Anchoring -OWNER S MANUAL-

Similar documents
TOOLS -OWNER S MANUAL-

THOR 10 HAMMER CAGE INSTRUCTIONS

RIGGERS SAFETY SAFETY IS IN THE DETAILS FULL LINE CATALOG

RIGGERS SAFETY SAFETY IS IN THE DETAILS FULL LINE CATALOG

TRAVSMART permanent single-cable horizontal lifeline system

MSA Confined Space Entry Equipment

Miller DuraHoist Safety Systems

QUALITY ALUMINUM BOAT LIFTS, INC. INSTRUCTIONS. Dominator Lake Lift

Low Wind High Yields Series

Array Solutions 350 Gloria Rd Sunnyvale, TX Phone FAX

GM-121: Container End Lock Anchor Wand Page 1 WINSAFE CORP. GM 121 CONTAINER END LOCK ANCHOR WAND OPERATING INSTRUCTIONS AND MAINTENANCE

PoolLock Easy Pool Cover

2,500/4,000 LB Easy Riser Vertical Cable Feighner Lift

CSO/STORMWATER MANAGEMENT. HYDROVEX FluidMoon Self-Adjusting Knife-Gate Regulator

-Round Down- Description & Overview. VEX Classroom Competition Round Down

Gas Cylinder Storage Structures

DIY Shallow Water Anchor Assembly Instructions for Rods, T-grips, Stainless Tips, Stainless Couplers, and the 4-in-1 Paddle

TorqBolt Wedge Anchors Torque Controlled Expansion Anchor

How Do I Install My Garden Master Bucket Garden?

Tripod Setup Guide (M-TPx)

Below are the instructions to build a roller-furling unit for under $10. Read the entire process before beginning the project.

Installation and Training Manual

Operator s Safety Manual Sumner Max Jax / Beam Jax

Security and confidence at height.

FLEXIBLE AND RELIABLE ANCHORING

Wellhead Mast. Installation and Operation Guide. Nanometrics Inc. Kanata, Ontario Canada

Inflatable Packer Single & Double. Single & Double Packer Dimension. Wireline Packer. Water Testing Packer (WTP) Packer

PHOENIX, ARIZONA USA

Troyer s Gourd Rack 8 unit F R H O P

L.Ph. Bolander & Sons 1355 Evans Ave. 800/

Foundation Products. Poured In Ground Anchor Bolts E1 - E4. Structural Foundations E5 - E12. Copyright 2016 s Industry Inc. SIE-RA-CMP EN

The All New DIAMOND & DIAMOND BT

XTS-Impact. XTS-Terminal (hold)

WELL COMPLETION & PROTECTION. www. .com MINERAL EXPLORATION ENVIRONMENTAL GEOTECHNICAL GEOTHERMAL ROTARY SONIC HDD

NAVIGATOR Product demonstration prop building instructions

TECHNICAL HANDBOOK nvent CADDY Speed Link Manual. SLS Locking Device

SERIES 2 RAMP OWNER S MANUAL TOOLS REQUIRED: BEFORE YOU BEGIN... Read and understand these instructions before beginning a ramp setup.

5/16 MAXFLOW SPOUTS 17/64 MAXFLOW SPOUTS. 5/16 black spout with barbs $0.25 $ /64 white spout without barbs. 5/16 white spout without barbs

1. Product Name. 2. Product Code. 3. Colour. 4. Brief Description. 5. Contents. Itinerant Frame. Likely to be as shown

GM-120: Container Top Lock Anchor Wand Page 1 WINSAFE CORP. GM 120 CONTAINER TOP LOCK ANCHOR WAND OPERATING INSTRUCTIONS AND MAINTENANCE

SAMPLE PAGE. Section 2... Wire Rope

Standard Operating Procedures

Crossed Roller Bearings Series Crossed Roller Bearings Series:

Telescopic winch handle Speedfriend"

Assembly instructions nortik scubi 2 Recreational kayak

DO NOT use any Alien Flier Zip Line Products or Accessories until you read and understand these SAFETY WARNINGS!

Model: 5100 OmniSteel Volleyball System

602 STRINGING MACHINE OWNER'S MANUAL

A-FRAME RESIN IN & OUT FLIP UP LADDER

SIMPLAIR PIPING TOOL. JXT Company

CARGO CONTROL Section 09 Page 52

Lectric Cycles Mid-Drive Electric Motor Installation

Casing Spacer Technology Leaders

BACKSTROKE START DEVICE

Boat Boat Loader Fitting Instructions

New Product Update - September 2017

FIRST TEAM SPORTS, INC Storm Portable Series Assembly Instructions

2019 MADONE ASSEMBLY MANUAL

Big Ride ASSEMBLY AND INSTALLATION INSTRUCTIONS * * C A U T I O N * *

Fall Protection for Compliance Workman : Quality, Comfort & Value

Order No Projection Backboard

MUELLER. A A Adjustable. Vertical Indicator Posts. Reliable Connections. General Information 2. Technical Data 3.

Soma Wind Generators

Utility Anchor System

COMPETITION EQUIPMENT. Enjoy the game

Poollift Delphin. Version: February, 2015 MANUAL AND OPERATING INSTRUCTIONS

SKI SPECIFICATIONS INSTALLATION, MAINTENANCE, SERVICE INSTRUCTIONS & ILLUSTRATED PARTS LIST

MUELLER. A Wall Type. Indicator Post. Reliable Connections. General Information 2. Technical Data/ Dimensions 3. Installation 4-5.

2019 MADONE ASSEMBLY MANUAL

MAY 2015 EQUIPMENT LIST CONTENTS: 1. SWIMMING LANES 2. STARTING BLOCKS 3. STORAGE DRUMS FOR SWIMMING LANES 4. WATERPOLO GOALS AND FIELD LINES

SET OF EUROLEAGUE BACKSTOP UNITS (Reference PK120)

WINSAFE CORP. OPERATING AND MAINTENANCE INSTRUCTIONS GM184 TOP ACCESS END LOCK ANCHOR WAND

BALL STOP INSTALLTION GUIDE

600 / 600FC OWNER'S MANUAL

Ropes for Subsea Cable Laying

Stand-N-Fish FULL DETAIL INSTALLATION INSTRUCTIONS

Aquatic Trap Instructions and Information

INSTRUCTION MANUAL. January 23, 2003, Revision 0

COASTAL IN-BOOM FURLING SYSTEM. Installation Manual

Side-of-Pole Mount for 1 Module (SPM1) For Module Types A & B

Anchorage Connectors

USER MANUAL. Beach volleyball posts BEACH CHAMP ID:

Standard Hangers and Adapters

PORTABLE CAPSTAN WINCHES LINE-UP

Spring steel fasteners KWHS-14R. KwikWire. Hanging system

SASK-A-POLE OWNERS AND USERS MANUAL

MODEL #7100X A-FRAME LADDER

Precision Liquid Settlement Array Manual

B-LINE SERIES. Spring steel fasteners KWHS-15. KwikWire. Hanging system

Float operated valve TYPE (SWDS)

Ground Release Shackle

USER GUIDE / PRODUCT MANUAL

SIGNATURE DEF REELS Models: Bare Reel Reel Reel Reel

COMPACT. VERSATILE. SAFE.

Heavy Equipment & Rigging Specialist Training

ISLAND MOORING SUPPLIES, LLC (IMS)

20', 15', AND 12' BALL STOPS ASSEMBLY INSTRUCTIONS

Deluxe Gourd Racks I D E G A. Parts List. Shown above are parts for the two-level, Deluxe Gourd Rack (DGR 12V)with 12 arms for vertically hung gourds.

Kennel-Gear Plastic Bowl System

Installation and Operating Instructions for Automotive Winch Synthetic Rope

Transcription:

ARE YOU READY TO Anching -OWNER S MANUAL-

TABLE OF CONTENT ANCHORING METHODS RELATED PRODUCTS PILINGS G2 POST CUBE DISPOSITION ( low profile and regular ) 2 7/8 STEEL PILE INSTALLATION ( galvanized staineless steel ) 3 1/2 PVC PIPE AND CAP IMAGES PILLING GUIDE (6 to 15 inches diameter ) P.2 P.3 P.4 P.5 P.6 UNDER WATER ANCHOR POINTS WITH ANCHOR LINES ANCHORING PLATE FOR CHAIN CHAIN ADJUSTER EXTERIOR ANCHORING RING FOR CHAIN ( regular H.D. ) G2 CONNECTING PIN FOR ANCHORING CHAIN ( 3/8 5/16 gages, galvanised staineless steel ) TMS ( TIDE MANAGEMENT SYSTEM ) CONFIGURATION GUIDE LINES AND TIPS P.7 P.7 P.8 P.8 P.9 P.9 P.10 ANCHORING STRUTS ( aluminum staineless steel ) P.11 ANCHORING STRUTS MISCELLANEOUS DOCK LEG SUPPORT WALL ANCHORAGES (painted steel stainless steel ) SPECIFIC HARDWARE FOR CONCRETE P.13 P.13 P.14 *** Note that it is preferable to consult the manual on a COLORED printed version, directly on your computer screen*** *The following instructions are guidelines to be followed. Candock will not be responsible f damages incured by the non-compliance to these guide lines. All distributs are required and responsible to provide theetical and practical training to clients on the complete use of the different dock systems. Candock inc. can not be held responsible in any way f any damages resulting from the fact that the client has not received adequate training. P.1

G2 POST CUBE TERMINOLOGY FLANGE High-density polyethylene resin Interi filled with expanded polystyrene Surface : Anti-skid L x W : 48 cm (19 ) x 48 cm (19 ) H : 36 cm (14 ) Dimensions (low profile cube) : L x W : 48 cm (19 ) x 48 cm (19 ) H : 23 cm (9 ) Weight : Cube: 9.55 kg (21 lbs.) Low profile cube : 7.5 kg (16.5 lbs.) G2 key f pin combo-pack Key f nut Ratchet key f nut + ratchet tool Piling bull 2 7/8 Piling driver 2 7/8 Piling lever ( f pile removal ) Zip cut grinder ( to cut-off exceeding pipe ) PVC glue ( to glue on the PVC cap ) Needed accessies 2 7/8 steel pipe PVC pipe ( 3 ) PVC cap FLANGE FLANGE: Ultra resistant plastic insert that allows a fluid yet durable system. Allowing the G2 POST CUBE to move up and down on the pile ( with tidal seasonnal variations ) witout any restriction while ensuring a sturdy and durable anching method. G2 POST CUBES AND PILING INSTALLATION See regular G2 CUBE assembly procedure as f the G2 POST CUBE installation while abiding to these rules: The pilings are mainly used in shallow water conditions ( MAX 2 meters ). Needing soft muddy sea bottoms, pilings are mainly used on she lines where the soil is soft and tractable. If the evironment is filled with rocks other solid debris, other methods should be prefered to anch your CANDOCK dock. An imptant aspect of the piling method consists in keeping the piles perfectly vertical. Using a level other precision tools is mandaty f every pile. If the sea bottom is made of clay, be careful not to penetrate the soil too deep as a suction effect will make the removal of those pilings practically impossible. Another imptant notion, never use pilings in agitated water ( maximum waves 0.6 meter / 2 feet ). Furtherme, pilings should not be used in areas that are consisting of loose soils and that are exposed to waves as the pilings maybe pulled out of the ground by wave action. G2 POST CUBES DISPOSITION MAX 7-9 meters (25-30 ) -Maximum 7 to 9 meters between each post cubes. ( ideally 13-14 cubes ) -Always surround POST-CUBE with 5 regular cubes on a minimum of 3 faces* (*To optimse efficiency ) -Always try to wk the pilings in pairs. x x x x P.2

2 7/8 STEEL PILE ( galvanized staineless steel ) Galvanized steel OR Staineless steel Diameter (exteri) : 2 7/8 (73 mm) Gage:.100 Weight : 3.5 lbs / linear foot (5.25 kg / linear meter) Piling bull 2 7/8 Piling driver 2 7/8 Piling lever ( f pile removal ) Zip cut grinder ( to cut-off exceeding pipe ) Needed accessies PVC pipe ( 3 ) PVC cap G2 POST CUBE G2 POST CUBES AND PILING INSTALLATION See regular G2 CUBE assembly procedure as f the G2 POST CUBE installation while abiding to these rules: The pilings are mainly used in shallow water conditions ( MAX 2 meters ). Needing soft muddy sea bottoms, pilings are mainly used on she lines where the soil is soft and tractable. If the evironment is filled with rocks other solid debris, other methods should be priised to anch your CANDOCK dock. An imptant aspect of the piling method consists in keeping the piles perfectly vertical. Using a level other precision tools is mandaty f every pile. If the sea bottom is made of clay, be careful not to penetrate the soil too deep as a suction effect will make the removal of those pilings practically impossible. Another imptant notion, never use pilings in agitated water ( maximum waves 0.3 meter ). PILING INSTALLATION -Using the piling driver piling bull, insert piles into the ground by pounding on the top of the piles. MAX. depth 2 meters (6 to 8 feet ) MIN. penetration 1 meter (3 feet) 90 -F optimal resistance, we suggest to use the proper material. Staineless steel being adapted f salt water and galvanized steel f fresh water environement -Maximum dept of water: 2 meters. Penetration: depending on water dept and the soil, minimally 1 meter. -Make sure to insert the pilings perfectly vertical ( 90 degrees ) P.3

3 PVC PIPE and CAP PVC Diameter (exteri) : 3 1/2 gage: 1/4 Weight : 1 lbs / linear foot (.45 kg / linear meter) Zip cut grinder ( to cut-off exceeding pipe ) PVC glue Needed accessies PVC pipe ( 3 ) PVC cap G2 POST CUBE Piece of cloth foam PVC CAP PVC PIPE AND CAP INSTALLATION Ususal lenght: 2 meters (6 to 8 feet ) -Always use PVC pipe sleeve f pile covering to prevent premature wear of the POST CUBE flange. Anticipate water level variation without risking pre-mature wear and tear of the G2 POST CUBE flange by lenghtening the PVC pipe under usual water line. PVC CAP PVC PIPE STEEL PIPE -Use PVC CAP to give a me finished look to your pilings. Make sure to insert provided ruber disc into the PVC CAP pri to inserting it onto the PVC pipe. The rubber disk will act as a damper to absb the shocks if the PVC pipe slides up and down on the steel pile. -Simply use PVC glue to secure the cap on the topof the PVC pipe. P.4

P.5

PILLING GUIDE (6 to 15 inches diameter ) -Aluminum -Staineless Steel 316 hardware Components: -1 Aluminum bracket ( against cube ) -1 Aluminum 90 degrees bracket with UHMW slide plate -1 SS 316 cable ( 48 / 121 cm ) -11 UHMW rollers -SS 316 harware and manillas Needed tools: -Key f nut -Ratchet key f nut -wrench key -pliers Needed accessies to install the product ( sold seperately ): -2 CANDOCK LUG CONNECTORS -2 CANDOCK NUTS 1 Using the requested CANDOCK LUG CONNECTORS(2) and CANDOCK NUTS(2), secure the aluminum bracket against the cube assembly 1 2 2 3 Using the supplied hardware, fasten the adjustable 90 degrees slider at ideal position depending on the pile position. Adjust the cable lenght and roller assembly to optimize vertical movement while eliminating lateral movements. Proper hardware is already included in the bracket kit 3 DISPOSITION MAX 7-9 meters (25-30 ) P.6

ANCHOR PLATE FOR CHAIN Staineless steel 316 5/16 chain gage OR 3/8 chain gage 15/16 key wrench Key f nut Ratchet key f nut + ratchet tool DISPOSITION Needed accessies 1 CANDOCK LUG CONNECTOR 1 CANDOCK NUT 1-Simply insert the CANDOCK LUG CONNECTORS into the cube tabs wherever the ANCHORING PLATES are needed. Secure by screwing the proper CANDOCK NUTS with proper toolings. (KEY FOR NUT RATCHET KEY FOR NUT) MAX 7-9 meters (25-30 ) *If in doubt refer your self to the CANDOCK LUG CONNECTOR section of the regular products OWNER S MANUAL. 2-Insert the Staineless steel anch plate into the CANDOCK LUG CONNECTOR, and to firmly secure it with the provided hardware. Make sure to angle it in the desired direction pri to final tightening. SEE CONFIGURATION GUIDELINES FOR DETAILS CHAIN ADJUSTER Staineless steel 304 Designed f 5/16 chain gage Pliers to manipulate the manilla Key f nut Ratchet key f nut + ratchet tool Included components: 1 CANDOCK LUG CONNECTOR 1 CANDOCK NUT 1 manilla DISPOSITION 1-Simply insert the CANDOCK LUG CONNECTORS into the cube tabs wherever the CHAIN ADJUSTERS are needed. Make sure to insert the 90 degrees angled staineless steel part pri inserting the CANDOCK LUG CONNECTOR. Secure by screwing the proper CANDOCK NUTS with proper toolings. (KEY FOR NUT RATCHET KEY FOR NUT) MAX 7-9 meters (25-30 ) *If in doubt refer yourself to the CANDOCK LUG CONNECTOR section of the regular products OWNER S MANUAL. **Make sure to secure your assembly by fastening the exeeding chain back to anch line with a regular manilla. SEE CONFIGURATION GUIDELINES FOR DETAILS P.7

EXTERIOR ANCHORING RING FOR CHAIN ( REGULAR OR H.D. ) Staineless steel 304 (REGULAR) Staineless steel 316 (H.D.) Interi diameter of the loop; 2 5/8 (67mm) 15/16 key wrench Key f nut Ratchet key f nut + ratchet tool Needed accessies 1 CANDOCK LUG CONNECTOR 1 CANDOCK NUT DISPOSITION 1-Simply insert the CANDOCK LUG CONNECTORS into the cube tabs wherever the ANCHORING RINGS are needed. Secure by screwing the proper CANDOCK NUTS with proper toolings. (KEY FOR NUT RATCHET KEY FOR NUT) MAX 7-9 meters (25-30 ) *If in doubt refer your self to the CANDOCK LUG CONNECTOR section of the regular products OWNER S MANUAL. 2-Insert the Staineless steel TREADED ROD into the CANDOCK LUG CONNECTOR and firmly secure with the provided hardware. Make sure to determine ideal vertical position pri to final tightening. SEE CONFIGURATION GUIDELINES FOR DETAILS G2 CONNECTING PIN FOR ANCHORING Staineless steel 304 HDPE Concrete Designed f 5/16 chain gage G2 key f pin combo-pack Pliers Needed accessies 1 Manilla DISPOSITION 1-Simply follow the regular G2 CONNECTING PIN assembly procedure. Make sure to validate their positionning pri to placing them. Connect chain to anching pin from underneath the dock ( in the water ). MAX 7-9 meters (25-30 ) IDEAL APPLICATIONS These G2 CONNECTING PNS FOR ANCHORING are made to simply give a me aesthetic anching method. Also restricting its access, this method discourages any malicious person from stealing your <floating system. SEE CONFIGURATION GUIDELINES FOR DETAILS P.8

CHAIN ( GALVANIZED OR STAINELESS STEEL, 5/16 OR 3/8 GAGE ) Staineless steel 304 316 Galvanized 5/16 3/8 Chain cutter zip-cut grinder DISPOSITION MAX 7-9 meters (25-30 ) SEE CONFIGURATION GUIDELINES FOR DETAILS TMS ( TIDE MANAGEMENT SYSTEM ) -304 Staineless steel eyelet -Flexible materiel: Natural latex -Orange wrap: Polyester sheath Needed accessies 2 Manillas 1 meter OR 2 meters 1-Simply insert this TMS cable to middle section of your anching lines. Using proper shackles and harware, securely fasten each ends against the the fixed anch point and the dock line sections of your anching lines. IDEAL APPLICATIONS Install TIDE MANAGEMENT SYSTEM ( TMS ) to the middle section of the line if water level fluctuates if location is exposed to regular waves and rough waters.make sure to use proper shakles depending on the requirements. SEE CONFIGURATION GUIDELINES FOR DETAILS P.9

CONFIGURATION GUIDELINES Pri to every installation, make sure to analyse these few key points to ensure a proper installation: -NATURE OF SEA BED -TIDAL VARIATIONS -WATER CURRENTS -RULES AND REGULATIONS APPLYING TO YOUR AREA -MOST COMMON AND USUAL WEATHER CONDITIONS -USUAL LOADS THAT WILL BE APPLIED TO THE DOCK SUFFICIENT SPACE BETWEEN LINES 45 DEGREE RULE 1 -Leave sufficient spacing between crossing lines to prevent friction and premature wear. PARITY IN APPLIED FORCES 45 0 4 TIDE MANAGEMENT SYSTEM -Install TIDE MANAGEMENT SYSTEM ( TMS ) on the middle section of the line if water level is fluctuating ( tidal seasonnal ) if location is exposed to regular waves and rough waters.make sure to use proper shakles depending on the requirements. NOTE THAT THE CABLES CAN BE COMBINED TO CREATE A STURDIER ANCHORING, DEPENDING ON THE CHARGES THAT WILL BE APPLIED TO THE DOCK. 2 UP / DOWN -Always keep parity between opposing lines and achs. Also equally adjust tensions in lines 2 4 [TOP VIEW] -When applying tension on anching lines, always pull away from the system with a 45 degrees angle. Such method will ensure an even tension in the lines and will optimize the stability of the anching pattern When using TIDE MANAGEMENT SYSTEMS (TMS), make sure to complete the procedure at low tide f an optimum efficiency. ALWAYS INSTALL CABLES UNDER TENSION 3 UP / DOWN P.10

PROPER ANCHOR CHOICE AND POSITIONNING 5 2 FOR 1 RULE 1-Abide to the 2 f 1 rule to maximise the stability of your anching. Complete the procedure at low tide f an optimal efficiency. X=2Y i.e -If the depth of the water plan is 2 meters, you have to move the fixed anch aside from the fixing point of a minimum of 4 meters. 6 ANCHOR TYPES 1-Concrete blocks 2-Chemical anchs 3-Helicoidal hook 4-Earth Anchs Use proper anchs depending on the nature of the seabed and loads applied to the dock. Y 2 meters If sea bottom is rocky and slipery, A series of dead weight combined together with chain may be suitable to prevent anch movements X 4 meters 5 6 PROPER LINE CONFIGURATIONS A UPPER SECTION F the upper section of the line, either chain proper rope are suggested to facilitate adjustements through out the season. Proper shakles and hardwares are mandaty If using rope as line upper section material, make sure to use proper rope and attach it as following to ensure a strong and adjustable layout. Simply insert shackle pin trough the ropestrands. Make sure to insert in the very middle of the rope to maximise strenght.finally, simply attach the shackle to the anch point on the dock *If using a TMS, another shackle should be used on the rope at a much lower point so when you put the TMS under tension, the shackle used to definitively secure the rope to the dock can be easily inserted. If rope is used between lower section and upper section ( TMS ), make sure to link both sections to the rope with proper splicing methods including stainless steel sleeve in loop to prevent premature wear of the rope. A B MIDDLE SECTION B Install TIDE MANAGEMENT SYSTEM ( TMS ) on the middle section of the line if water level is fluctuating if location is exposed to regular waves and rough waters.make sure to use proper shakles depending on the requirements. C BOTTOM SECTION Always use chain f the first section of the line to prevent premature wear against debris laying on sea bottom C P.11

ANCHORING STRUTS ( ALUMINUM OR STAINELESS STEEL ) CUBE END OF THE STRUTS: SHORE END OF THE STRUTS: IDEAL APPLICATIONS When used perpendicularly: UP TO 5 METERS VARIATION When used with a certain angle: UNDER 1 METER VARIATION Aluminum OR Staineless steel 316 lenth of 10 16 Custom lengths also available upon request Key wrench kit Hammer drill Regular drill Bits and hardware* *Depending on the environement and utility of the arms. Needed accessies 1 CANDOCK LUG CONNECTOR 1 CANDOCK NUT The anching struts are very useful in different situations; making it possible to solidly anch a dock to she line foundations rocks, these arms have practicaly no limitations. CANDOCK offers a wide range of these arms depending on the size of the project and the conditions it is operating in. From 1 meter long to 10 meter long, f tidal variations up to 5 meters, these anching systems are a great way to securelly attach your dock to permanent structures. Swivelling head, fixed head, aluminium staineless steel body, everything is possible. Depending on the situation, struts should be installed every 6 to 9 meters ( 20 to 30 ). 1- CUBE END OF THE ARMS: 1-Simply insert the LUG CONNECTORS into the cube tabs wherever the ANCHORING ARMS are needed. Secure by screwing the proper CANDOCK NUTS with proper toolings. (KEY FOR NUT RATCHET KEY FOR NUT) *If in doubt refer your self to the CANDOCK LUG CONNECTOR section of the regular products OWNER S MANUAL. 2-Install the destined part of the arms on the CANDOCK LUG CONNECTORS and firmly secure it with the provided hardware. Make sure to angle it in the desired direction pri to final tightening. 2- SHORE END OF THE ARMS *** If installed on a concrete wall/structure, see last page of this manual f specific hardware suggestion*** 1-Using proper hardware and tools, secure the fastening plate against concrete structure. Other structures may act as anch points but an extensive analysis of the structure must be done to insure a strong and durable anch point f the arm. NOTES -Make sure you install the arms at low tide and verify that they will accept variations. Make sure the installation moves freely in all conditions. -If installed perpendicular to she, use steel cables chains positionned in a X conguration to prevent unwanted lateral movements. -If used in a 45 degree angle, water level variations will be limited and a minimum of 3 struts should be used in oposite directions to prevent lateral movements SEE IMAGES LOWER P.11

ALLOWING VERTICAL VARIATIONS ( TIDAL, SEASONNAL OR FLASH FLOOD SURGES ) ANCHORING STRUTS allowing imptant tidal variations and offering unmatched resistance and sturdiness. UP / DOWN [UP TO 5 METERS] STRUTS COMPOSITION -Aluminum 6061 T6 -Staineless steel 316L PREVENTING ANY LATERAL MOVEMENTS STIFFENING CABLES P.12

DOCK LEG SUPPORT Aluminum Diameter of piles : 1 11/16 Needed accessies Pile 1 11/16 Piling driver 1 11/16 Zip cut grinder ( to cut-off exceeding pipe ) Key wrench Drill and bits The DOCK LEG SUPPORT, combined with piles 1 11/16", is a simple and affdable way to suppt our gangways and / fixed dock sections. Indeed, they can be adjusted in height and are easy to manipulate. It can also be used to connect our floating systems to aa existing, floating OR fixed, structure. When installing the bracket on a floating structure, the 1 11/16 " galvanized steel pile is to be inserted into the DOCK LEG SUPPORT,then into the cubes tabs and, finally, it must lengthened up to about 1 meter (3 feet) below the water line. If the suppt is to be installed on a fixed structure, the pile will necessarily have to sunked into the seabed to ensure durability. You can create an effective, affdable and easy to install attachment point to connect our systems to all other structures, floating OR fixed. WALL ANCHORAGES ( PAINTED STEEL OR STAINLESS STEEL ) Painted steel Satineless steel 15/16 key wrench Key f nut Ratchet key f nut + ratchet tool Included accessies: 1 CANDOCK LUG CONNECTOR 1 CANDOCK NUT Other needed accessies and tools: Proper hardware and tools to fix the bracket to existing floating structure. 1-FIXING THE BRACKET TO THE CUBE: 1-Simply insert the CANDOCK LUG CONNECTORS into the cube tabs wherever the WALL ANCHORAGE are needed. Secure by screwing the proper CANDOCK NUTS with proper toolings. (KEY FOR NUT RATCHET KEY FOR NUT) *If in doubt refer your self to the CANDOCK LUG CONNECTOR section of the - regular products OWNER S MANUAL. 2-Install the destined part of the bracket on the CANDOCK LUG CONNECTORS pri to firmly secure it with the provided hardware. Make sure to angle it in the desired direction pri to final tightening. 2-FIXING THE BRACKET TO THE FLOATING STRUCTURE: 1-Using proper hardware and tools, secure the fastening plate against the floating structure*. Other structure may act as anch points but an extensive analysis of the structure must be done. (*additionnal parts and brackets may be needed to properly connect to the dock if heights don t concur) MUST BE INSTALLED ON A FLOATING STRUCTURE OR AGAINST A FIXED STRUCTURE IN AN ENVIRONMENT WHERE WATER DOES NOT FLUCTUATE. P.13