CMAQ DETAILED PROJECT LISTING REPORT ( FY 2002 )

Similar documents
CMAQ DETAILED PROJECT LISTING REPORT ( FY 2001 )

Comprehensive Bicycle Master Plan 2014 ITE-IMSA Spring Conference March 6, 2014

ROADSOADS CONGESTION HAMPTON SYSTEMYSTEM MANAGEMENT. Part II Roadway Congestion Analysis Mitigation Strategies and Evaluation

Santa Clara I-280 CORRIDOR STUDY

Bluffdale South (SR140) Bicycle/Shoulder Lanes Project Type Bicycle

Cottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. Project Type Capital Improvement

% of Sales Tax (net of Admin) First Year Amount. Metro State of Good Repair 2% $ 17 $ 350 $ 910 $ 1,140 $ 2,400

EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives

2012 PRIORITY TRANSPORTATION PROJECTS

Broadway Complete Streets Project

2019 Federal Transportation Improvement Program

STATION #3 INITIAL ALTERNATIVES

2011 Multi-City Report on Crime and Disorder in Convenience Stores

I-105 Corridor Sustainability Study (CSS)

Keep Placer Moving. Placer is Growing. POPULATION (From 2014 to 2045) 70,000 new homes and well over 180,000 more residents

Financial Project ID No(s).: and ETDM No(s).: and 14181

Chapter 5 Future Transportation

Key objectives of the survey were to gain a better understanding of:

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Castro Valley Municipal Advisory Council March 19, 2018

Appendix C 3. Bicycle / Pedestrian Planning

Guidance. ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions

What Is a Complete Street?

INTRODUCTION. The focus of this study is to reduce congestion and improve mobility for all modes of transportation. Figure ES-1 Study Corridor Map

Designing Streets for Transit. Presentation to NACTO Designing Cities Kevin O Malley Managing Deputy Commissioner 10/24/2014

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

RapidRide Roosevelt Seat Sea t t le t le Depa De r pa t r men men t of Sept T an r sp an or sp t or a t t a ion

Ride Share Month Events Successful! Valley Metro and Governor Jan Brewer declared

Fiscal Year 2017 Bicycle and Pedestrian Metric Report

The Year Ahead: Virginia Department of Transportation Northern Virginia District

Broadstone. Arts District 280 Units HANCE PARK REDEVELOPMENT. enhance Park 49 Units Portland on the Park 148 Units. The Gold Spot Restaurants & Retail

SANTA CLARA COUNTY I-280 CORRIDOR STUDY

Circulation and Mobility

Plan Peoria AZ Public Workshop #1 April Day # Green, Red, or Yellow Category: (Public Safety, Transportation, Parks and Recreation, Natural Envi

including shade trees; Recommend minimum 13 ft total sidewalk

Cascade Bicycle Club Recommendations

INDEX. Geometric Design Guide for Canadian Roads INDEX

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016

2017 General Obligation Bond

Balancing Operation & Safety for Motorized and Non-Motorized Traffic

Sacramento Grid 2.0. The Downtown Transportation Study

Parks, Open Space, Trails and Recreation Master Plan

2017 (FY 21,22,23) Ohio CMAQ Project Selection

Tempe Bike Count Report 2014

KEARNY MESA COMMUNITY PLAN UPDATE

Hennepin County Bicycle and Pedestrian Planning

Board-Approved Funding Awards for Cycle 4 Active Transportation Grant Program Projects (in Order of Project Rankings) Approved on

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES

Cycle Track Design Best Practices Cycle Track Sections

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

EXISTING PRIORITIES FUNDED FOR CONSTRUCTION LRTP

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

STREET AND HIGHWAY PLAN

Bicyclist Safety Action Plan (BSAP) 2018 Update. Presentation by Michael Sanders February 28, 2018

Station 1: Street & Sidewalk Upgrades

ACTIA Programs Annual Compliance Report Reporting Year Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments

Welcome to the Quebec Alternatives Analysis Public Meeting

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

ROAD PROJECTS. Primary and Interstate Roads LRTP; Southern- Western Neighborhoods MP

2017 (FY 21,22,23) Ohio CMAQ Prioritization

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

Seattle Bicycle Advisory Board August 3, 2011

If a person walks within this focus area, these are examples of the places he or she could walk to or from:

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

RIVERSIDE, Newton MA BH NORMANDY RIVERSIDE LLC. Riverside Station. A green, transit-oriented community

February 11, 2016 TPO Board Presentation

Project Description Form 8EE

Comprehensive Collection of Stakeholder Alternatives by Mode

Tunnel Reconstruction Brooklyn CB 1 August 14, 2018

San Jose Transportation Policy

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

Active Transportation on the Rise

West Village Mobility & Integration

THE NACTO MANUALS AND DESIGNING FOR VISION ZERO ZAKI MUSTAFA SHIRLEY ZAMORA

SOLANA BEACH BICYCLE TRANSPORTATION PLAN SECOND ADDENDUM

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9.


Orinda Bicycle, Trails and Walkways Master Plan

VCF. Wednesday, November 27, Geoffrey Haines Sustainable Transportation Specialist

OKI Awards More Than $41 Million to Transportation Projects Across the Region

Thank you for attending

Freeway System Considerations

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Santa Ana Creating Community Together

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

OTO BIKE/PED PLAN REPORT

City of Atlanta-MARTA Sales Tax Referendum Draft Project List. Atlanta City Council Work Session May 19, 2016

Complete Streets: Plan, Policy & Performance

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE

Application to AASHTO to recognize six suggested relocations of U.S. Bicycle Route 1 in the Northern Virginia District.

Waterford Lakes Small Area Study

Regina Bikeways Needs Assessment Study: Measuring the value of the bikeway infrastructure

Terwillegar Drive Expressway Draft Concept Plan

F I S C A L Y E A R STATE OF T H E SYSTEM F I N A L R E P O R T. P R O G R A M M I N G A N D S Y S T E M A N A L Y S I S

Regional Transportation Needs Within Southeastern Wisconsin

4.1 Evaluation Criteria

Gerald Desmond Bridge Replacement: The Severance of a Major Bicycling and Ped Route

Presentation of Staff Draft March 18, 2013 COUNTYWIDE TRANSIT CORRIDORS FUNCTIONAL MASTER PLAN

Arlington Public Schools Thomas Jefferson Site Evaluation Transportation Networks. Thomas Jefferson Working Group Meeting #6 November 10, 2014

Transcription:

Fiscal Year = 'By Fiscal Year' and Status Selection Criteria = 'All' and State = '' 7/16/2003 $40,173,660 $40,575,179 101 $1,245,000 Demand Management Trip Reduction Prog Travel Reduction Pro Telwork Outreach Prog Demand Management Project - New Activity - Market Research - Other 328 2,539 557 $3,970,000 I/M and Other TCMs Various Locations Maricopa Co: Pave 24.56 miles of dirt roads I/M or Other TCM Project - Other - Pave dirt roads 1,686 $960,000 I/M and Other TCMs Efficient Street Sweepers I/M or Other TCM Project - Other - Sweepers 5,044 $749,685 I/M and Other TCMs Maricopa County Work Links I/M or Other TCM Project - Other - Work Links $720,000 I/M and Other TCMs Video Conferencing I/M or Other TCM Project - Other - Video nferencing 1 5 1 $100,000 I/M and Other TCMs Pave unpaved road at Smoketree St and Warner Dr and various locations I/M or Other TCM Project - Other - Pave unpaved roads 1,026 $1,603,100 Pedestrian/Bicycle 43rd Ave at Canal Diversion Channel: Construct bicycle underpass Pedestrian/Bicycle Project - Facilities - Bike underpass for.30 miles - Other 1 4 1 $705,000 Pedestrian/Bicycle 13th St: Mill Ave to Priest Dr - Improvements to bike facilities for 1.25 miles Pedestrian/Bicycle Project - Facilities - Other 5 2 1 $440,000 Pedestrian/Bicycle Shea Blvd: Saguaro Blvd to 144th St: Construct bike lanes for 3.00 miles Pedestrian/Bicycle Project - Other - Bike Lane 1 3 1

Fiscal Year = 'By Fiscal Year' and Status Selection Criteria = 'All' and State = '' $305,700 Pedestrian/Bicycle 29th Ave at the Canal- Construct bicycle underpass for.20 miles Pedestrian/Bicycle Project - Facilities - Bike underpass - Other 1 8 1 $200,000 Pedestrian/Bicycle McClintock Dr: University Dr to Rio Slado Parkway - Construct sidewalk & bikeway Pedestrian/Bicycle Project - Facilities - Construct sidewalk and bikeway - Other $125,000 Pedestrian/Bicycle Pedestrian Design Assistance Pedestrian/Bicycle Project - Other - Ped Design Assistance $119,058 Pedestrian/Bicycle New River Rd: Northern Ave to Peoria Ave Design multi-use path for 2.00 miles Pedestrian/Bicycle Project - Facilities - Separate Path $594,000 Shared Ride Regional Rideshare Program 442 3,416 750 $432,600 Shared Ride Acquire land for Regional Park-and-Ride (US 60 and Power Road) 1 2 1 $206,239 Shared Ride Design regional park-and-ride (loop 101 and Glendale Ave) Van Pool - Commuter Matching $200,232 Shared Ride Design Regional park-and ride (US 60 and power road)

Fiscal Year = 'By Fiscal Year' and Status Selection Criteria = 'All' and State = '' $180,778 Shared Ride Design Regional Rark-and-Ride (Interstate 10 and Pecos Road) $127,308 Shared Ride Repayment of advance pre-design for Regional Park-and-Ride (SR 51 and Bell Road) $3,489,100 Traffic Flow Improvements Interstate 17 at Thunderbird Rd and Greenway Road: Construct dual left turn lane $3,111,400 Traffic Flow Improvements Dobson Rd at Elliot Rd: Dual left turn lanes & auxiliary lanes in all direct. $3,017,600 Traffic Flow Improvements US 60 and Mesa Drive: Construct dual left turn lanes $1,888,000 Traffic Flow Improvements Construct traffic control signal system for integration with Glensale & Phoenix 10 129 $1,731,600 Traffic Flow Improvements AzTech Smart Corridor Program Systems - Other 9 119 $1,600,750 Traffic Flow Improvements Loop 101 Southern Ave to Guadalupe Rd: Construct freeway management system Systems - Other - Freeway Management Systems 5 64

Fiscal Year = 'By Fiscal Year' and Status Selection Criteria = 'All' and State = '' $943,000 Traffic Flow Improvements Various locations : Convert ramp to dual ramp meters Systems - Ramp Meters - Freeway Management Systems 5 65 $938,285 Traffic Flow Improvements $770,431 Traffic Flow Improvements 59th Ave: Camelback Rd to Beardsley Rd - Construct Computerized Signal System Phase 1, hardware and software to interface with Peoria and Phoenix Design and Construct Glendale Traffic Management Center Systems - Construct traffic management center - Other 16 167 4 53 $616,000 Traffic Flow Improvements US 60 at Stapley Drive & Val Vista Dr: Design dual left turn lanes at intersec. $441,000 Traffic Flow Improvements $398,313 Traffic Flow Improvements Glendale Ave- Install Traffic Control System Ph 3 Systems - Traffic Control Systems - Other Hardware and Software; Integrates with Peoria and Phoenix US 60 at Alma School Rd: Construct left turn lanes on structure for NB & SB 6 63 $80,000 Traffic Flow Improvements Bell Road: 51 St Ave to 83rd Ave - Design Computerized Signal System (Phase 2) 1 9

Fiscal Year = 'By Fiscal Year' and Status Selection Criteria = 'All' and State = '' $66,000 Traffic Flow Improvements Intelligent Transportation System Planning Systems - Other 1 5 $8,500,000 Transit Regional Rail Development; Final Engineering Transit Project - Facilities Improvements - Other - Regional Rail Development; Final Engineering 2 13 4 Nationwide Totals.... $40,173,660 $40,575,179 101