Juneau Aurora Harbor

Similar documents
1-44. SITKA HARBOR, ALASKA (Western Channel, Crescent Bay Basin, Channel Rock Breakwaters) (CWIS NOS , 16840, 10322, 55030, 13787)

Juneau Douglas Harbor

Cordova Harbor Page 2 of 9

Condition of Improvements 30 December 2014 Wrangell Harbors, Alaska (CWIS No , )

Ninilchik Harbor Page 2 of 11

Nome Harbor Page 2 of 12

Ketchikan Harbors Thomas Basin and Bar Point Harbor

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, 12270, & 10422) Condition of Improvement 30 September 2012

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, & 10422) Condition of Improvement 30 September 2009

1-22. KETCHIKAN, ALASKA (Thomas and Bar Point Basins) (CWIS NOS & 87071) Condition of Improvement 30 September 2007

Grays Harbor O&M and Deepening Dredging

Grays Harbor Federal Project

APPENDIX D REAL ESTATE PLAN

APPENDIX M DREDGED MATERIAL MANAGEMENT PLAN (DMMP) FINAL INTEGRATED FEASIBILITY REPORT AND ENVIRONMENTAL ASSESSMENT

CORPS FACTS. Harbor Dredging U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG

Pacific Ocean Division. Navigation Program Overview. Association of Pacific Ports 2016 Winter Conference Waikaloa, Hawaii.

CLARIFICATION PAPER DREDGED MATERIAL VOLUME ESTIMATES

DRAFT. October 17, 2014 File No Mr. Brendhan Zubricki Town Administrator Essex Town Hall 30 Martin Street Essex, MA.

Mouth of the Columbia River Jetties Three-Phase Construction Plan

Figure 1 Example feature overview.

JUNEAU SECOND CHANNEL CROSSING WATERWAY USER SURVEY RESULTS

Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M)

Shoreline Response to an Offshore Wave Screen, Blairgowrie Safe Boat Harbour, Victoria, Australia

Utilizing Vessel Based Mobile LiDAR & Bathymetry Survey Techniques for Survey of Four Southern California Breakwaters

PLAQUEMINES PARISH BARRIER ISLAND RESTORATION & SUSTAINABILITY. MVD/Gulf Coast Regional Dredging Meeting November 5, 2013

V. HARBOR DEPTHS, CHANNEL DESIGN AND PROPOSED CONSTRUCTION AND DREDGING

Eelgrass and Macroalgae Presence/Absence Preliminary Surveys BHP Proposed Grays Harbor Potash Export Facility A Task 400

Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M)

Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M)

Beach Nourishment Impact on Beach Safety and Surfing in the North Reach of Brevard County, Florida

PNWA Conference Update

HARBOR INFRASTRUCTURE INVENTORIES Oak Orchard Harbor, New York

Figure 4, Photo mosaic taken on February 14 about an hour before sunset near low tide.

NSPS SUBPART Ka Check-off Form JULY 11, LAFAYETTE ROAD NO., ST. PAUL, MN

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE 8-FOOT CHANNEL OF THE FEDERAL NAVIGATION PROJECT IN KENNEBUNK RIVER KENNEBUNK & KENNEBUNKPORT, ME

Water Resources Report RKLD Annual Meeting July 30, 2016

ST. JOSEPH PENINSULA, GULF COUNTY, FLORIDA Beach Re-Nourishment and Environmental Enhancement Project RECOMMENDATIONS

Comparison of Predicted and Measured Shoaling at Morro Bay Harbor Entrance, California

Unalaska Navigation Channel Improvements

St. George Harbor Feasibility Study. Appendix A - Hydraulic Design. St. George, Alaska. Tentatively Selected Plan August 17, 2018

EPA R6 Dive Team Operations Report. San Jacinto Waste Pits Channelview, TX December 9-10, 2015

Outlet Structures T-12

Port Sections Guide Section 01

HARBOUR SEDIMENTATION - COMPARISON WITH MODEL

Southwest Washington Littoral Drift Restoration Project: Design, Construction, and Monitoring

PORT OF SEATTLE TERMINAL 91 UNDERWATER REGRADING

SPECIAL SPRING 2018 STORM REPORT ON THE CONDITION OF THE MUNICIPAL BEACHES FOR THE BOROUGH OF STONE HARBOR, CAPE MAY COUNTY, NEW JERSEY

Designing a Harbor Entrance to Defeat Swell Wave Agitation. FAX (506) ; 2

Coastal Engineering Technical Note

Redondo Beach Boat Launch Ramp Facility

PEASE DEVELOPMENT AUTHORITY DIVISION OF PORTS & HARBORS ANNUAL DREDGE REPORT

DEPARTMENT OF THE ARMY GALVESTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1229 GALVESTON, TEXAS CESWG-CDR (1145)

Sediment Management Plan Rehoboth Bay

Eelgrass Survey Reporting Form 2222 Channel Road Newport Beach, CA Eelgrass (Zostera marina) Survey

SACO RIVER AND CAMP ELLIS BEACH SACO, MAINE SECTION 111 SHORE DAMAGE MITIGATION PROJECT APPENDIX F ECONOMIC ASSESSMENT

Figure79. Location map for the 10 NJBPN profile sites in Atlantic County, NJ 155

ADA TRANSITION PLAN 2013

MOREHEAD CITY HARBOR, NC. Dredged Material Management Plan (DMMP)

SECTION XI - COAST PILOT UPDATING. 1. To acquire a general knowledge of the responsibilities of the Auxiliary in COAST PILOT UPDATING activities.

General Inspection Guidance for Waste Management Units Requiring Air Emission Controls Under RCRA Air Standard Subpart CC

Southeast Sustainable Salmon Fund Project Statement of Work

DREDGING AND DISPOSAL REPORT for the PORT OF BROOKINGS PORT OF BROOKINGS HARBOR, OREGON

An Example of a Unique Partnership for Contaminated Sediment Management The Port Hueneme Experience

Northern Indiana Public Service Company (NIPSCO) 2723 East 1500 North, Wheatfield, Indiana, USA Golder Associates Inc.

2016 Annual Inspection Report

M/V SELENDANG AYU. Unalaska Island, Alaska

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

State of Texas Operations and Maintenance

HARBOR INFRASTRUCTURE INVENTORIES Lorain Harbor, Ohio

THE SYLLABUS FOR WRITTEN EXAMINATION PILOT'S FOURTH CLASS LICENCE (TEES AND HARTLEPOOL) AND

PHYSICAL MONITORING WILMINGTON HARBOR NAVIGATION PROJECT REPORT 1: August 2000 June 2003

Removal of Lead-Based Paint

Amalga Fish Cleaning Station Project Feasibility -Draft-

ADA Transition Plan. City of Gainesville FY19-FY28. Date: November 5, Prepared by: City Of Gainesville Department of Mobility

Bear Cove Coastline Reestablishment

Objectives, Design Evolution, Standardization, Research platform piggybacks Proposed modifications

Imagine that you can see a side view of a wave as it approaches a beach. Describe how the wave changes as the wave approaches the beach.

USE OF SEGMENTED OFFSHORE BREAKWATERS FOR BEACH EROSION CONTROL

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

HARBOR INFRASTRUCTURE INVENTORIES Port Sanilac Harbor, Michigan

The development of the historical harbour of Paphos, Cyprus H.J. van Wijhe*, M. Meletiou^ Division, P.O. Box 152, 8300 AD Emmeloord, The Netherlands

Hydrographic Surveying Methods, Applications and Uses

Town of Poughkeepsie Received: Permit # Aboveground/Inground Pool Building Permit Application

COUPLED MANAGEMENT STRATEGY LAKE CATHIE ESTUARY & COAST

RE: Hurricane Matthew Beach Damage Assessment and Recommendations [CSE 2416]

OECS Regional Engineering Workshop September 29 October 3, 2014

MILE POINT TRAINING WALL JACKSONVILLE, FL. Geotextile Tube Installation

Town of Bourbon. Americans with Disabilities Act Transition Plan: Pedestrian Facilities in the Public Right-of-Way

What are Waves? Earthquake. Waving flags. Vocal Cords Vibrate

2018 Annual Inspection Report

UPPER BEACH REPLENISHMENT PROJECT RELATED

CCR Landfill 2017 Annual Inspection Report NC1 Ash Disposal Area

CHAPTER 134 INTRODUCTION

23- Year Sand Volume Changes at Site 132, 15th Street, Brigantine

UPDATE OF RESTORED SAN DIEGUITO LAGOON INLET CHANNEL EXCAVATION AND DREDGING PLAN. (Previously submitted on 30 March 2006 as CE Reference # 04-19c)

PORTS AUSTRALIA. PRINCIPLES FOR GATHERING AND PROCESSING HYDROGRAPHIC INFORMATION IN AUSTRALIAN PORTS (Version 1.5 November 2012)

Implications of proposed Whanganui Port and lower Whanganui River dredging

CITY OF NAPLES STAFF REPORT

Volume and Shoreline Changes along Pinellas County Beaches during Tropical Storm Debby

Assateague Island National Seashore North End Restoration Project Timeline

Transcription:

Juneau Aurora Harbor

Aurora Harbor Page 2 of 6

Condition of Improvements 31 December 2017 Aurora Harbor Juneau, Alaska (CWIS No. 020960) Authorization Rivers and Harbors Act, 3 July 1958 (House Doc. 286, 84th Congress, 2nd Session) as adopted, provides for an adjacent basin 19 acres in area dredged to depths of -12 feet MLLW and -14 feet MLLW, protected by a jetty 530 feet long and a breakwater 1,150 feet long. Table 1 Existing Project Length ft. Width ft. Depth ft. Basin 19 acres -12 &-14 Main Breakwater 1500 North Jetty 670 Project Usage Aurora harbor provides protected moorage for approximately 550 small craft and seaplanes. The combined Juneau-Douglas complex (see also Douglas Harbor and Harris Harbor) gives protection and moorage to approximately 1,000 vessels, half of which are active in commercial fishing. All transportation to the area is by sea or air. Progress of Work 1962 Aurora Harbor: Design modifications increase the length of the jetty to 670 feet and the main breakwater to 1500 feet. Work commences on the North Jetty in August and is completed in September. Dredging of the new basin begins in December. 1963 Dredging of Aurora Basin is completed in March with the exception of the most northerly corner where hard bottom prevents dredging. Contract for the main breakwater is awarded in June and begins in July. 1964 The main breakwater for Aurora Harbor is completed in February. 2002 A condition survey of the harbor is conducted in April. Aurora Harbor Page 3 of 6

Progress of Work 2003 Vertical and oblique aerial photography is taken of Aurora harbor. 2005 A condition survey of the harbor is conducted in April. 2009 A condition survey of the harbor is conducted in August. 2012 USACE Comprehensive Evaluation of Project Datums Compliance report completed and recorded in September. 2013 A condition survey of the harbor is conducted in May. 2014 A control survey was performed to update all horizontal and vertical project control. 2016 Sediment sampling in the north half of the harbor (project depth -12 feet MLLW) is completed in September. 2017 A condition survey of the harbor is conducted in June. An inspection of the wooden wave barrier on the main breakwater is conducted in August and reveals the wood on the lower portion of the wave barrier is deteriorating and should be repaired. Table 2 Cost to Date Project Description Cost $ 087219/087227 CG Appropriations 1,910,563 087219/087227 CG Costs 1,910,563 087219/087227 O&M Appropriations (prior to FY78)* 429,023 087219/087227 O&M Costs (prior to FY78)* 429,023 020960 O&M Appropriations 50,000 020960 O&M Costs 8,517 *Cost prior to FY78 shared with Harris Harbor Table 3 Range of Tides in feet Tide Station Mean Range Diurnal Range Extreme Range 945 2210 Juneau AK 13.74 16.31 30.71 Controlling Depth In 2017 at Aurora Harbor, a depth of -4.4 feet controls the -12 feet MLLW area along the northern float at the gangway and a depth of -10.9 feet controls the -14 feet MLLW area at the southernmost float. There is minor shoaling along the harbor perimeter. Aurora Harbor Page 4 of 6

Maintenance Dredging Supplement A. Sampling and Testing 1. In September 2016, samples were collected at seven (7) locations within Aurora Harbor; material was classified as silty sand (SM) in five (5) locations and silt with sand (ML) in two (2) locations. 2. Chemical analysis was conducted on five samples; four samples in the northern half of Aurora Harbor and one in the southern half ( boat prism ) where the City and Borough of Juneau considered dredging deeper than project depth for a tug. The boat prism sample exceeded several ADEC and DMMP screening criteria and therefore will not be considered for dredging below project depth. The other four samples were evaluated using the test methods as outlined with results below: Table 4 Chemical Testing (2016) Method Chemical Analysis Results AK101 Gasoline Range Organics ND (none detected ) AK102/103 Diesel Range Organics/ Residual Range Organics All below project screening limits 6000-7000 s (10) RCRA Metals (10) of (10) detected; Arsenic and chromium above ADEC screening levels, all others below minimum levels 9060 Total Organic Carbon 11,000-35,000 ppm 8260B Volatile Organic Compounds ND 8081A Pesticides ND 8082 Polychlorinated Biphenyls ND 8270D Semi-volatile Organics Exceeded DMMP screening level for bis-(2- ehtylhexyl) phthalate and diethyl phthalate. Did not exceed ADEC screening levels Otherwise ND or below minimum levels EPA 160.4 Total Volatile Solids 1.2-2.8% EPA 350.1 Ammonia ND Krone et. Al. Tributyltin ND Screening levels are defined by ADEC 18 AAC 75 Method 2 Table B1 and B2 Cleanup Level and USACE Seattle District Dredged Material Management Program (DMMP) User s Manual, August 2016. Aurora Harbor Page 5 of 6

Aurora Harbor, Juneau, Alaska Oblique of Aurora Harbor, June 2017 The breakwater at Aurora Harbor, August 2017 Aurora Harbor Page 6 of 6