MISSISSIPPI RIVER SPILLWAY PLAN (2013 FLOOD RECOVERY) MISSISSIPPI RIVER SPILLWAY PROFILE (2013 FLOOD RECOVERY) C-200 PROJECT BOUNDARY

Similar documents
NEW INTERLOCKING BLOCK RETAINING WALL, TYP. 7' - 0" 4' - 0" CRUSHED ROCK, TYP. 3' - 0" 8' - 0" 2' - 0" 3' - 0" 6' - 0" 24' - 0" 1% MIN.

LOT 2 PEDRICK-ECKERD FILING NO. 3

NMSU PROJ #3077 STORAGE FACILITY - PHASE 3 BUILDING C (384)

JOHNSTON COUNTY DEPARTMENT OF UTILITIES DUCHESS DOWNS FORCE MAIN IMPROVMENTS OCTOBER 2017

HORIZONTAL SLIDER - NON-IMPACT

E. STRUCTURAL STEEL G. STRUCTURAL SPECIAL INSPECTIONS

TYPICAL CARRIAGEWAY SCALE - A3 SIZE

Instructions for Continued Airworthiness

REQUEST FOR COMMENTS

GREEN MOUNTAIN POWER CORP.

HD CONDUIT MIN. 10% FALL CHAMBER MONITORING SYSTEM HD CONDUIT REFER NOTE 13 SECTION C-C DETAILS OF BENCHING

1'-0" [0.305 m] WALL TYPICAL U.N.O. OPP. HAND C S3.3 S3.3 TW 99'-8 OPP. HAND TW 99'-8 TF 95'-6 B S3.2

PLAN - TYPICAL WETLAND NOT TO SCALE SECTION - TYPICAL WETLAND NOT TO SCALE

TeeJay Publishers Homework for Level C book Ch 11 - Position/Movement. Bill. Bob. Dan. Joy

Stettler Shop and Office

Models 461-S, 461-8S and S Regulators Regulators Installation and Maintenance Instructions

Mechanical Drawings POS-Line 17.3 (438.2 mm)

BED TOWER ADDITION EXPANSION & RENOVATIONS

10mm SHOWER PANEL SIZES 1000 & 1200 SIZES 500, 600, 700, 800 & 900 SIZES 1000 & 1200 OPTION 1 - PAGES 2-4 OPTION 2 - PAGES 2-5 OPTION 3 - PAGES 6-7

Workrite Sierra HX & HXL Assembly Instructions for 3-leg Electric Workcenters

St Ac Ex Sp TOPICS (Text and Practice Books) 4.1 Triangles and Squares Pythagoras' Theorem - -

UNIFORM STANDARD DRAWINGS CLARK COUNTY AREA, NEVADA YEAR 2016 REVISIONS

Fino Installation Instructions

Gary L. Owens Trust Administrative Permit. Application

Bollard Post, Model R-8902

Long term biosolids experiments: Nitrogen and Organic Matter

Unit 6 - Quiz 1. Look at the pictures and write the missing letters. (5x2=10)

Cooling System. Table of Contents. Section 6C - Models with Closed Cooling. Models with Closed Cooling

Flow Divider / Combiner Cartridge Valves

MOBILEYE SERIES / C MOBILEYE DISPLAY BATTERY BOOST DETAIL STARTER CABLE TO CHASSIS BATTERY

THE RILEY BULDING 219 W. FOURTH STREET, AUSTIN, TX 78701

Copyright 2015 Winnebago Industries, Inc.

Holder Assembly. Assembly. 1 MCP bottom holder. 2 MCP top holder 3 Clip. 9.5x9.5x0.4 1 lbf. Weight: 0.32 lbs. Allen Zhao

NIC Nano 0.85 CTO-Balloons For your most challenging cases

LS3L-R-D. Litespeed MOD 3 LED Recessed Slot. Ordering Guide. Key Features. Performance LITESPEED LS3L-R-D. Fixture Type: Project Name:

The following excerpt are pages from the North American Product Technical Guide, Volume 2: Anchor Fastening, Edition 16.

Mechanical Drawings POS-Line 17.3 (438.2 mm)

The following excerpt are pages from the North American Product Technical Guide, Volume 2: Anchor Fastening, Edition 16.1.

CONSTRUCTION DOCUMENTS C A THOMAS FARMS WETLAND RESTORATION PROJECT COLLIER COUNTY NATURAL RESOURCES CONSERVATION SERVICE WETLANDS RESERVE PROGRAM

Headwater elevation water surface elevation just. Tailwater elevation water surface elevation just

Gas Tank Gasket Kit & 22

AN Wireless Tower Assembly Instructions

* LANDING ROLLED CURB SIDEWALK RAMP TYPE R (ROLLED SIDES) * LANDING ** RAMP FULL CURB HEIGHT MAY BE REDUCED TO ACCOMMODATE MAXIMUM SIDE FLARE SLOPE

7500 Series Heavy Duty Precision Ground Radial Bearings

CC24-7 ELITE. Temperature Controller USER S MANUAL Legion Dr. Mason, MI USA April 2011 Ph. (517) Fax (517)

THINK SAFETY - WORK SAFELY

Plant Growth Regulators in Spring Wheat. Anne Kirk, Craig Linde, and Pam de Rocquigny. Manitoba Agriculture

* SEE ANCHOR SCHEDULE SHEET 7

McAfee Change Control and Application Control Installation Guide For use with epolicy Orchestrator and 4.6.0

7.2 Assess Your Understanding

Hybrid Relief Valves

Mainline. Train timetable. Valid from 9 December Harwich Town to Manningtree

ZFP N W BR 63V. FREEPORT, BAHAMAS MYGF/FPO BUUCK ONE RNAV DEPARTURE (BUUCK1.BUUCK) .RNAV.SID. (RWY 06) BUUCK

Lecture Note for Open Channel Hydraulics. V F =, gl

General Information. Runway Information. Communication Information

MORNING SIDE - AQUATIC CENTER RENOVATIONS 2400 HARN BOULEVARD, CLEARWATER, FL 33756

AQUATICS CENTER NEW ENGLAND SPORTS VILLAGE. 60% Construction Set NOT FOR CONSTRUCTION 27 JULY 2017 AQUATICS CENTER LLB ARCHITECTS CONSULTANTS

Ruth Foster, M.Ed. Author

Geometry Proofs: Chapter 7, Sections 7.1/7.2

6 TRIGONOMETRY TASK 6.1 TASK 6.2. hypotenuse. opposite. adjacent. opposite. hypotenuse 34. adjacent. opposite. a f

Bryn Mawr Subdivision, Phase II Traffic Impact Study City of Crystal Lake McHenry County, Illinois Prepared for: The City of Crystal Lake, On Behalf O

Tweed Border Hockey Association Inc.

MATHEMATICAL PRACTICES In the Solve It, you used what you know about triangles to find missing lengths. Key Concept Law of Sines

GEO GRAPHICAL RESEARCH

Linking Your Accounts

Connectors according to DIN / IEC

Chapter 31 Pythagoras theorem and trigonometry (2)

POST POOL RULE SIGN NO GLASS OR ANIMALS IN THE FENCED POOL AREA NO FOOD, OR BEVERAGES IN POOL OR ON WET DECK SHOWER BEFORE ENTERING POOL

VENTS SERIES DOMESTIC ELECTRIC FANS. User s Manual

ALLMATIC CENTRO GRIPP FOR CENTRAL GRIPPING

Column w/laterals. Steel Column A992 50ksi Steel. 1 Rev

MEMORANDUM. TNC Fisher Slough Final Design and Permitting Subject: DRAFT Technical Memorandum: Levee Emergency Spillway Design

PARK HILL HIGH SCHOOL TURF FIELD IMPROVEMENTS

TRANSMITTAL COVER. Document Attached: CCAT-JEC-DSl-0041, RFI 01382, PG S 1003B and PG S 1104 Action:

Length, Perimeter and Area

SENIOR ASSISTED LIVING FACILITY BASE LINE, HIGHLAND, CA

1 Measurement. What you will learn. World s largest cylindrical aquarium. Australian Curriculum Measurement and Geometry Using units of measurement

SITE NAME: PSL NUMBER: SITE ADDRESS:

Reef stainless steel channels

400 Series Flat Panel Monitor Arm Rotate Mount Double Pivot P/L

City of Rio Rancho Department of Public Works

LEVEL 1 LAW THEORY AND GAME MANAGEMENT EXAMINATION

Lesson 2 PRACTICE PROBLEMS Using Trigonometry in Any Triangle

SAMPLE PROJECT 1234 SAMPLE PROJECT DR PLEASANTON, CA 94588

MEASURING FOR CUSTOM-MADE PRESSURE GARMENTS. Revised January 2013 Copyright 2013, Bio-Concepts, Inc., All Rights Reserved

I Information about Form 990 and its instructions is at Inspection

HCI Examination Please answer in Swedish or English

SECTION 5 CONVEY LINE & CONVEY LINE ACCESSORIES Tubing and Pipe

UNIVERSITY OF MISSISSIPPI RESEARCH FOUNDATION FORM 990 TAX YEAR 2014

LOVE HEARTS / STARS OTTOMAN STORAGE BOX ASSEMBLY INSTRUCTIONS

I Information about Form 990 and its instructions is at Inspection

Airport Information. Details for SAAB. State/Province

Apply the Pythagorean Theorem

I Information about Form 990 and its instructions is at Inspection

RM-1328 R10. Sensus Metering Systems. Model 121 Regulators. Installation and Maintenance Instructions

I Information about Form 990 and its instructions is at Inspection

HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX E OVERTOPPING & FAILURE ANALYSIS

Return of Organization Exempt From Income Tax. Under section 501(c), 527, or 4947(a)(1) of the Internal Revenue Code (except private foundations)

Public Inspection Copy Return of Organization Exempt From Income Tax

Type overview. Technical data. Safety notes

Transcription:

c:\pw_working\mvr\b5eddlh\d032060\_-200xxx.dgn $TE$ 5E 9:6:5 M N 37+00 372+00 373+00 37+00 PO N 3397.37 E 23639.0 535.90 537.6 535.8 535.27 535.2 535.07 H:V 50H:V 375+00 5H:V 376+00 5H:V H:V 3H:V PROJET OUNRY MISSISSIPPI RIVER SPILLWY PLN (203 FLOO REOVERY) SLE : "=80-0" 0 80 60 LY P (STGE I) 55 ESIGN GRE TOP OF SPILLWY EL. 5.9 5 700 SPILLWY MISSISSIPPI RIVER SPILLWY PROFILE (203 FLOO REOVERY) SLE : "=80-0" 0 80 60 5H:V H:V 3H:V 3H:V H:V 50H:V 377+00 378+00 379+00 5H:V POE N 335.5 E 2368. 5H:V H:V 3H:V EPHEMERL WETLN (STGE I) 55 MISSISSIPPI RIVER SPILLWY (203 FLOO REOVERY) 5 50H:V 50H:V 0 5H:V H:V 0 I ESIGNE Y: TE: MRK ESRIPTION U.S. RMY ORPS OF ENGINEERS KNM ROK ISLN ISTRIT W N Y: K Y: SOLIITTION NO.: ROK ISLN, ILLINOIS PLOT SLE:PLOT TE: PROJET OE: FILE NME: 380+00-200 MISSISSIPPI RIVER SPILLW Y PLN N PROFILE (203 FLOO REOVERY) _-200xxx.dgn

GENERL SHEET NOTES. SPILLWY ONSTRUTION WS OMPLISHE IN THE RY. 2. ONTRTOR LERE N GRUE SPILLWY RE. MTERILS WERE PLE ON THE LN SIE OF THE LEVEE IN RES JENT TO THE SPILLWY UT NO LOSER THN 5 FEET FROM THE LEVEE TOE. 3. VEGETTION WS STRIPPE TO EPTH OF 3 INHES. STRIPPE MTERIL WS REUSE S TOPSOIL ON THE LY LEVEE REPIR TO MX EPTH OF 6 INHES. EXESS MTERIL WS ISPOSE OF Y SPREING LONG LN SIE LEVEE TOE.. EXVTE LEVEE TO THE ELEVTIONS N SLOPES SHOWN ON THE TYPIL SETIONS S NEEE. 5. PREPRE THE SUGRE N PRTIL FILL SURFES. 6. URING GRING, ERTHEN MTERIL WS THOROUGHLY MIXE S SPEIFIE. 7. FILL WS PLE N OMPTE. c:\pw_working\mvr\b5eddlh\d032060\_-20xxx.dgn $TE$ 9:6:55 M 5E EL. 538.0 5 3 KEY INTO EXISTING GROUN 0 RIVER SIE ONRETE RIPRP EL. 5.9 2" RIPRP 0" EING SLE : "=-0" 0 2 2 LN SIE GEOTEXTILE FRI 6" RINGE STONE MISSISSIPPI RIVER SPILLWY TYPIL SETION (203 FLOO REOVERY) 5 EL. 537.0 7.5 8. RIVER SIE SLOPE (ONSTRUTE TO THE SLOPES N GRES SHOWN):. PLE EING.. PLE RIPRP. 9. ONSTRUTION (ONSTRUTE TO THE SLOPES N GRES SHOWN):. PLE GEOTEXTILE FRI.. PLE, OMPT N FINISH RINGE STONE.. PLE.. FILLE VOIS WITH RINGE STONE. 0. LL ISTURE RES WERE SEEE. ESIGNE Y: TE: MRK ESRIPTION U.S. RMY ORPS OF ENGINEERS KNM SOLIITTION NO.: W N Y: K Y: ROK ISLN ISTRIT ROK ISLN, ILLINOIS MISSISSIPPI RIVER SPILLW Y PROJET OE: PLOT SLE:PLOT TE: TYPIL SETIONS I (203 FLOO REOVERY) -20 FILE NME: _-20xxx.dgn

ESIGNE Y: TE: MRK ESRIPTION W N Y: K Y: PLOT SLE:PLOT TE: FILE NME: SOLIITTION NO.: 2+00 PROJET OE: I POE N 2352.8 E 295.3 PO +00 0+00 39+00 E 29833.96 38+00 N 2360.33 37+00 36+00 35+00 3+00 33+00 32+00 3+00 30+00 3+00 32+00 33+00 3+00 35+00 36+00 37+00 38+00 39+00 0+00 +00 2+00 c:\pw_working\mvr\b5eddlh\d032060\_-202xxx.dgn $TE$ 5E ::22 M PLN N PROFILE U.S. RMY ORPS OF ENGINEERS ROK ISLN ISTRIT ROK ISLN, ILLINOIS KNM _-202xxx.dgn 0 60 SLE : "=80-0" 80 LY P (STGE I) 55 0 60 SLE : "=80-0" 80 55 IOW RIVER SPILLW Y (STGE I) -202 H:V 5H:V H:V H:V H:V H:V 5H:V 5H:V 5H:V 5H:V 5H:V 5H:V N IOW RIVER SPILLWY PLN (STGE I) ESIGN GRE IOW RIVER SPILLWY (STGE I) EL..2 IOW RIVER SPILLWY PROFILE (STGE I)

ONSTRUTION WORK LIMITS 20 200 THIKNESS SHLL E THE GRETER OF 8" OR LOK THIKNESS 535 EXISTING GROUNLINE SEE NOTE 5 3 5 RIVER SIE EL. 535.0 8 9" 2" EL..2 L 5 EL..0 OMPTE FILL GEO-TEXTILE FRI SEE NOTE 3 LN SIE EXISTING GROUNLINE PPROX..75" THIK RTIULTE ONRETE LOK () REVETMENT 30 SEE NOTE 0 RUSHE STONE T SILL 3 LYER OF 00L RIPRP ON EING STONE 5 EL. 539.2 9" EING STONE E 535 SEE NOTE 5 ONSTRUTION JOINT -" 2 # RTIULTE ONRETE LOK () REVETMENT ONNET RTIULTE ONRETE LOK () TO UTOFF WLL ORING TO LOK MNUFTURER INSTRUTIONS 530 LYER OF 00 L RIPRP OVER EING STONE REINFORE ONRETE UTOFF WLL RINGE STONE SEE NOTE 2 530 8" # @ 2" O.. SPILLWY TYPIL SETION ST. 3+ TO 2+ (STGE I) NO SLE SPILLWY TYPIL SETION ST. 2+ (STGE I) NO SLE RIPRP 525 535 530 525-00 -00 " TOPSOIL, SEE FERTILIZE N MULH EXISTING GROUNLINE SEE NOTE 5 3-75 -50-25 0 25 50 75 00-75 5 EL. 535.0 20 200 RIVER SIE 3 9" 2" LYER OF 00 L RIPRP OVER EING STONE -50 EL..2-25 EL..0 ONSTRUTION WORK LIMITS REINFORE ONRETE UTOFF WLL RTIULTE ONRETE LOK () REVETMENT L 0 5 EL..0 EXISTING GROUNLINE OMPTE FILL GEO-TEXTILE FRI SEE NOTE 3 PPROX..75" THIK RTIULTE ONRETE LOK () REVETMENT 25 RIPRP LN SIE SEE NOTE 30 0 RINGE STONE SEE NOTE 2 50 RUSHE STONE T SILL 3 LYER OF 00L RIPRP ON EING STONE 75 5 9" EING EL. 539. STONE E 00 525 535 530 525 RTIULTE ONRETE LOK () REVETMENT -0" NOTES: 3" REINFORE ONRETE WLL 3" -0" MIN. 3 # 3" # @ 2" O.. ETIL FOR UTOFF WLL 3" # @ 2" O... LEVEE STTIONING HS HNGE SINE STGE I UE TO MULTIPLE LEVEE REPIRS. 2. GGREGTE EING IS 9" THIK UNER RIPRP ON RIVER SIE OF SPILLWY, GGREGTE RINGE LYER IS 6" UNER THE RTIULTE ONRETE LOK (), OR S REOMMENE Y THE MNUFTURER, N 9" THIK UNER RIPRP TIE-IN ON REFUGE SIE OF SPILLWY. 3. GEOTEXTILE FRI PLE OVE N ELOW RINGE STONE ENETH RTIULTE ONRETE LOK () REVETMENT.. FOR ETIL THIS SHEET, ONSTRUTION JOINTS IN WLL RE EPTLE IF THE REINFOREMENT IS ONTINUOUS THROUGH THE JOINT. EXPNSION JOINTS RE NOT NEESSRY. 5. LL EXPOSE EGES OF UTOFF WLL SHLL HVE 3#" Y 3#" HMFER. 6. EGRE EXISTING LEVEE SETION N USE S ORROW FOR NEW SPILLWY SETION. 7. URING GRING OF SPILLWY SETION, ERTHEN MTERIL WS THOROUGHLY MIXE. -0" ESIGNE Y: TE: MRK ESRIPTION KNM U.S. RMY ORPS OF ENGINEERS SOLIITTION NO.: W N Y: K Y: ROK ISLN ISTRIT ROK ISLN, ILLINOIS PROJET OE: PLOT SLE:PLOT TE: FILE NME: _-203xxx.dgn c:\pw_working\mvr\b5eddlh\d032060\_-203xxx.dgn $TE$ 9:7:2 M 5E 9" GGREGTE EING STONE LYER GEO-TEXTILE FRI 6" GGREGTE RINGE STONE LYER, OR S REOMMENE Y MNUFTURER 3-0" -0" 9" GGREGTE RINGE STONE LYER 6" GGREGTE RINGE STONE LYER, OR S REOMMENE Y MNUFTURER RIP RP SIE SLOPE TIE IN (STGE I) 2... TO RIP RP TIE IN (STGE I) 3... TO GRVEL RO TIE IN (STGE I) I NO SLE NO SLE NO SLE -203 3 GEO-TEXTILE FRI 8" GRNULR RO SURFE (SEE ETIL ON SHEET 303) 8. EXESS ERTHEN MTERIL EXVTE FROM SPILLWY GRING (EXLUING 3" STRIP LYER) WS USE FOR LEVEE ONSTRUTION OF LEVEE SETIONS IMMEITELY JENT TO THE SPILLWY EN SETIONS. IOW RIVER SPILLW Y TYPIL SETIONS (STGE I)

c:\pw_working\mvr\b5eddlh\d032060\_-20xxx.dgn $TE$ 5E 9:7:7 M RIPRP GEOTEXTILE FRI " TOPSOIL, SEE, FERTILIZE & MULH GEOTEXTILE FRI RTIULTE ONRETE LOK REVETMENT GGREGTE EING 3-0" RIPRP SETION @ SIE SLOPE RIPRP PROTETION (STGE I) UTOFF WLL ETIL (STGE I) 3 - # RS -0" LP -0" (MIN) # OWELS @ 2" O.. 5-0" # @ 2" O.., E.W. 8" LOK THIKNESS RTIULTE ONRETE LOK () GRETER OF 8" OR MFGR. INSTRUTIONS THIKNESS SHLL E -" WLL ORING TO LOK ONNET TO UTOFF SETION @ SIE SLOPE LOK TERMINTION (STGE I) 3-0" I -20 SPILLW Y TRNSITION TYPIL SETIONS (STGE I) ESIGNE Y: TE: MRK ESRIPTION U.S. RMY ORPS OF ENGINEERS KNM ROK ISLN ISTRIT W N Y: K Y: SOLIITTION NO.: ROK ISLN, ILLINOIS PLOT SLE:PLOT TE: PROJET OE: FILE NME: _-20xxx.dgn

c:\pw_working\mvr\b5eddlh\d032060\_-205xxx.dgn $TE$ 5E 9:7:2 M 56+00 57+00 52+00 55 53+00 5+00 55+00 58+00 59+00 60+00 IOW RIVER SPILLWY PLN (203 FLOO REOVERY) SLE : "=80-0" 0 80 60 ESIGN GRE LY P (STGE I) IOW RIVER SPILLWY (203 FLOO REOVERY) 52+00 53+00 5+00 55+00 56+00 57+00 58+00 59+00 60+00 IOW RIVER SPILLWY PROFILE (203 FLOO REOVERY) SLE : "=80-0" 0 80 60 0 H:V 5H:V 2 H:V 5H:V 5H:V 5H:V ESIGN GRE TOP OF SPILLWY EL..5 0 N 55 I ESIGNE Y: TE: MRK ESRIPTION U.S. RMY ORPS OF ENGINEERS KNM ROK ISLN ISTRIT W N Y: K Y: SOLIITTION NO.: ROK ISLN, ILLINOIS PLOT SLE:PLOT TE: PROJET OE: FILE NME: 6+00-205 IOW RIVER SPILLW Y PLN N PROFILE (203 FLOO REOVERY) _-205xxx.dgn

GENERL SHEET NOTES. SPILLWY ONSTRUTION WS OMPLISHE IN THE RY. 2. ONTRTOR LERE N GRUE SPILLWY RE. MTERILS WERE PLE ON THE LN SIE OF THE LEVEE IN RES JENT TO THE SPILLWY UT NO LOSER THN 5 FEET FROM THE LEVEE TOE. 3. VEGETTION WS STRIPPE TO EPTH OF 3 INHES. STRIPPE MTERIL WS REUSE S TOPSOIL ON THE LY LEVEE REPIR TO MX EPTH OF 6 INHES. EXESS MTERIL WS ISPOSE OF Y SPREING LONG LN SIE LEVEE TOE.. EXVTE LEVEE TO THE ELEVTIONS N SLOPES SHOWN ON THE TYPIL SETIONS S NEEE. 5. PREPRE THE SUGRE N PRTIL FILL SURFES. 6. URING GRING, ERTHEN MTERIL WS THOROUGHLY MIXE S SPEIFIE. 7. FILL WS PLE N OMPTE. c:\pw_working\mvr\b5eddlh\d032060\_-206xxx.dgn $TE$ 9:7:3 M 5E EL. 538.0 5 KEY INTO EXISTING GROUN 0 EXVTE RIVER SIE ONRETE RIPRP EL..5 2 2" RIPRP 3 0" EING FILL EXISTING GROUN EXISTING GROUN WS OVE N ELOW PROPOSE GRE FOR NEW SPILLWY. SLE : "=-0" 0 2 GEOTEXTILE FRI 6" RINGE STONE IOW RIVER SPILLWY TYPIL SETION (203 FLOO REOVERY) LN SIE 5 EL. 537.0 8. RIVER SIE SLOPE (ONSTRUTE TO THE SLOPES N GRES SHOWN):. PLE EING.. PLE RIPRP. 9. ONSTRUTION (ONSTRUTE TO THE SLOPES N GRES SHOWN):. PLE GEOTEXTILE FRI.. PLE, OMPT N FINISH RINGE STONE.. PLE.. FILLE VOIS WITH RINGE STONE. 0. LL ISTURE RES WERE SEEE. ESIGNE Y: TE: MRK ESRIPTION U.S. RMY ORPS OF ENGINEERS KNM SOLIITTION NO.: W N Y: K Y: ROK ISLN ISTRIT ROK ISLN, ILLINOIS IOW RIVER SPILLW Y PROJET OE: PLOT SLE:PLOT TE: TYPIL SETION I -206 FILE NME: (203 FLOO REOVERY) _-206xxx.dgn

c:\pw_working\mvr\b5eddlh\d032060\_-207xxx.dgn $TE$ 5E 9:7:39 M 2" RIPRP 3 SPILLWY TRNSITION 5 (MX.) 0" EING SLE : "=3-0" 0 3 SPILLWY TRNSITION RIPRP EXISTING LEVEE 5 (MX.) GEOTEXTILE FRI 6" RINGE STONE 6" RINGE STONE GEOTEXTILE FRI SLE : "=3-0" 0 3 0" RIPRP SIE SLOPE TIE-IN (203 FLOO REOVERY) TIE-IN TO LEVEE (203 FLOO REOVERY) EXISTING LEVEE GEOTEXTILE FRI 6" RINGE STONE 2" RIPRP LN SIE EXISTING JENT LEVEE EXISTING GROUN RIVER SIE ONRETE RIPRP 0" EING NO FLTTER THN 2H:V 2 6" RINGE STONE RIPRP SLE : "=3-0" 0 3 GEOTEXTILE FRI 6" RINGE STONE SLE : "=3-0" 0 3-207 IOW RIVER SPILLW Y TYPIL SETIONS (203 FLOO REOVERY) U.S. RMY ORPS OF ENGINEERS ROK ISLN ISTRIT ROK ISLN, ILLINOIS KNM TO RIPRP TIE-IN LN SIE (203 FLOO REOVERY) TO RIPRP TIE-IN SPILLWY (203 FLOO REOVERY) I ESIGNE Y: TE: MRK ESRIPTION W N Y: K Y: PLOT SLE:PLOT TE: FILE NME: SOLIITTION NO.: PROJET OE: _-207xxx.dgn

c:\pw_working\mvr\b5eddlh\d032060\_-208xxx.dgn $TE$ 5E 9:7: M 2% 2% 2 2 30" 00 L RIPRP 2 EXISTING GROUN EL. 53.0 GEOTEXTILE IOW OT GRTION PPROX. 3 ROWY SETION (STGE I) SLE : "=-0" 0 8 3 SLE : NO SLE GRVEL RO TYPIL SETION (STGE I) ST. 30+00 TO ST. 93+00 ST. 39+00 TO ST. 3+00 RUSHE GGREGTE RO TYPIL SETION (STGE I) RUSHE GGREGTE RO TYPIL SETION (STGE I) 3 SLE : NO SLE SLE : NO SLE 2% 2 UPSTREM OF LOK N M 7 20 OWNSTREM OF LOK N M 7 OMPTE SUSE 8" OMPTE GRVEL GRNULR SURFING NEW " RUSHE GGREGRTE REFUGE SIE LEVEE SIE 20 REFUGE SIE LEVEE SIE 20 EXISTING GRVEL RO NEW 0" THIK RUSHE GGREGRTE EXISTING SUSE NEW SUGRE EXSITING GROUN REFUGE SIE LEVEE SIE I -208 SPILLW Y RO TYPIL SETIONS (STGE I N STGE I) ESIGNE Y: TE: MRK ESRIPTION U.S. RMY ORPS OF ENGINEERS KNM ROK ISLN ISTRIT W N Y: K Y: SOLIITTION NO.: ROK ISLN, ILLINOIS PLOT SLE:PLOT TE: PROJET OE: FILE NME: _-208xxx.dgn