EVALUATION OF GROUP-BASED SIGNAL CONTROL THROUGH FIELD OPERATIONAL TESTS *

Similar documents
ANALYSIS OF SATURATION FLOW RATE FLUCTUATION FOR SHARED LEFT-TURN LANE AT SIGNALIZD INTERSECTIONS *

Available online at ScienceDirect. Analysis of Pedestrian Clearance Time at Signalized Crosswalks in Japan

PAVEMENT MARKING TREATMENTS ON INTERSECTION APPROACHES WITH EXCLUSIVE RIGHT-TURN LANES *

MEASURING PASSENGER CAR EQUIVALENTS (PCE) FOR LARGE VEHICLES AT SIGNALIZED INTERSECTIONS

Chapter 5 5. INTERSECTIONS 5.1. INTRODUCTION

Arterial Traffic Analysis Actuated Signal Control

Saturation Flow Rate, Start-Up Lost Time, and Capacity for Bicycles at Signalized Intersections

Chapter Capacity and LOS Analysis of a Signalized I/S Overview Methodology Scope Limitation

A Proposal for the Estimation of Loss Time of Right-turn Traffic at. Signalized Intersections in Japan

Development of Professional Driver Adjustment Factors for the Capacity Analysis of Signalized Intersections

Analysis of the Interrelationship Among Traffic Flow Conditions, Driving Behavior, and Degree of Driver s Satisfaction on Rural Motorways

Volume-to-Capacity Estimation of Signalized Road Networks for Metropolitan Transportation Planning

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

Module 3 Developing Timing Plans for Efficient Intersection Operations During Moderate Traffic Volume Conditions

Methodology for analysing capacity and level of service for signalized intersections (HCM 2000)

An Analysis of Reducing Pedestrian-Walking-Speed Impacts on Intersection Traffic MOEs

Updated Roundabout Analysis Methodology

A STUDY ON TRAFFIC CHARACTERISTICS AT SIGNALIZED INTERSECTIONS IN BEIJING AND TOKYO

Roundabout Model Calibration Issues and a Case Study

Analysis of Signalized Intersections

Evaluation of service quality for pedestrian crossing flow at signalized intersection

Traffic Signals. Part I

URBAN STREET CONCEPTS

Capacity and Performance Analysis of Roundabout Metering Signals

DOI /HORIZONS.B P23 UDC : (497.11) PEDESTRIAN CROSSING BEHAVIOUR AT UNSIGNALIZED CROSSINGS 1

Gap Acceptance Cycles for Modelling Roundabout Capacity and Performance

Impact of Signalized Intersection on Vehicle Queue Length At Uthm Main Entrance Mohd Zulhilmi Abdul Halim 1,b, Joewono Prasetijo 2,b

MEASURING CONTROL DELAY AT SIGNALIZED INTERSECTIONS: CASE STUDY FROM SOHAG, EGYPT

Estimating Base Saturation Flow Rate for Selected Signalized Intersections in Khartoum State, Sudan

Probabilistic Models for Pedestrian Capacity and Delay at Roundabouts

6.4.2 Capacity of Two-Way Intersections-HCM Method

TABLE OF CONTENTS 1. INTRODUCTION 2. TRAFFIC ENGINEERING FUNDAMENTALS 9. SYSTEM CONTROL 3. DATA COLLECTION 4. SIGNAL PHASING 10. SPECIAL OPERATIONS

ANALYSIS OF SIGNALISED INTERSECTIONS ACCORDING TO THE HIGHWAY CAPACITY MANUAL FROM THE POINT OF VIEW OF THE PROCESSES APPLIED IN HUNGARY

Analysis of Unsignalized Intersection

Conversation of at Grade Signalized Intersection in to Grade Separated Intersection

Actuated Signal Timing Design CIVL 4162/6162

Available online at ScienceDirect International Symposium of Transport Simulation (ISTS 16 Conference), July 7~8, 2016

A Study on Adjustment Factors for U-Turns in Left-Turn Lanes at Signalized intersections

A new lost time estimation method for right-turn traffic in Japan considering signal phasing and sneakers

TRAFFIC SIGNAL WARRANT STUDY

SIDRA INTERSECTION 6.1 UPDATE HISTORY

Mathematics of Planet Earth Managing Traffic Flow On Urban Road Networks

6. signalized Intersections

Evaluating Roundabout Capacity, Level of Service and Performance

An Analysis of the Travel Conditions on the U. S. 52 Bypass. Bypass in Lafayette, Indiana.

Pedestrian Level of Service at Intersections in Bhopal City

Effect of Supplemental Signal on Start-Up Lost Time at Signalized Intersection

Yellow and Red Intervals It s Just a Matter of Time. 58 th Annual Alabama Transportation Conference February 9, 2015

Application of Diamond Interchange Control Strategies at Closely Spaced Intersections

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

LYNNWOOD ROAD ARTERIAL STUDY The effect of intersection spacing on arterial operation

Traffic Signal Design

Unit 7 Speed, Travel Time and Delay Studies

Traffic Signal Optimization Project (Hosman Road) (Future Coordinated Corridor)

QUEUE DISCHARGE BEHAVIOR AT SIGNALIZED INTERSECTION: A COMPARISON BETWEEN FIELD MEASUREMENTS WITH ANALYTICAL AND MICRO-

A Comprehensive HCM 2010 Urban Streets Analysis Using HCS 2010 US 31W in Elizabethtown, KY

Issues in Performance Assessment of Sign-Controlled Intersections

A STUDY ON GAP-ACCEPTANCE OF UNSIGNALIZED INTERSECTION UNDER MIXED TRAFFIC CONDITIONS

A New Lane-Based Model for Platoon Patterns at Closely-Spaced Signalised Intersections

Tight Diamond Interchange versus Single Point Urban Interchange: Pedestrians Prospective

BLOSSOM AT PICKENS SIGNALIZED INTERSECTION IMPROVEMENT STUDY

Road Conversion Study Plumas Street

DERIVATION OF A SIGNAL TIMING SCHEME FOR AN EXTERNALLY SIGNALIZED ROUNDABOUT

HIGHWAY CAPACITY MANUAL 2010: NEW SIGNALIZED INTERSECTION METHODOLOGY. James A. Bonneson, Ph.D., P.E.

Intersection of Massachusetts Avenue and Maple Street in Lexington Signalized Intersection and Roundabout Comparison

Access Location, Spacing, Turn Lanes, and Medians

Development of Saturation Flow Rate Model for Heterogeneous Traffic at Urban Signalized Intersection

CAPACITY, LEVEL OF SERVICE, FUNDAMENTALS OF HIGHWAY CAPACITY ANALYSIS

Chapter 7 Intersection Design

Measuring and Assessing Traffic Congestion: a Case Study

Introduction to Traffic Signal Timing

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

Zhang and Nakamura - 1 -

EFFICIENCY OF TRIPLE LEFT-TURN LANES AT SIGNALIZED INTERSECTIONS

Roundabout Model Calibration Issues and a Case Study Rahmi Akçelik

William Castro Associated Professor, Faculty of Engineering, Universidad Nacional de Colombia Bogotá, Colombia,

Roundabouts in Australia: the state of the art on models and applications

The calibration of vehicle and pedestrian flow in Mangalore city using PARAMICS

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

(Received December 19, 2003)

A New Approach for Modeling Vehicle Delay at Isolated Signalized Intersections

Controlling Traffic by Designing Signal at Intersection of Vidisha Sachin Jat 1 Mr. S.S. Goliya 2 Sachin Nagayach 3 Rohit Gurjar 3

Working White Paper on the Implementation of the Highway Capacity Manual 6 th Edition in Synchro

PERFORMANCE EVALUATION OF AT GRADE INTERSECTIONS AND IMPROVEMENT USING SIGNAL COORDINATION

Evaluation and Changes to Pedestrian Priority Phase Signal (Scramble Crossing) at Bay Street and Bloor Street

ROUNDABOUT MODEL COMPARISON TABLE

Public Opinion, Traffic Performance, the Environment, and Safety After Construction of Double-Lane Roundabouts

Effectiveness of Signal Coordination for Pedestrian Flows Considering Bi-directional Flow Impacts

COMPARISON OF STOPPED DELAY BETWEEN FIELD MEASUREMENTS AND HCM 2010 ESTIMATIONS AT ACTUATED SIGNALIZED INTERSECTIONS BY MOHAMMED ABDUL RAWOOF SHAIK

Planning and Design of Proposed ByPass Road connecting Kalawad Road to Gondal Road, Rajkot - Using Autodesk Civil 3D Software.

QUEUE LENGTH AT SIGNALIZED INTERSECTIONS FROM RED-TIME FORMULA AND HCM COMPARED TO FIELD DATA

Signal Timing Design CIVL 4162/6162

EVALUATION OF METHODOLOGIES FOR THE DESIGN AND ANALYSIS OF FREEWAY WEAVING SECTIONS. Alexander Skabardonis 1 and Eleni Christofa 2

Manual 2010 roundabout capacity model

3 ROADWAYS 3.1 CMS ROADWAY NETWORK 3.2 TRAVEL-TIME-BASED PERFORMANCE MEASURES Roadway Travel Time Measures

AN ASSESSMENT OF THE HIGHWAY CAPACITY MANUAL EDITION 6 ROUNDABOUT CAPACITY MODEL

CALIBRATION OF THE PLATOON DISPERSION MODEL BY CONSIDERING THE IMPACT OF THE PERCENTAGE OF BUSES AT SIGNALIZED INTERSECTIONS

ROUNDABOUT MODEL COMPARISON TABLE

Operational Ranking of Intersections: A Novel Prioritization Methodology

INTERCHANGE RAMP TERMINALS

Transcription:

EVALUATION OF GROUP-BASED SIGNAL CONTROL THROUGH FIELD OPERATIONAL TESTS * By Nan KANG **, Wael ALHAJYASEEN ***, Hideki NAKAMURA ****, Miho ASANO ***** and Keshuang TANG ****** 1. Introduction At signalized intersections, green times should be assigned to satisfy the traffic demand for all approaches. Stage-based signal control is the most common and basic control policy worldwide particularly at Japanese signalized intersections. It is defined as a signal control policy in which compatible traffic movements are grouped to move together in a specific time span within a signal cycle, which are referred to stages, and green times are then assigned to each stage depending on the movement with the highest demand in each stage. At intersections with relatively balanced traffic demand in opposite approaches, the stage-based signal control can assign green time reasonably for each stage. However, at intersections with imbalanced traffic demand in opposite approaches, a portion of the assigned green time to the approaches with minor traffic demand will not be used since stage-based signal control assigns equal green time to major and minor traffic demand approaches. Since this control policy has a stable phasing plan and the green time is assigned for an approach not for movements, long cycle length and large delay are likely to occur at such intersections. In order to overcome such deficiencies, group-based signal control was invented and widely used in different countries. It is defined as signal control which directly assigns green times to traffic movements without the need to maintain a specific stage structure. This policy can assign the green time to each traffic movement rather than a stage of different movements, therefore the unused green time which is assigned by stage based signal control to the approaches with minor traffic demand can be avoided. Such control policy provides flexible phasing structure where different non-conflicting movements can be joined together in one phase. This mechanism might reduce the cycle length by saving the unused green time, and furthermore delay as well. Furthermore, the flexible phasing structure is advantageous in avoiding several conflicts between traffic movements which might have positive impact on the safety phases, the flexible phasing patterns which might confuse drivers at the beginning and the end of green phases. This possible negative impact might be the main reason behind the limited application of this policy in Japan. In this study, the operational and safety performance before and after the implementation of group-based signal control at two test intersections are evaluated and compared. 2. Literature review Many studies found that traffic flow characteristics at signalized intersections, such as start-up lost time SULT, clearance lost time CLT and saturation flow rate SFR are influenced by geometric design, signal control and user attributes (Noyce et al. 2 1) ; Lin et al. 24 2) and 25 3) ; and Tang and Nakamura 27 4) ). The differences in these variables under group-based signal control and stage-based signal control were also explored by the authors recently. An international comparative study between Germany and Japan analyzed SULT, CLT, and SFR at typical signalized intersections with pretty close intersection size and traffic demand (Tang and Nakamura, 27 5) ). Following that, a before-and-after study at Yokkaichi City in Japan was performed to further explore the impacts of group-based signal control on operational performance and safety performance (Tang and Nakamura, 28 6),7) ). However, Tang and Nakamura included in their analysis one Japanese intersection with a specific traffic condition. This study aims to evaluate the operational and safety performance of group-based signal control at an intersection in Tahara City, Japan and compare this performance with that of Yokkaichi city intersection which was analyzed by Tang and Nakamura, 28 6),7). 3. Site description and data collection Two intersections in Japan have been chosen to evaluate the performance of group-based signal control. One is located in Yokkaichi City of Mie Prefecture (site Y) which connects national Route 23 and a prefectural road. It is characterized by complex geometry, high vehicular traffic demand, very low pedestrian demand, large proportion of heavy vehicles, and apparent demand fluctuations during different time of the day. The other one is located in Tahara City of Aichi Prefecture (site T) connecting prefecture Route 2 and a city road. This intersection has a common *Key words: group-based signal control, performance evaluation **Student Member of JSCE, Dept. of Civil Eng., Nagoya Univ. (Furo-cho, Chikusa-ku, Nagoya 464-863, Tel. 52-789-5175, FAX: 52-789-3837, Email: kang@genv.nagoya-u.ac.jp) *** Member of JSCE, Postdoctoral Research Fellow, Dr. Eng., Dept. of Civil Eng., Nagoya Univ. ****Member of JSCE, Professor, Dr. Eng., Dept. of Civil Eng., Nagoya Univ. *****Member of JSCE, Assistant Professor, Dr. Eng., Dept. of Civil Eng., Nagoya Univ. ******Member of JSCE, Dr. -Eng, the Univ. of Tokyo

Prefecture Route 2 SB Traffic signal NB SB Detector Video camera Traffic signal for vehicles Traffic signal for pedestrian EB Prefecture Route 2 WB EB WB Vehicle trajectory NB Passing time Figure 1 Configuration, signal light settings and detector arrangement for site Y NB Prefecture Route 2 Figure 2 Configuration, signal light settings and detector arrangements for site T Table 1 Survey times and weather conditions at sites Y and T Location Condition Date Time Weather Yokkaichi Tahara Before After 27.2.26(Mon) 14:~15:3 (PM off peak)/17:~18:3 (PM peak) Sunny 27.2.27(Tue) 7:~8:3 (AM peak)/1:~11: (AM off peak) Sunny 27.6.18(Mon) 17:~18:3 (PM peak) Rainy 27.6.19(Tue) 7:~8:3 (AM peak) /1:~11: (AM off peak) /14:~15:3 (PM off peak) Sunny Before 28.11.5(Wed) 14:~15:3 (PM off peak)/15:3~17: (PM peak) Sunny After 28.12.1(Wed) 14:~15:3 (PM off peak)/15:3~17: (PM peak) Sunny geometric layout and relatively low pedestrian demand. Vehicular traffic demand and heavy vehicle proportion are high since the Toyota Automobile Factory is very close to the site. Furthermore, vehicular traffic demand is imbalanced at both of the two directions. At site Y, the upstream and downstream of both NB and SB are separated however the EB and WB have a combined upstream and downstream as show in Figure 1. While site T is a common 4-leg intersection as shown in Fugure2. Table 1 shows the time and weather condition of the before and after surveys for site Y and site T. Since Tahara intersection was surveyed during the PM peak and off peak hours only, the PM peak hour was chosen as the analysis period for the performance evaluation in this paper. As shown in Table 1, one rainy day was included in the survey at site Y. Signal timing, phasing information and traffic flow characteristics are extracted from the video tapes. According to the observations at site Y, imbalanced traffic demands prevail at east-bound (EB) and west-bound (WB) approaches. The traffic demand of EB-LT in AM peak-hour is higher than that of WB, in contrast, the opposite situation often takes place during PM peak. At site T in PM peak hour, the traffic demand of SB-LT is higher than that of NB. However, the traffic demand of NB-R is higher than that at of SB. Meanwhile, all traffic movements at WB have higher demand than EB. During the PM peak hour, initial queues occurred on WB (the critical traffic movement) at site Y when stage-based signal control was applied which resulted in significantly large delays. This means that the assigned green time to the phase which includes the through and left turning of WB and EB could not satisfy the traffic demand at the WB. Moreover, the assigned green time to the through and left turning of EB is partially used since the demand was low. In order to overcome these problems, group-based signal control was installed at site Y on the WB and EB. Figure 3 shows the phasing plans for site Y in before and after cases. The extra green phases (φ2a, φ2b) are implemented depending on the traffic demand. At site T, initial queue did not occurred at any traffic movement in the before condition which means that the assigned green time for each traffic movement was sufficient. Due to the imbalanced traffic demand between the NB and SB, EB and WB, the assigned green time by stage-based signal control was partially used by the minor traffic movements (NB and EB). In order to improve this deficiency and to investigate the possible effects on the safety performance, group based signal control was implanted at all approaches. Figure 4 shows the phasing plans for site T in before and after cases. By comparing the phasing plans after the implementation of group-based signal control in site Y and site T, phasesφ2a-1,φ2b-1,φ5a-1 andφ5b-1 are applied only at site T in order to provide a clearance time between the right turning traffic and the opposing through traffic. To provide a general view on the traffic conditions during the before and after surveys for site Y and site T, traffic

Average green time, s Traffic volume, veh/1.5h Average green time, s Traffic volume, veh/1.5h φ2 φ3 φ4 φ5 φ2 φ3 φ4 φ5 Before Before φ2a φ2a-1 φ2a-2 φ5a-1 φ5a-2 φ3 φ4 φ6 φ5 φ3 φ4 φ6 φ7 φ2b φ2b-1 φ2b-2 φ5b-1 φ5b-2 After Figure 3 Phasing plans applied at the site Y in the before and after study After Figure 4 Phasing plans applied at the site T in the before and after study 7 6 5 4 3 2 1 56 39 39 31 23 16 16 7 63 Green time_before Green time_before Green time_after 14 6 54 Green time_after 51 Flow rate_before48 Flow rate_before 48 12 5 Flow rate_after Flow rate_after 41 1 4 4 37 38 38 4 8 3 3 23 24 3 25 25 2 6 2 17 18 2 4 11 11 8 1 2 NB-LT NB-R SB-LT SB-R WB-L WB-Th WB-R EB-LT EB-R EB-LT EB-R WB-LT WB-R SB NB Approach_Movement Approach_Movement 16 14 12 1 8 6 4 2 Figure 5 Observed average flow rates and green times at site Y in the before and after study Figure 6 Observed average flow rates and green times at site T in the before and after study demand and green times for each movement are presented in Figure 5 and Figure 6 respectively. The critical movement at site Y is WB approach (WB-LT) while SB approach (SB-LT) and WB approach (WB-LT) are the critical movements at site T. Meanwhile WB-LT at site Y and SB-LT at site T were chosen as the subject traffic movements for intersection performance evaluation in this study. As shown in Figure 5 and Figure 6, after the implementation of group-based signal control, the green time is assigned reasonably to each movement according to traffic demand. However, there is an exception at site T where the assigned green time to NB-R is shorter than that of SB-R although the traffic demand of NB-R is higher than that of SB-R. This can be referred to the existence of phaseφ2b-2 which provides the SB-R with an extra green time. But this green time is not used since the demand of right turn traffic is very low. The same situation occurred at the WB-R of site T. In the before study, oversaturated condition is observed at the WB-LT of site Y, which means that the assigned green time did not satisfy the traffic demand. Therefore, after the implementation of group-based signal control a longer green time is assigned to the WB-LT which eliminated the oversaturated condition as shown in Figure 5. After the implementation of the group-based signal control, it was observed that at site Y, the average cycle length remained the same as the before condition. However, at site T, the average cycle length was reduce at site T from 144s to 135s (exclude pedestrian phase). This can be referred to the traffic characteristics of site T where all the opposite directions are characterised by imbalanced traffic demand which is advantageous for group based signal control. 4. Results and discussion (1) Operational performance a) Traffic flow characteristics Start-up lost time (SULT), clearance lost time (CLT), and saturation flow rate (SFR) were used to represent traffic flow characteristics in this study as they are key parameters in the calculation of capacity. These three parameters can only be measured under saturated conditions, and are computed according to the equations provided by the Highway Capacity Manual 2 8) as shown in Equations (1), (2) and (3). SULT = ( H 1 + H 2 + H 3 + H 4 4 H 5 + + H n ) 4 n 4 SFR = 36/( H 5 + + H n ) n 4 (1) (2)

Start-up lost time(sult), s Saturation flow rate (SFR), pcu/l/h Clearance lost time (CLT). s 11. 9. 7. 5. 3. 1. -1. 9.6 8 5.98 4.62 2.38 2.49 1.71 1.57 1.9.1 -.4 -.2 before(n=31) after(n=3) before(n=47) after(n=49) 26 24 22 2 18 16 14 12 1 2293 2411 225 2182 1943 1764 1825 1763 167 1565 1333 1457 before(n=31) after(n=3) before(n=47) after(n=49) 8. 7. 6. 5. 4. 3. 2. 1.. 7. 7. 6. 6. 4.93 5.19 5.38 5.72 2.3 2.5.. before(n=31) after(n=3) before(n=47) after(n=49) Legend Max Mean+Std.dev Mean Mean-Std.dev Min WB-LT (site Y) SB-LT(site T) a) Observed SULT b) Observed SFR c) Observed CLT Figure 7 Observed SULT, SFR and CLT at site Y and site T in the before and after study (n : number of samples) CLT =Y+AR-T e (3) Where H i is time headway of the ith vehicle passing the stop-line in queue (s); n is total number of queued vehicles; Y is yellow time (s); AR is all-red time (s) and T e entry time of the last cleared vehicle after the start of intergreen (s). Note that T e equals to Y+AR if no vehicle enters after the start of intergreen, while T e equals to if a vehicle enters after the end of all-red. Figure 7a) presents the observed SULT of the subject traffic movements at site Y and site T. SULT of WB-LT is reduced after the implementation of group-based signal control at site Y, however, it increased at site T on SB-LT. As mentioned in the introduction part, group-based signal control has a variable phasing plan which is changing dependent on the traffic condition. Such flexible phasing plan might confuse the drivers who are waiting for the start of green time at the head position of the queue. Actually the first and the second vehicle spend longer response time since they cannot expect which phase will be displayed. According to the computing method, SULT should increase after the implementation of group-based signal control which is in accordance with the observation at site T. However at site Y, SULT decreased which can be referred to the rainy weather condition during the survey. Due to the rainy condition, drivers might try to keep longer headways, especially in the back of the queue which will result in smaller SULT (Equation 1). Although this does not reflect any kind of improvement since the reduction is only because of the methodology which is used for calculating SULT. Figure 7b) shows the observed SFR for the subject traffic movements. It was found that SFR of WB-LT at site Y was slightly reduced in the after condition due to the rainy weather. At site T, SFR of SB-LT did not significantly change after the implementation of group-based signal control, because there is no change in road and weather conditions in the before and after cases. Meanwhile, the result can imply that group-based signal control may not influence the driver behavior in the rest part of the queue excluding the first several drivers. Figure 7c) presents the observed CLT of the subject traffic movements at site Y and site T. CLT refers to the time between signal phases during which an intersection is not used by any traffic. It is composed from the lost time in yellow and all-red clearance interval. The results show that CLT slightly increased at both sites.and that drivers become more conservative when they decide to pass or stop after the onset of yellow signal as they can hardly presume what conflicting traffic movements will be released in the next phase. b) Capacity Capacity is computed according to the methodology proposed by Highway Capacity Manual 2 8) as shown in Equation (4) and (5). c = SFR G e C (4) G e = G + Y + R (SULT + CLT) (5) Where C is cycle length(s) and G e is effective green time(s). The capacities of the subject traffic movements at site Y and site T are shown in Figure 8. The result shows that the capacities of WB-LT at site Y and SB-Th at site T increased after group-based signal control was implemented. The capacity is mainly dependent on SFR, lost time (SULT, CLT), and the green time allocation. According to the results on SFR and lost time discussed before, it is concluded that the major reason behind the increasing in the capacity is the green time allocation. It can imply that group-based signal control can provide better green time allocation to the subject traffic movements. c) Control delay Control delay is computed according to the methodology proposed by Highway Capacity Manual 2 8) as shown in Equation (6). control delay = d 1 (PF) + d 2 + d 3 (6) Where d 1 is uniform control delay(s/veh); PF is uniform delay progression adjustment factor; d 2 is incremental delay(s/veh) and d 3 is initial queue delay(s/veh). The initial queue delay was considered only at site Y due to the observed residual queues before the implementation of group-based signal control, but was not considered in the delay estimation at site T since no residual queues existed in the before and after surveys.

Observed PET, s Control delay (s/veh) Capacity (pcu/h) Figure 9 shows the estimated control delay for site Y and site T. It can be concluded that control delay at both sites significantly reduced after the implementation of group-based signal control. This can be referred to the cycle length reduction and the better allocation of green time to the subject traffic movements. Although the cycle length of site Y did not change significantly in the before and after conditions, the control delay remarkably reduced. This can imply that control delay might be also strongly related to the green time allocation, not only to the cycle length. 7 6 5 4 3 2 1 424 59 before(n=31) after(n=3) 489 67 before(n=47) after(n=49) (2) Safety performance As mentioned in the introduction, the influence of the frequent and flexible phase switching pattern of group-base signal control on the safety performance is one of the major reasons behind the limited application of this control policy in Japan. Thus, this study tries to investigate the effect of group based signal control upon intersection safety during intergreen intervals rather than green intervals. To evaluate the safety performance, particularly the conflict risk during intergreen, the post-encroachment time index (PET) is used in this paper. PET is defined as the time between the last clearing vehicle and the first entering vehicle of two conflict traffic movement during intergreen. For example, PET bewteen SB-T and NB-R is the time between the last clearing vehicle of SB-T and the first entering vehicle of NB-R. Figure 1 shows the observed PET values for the conflict point between WB-Th and EB-R at site Y and the conflict point between SB-Th and NB-R at site T. It was found that PET increased after group-based signal control was implemented. According to the definition of PET, two reasons might contribute to this result. After the implementation of group-based signal control, the clearing vehicle after the onset of yellow might hesitate to enter the intersection since the driver cannot make sure which conflicting movement will be released. On the other hand, since the phasing pattern will become more flexible due to the implementation of group-based signal control, the first entering vehicle will spend longer response time since the drivers cannot expect which phase will be displayed. This makes the first entering vehicle enter the intersection more late. 5. Conclusion Figure 8 Estimated capacities of subject traffic movements in the before and after study (n: number of samples) 35 3 25 2 15 1 5 319 112 Figure 9 Estimated control delay of subject traffic movements in the before and after study 18 16 14 12 1 8 6 4 2 before after before after 53 17 16.8 3.5 11.3 7.5 12.6 12.8 Figure 1 Observed PET in the before and after study (n: number of samples) 6.6 1.1 33 15.1 5.4 before(n=24) after(n=17) before(n=21) after(n=14) WB-Th&EB-R (site Y) SB-Th&NB-R (site T) 12 In this paper, the operational and safety performance after the implementation of group-based signal control at two different sites were evaluated and compared with the before condition where stage-based signal control was applied. The two sites are located in Yokkaichi City and in Tahara City in Japan. Generally, it is concluded that group-based signal control can assign green time more reasonably to each traffic movement and improve the operational performance by providing higher capacities and lower delays. Due to this flexible phasing pattern, drivers especially in the first several vehicles and the last several vehicles might hesitate to enter the intersection which leads to longer SULT and CLT. However, such phenomena will result in larger PETs between the clearing and the entering vehicles which can be considered as safety improvement. By comparing the performance of the two intersections, it is concluded that group-based signal control resulted in better performance at the intersection of Tahara City since all opposing traffic movements have imbalanced demand. However the improvements at the intersection in Yokkaichi City were limited since only two opposing traffic movements have imbalanced traffic demand. Since the traffic condition at WB-LT of the intersection in Yokkaichi City was oversaturated in the before survey, the implementation of group-based signal control was very effective in relieving the traffic condition by providing longer green times. This led to an increase in the capacity by 39.1% and a reduction in control delay by 64.9%. However at the intersection in Tahara City, although the oversaturated condition did not occur in the before survey, improvements were observed after the implementation of group based signal control, for example the capacity increased by 24.1% and a control delay was reduced by 37.7% on SB-LT traffic movement. This can be referred to the better allocation of green time which led to a significant reduction in cycle length. The average PET for both intersections increased after the implementation of group based signal control. However the

increase in PET at the intersection in Tahara City was higher than that of the intersection in Yokkaichi City. This can be contributed to the different phasing plan of group-based signal control which is used at the intersection in Tahara City. Reference 1). Noyce, D.A. Traffic Characteristics of Protected/Permitted Left-turn Signal Displays. Presented at 2 Annual Meeting of the Transportation Research Board (TRB), Washington, D.C., Jan, 2. 2). Lin F. B., P. Y. Tseng, and C. W. Su. Variation in Queue Discharge Patterns and Their Implications in Analysis of Signalized Intersections. Transportation Research Record 1883, Transportation Research Board (TRB), National Research Council, Washington, D.C., 24, pp.192-197. 3). Lin, F.B., and R. Thomas. Daniel. Headway compression during queue discharge at signalized intersections. Transportation Research Record 192, Transportation Research Board (TRB), National Research Council, Washington, D.C., 25, pp.81-85. 4). Tang, K. and H. Nakamura. An Analysis on Saturation Flow Rate and Its Variability. The 11th World Conference on Transport Research, Berkeley, June, 27. 5). Tang, K. and H. Nakamura. A Comparative Study on Traffic Characteristics and Driver Behavior at Signalized Intersections in Germany and Japan. Journal of the Eastern Asia Society of Transport Studies, Vol.7, No., 27, pp.247-2485 6). Tang, K. and H. Nakamura. Operational Performance of Group-based Signal Control Policy under Various Traffic Conditions. The 1th International Conference on Applications of Advanced Technologies in Transportation, Athens, May, 28. 7). Tang, K. and H. Nakamura. Impacts of group-based signal control policy on driver behavior and intersection safety. IATSS Research, Vol.32 No.2, 28 8). HCM 2, Transportation Research Board, 21