Cozumel Turbodraft. Operational Considerations

Similar documents
TurboDraft Fire Eductor

TurboDraft. Fire Eductor Operating Instructions.

Apparatus Operator Refresher Training Program

Chapter 14 Water Shuttle Operations

OPERATION AND MAINTENANCE MANUAL

Driver Operator Pumps: Basic Pump Operations

Vacutrans Instructions

INSTRUCTOR GUIDE REFERENCES: PUMPING APPARATUS DRIVER/OPERATOR HANDBOOK, FIRST EDITION, IFSTA

SAFETY MANUAL FOR FLAMMABLE PRODUCT TRANSFER

ETL listed for installations within 5 ft. (1.5M) of outer edge of water

DESIGN DATA A WET PIPE BLADDER TANK FOAM/WATER SYSTEM WITH HYDRAULICALLY ACTUATED DELUGE CONCENTRATE CONTROL VALVE

Suction Sampler. Purpose of this document

Geotech 1.66 Auto-Reclaimer

Geotech 1.66 Auto-Reclaimer Installation and Operation

KILGORE FIRE DEPARTMENT

Developed by Lieutenant Randy Stuart, Engineer Matt Hintzman and Firefighter Chris Sandoli November 2010

WARNING: FOR OUTDOOR USE ONLY

Developed by Engineer Ben Wynkoop, Lieutenant Randy Stuart, and Firefighter Alex Klinger September 2011

AIR-OPERATED DOUBLE DIAPHRAGM PUMP USER S MANUAL

Accu-Tab PowerBase 3012AT by Axiall Corporation

TECHNICAL DATA. than the water inlet pressure to the concentrate

Dry Hydrants. The installation of a non-pressurized pipe system into local water sources provides a ready means of supplying water to fire engines.

Chapter 16 Test. Directions: Write the correct letter on the blank before each question.

Developed by Engineers Alex Klinger and Shelby Vrem November 2015

FIRE FIGHTER II - SKILLS PERFORMANCE SHEET

Appendix A. Imbrium Systems Jellyfish Filter Inspection and Maintenance Information

PHILADELPHIA FIRE DEPARTMENT HIGH PRESSURE FIRE HYDRANT SYSTEM PFD TRAINING MANUAL SUPPLEMENT ENGINE PRACTICES SUPPLEMENT 101 PAGE 1

Wilson County Emergency Management Agency 110 Oak Street Lebanon, Tennessee 37087

All information correct as of 25 th September 2013 and subject to change without notice. 6 inch HURRICANE modular dredge equipment operations manual.

DESIGN DATA OBSOLETE. C. Inspections - It is imperative that the system be inspected and tested on a regular basis. See Inspection

Geotech 3.5 Auto-Reclaimer

Idaho Fire Service Technology Fire Fighter II

II-28 STOKES BASKET OPERATIONS

VRS Assembly & Operating Instructions

Idaho Fire Service Technology Pumping Apparatus Driver/Operator Skill Sheet: 1

Township of Cumru Fire Department 03/12/2008 Standard Operating Guidelines Page: 1 of 8 Section 15.05

PRO SINK -R 1 and 2. Dilution system CONTENTS

Advanced Fluid Handling Cart Owner s Manual

Model PSI Compressor with 3-Gallon Air Tank 12VDC

2.0 INSTALLATION & SERVICE

!!!! SERVICE MANUAL PRESSURE POT 2 GALLON. Service Manual: LT Washington St 931 Progress Ave., #7

SEMI FIXED/PORTABLE LINE PROPORTIONERS SLP NPR270

Discharge Relief Valve Operation & Maint.

Model: 43T. Bermad Pressure Relief Valve

Flow Material Length. Weight GPM LPM. Style 3095

Essentials of Fire Fighting 6 th Edition Firefighter I

2017 Volunteer Week - Course Descriptions

ANDERSON GREENWOOD SERIES 9000 POSRV INSTALLATION AND MAINTENANCE INSTRUCTIONS

Tentec. Instruction Document. Mini Air Driven Pump Unit Model: HTT.627X Series. Part Identifier

NORMAL OPERATING PROCEDURES Operating Parameter Information

HEAT EXCHANGE AND TRANSFER, INC. 500 Superior Street Carnegie, PA (412) Fax: (412)

Wilson County Emergency Management Agency 110 Oak Street Lebanon, Tennessee 37087

3 GALLON, OILLESS PANCAKE COMPRESSOR INSTRUCTIONS. Item #31289

Installation, Operation & Maintenance Manual for Flo-Max Coupler Bracket Model FM150

S P E C I A L O P E R A T I O N S : S W I F T W A T E R B O A T O P E R A T I O N S ( 1. 1 ) T A S K S K I L L D E S C R I P T I O N A N D D E T A I L

Essentials of Fire Fighting

FIRE FIGHTER II SKILL PERFORMANCE CHECK SHEETS NFPA FIRE FIGHTER II SKILL STATION MENU

OPERATION MANUAL NTF-60 Plus

MEGR-1627 Instruction Manual

Wet pipe low flow foam/water system

ATD LB PRESSURE BLASTER INSTRUCTION MANUAL

LAKOS Waterworks. PWC Series Sand Separators. Installation & Operation Manual LS-829 (10/12)

WPB 5 / 7 / 10 INSTALLATION, OPERATION, & MAINTENANCE

FIRE FIGHTER II JPR: FFII-1A

Developed by Lt. Randy Stuart Eng. Ben Wynkoop, and FF. Alex Klinger in Sept 2011

Installation of Your SprayMaster System

ISB SERIES INTERNAL SHOT BLASTING MACHINES INSTRUCTION MANUAL MANUAL NUMBER

RESCUE TECHNICIAN PROFESSIONAL QUALIFICATION CHAPTER 5 SKILL STATION MENU GENERAL REQUIREMENTS/CORE COMPETENCIES

MFD Monroe Fire Department. Standard Operating Guidelines. Drivers Clearance & Training Program Guidance ADMINISTRATION

Spot Weld Drill Spot Weld Removal System Instruction Manual

Sunrise Fountain Water Wonders Assembly & Mounting Instructions

5 Gallon Pressure Pot with HVLP Spray Gun and Hose

Installation Operation Maintenance

5.0 INSPECTING, FILLING AND LABELING SMALL CYLINDERS

Rejuvenation Instructions

This guidance applies to those individuals who perform acid cleaning or chemical treatment aboard Marine Depot Maintenance Command Yermo CA.

Air Eliminators and Combination Air Eliminators Strainers

TECHNICAL DATA. Low-Flow Foam Preaction System with Hydraulically Actuated Concentrate Control Valve.

A/C SOLVENT FLUSH (For use with CPS SUPER FLUSH SOLVENT) TO BE OPERATED BY QUALIFIED PERSONNEL ONLY OPERATION MANUAL

1805 Series Relief Valves

MODEL NUMBER: P-A AUTOMATIC PORTABLE COMPRESSOR

EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG Singapore Telephone: Fax:

OPERATION MANUAL NTF-15

SAFETY MEASURES. These important guidelines should always be followed to work safely with the PRIMATECH pneumatic stapler model Q180:

Service and Repair Manual

UBEC 1AT. AUTO TANK Fill System Installation, Operation, & Setup Instructions

Atlantic County Tender Task Force B Bravo Division When Atlantic County Tender Task Force B is required the following procedure should be followed:

TABLE OF CONTENTS. 14 Operating Instructions Load vs. Contact

Operation & Maintenance Manual Place this manual with valve or person responsible for maintenance of the valve

Bobtail DOT 407 / 412 Vacuum

Operating Instructions Model and Hydrostatic Test Pump

GETZ EQUIPMENT INNOVATORS RECOVERY SYSTEM CLEAN AGENT FE-36 / HALOTRON 1 PART NO. 4G59751 OPERATIONS MANUAL

Irrigation System Winterization and Pressurization Procedures

Bermad Model:

Halsey Taylor Owners Manual 4410 Freeze Resistant Tubular Fountain STOP!

Lockout Tagout Policy

Halsey Taylor Owners Manual STOP!

COATINGS SPRAY GUIDE Acrylics (210, 211, 211HT, and 212)

MODEL 840 AIR HYDRAULIC PUMP INSTRUCTION

627 Series Pressure Reducing Regulators

Transcription:

Cozumel Turbodraft Operational Considerations

Safety Guidelines Safety Guidelines 1. Carefully read and follow all operating instructions before putting the TurboDraft unit into service. 2. Be sure all pump operators are properly trained in the correct and safe use of the fire pump that is supplying the TurboDraft unit. 3. Proper personal protective equipment should be utilized while operating any fire pump and while present at any emergency scene. 4. Be sure all hose connections are snug and secure. 5. Use caution at all times around any high pressure pump connections. 6. Always understand and follow all department rules, guidelines and operating procedures.

Objectives Incident Sized-Up Strategic Goals and Action Plan Communicated to all Receive Task Level assignment through Command Select tools and equipment Layout and implement Safety Check Evaluate Adjust if necessary, be effective

Incident Sized-Up Objectives

Incident Sized-Up What do I have? What am I doing? What do I need? Who is command? Make clear strategic goals Make clear given or received assignments

Objectives Strategic Goals and Action Plan Communicated to all

Strategic Goals and Action Plan Strategic goal for the incident is to confine the fire to structure and extinguish. Action Plan includes assigning an engine company to lay 5 5 and 2.5 hose to the water source, and estimate usable gallons per minute available. Task Level is to establish and advise command when water source is established.

Objectives Receive Task Level assignment through Command

Turbodraft Assignment from Command Officer confirms assignment Officer conducts own Size- up Officer Forms Action Plan

Officer s s Plan Officer forms a plan How many 100 sections (1 or 2) of 5 5 hose Start at water source and work back to engine Prevents large amounts of 5 5 at water source Plan for large arcs not tight turns in 5 5 hose

Officer s Plan Cont. Ensure no kinks when flowing water Start slow and allow 2.5 to fill and begin filling 5 5 hose Allow all air to evacuate from 5 5 hose Open 5 5 valve and allow water to circulate from 2.5 to turbodraft creating venturi to maintain flow back to engine See Manufacturer Operation manual for examples:..\....\playa Del Carmen\Truck Class big water ppts\turbodraft operating_instructions.pdf

Objectives Select tools and equipment

Objectives Layout and implement

Safety Check Objectives

Evaluate Objectives

Objectives Adjust if necessary, be effective

Turbodraft Setup Per Manufacturer TurboDraft Setup/Operation The unit requires a 2-1/22 inch discharge line from the fire truck and a 5 inch supply line to return water flow to the fire pump. The lines should be stretched from the truck to the water s s edge avoiding sharp bends and kinks.

Turbodraft Setup Before connecting hoses to the TurboDraft, inspect the unit to be sure no debris has entered the inlet or discharge openings. Connect the 2-1/22 inch line to a discharge from the pump and to the TurboDraft unit, as shown below.

Turbodraft Setup Connect a 5 inch LDH supply line to pump intake valve and TurboDraft unit, as shown below. Care should be taken to insure all connections are tight and secure. A rope or webbing may be attached to the handle and secured.

Turbodraft Setup Submerge in 2 to 3 feet of standing water, with the screen/strainer facing up, 1 to 1-1/21 1/2 feet of moving water. After the above steps are complete the unit is ready to be put into operation.

Turbodraft Setup Engine should be placed into pump gear and truck prepared for pumping operations. The intake valve should be closed.

Turbodraft Setup Open the bleeder on the suction intake valve to allow any air in the hose to be vented. Open the tank-to to-pump valve. Increase the engine pressure to 175 PSIG.

Turbodraft Setup Open the 2-1/22 inch discharge supplying the TurboDraft unit and maintain discharge pressure at 175 PSIG. This is required to start suction flow back to the truck.

Turbodraft Setup As the 2-1/22 inch line is charged, the 5 inch line will immediately start to fill. Close the bleeder once water reaches it and slowly open the suction intake valve. The water supply is now established.

TurboDraft Set-Up/Operation TurboDraft Set-Up/Operation Close the tank-to-pump valve. At this point the truck s tank should be refilled. Open the tank fill valve 1/4 to 1/2 open and allow tank to fill. The truck tank should always be kept full to allow the water supply to be reestablished, if necessary.

TurboDraft Set-Up/Operation With 100 ft. of 5 inch hose, it should take approximately 100-250 gallons of water to establish a water supply to the truck. Once tank is full, close tank fill valve. Slowly open required discharge valve(s). Maintain the required pressure (see Chart 1, page 12) on the TurboDraft 2-1/2 inch line at all times.

TurboDraft Set-Up/Operation During the use of the TurboDraft unit, care should be taken not to exceed supply source availability. This will cause the supply line from unit to collapse. (see Flow Chart 1 on page 12). Supply line (5 inch LDH) from the unit should always be monitored. Maximum flow from the TurboDraft unit is achieved when the supply line starts to become soft.

TurboDraft Set-Up/Operation If the supply line flow is exceeded and the line collapses, simply open the tank-to to-pump valve and decrease the discharge flow until the supply line recovers. Once stabilized, close the tank-to to-pump valve and top off the tank as soon as possible

Problem Solving Trouble establishing or keeping initial venturi circulation - out through 2.5 > Turbodraft > back through 5 5 to engine. Check the following: Engine is in pump Tank to pump is open Hose is connected properly No kinks in hose (2.5 or 5 ) 5 Turbodraft screen isn t t blocked and is facing up Valve is open to receive 5 5 flow

Clearing Blocked Screen Open Tank to pump Close 5 5 valve Flow for 30 seconds Open 5 5 valve Check for status of flow

Estimated Flow Capability

Estimated Flow Capability

Estimated Flow Capability

Care and Maintenance Care and Maintenance The TurboDraft unit is manufactured from aluminum and stainless steel. Little maintenance is required to keep your TurboDraft unit in proper operating condition. Before and after using the TurboDraft, carefully inspect the unit for any damage to the body, tail, and fire connections.

Care and Maintenance After use, flush the unit with clean water to remove any mud, sand or debris from the inside and outside surfaces. Be sure to thoroughly flush the 2-1/22 inch connection, as any sand or grit will effect the swivel action. Also, inspect that the screen is free from any obstructions (grass, leaves, etc.). Mild soap and a soft brush should remove any dried mud or soils from the unit.

Care and Maintenance IMPORTANT - Inspect nozzle orifice to be sure there are no obstructions. Any restrictions within the nozzle will dramatically effect the performance of the TurboDraft unit. Safely store the unit securely on or in the apparatus to avoid injury to personnel and damage to the TurboDraft

Good Luck and Be Safe!