Offshore Pipeline Installation SEABED INTERVENTION THE GAME-CHANGING EFFECT DISRUPTION TO HEAVY LIFTING HOW DO YOU MAKE THE SEABED?

Similar documents
DECOMMISSIONING. Mark Couwenberg Naval Architect Damen Offshore & Transport 12 May 2017

Royal Belgian Institute of Marine Engineers

Making waves through turbulent times

Global SURF (Subsea Umbilicals, Risers and Flowlines) Market: 2018 World Market Review and Forecast to 2023

Barging in on Trent. Mexico s deep dilemma Tiny Timor joins the fray Double first for Baobab

Minimal Structures for Marginal Nova Scotia Developments

ROV Development ROV Function. ROV Crew Navigation IRATECH SUB SYSTEMS 2010

The SDS Skip. Subsea Deployment Systems Ltd.

Charlottetown Marine Terminal Pipeline Decommissioning Project Description

CB-40 Data Buoy Quick Start Guide

Construction. MCP-01: Construction to Decommissioning

Risk Reduction in Offshore Decommissioning Chevron s Success in the Gulf of Mexico

Fully Submersible Heavy Lift Vessel

TARPON A Minimal Facilities Platform

APPENDIX D Oil Loading Pipeline - Options

Deepwater Floating Production Systems An Overview

Development of Self-Installing Deepwater Spar. Ashit Jadav February 2017

GLS New Technology Rising to the Challenge of Subsea lifting. Subsea 2012 Paddy Collins

Cook Inlet pipeline crossing is about making the best choices

Shell Beaufort and Chukchi Sea Program Update

Regulations and Cost Estimation for the Decommissioning of a Sample Fixed Offshore Platform in Brazil

Fully Submersible Heavy Lift Vessel

OVERVIEW. Capabilities & Services

Offshore Decommissioning: An Educational Opportunity

LIBERATING A TECHNICAL CHALLENGE

Design of Offshore Structures Prof. S. Nallayarasu Department of Ocean Engineering Indian Institute of Technology, Madras

Decommissioning Ageing Infrastructure: Abandoning or Re-Routing Hydrocarbon Pipelines. Dave Vernon - Director of Isolation Services

Valve Replacement: Using Non-Intrusive Isolation Technology to Minimize Production Downtime

Proceedings of the ASME th International Conference on Ocean, Offshore and Arctic Engineering

Science 8 Chapter 9 Section 1

Global Floating Rig (Floater) Market: Trends and Opportunities ( ) February 2014

Offshore Oil and Gas Platforms for Deep Waters

RPSEA UDW Forum June 22 & 23, Secure Energy for America

Case Study: Crowley Shines during Kitchen Lights Installation

SEA BREEZE Sea Breeze

7 th Dec: TRENDS & FORWARD PROSPECTS FOR SCOTTISH COD, HADDOCK, WHITING, SAITHE Fishing & Uptake

Heavy Lift Methods in Decommissioning of Installations

Ballast. Stability Lab Experiment. Have you ever been in a boat at sea in large waves? The boat moves up and down as the waves pass under the boat.

Learning from other Geographies North Sea

sarens

35 years of unparalleled support to the offshore oil and gas industry.

Natural Gas Market Perspectives

Sustainable Installation & Maintenance Methods Keith McDermott Commercial Director for Tidal Energy Mike Wilson - Managing Director Mike Wilson

Protectingpipelinesfor

Dear stakeholder, This information is extensive this year and comprises the following:

Panel Discussion on unmanned Hydrography

SHELL FLAGS INSPECTION CASE STUDY

HISTORIQUE ET EVOLUTION DES PLATES-FORMES AVEC TETES DE PUITS EN SURFACE (SPAR? ) LES TENDANCES POUR LE FUTUR

A fitting debut PIPELAYING

Introduction and background

Centre of Excellence for Subsea Safety

Pile Gripper Systems

Offshore Losses Case Studies

Chapter 2 Platform Integration and Stationing

Field Development & Construction

Technology and innovation challenges for UK Offshore Wind Energy Andrew Scott

Simon Stonehouse. Hull Underwriter Brit Insurance plc

WIND TURBINE SHUTTLE HUISMAN PRODUCT BROCHURE

The WIRTGEN GROUP User Magazine // N o 05. WIRTGEN GROUP solutions for automation and process optimization: On the leading edge

OFFSHORE SURVEY IN DEVELOPMENT PROJECTS. Ian Douglas Head, Offshore Surveys, Shell Projects & Technology Europe

OFFSHORE CRANES & ACCESS SYSTEMS

Alternative Installation Methods for. Offshore Wind Substations

ABANDONMENT REPORT AND REVIEW OF MMS DECOMMISSIONING COST ESTIMATE

THE DEEP OFFSHORE MARKET

AADE-06-DF-HO-17. Cuttings boxes on North Sea drilling rig

Caltec. The world leader in Surface Jet Pump (SJP) and compact separation systems for upstream oil and gas production enhancement

Offshore wind power in the Baltic sea

This lesson will be confined to the special case of ships at rest in still water. Questions of motions resulting from waves are not considered at

Fundamentals Of Petroleum Engineering PRODUCTION

OFFSHORE WIND: A CRASH COURSE

Trine Risøy, Bergen,

Siri Caisson Permanent Support - A Unique Challenge

Wave Energy. ME922/927 Wave energy

New Innovative Anchor Solution for Deepwater Mooring Gravity Intalled Anchors Reduce Time and Costs of Marine Operations Jon Tore Lieng CTO

OFFSHORE CREDENTIALS. Accepted for wind resource assessment onshore and offshore by leading Banks Engineers, globally

A Novel Platform for Drilling in Harsh High-Latitude Environments.

Examining the merits of jack up platforms as foundations for the offshore wind industry

Entry Level Requirements and Basic Introductory Course Outline for New Remotely Operated Vehicle (ROV) Personnel

Policy Redesign Project. Plant Safety Policy. Table of Contents

Scottish Hydro Electric Power Distribution Operation, Inspection, Maintenance and Decommissioning Strategy Bute Cumbrae Cable Replacement

Company presentation

Heron s Application for Wind Industry - Gorillas Need Not Apply

$ Millions. The PC Semi: A Low Motion Semisubmersible Capable of a Wet or Dry Tree Configuration. Semi Hull CAPEX Differentials. Topsides.

The Benefits Of Composite Materials In Deepwater Riser Applications. 26 th March 2015 Hassan Saleh Senior Engineer 2H Offshore Engineering Ltd

Winter Ice Manufacture by Snowmaking: A Novel Approach for Massive Ice Production for a Variety of Industrial and recreational Applications

CONTACT US 24/7 T E THE NETHERLANDS / ROTTERDAM T SINGAPORE / SINGAPORE T

Historically, pipelines have been the primary

Protection for Vessels Engaged in Servicing Submarine Cables

Semi-Submersible Offshore Platform Simulation Using ANSA & META

Content. will also be implemented at other Shell assets in the area. Even though the surface is not dry and therefore does

Japan s Floating Offshore Wind Projects

Report of the Committee to Study Offshore Wind Energy and the Development of Other Ocean Power Technology

3.9 MW-30JD Mooring Winch. Technical Parameter

N2 Membrane+ Nitrogen Production Systems for Offshore. Where you are. Where you need to be. We are here too.

VIDEO TRANSCRIPT. A Proposal to Expand the Flower Garden Banks National Marine Sanctuary An interview with Sanctuary Superintendent, G.P.

Dunlin Alpha Decommissioning

Cost efficient deep-water lowering with HMPE rope. Neil, LIU Yong-Le Technical Manager DSM Dyneema APAC Dec 02, 2016

(Refer Slide Time: 0:25)

Innovative and Robust Design. With Full Extension of Offshore Engineering and Design Experiences.

INTRODUCTION DELTA GROUP

Transcription:

OSI 2016 VOLUME 9 ISSUE 1 OSI VOL. 9 ISSUE 1 2016 i n d u s t r y DECOMMISSIONING THE GAME-CHANGING EFFECT DISRUPTION TO HEAVY LIFTING OFFSHORE-INDUSTRY.EU SEABED INTERVENTION HOW DO YOU MAKE THE SEABED? Offshore Pipeline Installation how does it work?

The Game-Changing Effect Global Decommissioning Boom Brings Disruption To Heavy Lifting Photo courtesy of Saipem 8 OSI 2016 Volume 9 Issue 1 www.offshore-industry.eu

The anticipated boom in North Sea decommissioning will pose unprecedented logistical challenges, not least the task of heavy lifting of topside rigs weighing more than 10,000 tonnes. These represent about 9% of all North Sea installations. Words by David W. Smith To date, only two vessels have coped with lifts of more than 10,000 tonnes: the Thialf, the world s largest crane vessel, and the Saipem 7000. All that will change later this year when Allseas introduces the 38-metre-long Pioneering Spirit, which can lift 48,000 tonnes in one go. The Pioneering Spirit was scheduled to remove the 13,000-tonne topside from Talisman s Yme platform in the Norwegian North Sea last year before moving on to the 24,000-tonne topside from Shell s Brent Delta platform in British waters. Both projects were put on hold due to delays in delivery of some of the vessel s components. Pioneering Spirit The introduction of such a large vessel will greatly simplify the dismantling of topsides, with all but the most essential decontamination and disaggregation work to be conducted onshore in a decommissioning yard. The Pioneering Spirit is a game changer that will bring significant benefits to the whole sector, including recycling, Neil Etherington of Humberside-based Able UK, which will recycle 98% of the Brent Delta platform, told DecomWorld. To prepare for the topside we re building 120 metres of new quay, around half of which will have a load capacity of 60 tonnes per square metre. It s ideally suited to receiving the barge that will be dispatched from the Pioneering Spirit containing the load. To lift the Brent Delta platform, the Pioneering Spirit will attach hydraulic clamps under the structure before pumping water out of its ballast tank to lift it in seconds. Operating such a huge ship does not come cheap and the boat will have to be kept busy to justify its price tag of USD 1.7 billion. Allseas has a contract from Shell to remove the topsides of two of the other three platforms in the Brent field Bravo and Alpha and an option for the fourth platform, Charlie. And there is likely to be more work for the Pioneering Spirit, especially in the central and northern parts of the North Sea, where platforms tend to be larger to cope with deeper waters and harsher weather. According to trade association Decom North Sea, the UK and Norway sectors of the North Sea possess a combined 4.5 million tonnes of steel associated with fixed-steel or concrete-gravity base topsides which will all eventually need to be decommissioned. The largest topside for a fixed installation is Norway s 53,000-tonne Gullfaks. Before the advent of the Pioneering Spirit, large platforms were commonly removed >> www.offshore-industry.eu OSI 2016 Volume 9 Issue 1 9

Neil etherington, able uk The Pioneering Spirit is a game changer that will bring significant benefits to the whole sector, including recycling. using processes known as piece small to cut the topside into pieces, or reverse install, which involved cutting and removing large modules in reverse order to installation. The latter method was used to decommission the North West Hutton platform, 86 miles off the Shetland Islands, in 2008. It took 22 modular lifts to complete the largest module weighing 2,800 tonnes. Building To Local Requirements Despite its imposing build, vessels of the size of the Pioneering Spirit are not about to play a role in heavy lifting in the Gulf of Mexico, according to Tom Cheatum, business manager of Versabar. It s old technology given a new purpose because of its massive size, Cheatum told DecomWorld. It s well designed for the North Sea environment. But it would be enormously expensive to transport it to the Gulf of Mexico and we don t really need a vessel that big here. Platforms tend to be smaller as the weather is more benign. Nevertheless, there is a huge amount of decommissioning to be done in the Golf of Mexico, where oil companies face the same problem of ageing assets. Mark Kaiser, director of Louisiana State University s Research and Development Center for Energy Studies at Louisiana State University, says that in 2016 up to 250 structures will be removed in the region and the numbers will rise in the future as low oil prices provide incentives against deferring the process. As in the North Sea, the frequency of decommissioning places huge demands on offshore equipment resources. Figures from the US Bureau of Safety and Environmental Enforcement show that as of February 2015 there were 241 platforms in the Gulf in the category of idle iron, and a further 294 on expired, or terminated, leases. VB10000 Versabar s VB10000, the largest heavy-lift ship operating in the Golf of Mexico, is capable of lifting 7,500-tonne objects. It had a noticeable success with the lift of the Red Hawk Spar in 2014, but could not raise larger rig structures, causing Eric Smith, associate director of the Tulane Energy Institute, to question the ability of existing ships in the Golf of Mexico to lift giant structures such as Shell s Ram Powell TLP. However, Versabar is able to use its Versatruss system for 15,000- to 10 OSI 2016 Volume 9 Issue 1 www.offshore-industry.eu

The Claw In 2011 Versabar engineered, fabricated, tested and deployed a new underwater lift device named The Claw. The Claw was designed to retrieve topsides from the seafloor with minimal subsea preparation. The two identical grappling devices are 122 feet tall, 112 feet wide, and weigh almost 1,000 tonnes per piece. Controlled by the VB 10000 lifting system, each set of massive steel jaws operates independently, but for larger loads each jaw can be used in tandem for a double-claw lift. Photo courtesy of Versabar 20,000-tonne platforms, according to Mr Cheatum. Versatruss distributes the load evenly on the centreline of two barges and is scalable up to about 20,000 tonnes. We re doing proposals for large lifts at the moment, he said. Meanwhile, Allseas has started building an even larger vessel than the Pioneering Spirit. Its topside lift capacity will be 72,000 tonnes and it will have a width of 160 metres, whereas the Pioneering Spirit is 124 metres wide. Allseas expects it to be operational in 2020. The two Allseas ships could handle twelve to eighteen topsides a year, radically altering the decommissioning market in the North Sea. i. www.allseas.com i. www.hmc.heerema.com i. www.vbar.com Photo courtesy of Heerema www.offshore-industry.eu OSI 2016 Volume 9 Issue 1 11