projects\Sandy Creek\16215106.00 CCR Rule Implementation\2018 Annual Dust Report\Dust Control Plan - Revision 2\R121818 Dust Control Plan Rev 2.docx 6 CCR Fugitive Dust Control Plan

4.4 CCR Landfill Fugitive Dust Control Measures This subsection covers the landfilling of CCR materials at the CCR landfill. measures used for this portion of the Facility s operation include the following: Dust control The CCR material is conditioned as it is landfilled as discussed in Section 5; The conditioned ash will be compacted during placement; Facility roads to the CCR landfill will be watered as necessary to minimize airborne dust; The maximum size of certain CCR landfill areas will be controlled (active area no larger than one acre, exposed disposal surfaces no larger than five acres in accordance with New Source Review Permit 70861, Condition 25); and The nature of the fly ash is such that when moistened a harder top layer develops which is utilized as necessary to decrease dust generation due to wind erosion. A protective cover layer of soil or bottom ash over fly ash is also used on the CRR landfill to minimize wind erosion. M:\Projects\Sandy Creek\16215106.00 CCR Rule Implementation\2018 Annual Dust Report\Dust Control Plan - Revision 2\R121818 Dust Control Plan Rev 2.docx 7 CCR Fugitive Dust Control Plan

5.0 LANDFILLING CCR AS CONDITIONED CCR ( 257.80)(b)(2) Since the Facility has a CCR landfill, per 257.80(b)(2), this Plan includes in this section the procedures to emplace CCR into the landfill as conditioned CCR. For the purposes of this Plan, conditioned CCR means wetting the CCR with water, to a moisture content that will prevent wind dispersal but not result in the generation of free liquids. Bottom ash generated at the Facility is pre-conditioned with moisture to enable transportation and landfilling in its as-generated state. Though the need is not anticipated, moisture could be added to the bottom ash at the CCR landfill using the Facility s water truck to minimize fugitive CCR dust from becoming airborne if necessary. Fly ash generated at the Facility is pre-conditioned with moisture prior to its release into transfer trucks (whether at the SDA or at the silo) or transferred directly, and within a closed system, into enclosed tank trucks when sold. If additional conditioning of the fly ash is required, it will be performed at the CCR landfill to minimize the potential for fugitive dust generation and assist in achieving an efficient landfilled density, or the transfer procedures into the enclosed tank trucks for conveyance off-site modified. The fly ash to be landfilled will be hauled to the disposal area, where water will be added using a spreader bar or other suitable equipment. The water will be added to the ash in a way that minimizes the generation of fugitive dust. The moisture addition will be to a level which will prevent wind dispersal during landfilling (emplacement), but not so much that free liquids are generated. M:\Projects\Sandy Creek\16215106.00 CCR Rule Implementation\2018 Annual Dust Report\Dust Control Plan - Revision 2\R121818 Dust Control Plan Rev 2.docx 8 CCR Fugitive Dust Control Plan

6.0 TRACKING CITIZEN COMPLAINTS ( 257.80)(b)(3) As set forth in 40 CFR 257.80(b)(3), this Plan includes procedures for logging citizen complaints to the owner or operator involving CCR fugitive dust events at the Facility. When Facility personnel receive any citizen complaints involving CCR dust events, or when TCEQ or EPA inspect the site based upon complaints involving CCR fugitive dust events, the complaint will be logged and the log maintained by the plant Compliance Manager. The information to be documented will include the following: Date and time of complaint; Date and time of alleged CCR fugitive dust-related issue being noted; Description of alleged event; Copies of any pertinent documents provided by the TCEQ or EPA, and Name of Facility person logging the complaint. This information will be included in the annual reports as described in Section 3.1 of this Plan. M:\Projects\Sandy Creek\16215106.00 CCR Rule Implementation\2018 Annual Dust Report\Dust Control Plan - Revision 2\R121818 Dust Control Plan Rev 2.docx 9 CCR Fugitive Dust Control Plan

7.0 ASSESSMENT OF EFFECTIVENESS ( 257.80)(b)(4) Per 257.80(b)(4), the Plan must describe procedures used by the owner or operator to periodically assess the Plan s effectiveness. The following measures will be used to assess the Plan s effectiveness: The number of on-site observations of CCR airborne dust; On-site incidents of CCR airborne dust, as recorded by the owner or operator. This will include date, time, description of the incident and the related corrective measures; The number and character of any complaints received relating to CCR fugitive dust; and The results of any regulatory inspections related to CCR fugitive dust. The required annual reports will also act as a benchmark for the effectiveness of the Plan, the measures included in it, and Facility personnel s implementation of these measures. M:\Projects\Sandy Creek\16215106.00 CCR Rule Implementation\2018 Annual Dust Report\Dust Control Plan - Revision 2\R121818 Dust Control Plan Rev 2.docx 10 CCR Fugitive Dust Control Plan