2018 2027 IP IP Amendments for Consideration in January, 2019
FNDING FNDING DESCRIPION FNDING FNDING DESCRIPION ADAP Appalachian Development L Local ransportation Assistance Program APD Appalachian Development NHP National Highway Performance Program BA Bonus Allocation NHPB National Highway Performance Program(Bridge) BOND R Revenue Bond NHPBA National Highway Performance Program(Bonus Allocation) CMAQ Congestion Mitigation NHPIM National Highway Performance Program (Interstate Maintenance) DP Discretionary or Demonstration O Local, Non Federal or State Funds ER Emergency Relief RR Rail-Highway Safety FBS Capital Program - Bus Earmark (5309) RAP Rural ransit Assistance Program FED nidentified Federal Funding S State FEPD Elderly and Persons with Disability (5310) S(M) State Match for SP-DA or Garvee Projects FF Federal Ferry SMAP Operating Assistance and State Maintenance FMOD Fixed Guideway Modifications SRS Safe Roads to School FMPL Metropolitan Planning (5303) SHSR Stimulus High Speed Rail FNF New Freedom Program SP Surface ransportation Program FNS New Starts - Capital (5309) SPDA Surface ransportation Program (Direct Attributable) FN Non rbanized Area Formula Program SPE Surface ransportation Program (Enhancement) (5311) FSGR State of Good Repair SPEB Surface ransportation Program (Enhancement) FSPR State Planning and Research SPOFF Surface ransportation Program (Off System) FZ Capital Program - Bus Earmark (5309) SPON Surface ransportation Program (On System) HFB Highway Fund Bridge Replacement Highway rust Funds Program HP High Priority AP ransportation Alternatives Program HRRR High Risk Rural Roads APDA ransportation Alternatives Program (Direct Attributable) HSIP Highway Safety Improvement Program APDA ransportation Alternatives Program (Direct Attributable) JARC Job Assistance and Reverse Commute (3037) IGER IGER Discretionary Grants
PROPOSED AMENDMENS and MODIFICAIONS O ROADWAY PROJECS IN HE FBRMPO IP PROJEC ROES DIVISIONS CONIES DESCRIPION IP Amendment Detail OAL COS (in thousands) ACIVIY FNDING Cost in housands 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 POS YEARS 5840 SR 1547 14 Old Airport Road, S Cost Increase and Henderson 25 to Mills Gap Road. Project to tilize Build $ 9,200 Widen Roadway. NC Bonds Build NC 600 600 600 600 600 600 600 600 600 3,600 200 5834 SR 3116 13 Buncombe SR 3116 (Mills Gaps Road), S 25 (Hendersonville Road) to SR 3157 (Weston Road). pgrade Existing Roadway Delay from FY 18 to FY 19 $ 21, 6,167 6,167 6,167 3,000 W 5213DIV Various Various, Division 13 Rumble Strips, Add and Guardrail, Safety and Construction in FY 19 Lighting and FY 20 Not Improvements at Previously Programmed Selected Locations in the Divison Category $ 1, HSIP HSIP 50 50 700 700 R 2588B NC 191 14 Henderson NC 191, SR 1381 (Mountain Road) to NC 280 South of Mills River Accelerate Construction from FY 22 to FY 21 $48, 2,250 2,250 14, 14, 14, I 4400BA I 26 14 Henderson I 26, S 64 (Exit 49) Interchange Delay from FY 19 to FY 21 $ 29,400 6,000 5,850 5,850 5,850 5,850 5868 SR 1477 SR 1477 (Riverside Drive), NC 251/SR 1781 (Broadway) to I 40/SR 1231 (Hill Street). Widen Roadway Delete. Work to be Accomplished as Project I 2513D $9, 1,200 2,600 2,600 2,600 I 2513D SR 1477 SR 1477 (Riverside Drive), NC 251/SR 1781 (Broadway) to I 40/SR 1231 (Hill Street) Add Segment to I 2513. Project Formely Identified as 2868 $9, 1,200 2,600 2,600 2,600 SR 1 Various Statewide Various, Safe Routes to School Program. Projects to Improve Safety, Reduce raffic, Fuel Consumption and Air Pollution in Vicinity of Schools/ Add Construction in FY 19 Not Previously Programmed $ SRS
PROPOSED AMENDMENS and MODIFICAIONS O BIKE/PED PROJECS IN HE FBRMPO IP IP Amendment OAL COS (in PROJEC ROES DIVISIONS CONIES DESCRIPION ACIVIY FNDING Detail thousands) Cost in housands 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 POS YEARS EB 5821 Reems Creek Greenway Buncombe County Construct Multi se Path along the Reems Creek Greenway corridor from the western edge of the own of Weaverville to Karpen Soccer Fields. Delay PE from FY 2018 to FY 2019 $600 DA 480 L 120 5019A Clingman Forest and own Branch Greenways City of Asheville Clingman Forest and own Branch Greenways Accelerate funding from FY 2021 to FY 2020 $4,275 DA 3420 L 855
PROPOSED AMENDMENS and MODIFICAIONS O RANSI PROJECS IN HE FBRMPO IP PROJEC ransit Partner DESCRIPION IP Amendment Detail OAL COS (in thousands) FNDING Cost in housands 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 POS YEARS O 6154 Mountain Mobility Buncombe County Buncombe County Mountain Mobility. ransit Operating Assistance Modify (increase) funding for FY 19 $ 2,681 FZ 90 239 250 250 250 261 L 90 239 250 250 250 262