Public Bike Share Schemes. 14 December 2017

Similar documents
EASY AS RIDING A BIKE

Public Bicycle Sharing Scheme

ReadyBike. Corporate Packages

AGENDA. Stakeholder Workshop

BIKEPLUS Public Bike Share Users Survey Results 2017

Abellio s sustainable door-to-door Approach

The most innovative bike hire scheme in the UK

Bike share success factors

Case study Dublin (IE)

Regional Bicycle Share Program Knight Cycle. Every Day Counts Stakeholder Partnering Session NJDOT / FHWA August 4, 2017

Santander Cycles Business Accounts

Walking and Cycling Action Plan Summary. A Catalyst for Change The Regional Transport Strategy for the west of Scotland

DIRECTION REGARDING WEHO PEDALS BIKE SHARE PROGRAM AND DOCKLESS BIKE SHARE PILOT MAYOR PRO TEMPORE JOHN D' AMICO COUNCILMEMBER LAUREN MEISTER

The Development and Policy Recommendations for Dockless Bike Share (DBS) in China

Is St. Louis Ready for a Bike Share System? May 14, 2014 Public Open House

Bike-sharing. The State of Play:

BICYCLE SHARING PROGRAM DEVELOPMENT. CUTR Webcast Series June 27, 2013

Contents Location Map Welcome and Introduction Travel Plan Management Science Park Accessibility Walking Cycling Bus Rail Car Sharing Contact Details

Environment Committee 5 June 2018

Santander Cycle Hire. Presentation by: David Eddington Cycle Hire Operations Manager Transport for London

TRAVEL PLAN ANNUAL MONITORING REPORT

TRAVEL PLAN ANNUAL MONITORING REPORT

Final Plan 20 December 2016

PBS CITY SPECIFIC PLAN VADODARA. Stakeholder Workshop

Velocity Presentation Erdem Ovacik REGULATING INDEPENDENT BIKE SHARES

Nottingham Cycle City Frequently Asked Questions

University of Leeds Travel Plan

TAC February 1, 2012 Prepared by Metro Bike Program

London s Cycling Revolution Berlin

Study on Development and Parking Management of Dockless Bike Share (DBS) and in Tianjin

Abellio s Cycle Strategy

EXECUTIVE SUMMARY: TRANSIT-ORIENTED DEVELOPMENT IN SMITHS FALLS, ONTARIO; A COMPARISON BETWEEN TWO SITES

Rochester Area Bike Sharing Program Study

Strategy for Walking & Cycling Action Plan

CYCLING SCOTLAND SCOTTISH CHARITY NO.SCO29760 CYCLE FRIENDLY EMPLOYER AWARD HANDBOOK

Reflections on our learning: active travel, transport and inequalities

London Cycle Network Annual Report 2000

Using parking policy and parking levies to tackle transport and environmental issues

4)?iff ~~~ City of Richmond. (}) 'v~... uv- ~ Report to Committee. if ~ 13"' ~DBYCAO. Gf"""

Produced by nextbike UK

COMBINING THE POWER OF BICYCLE USE AND PUBLIC TRANSPORT: IMPLEMENTING THE BIKE-TRAIN SYSTEM IN THE NEW ZEALAND CONTEXT

Local Sustainable Transport Fund

94-98 St Albans Road. Sustainable Transport Strategy St Albans Road November 2018

Cycling in the Netherlands The City and the region Utrecht

Active Travel Strategy Dumfries and Galloway

BIKESydney s response to Sydney Airport s Preliminary Draft Major Development Plan. Introduction. To:

Part 3: Active travel and public transport planning in new housing developments

B. THAT Council direct staff to prepare by-law amendments to allow for Public Bike Share City-wide.

SCAG EMERGING REGIONAL ISSUES: GOMONROVIA OVERVIEW. City of Monrovia

2012 Olympic Games Impact on Relocation

Our Cycle Promise. northernrailway.co.uk. Produced in partnership with Sustrans. July 2017

Integrating health aspects into transport policy and planning. Cycling Plan in the Ile-de-France Region. Françoise GUASPARE Ile-de-France Europe

Cyclepoint: a NedRailways concept. Leeds Cyclepoint. A New Way of Continuing the Journey

phoenix regional bike share program sponsorship

Joint Response to the Department for Transport Consultation on the Station Champions Report on Better Rail Stations. February 2010

CAMBRIDGE ACCESS STUDY: TACKLING CONGESTION WORKSHOP

An established scheme: dublinbikes. Damien Ó Tuama Mobilities Consultant

BICYCLE PARKING IN RESIDENTIAL AREAS

Travel Planning WC & NWCD Cycling Group. Thursday 2 nd July Amanda Holden

NYCBS December 2014 Monthly Report

ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025

Case study. Bostin Bikes. Dotmailer campaigns which enabled intelligence to be gathered regarding open and click-through rates.

The role of the Authority in promoting sustainable transport. Gerry Murphy South East Regional Assembly 27 th May 2011

Dockless Cycle Share

Executive Summary Leadership Cincinnati Class 34. Project: Cinci Bikes

NYCBS November 2014 Monthly Report

21.07 TRANSPORT CONNECTIVITY AND INFRASTRUCTURE

Bike Friendly Business Application Form

interchange audit ABERDEEN Introduction Purpose of the Interchange Audit Interchange Audit Linking cycling with public transport

UNIVERSITY OF STRATHCLYDE TRAVEL PLAN 2016 TO 2020

UNIVERSITY OF STRATHCLYDE TRAVEL PLAN 2016 TO 2020

Bike Share in the U.S.: 2017

NYCBS April 2014 Monthly Report

Bicycle and Pedestrian Access in Transit Oriented Developments. Bruce Wright Chairman, Fairfax Advocates for Better Bicycling April, 2009

Making Dublin More Accessible: The dublinbikes Scheme. Martin Rogers Colm Keenan 13th November 2012

Towards a Sustainable Transport Network in the West Region. Padraic O Donoghue

Case study Strasbourg (FR)

Discussion Paper 1 June 2014 Current State of Transportation in Burlington

CAMPUS GUIDE TO BIKE SHARE. h o w t o p l a n a n d l a u n c h a s u c c e s s f u l u n i v e r s i t y b i k e s h a r e p r o g r a m

Transportation Master Plan Advisory Task Force

2017 Florida Commuter Transportation Summit

Integration of Sustainable Travel Modes

Regional Cycle Programme Update

University of Bristol Cycle to Work Scheme ( the Scheme )

Leeds CyclePoint YOUR GUIDE TO. Welcome to CyclePoint. CyclePoint offers five services in one unique environment

November 2018 Monthly Report

The definition of system size This makes it possible to subsequently define the appropriate number of bicycles to be used in the system.

NACTO s 1/16/18 Webinar Unanswered Questions Linking Bike Share & Transit

Annual General Meeting Meeting Notes

Government transport policy

TRANSPORT AND MOVEMENT

FACTSHEET on Bike sharing and public bicycle system

FASTER. EASIER. COOLER.

Green Travel Strategy & Action Plan

January 2019 Monthly Report

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

Wayfinding and Walking in London. Lilli Matson Transport for London May 2013

This objective implies that all population groups should find walking appealing, and that it is made easier for them to walk more on a daily basis.

DELIVERABLE 2.4 BIKE SHARING FOR DIFFERENT TARGET GROUPS. WP 2: Communication & Organisation Knowledge Centres

Staff Travel Survey 2015 Key Findings

Transcription:

Public Bike Share Schemes 14 December 2017

What is public bike share? l Any scheme where bikes are made available for members of the public to use l Operating models include: Self-service (docking stations) Self-service (dockless) Rail station hubs Bike share lockers

Self-service (docking stations) l Docking stations at key locations and convenient intermediate points l Docks have capacity for 5-20 bikes l Users return the bike to any dock to end the hire session l Some schemes allow bikes to be returned to nearby cycle parking stands if the dock is full l Pricing encourages short trips (30 mins), but can be hired for longer

Self-service (docking stations) l Pros: Predictable bike locations Supports one-way short trips Docks act as marketing tool Users don t need smart phones l Cons: Capital cost of docks Planning permission for docks May need to relocate docks Can t terminate hire if dock is full Need to redistribute bikes Difficulty getting sponsorship

Self-service (dockless) l Bike location, payment and release via a smart phone app l Bikes fitted with GPS trackers l Use of geo-fencing to: Avoid street clutter / obstructions Avoid sensitive locations Prevent hires ending outside an area l Free-floating schemes allow bikes to be dropped anywhere: Guidelines issued to users about how / where to park a bike

Self-service (dockless) l Pros: Low / zero setup cost for LA No infrastructure needed Greater flexibility for users App used to drive behaviour l Cons: More difficult to find bikes Bikes can be left in undesirable locations Distribution challenges Lacks street presence of docks Users need smart phone & app

Railway station hubs l Offers onward travel for rail travellers l Provides a central location for community bike hire l Hire can be return to base or return to any station with a bike hire facility l Pricing model more geared to all-day hire than short trip l They are often staffed l Popular in Netherlands (OV Fiets)

Railway station hubs l Pros: Integrated with rail use Uses established national network No problems with street clutter Users do not need smart phone l Cons Often back to base only Caters for limited number of journey types Requires space within rail station

Bike share lockers l Often located at rail stations / other transport interchanges facilitates onward travel l Can have multiple sites within urban area, although often only single site l Hire can be return to base or return to any locker site l Pricing more geared to all-day / multi-day hire than short trip

Bike share lockers l Pros: Predictable bike locations Can integrate with public transport Folding bikes fit in a car boot Can install in buildings / outside l Cons Capital cost of bikes and lockers Bikes are not visible, so less clear what is on offer Folding bikes can be a challenge for new users Does not cater for short journeys

Existing local scheme: Readybike (Reading) l Operator = Hourbike l Docked bike hire l Capital cost = 12k per dock / 550 per bike l Revenue cost = 130k for first 3 yrs l 200 bikes / 29 docking stations l New contract in 2016: sponsorship / l Target market = commuters hires cover operating costs l Docking stations at rail stations, l Monthly monitoring report provided shopping centres, major employment sites and selected residential areas l Slow growth l Live online map of docks l Casual use / annual subscription l Usage targets not achieved l Average rentals per month = 2,300 l Subscription options for regular, occasional, businesses and students l 97% of subscriber trips within 30 minute free period

Existing local scheme: Slough Cycle Hire l Operator = ITS / Groundwork l Capital cost = 3.5k for design / 36k for dock + 18 bikes / 50k l Docked bike hire workshop l 60 bikes / 11 docking stations l Revenue cost = 59k (year 2) l Target market = commuters l Limited sponsorship success l Docking stations at rail stations, l Monthly monitoring report provided shopping centres, major employment sites, leisure centre & local centres l Poor uptake and slow growth l Live online map of docks l User must pre-register: membership card used to release the bike l PAYG / regular user subscriptions l Usage targets not achieved l Average rentals per month = 416 (year 2) l Slough keen for shared scheme

Planned local scheme: Heathrow Airport l Heathrow looking to launch public bike hire scheme in Spring 2018 l Looking at dockless scheme with circa 1,000 bikes l Geo-fencing to be used to restrict where bikes can be left l Pricing model based on 50p for 30 minutes l Target market = airport staff l Bikes are likely to find their way out of the airport as staff ride them home l Possible future consultation with l Heathrow are offering to extend the users regarding cycling infrastructure scheme into neighbouring authorities needs at no initial capital cost l Heathrow would pay all revenue costs, including redistribution and maintenance of bikes l GPS allows bike journeys to be tracked data can be used to inform cycle network development

Alternative proposal: Nextbike l Nextbike has made an approach to RBWM l Existing schemes in Glasgow, Stirling, Milton Keynes and Bath l Would offer a mix of docked, dockless and virtual stations l Nextbike to cover initial capital costs l On-going revenue costs covered by corporate sponsorship l GPS allows bike journeys to be tracked data can be used to inform cycle network development l Would not easily serve crossboundary trips unless neighbouring authorities sign up

Points to consider l Who is the target market? l Do we need to cater for foreign language users? l Are hires likely to be short A-B or longer and return to base? l What are key origins / destinations? l Are we likely to have significant numbers of cross-boundary trips? l What infrastructure will be needed? l Which areas are suitable for docks / cycle parking? l Which areas need to be kept clear? l What powers will we have to deal with obstructions? l What powers will we have to ask operators to cease operations? l What safety advice will users get? l Will users be insured? l How will abandoned / defective bikes be reported? l What complaints procedures will be in place? l Ask operators to sign up to TfL code of practice.