Balmoral Offshore Engineering

Similar documents
1. The well has been shut in on a kick and the kill operation has not started.

SURFACE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE

Casing and Cementing Requirements

HPHT Annular Casing Packer. Obex Annular Casing Packer

Development of a Subsurface Mudline Packer to Reduce Risk of Flow after Cementing and Sustained Casing Pressure, While Providing a Platform for P&A.

Why Do Not Disturb Is a Safety Message for Well Integrity

Float Equipment TYPE 925/926

Casing Design. Casing Design. By Dr. Khaled El-shreef

International Association of Drilling Contractors North Sea Chapter HPHT Guidance on MODU Safety Case Content

IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack)

Subsea Safety Systems

Practice Exam IADC WellSharp Driller and Supervisor

Testing Services Overview

TEST SPECIFICATION NYT-909-C

Railroad Commission of Texas. Chairman Barry T. Smitherman Commissioner David Porter Commissioner Christi Craddick

Deepwater Horizon Incident Internal Investigation

Platelets & Plasma The Management of Unplanned Flow

NORSOK standard D-010 Rev. 3, August 2004

APPENDIX A1 - Drilling and completion work programme

DuPont Kalrez. Oil and Gas Product Selector Guide. Technical Information April 2017

On-Off Connector Skirt

Drilling riser buoyancy systems. matrix composites and engineering

Perforating Center of Excellence TESTING SERVICES OVERVIEW

EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG Singapore Telephone: Fax:

Chapter 4 Key Findings. 4 Key Findings

Restoring Fluid Flow in Tubing Strings

HYDROSTATIC LEAK TEST PROCEDURE

Texas Administrative Code

SWAGED CONNECTION SYSTEM FOR STRUCTURAL & PRESSURE TIGHT APPLICATIONS. Providing Total Solutions Through Swaging Technology

Study Guide IADC WellSharp Driller and Supervisor

TECHNICAL DATA. Q = C v P S

Captain Wellhead & Tree

Sample C ylinde rs, Acce ssorie s, and O utage Tube s

Barrier Philosophy for Wells on Gas lift and Ways of Reducing HSE Risks. Alan Brodie Feb 2011 For more info visit

Dynamic Underbalance (DUB)

COGCC OPERATOR GUIDANCE MECHANICAL INTEGRITY TEST GUIDANCE: PRACTICES AND PROCEDURES

Reliability of Annular Pressure Buildup (APB) Mitigation Technologies

PTRT 1471: Exploration and Production I. Chapter 6: Drilling and Well Completion

T e l N o : F a x N o : E m a i l : a i s h c m c - m e. c o m w w w. c m c - m e.

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS

Type 967 Diamond Broaching Type 968 Sidewinder reamer shoe

ECD Reduction Tool. R. K. Bansal, Brian Grayson, Jim Stanley Control Pressure Drilling & Testing

Best Practices - Coiled Tubing Deployed Ball Drop Type Perforating Firing Systems

Drilling Efficiency Utilizing Coriolis Flow Technology

INTERMEDIATE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE

W I L D W E L L C O N T R O L FLUIDS

TECHNICAL DATA. Q= Cv S

W I L D W E L L C O N T R O L CIRCULATION & WELL CONTROL

DRILLING HOSE SOLUTIONS

TECHNICAL DATA 3 MODEL G-3000 DRY VALVE RISER ASSEMBLY

Solid Expandable Tubular Technology: The Value of Planned Installation vs. Contingency

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD

OCEAN DRILLING PROGRAM

UIB30 and UIB30H Sealed Inverted Bucket Steam Traps for use with Pipeline Connectors

Learn more at

Fully Submersible Heavy Lift Vessel

float equipment OPERATING MANUAL TYPE 505/506 Float Equipment 1. INFORMATION & RECOMMENDATIONS Float Equipment

CLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD. 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems.

REV: 03/17. User Manual

DI-DRO ADVANCED FORMING SYSTEMS

E NGINEERED C EMENTING S OLUTIONS

Engineered solutions for complex pressure situations

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM

(12) Patent Application Publication (10) Pub. No.: US 2014/ A1

the annulus between the second casing string and the surface casing [must be] open to the atmosphere in the manner described in subsection (2).

Squeeze Cementing. Brett W. Williams Cementing Technical Advisor January 2016 Tulsa API Meeting

TECHNICAL BENEFITS OF CJS / RAISE HSP. Technical Advantages

New generation of solid expandable liners help give operators a jump on trouble zones

The key to connectivity

August 21, Deepwater MPD / PMCD

Hydro-Mech Bridge Plug

TECHNICAL DATA Q = C. v P S. 2 Model G-2000 Dry valve. Page 1 of 13

Case History. North Sea Platform Wellhead Isolation Tubing Hanger Body Seals Locking Device 20-3/4 x 13-3/8 Mandrel Neck Seal

SCORPION HIGH-QUALITY, FULLY COMPOSITE PLUGS

Commentary on the book by Andrew Hopkins. By Graham Dalzell

Inflatable Packers for Grouting 11/10/00

FV Flash Vessel Installation and Maintenance Instructions

S1, S2, S3, S5, S6, S7, S8, S12 and S13 Separators Installation and Maintenance Instructions

The SPE Foundation through member donations and a contribution from Offshore Europe

N2 Membrane+ Nitrogen Production Systems for Offshore. Where you are. Where you need to be. We are here too.

Operating Procedures for GripTight 15.5 SDR & IPS Test Plugs

Dilution-Based Dual Gradient Well Control. Presented at the 2011 IADC Dual Gradient Workshop, 5 May 2011 by Paul Boudreau, Dual Gradient Systems LLC

Comparison of Steel Tubes and Thermoplastic Hoses in Umbilical Service

TIGHTNESS. Glass sealing Thanks to our glass-sealing technology, ODU products can meet the most demanding tightness requirements.

Advanced Applications of Wireline Cased-Hole Formation Testers. Adriaan Gisolf, Vladislav Achourov, Mario Ardila, Schlumberger

Installation Instructions For Flat Seated Bolted Type RAH Series Disk Holders

BIMBAR INFLATABLE PACKERS AND ACCESSORIES

Retrievable Bridge Plugs

Air Pressure Relief Valves

INTERPRETATION NOTE ISSUED UNDER THE PETROLEUM DRILLING REGULATIONS (CNR 1150/96)

EXPERIMENTAL STUDY ON THE HYDRODYNAMIC BEHAVIORS OF TWO CONCENTRIC CYLINDERS

Centre of Excellence for Subsea Safety

Permanent buoyancy systems. matrix composites & engineering

Liquid Nitrogen for Duct Cleaning

Hard or Soft Shut-in : Which is the Best Approach?

Top Tensioned Riser Challenges and Solutions for Dry Tree Facilities in Asia Pacific

6.6 Relief Devices. Introduction

Flange Bolt Torquing. for Resistoflex Plastic-Lined Piping Products. Torquing. Retorquing. Hydrotesting. Annual retorquing

Distributed Acoustic Sensor for Oil and Gas

COMBINATION AIR RELEASE DEGASSING (CARD) VALVES INSTALLATION AND MAINTENANCE MANUAL

Transcription:

Balmoral Offshore Engineering Buoyancy, insulation and elastomer products Balmoral Casing Guard Annular pressure build-up mitigation system Connect with us: www.balmoraloffshore.com TM

Balmoral Casing Guard TM C annulus Shoe gaps allow venting to/from the annuli. Shoe gaps may become plugged during cementing due to formation collapse or solids settlement Conductor casing B annulus Surface casing A annulus Balmoral Casing Guard APB mitigation system Production casing Intermediate casing Cement

Annular pressure build-up (APB) As a subsea well is drilled, successively smaller casings are introduced creating a number of fluid-filled annular spaces. Only the inner-most annulus (A) can bleed off through the subsea tree. The outer annuli (B and C) may be open to fluid movement through open shoes but, in practice, these annuli frequently get plugged off during cementing by formation collapse or solids settlement. Due to the combination of extreme water depths and hole depth in many modern offshore wells, HP/HT reservoir fluids can reach temperatures as high as 350ºF while flowing. When a well is brought on line these hot fluids rise up the casing string, elevating the temperature of the casings and annular fluids during flow. If thermal expansion of the annular fluids is restricted by plugging, a major pressure increase, known as annular pressure build up (APB), occurs. Pressure increases of 80-150psi/ºF are typical, meaning that even a relatively modest temperature increase of 100ºF can result in pressures approaching 15,000psi. It is not generally cost effective and, in many cases, impractical to design the casing string to tolerate the potentially massive APB s in modern wells. Engineered APB mitigation systems are therefore required to accommodate such expansion. APB is known to have caused the rupture of intermediate and production casings on several wells over the last 10 years. The financial impact and recovery implications of such failures are enormous. C annulus B annulus A annulus Perspective representation of well Balmoral Offshore Engineering Balmoral Casing Guard 1

The theory of APB mitigation Recognised APB mitigation systems include precision-engineered bursting discs and nitrogen fluid spacers. Potentially, however, the most simple mitigation system is that of syntactic foam elements with designed collapse performance located within the casing annuli. The annular volume increase resulting from this engineered foam collapse accommodates the thermal expansion of the trapped fluid and significantly reduces APB. Balmoral is acknowledged as an innovative and proactive developer in the fields of advanced syntactic foam systems for subsea buoyancy and insulation use. The company has now developed a family of unique syntactic foam systems that provide protection against excessive APB in casings during the start-up of subsea wells. Known as Balmoral Casing Guard (BCG), in-house technologists developed the materials by applying behaviour patterns for syntactic foams, originally established for more traditional buoyancy and insulation systems, to the unique requirements of APB mitigation. Pure syntactic foams comprise hollow glass microspheres (HGMS) suspended in a thermoset resin matrix. HGMS grades are available with collapse pressure ratings ranging from 250-28,000psi; these collapse pressures are not temperature sensitive. Discrete steps in collapse pressure mean that, in the absence of other factors, protection against APB could only be provided at those specific pressures determined by the glass microsphere pressure ratings. However, the collapse pressure of each microsphere grade can be enhanced by the selection of a matrix resin system with appropriate mechanical performance. By careful selection, syntactic foams with a continuum of collapse pressures from 250-28,000 psi can therefore be created. As the mechanical performance of the matrix resin system is temperature dependant so too is the collapse pressure of the syntactic foam even though the collapse pressure of the glass microspheres is not temperature dependant in isolation. It is therefore possible to formulate a syntactic foam which will suffer hydrostatic collapse (HCP), and thus APB mitigation, at effectively any combination of pressure and temperature. The effects on HCP of microsphere grades of temperature and resin matrix Tg are illustrated in Figures 1 and 2. The amount of foam volume contraction upon hydrostatic collapse - known as the collapse percentage - is a function of the volume fill of the foam by microspheres. Contractions of 30-40% are routinely available. The volume contraction behaviour of a typical medium Tg grade of Balmoral Casing Guard is given in Figure 3. 2 Balmoral Offshore Engineering Balmoral Casing Guard

Balmoral APB mitigation system When specifying APB mitigation requirements the operator s well design engineers will normally declare: 1. The temperature and annular pressure range at which pressure mitigation is likely to take place 2. The collapse volume required. Collapse volume is the additional volume in the casing annulus required to be created by foam collapse and is based on the anticipated fluid thermal expansion and the residual annular pressure build-up that the casings are able to accommodate. The volume of Balmoral Casing Guard required to achieve APB mitigation is dictated by the collapse volume for the particular annulus, based on the annular volume and temperature rise, and the collapse percentage of the selected foam for the specified collapse pressure band. Standard practice is to allow a modest excess of foam, typically 20-25%, as a safety margin should the collapse volume be underestimated. In the majority of cases the APB is linked directly to annular fluid temperature increase upon well start-up. In this situation, the standard design practice for BCG is to select a foam grade where the matrix Tg is close to or less than the temperature at which the APB mitigation is to take place. This ensures that BCG collapse pressure is highly sensitive to temperature change and collapse is guaranteed once the design APB mitigation temperature is reached. The effect of temperature upon the volume compression behaviour of a BCG system based on a low pressure-rated HGMS and matrices of varying Tg is shown in Figure 4. In certain circumstances APB may occur across a range of operating temperatures. In order to mitigate APB in these circumstances the foam performance is completely different, the requirement being for a system with a collapse pressure which is largely insensitive to temperatures across the range of interest. This is achieved by selecting a foam matrix with a Tg far above the temperature range of interest. The only significant means of collapse pressure control for these systems is now through HGMS grade selection. The behaviour of such systems is illustrated in Figure 5. Balmoral Offshore Engineering Balmoral Casing Guard 3

Application and operation of Balmoral Casing Guard Balmoral Casing Guard is supplied as an easy-to-install kit for site application. It is routinely supplied as foam quadrants, typically 0.5 1.5m in length. These quarter cylinders are bonded to the outside diameter to create a continuous cylindrical section or, where a complete cylinder could later result in restricted fluid flow, in two or three sections around the casing outside diameter. The effective outside diameter of the installed BCG quadrants is restricted to minimise damage to the foam during casing deployment. The complete BCG kit comprises the quadrant sections, adhesive system, powered adhesive dispensing equipment, banding and full HSE and installation documentation. Once installed and the coated casing run, BCG has no detectable effect upon normal well operations and remains passive. When the design collapse conditions are reached, BCG responds immediately to provide the degree of APB mitigation specified by the engineering design team. Alternative applications Balmoral Casing Guard materials can be successfully adapted for wider use in downhole applications including radial cavity inserts for pressure deformation swaging where pressure/temperature combinations range from 35 C-130 C and 6000psi-10000psi. Balmoral Offshore Engineering s technical team would be pleased to discuss project-specific enquiries. 4 Balmoral Offshore Engineering Balmoral Casing Guard

HEAD OFFICE AND FACTORIES Balmoral Park, Loirston, Aberdeen AB12 3GY, Scotland T +44 (0)1224 859000 F +44 (0)1224 859059 E offshore@balmoral.co.uk www.balmoraloffshore.com BOE-CG-0812-REV01