Contents. 3) WTG Installation Vessel ) Array cable burial Vessel ) Hotel vessel ) Substation works... 5

Similar documents
Contents. 3) WTG Installation Vessel ) Hotel vessel ) Substation works ) Survey Vessel... 5

Contents. 3) WTG Installation Vessel ) Array cable installation Vessel ) Hotel vessel ) Survey Vessel ) Guard Vessels...

Contents. 3) WTG Installation Vessel ) Array cable installation Vessel ) Hotel vessel ) Rock bag removal Export cable ends...

Contents. 3) Construction Vessels ) Guard Vessels ) Crew Transfer Vessels ) Upcoming Operations (following 7 days)...

Contents. 3) Construction Vessels ) Guard Vessels ) Crew Transfer Vessels ) Upcoming Operations (following 7 days)...

Contents. 3) Construction Vessels ) Guard Vessels ) Crew Transfer Vessels ) Upcoming Operations (following 7 days)...

Contents. 3) Construction Vessels (All dates are weather dependant) ) Survey Vessel ) Guard Vessels... 4

Contents. 3) Construction Vessels (All dates are weather dependant) ) Survey Vessel ) Guard Vessels... 5

The Array cable installation vessel Stemat 82 and Assist tugs Lydia D and Claudia B are expected to commence installing array cables during week 5.

NOTICE TO MARINERS DUDGEON OFFSHORE WIND FARM CONSTRUCTION WORKS

NOTICE TO MARINERS DUDGEON OFFSHORE WIND FARM CONSTRUCTION WORKS

Other vessel's involved in the Swale cable pull in and burial operations will be the multicat Wiltango, and the barges Wilcarry 300, & Wilcarry 342.

Notice of operations at London Array Offshore Wind Farm

NOTICE TO MARINERS DUDGEON OFFSHORE WIND FARM CONSTRUCTION WORKS

The vessel Nova K, will be undertaking survey and PLGR work on the array cable routes.

Notice of operations at London Array Offshore Wind Farm. Date of Notice: 20 th May 2012 Notice no: 75. London Array Offshore Wind Farm

Notice to Mariners No 24 / 2017 Blyth Offshore Demonstrator Project 9 th September 2017

Notice of operations at London Array Offshore Wind Farm. Date of Notice: 03 rd June 2012 Notice no: 77. London Array Offshore Wind Farm

Notice of operations at London Array Offshore Wind Farm. Date of Notice: 01 st July 2012 Notice no: 81. London Array Offshore Wind Farm

For live Kingfisher updates of offshore activities, visit and on Twitter. 1 of 10

Safety Zone Application Construction Phase Sheringham Shoal Wind Farm Project

Nemo Link s puxo campaign

All Array cables have been installed and the cables have now been buried.

The shaded blocks below indicate the areas of activity published within this Bulletin.

London Array Offshore Wind Farm. Vessel Data Matrix

G9 Stakeholder Forum Marine Operations

G+ Global offshore wind health and safety organisation

MARINERS BRIEFING NEW ENGLAND SURVEY ACTIVITY CONTACT. RODNEY AVILA FISHERIES LIAISON Phone:

MARINERS BRIEFING NEW ENGLAND SURVEY ACTIVITY CONTACT. RODNEY AVILA FISHERIES LIAISON Phone:

The shaded blocks below indicate the areas of activity published within this Bulletin.

Protection for Vessels Engaged in Servicing Submarine Cables

The shaded blocks below indicate the areas of activity published within this Bulletin.

GERMAN RENEWABLE SHIPBROKERS S GERMAN RENEWABLE VESSEL PORTFOLIO ANY VESSEL ANYTIME

Scottish Hydro Electric Power Distribution Operation, Inspection, Maintenance and Decommissioning Strategy Bute Cumbrae Cable Replacement

The shaded blocks below indicate the areas of activity published within this Bulletin.

3 CONSTRUCTION. 3.1 Construction Methods and Sequence. 3.2 Construction Sequence

Multi-Purpose Workboats and Vessels. Marine Engineering and Construction. Salvage and Wreck Removal. Marine Consultancy Services

Notice of operations at London Array Offshore Wind Farm

THE ROLE OF INSTALLATION AND SUPPORT VESSELS

That is why. April 24, 2008

For live Kingfisher updates of offshore activities, visit and on Twitter. 1 of 10

The shaded blocks below indicate the areas of activity published within this Bulletin.

Gorgon - Pilotage - Passage Plan Materials Offloading Facility (MOF) to PBG

Dive Operations Plan for Personal Submersibles. Revision

ADANI PORTS & SEZ LTD. ++ MUNDRA PORT ++ GENERAL INFORMATION

Code of Practise for Deployment and Marking of Fishing Gear

Marine Management Organisation Marine Licence

Towing Officers' Assessment Record: Western Rivers

NOBLE REV 02 FPSO MOORING SYSTEM INTEGRITY STUDY

THE SYLLABUS FOR WRITTEN EXAMINATION PILOT'S FOURTH CLASS LICENCE (TEES AND HARTLEPOOL) AND

OFFSHORE SURVEY IN DEVELOPMENT PROJECTS. Ian Douglas Head, Offshore Surveys, Shell Projects & Technology Europe

HDD Wire Guided Waterway Crossing ATON Plan. Augwick Creek (S-L28)

UNDERWATER SERVICES COMPANY PROFILE

The shaded blocks below indicate the areas of activity published within this Bulletin.

Order no. 939 of 27 November 1992 on the protection of submarine cables and submarine pipelines (the Cable Order)

Anchor operations for Jack-up barge in offshore wind farms during service Customers perspective

Towing Officers' Assessment Record: Near Coastal/Oceans

Offshore Wind Vessels. Steven Kopits Douglas-Westwood LLC

The shaded blocks below indicate the areas of activity published within this Bulletin.

Gorgon - Pilotage - Passage Plan PBG to Materials Offloading Facility (MOF)

LIST OF NOTICES TO MARINERS 2017 PAC 201 JUAN DE FUCA STRAIT AND STRAIT OF GEORGIA, FIRST EDITION, 2012

Astrolabe Reef Access Plan Stakeholder Presentation

Cook Inlet pipeline crossing is about making the best choices

LIST OF CORRECTIONS. 14 / July /052(T) - 07/125(T) - 08/136(T) - 08/137(T) - 12/177(T) - 15/212(T) - 18/232-22/285(T)

The shaded blocks below indicate the areas of activity published within this Bulletin.

LIST OF CORRECTIONS. 02 / January /052(T) - 07/125(T) - 08/136(T) - 08/137(T) - 12/177(T) - 15/212(T) - 18/232-22/285(T)

The shaded blocks below indicate the areas of activity published within this Bulletin.

Good Mooring to You! Jensen Beach Mooring Field. Kathy Fitzpatrick, P.E. Coastal Engineer, Martin County

Preliminary Survey Notification and Information for Fisheries Interests.

Charlottetown Marine Terminal Pipeline Decommissioning Project Description

TAT 14 (Segment K) North Western Approaches

South African Maritime Safety Authority Ref: SM6/5/2/1 /1

APPENDIX D Oil Loading Pipeline - Options

Wind Mills of the Mind Delivering large scale offshore wind. Andy Kinsella CEO, Offshore November 24th, 2011, Dundalk

Towing Officers' Assessment Record: Great Lakes/Inland

Gorgon - Pilotage - Passage Plan - PBG to Gorgon Marine Terminal - Alternative Route

STAKING TRAFFIC CONTROL SIGNAL SYSTEMS

Certified Professionals in Hydrographic Solutions

A Consultation on the Proposed Port/Pilotage/VTS limits for St Helier and associated Guidance/Restrictions

IMCA Competence Assessment Portfolio June 2013

Managing Dynamic Positioning (DP) Operations

11 Anchor Handling & MOU Moving 11-2

SOP-003 GYRO CALIBRATION AND VERIFICATION PROCEDURE

CHAPTER 8 STAKING SIGNALS AND LIGHTING FIELD GUIDE. 8.1 Staking Traffic Control Signal Systems

SOP GEN-007X Crane and Winch Operations

Oil Tanker - VLCC. Yosu Inward Transit Monitoring (Entering into the Port of Yosu on a Loaded VLCC) LEG 1: APPROACHING ANCHORAGE AND PILOT STATION

UNDERSTANDING IN DEPTH, COMMITTED TO CORE.

The shaded blocks below indicate the areas of activity published within this Bulletin.

NOTICE TO MARINERS. Western Link Project. Shallow and Deep water cable installation

Liverpool Yacht Club Tranmere Sailing Club Tranmere Sailing Club, Offshore Challenge Saturday 2 nd July 2016

35 years of unparalleled support to the offshore oil and gas industry.

SAILING INSTRUCTIONS

OCEAN BREEZE. Ocean Breeze is a Deeper Water Wind turbine Foundation System for The Largest Wind Turbine Towers Sited in Waters up to 200m

Gorgon - Pilotage - Passage Plan - Gorgon Marine Terminal to PBG Alternative Route

Gorgon Pilotage Passage Plan - PBG to Gorgon Marine Terminal Primary Route

Work Permit Help Document For changes introduced in ShIPS Revision 7.1 (Released 11/12/2008)

TRACK RECORD. First Mover. Burbo Bank Ext. - Tristan Stedman

Shaded blocks indicate activity.

Argentine Navy ARA San Juan (S-42) Search 2018

Seventeenth Coast Guard District Auxiliary Policy Directive 01-07

Transcription:

Weekly Notice of Contents 1) Notice to Mariners (NtM) (Active)... 2 2) Hazards/Mitigation for Project Vessels and PAX... 3 3) WTG Installation Vessel... 4 4) Array cable burial Vessel... 4 5) Hotel vessel... 4 6) Substation works... 5 7) Export Cable Vessel... 5 8) Survey Vessel... 5 9) Installation Vessels Fibre Optic Cable... 6 10) Guard Vessels... 7 11) Crew Transfer Vessels... 7 12) Upcoming (following 7 days)... 9 13) Summary of (previous 7 days)... 10 14) Looking further ahead (beyond 7 days) (new activities starting)... 10 15) Project Met mast details... 11 16) Project Wave Rider... 11 17) As Laid Cardinal Buoy Positions... 11 18) Contact details... 11 19) Export Cable Coordinates... 12 20) Flotel Anchorage Position... 13 21) Site Chart... 13 22) WTG Coordinates in LAT and LON... 14 Page 1 of 14

Weekly Notice of WNoO application: - Issued weekly by the ROW Project Marine Co-ordination Team - Notice to Mariners (NtM) will be issued for any unplanned/unmarked navigational hazards introduced by the project within our area of operation 1) Notice to Mariners (NtM) (Active) Notice to Mariners Ref. NTM001 NTM009 NTM016 NTM017 NTM032 NTM049 NTM056 NTM057 NTM 064 NTM 065 NTM 068 NTM 069 Date of Issue Activity (Vessel in brackets) Status of Works Expected close out 15/12/2015 Cardinal as Laid Positions Ongoing June 2018 10/03/2016 Approval of Safety Zones Ongoing June 2018 27/05/2016 Installation Rock Pads Ongoing June 2018 24/06/2016 Installation Rock Pads Round 2 Ongoing June 2018 28/09/2016 09/02/2017 Revised Project Wave Rider Positions Safe distances of all structures within Rampion Offshore Wind Ongoing June 2018 Ongoing Until further notice 28/03/2017 Revised Export Cable Hazards Ongoing Until further notice 28/03/2017 Inter Array cables shallow buried/exposed cable hazards Ongoing Until further notice 09/05/2017 Export cable ROV Surveys Ongoing 20/06/17 17/05/2017 Main Array Hazard Area Ongoing August 2017 20/06/2017 Installation of Fibre Optic cables Planned 30/07/17 07/07/2017 Offshore Export cable jointing Planned 30/08/2017 Secretary of State has approved our application for statutory Safety Zones (08/03/16) during the construction of the Rampion Wind Farm. These Safety Zones are defined as: 500m around all structures (where construction vessels are present) 50m around all structures (whilst personnel are working on them) including the offshore substation. All project vessel masters and 3 rd party sea users are requested to remain a minimum safe distance of 500m around each vessel. Project vessels are to keep a sharp lookout (Radar/AIS and visual) for nonproject vessels entering these zones and report to Duty MC via P1 ASAP. Page 2 of 14

Weekly Notice of 2) Hazards/Mitigation for Project Vessels and PAX GSK pipeline o 30m Safety Zone either side of the GSK pipeline situated to the East of the export cable corridor. No project vessels will be permitted to enter this safety zone without prior permission by the Duty MC Redundant sewage outfall pipeline o 30m Safety Zone either side of the redundant sewage outfall pipeline to the west of the cable route Fishing gear o All Vessels to keep a sharp lookout and report any fishing gear to duty MC who will in turn distribute information to all other project vessels. o All vessels to operate appropriately where the hazard of fishing gear exists Fishing vessels o Standing order for all project vessels to pass at a safe distance. Dive Vessels/Divers o Standing order for all project vessels to pass at a safe distance o Specifically, if any vessel is present over a known dive site, project vessels are to pass a minimum of 1NM uptide. Scour protection and exposed cables on sea bed around foundations o Guard vessel in operation o Co-ordinates disseminated to FLOs Subsea cables (buried, shallow buried and surface laid). o All project vessels to keep a sharp lookout for third party sea users venturing near subsea cables laid on sea bed. Report any such instances to Traffic ASAP. Special consideration of the exposed cable at the jointing location (50 42.97 N, 000 17.88 W) and to the east of the Offshore Substation. Drift Netting o Project vessels to operate accordingly during transits in darkness with regard to the commencement of the drift net season Refer to Documents RAM-ERA-SMG-SAF-0001_00 (Guidelines for CTV operators on specific hazards) Ensure all project vessels have latest Office Site Chart (Check with Duty MC for latest Rev) Page 3 of 14

Weekly Notice of Name Flag Call Sign/MMSI Contact Info L (m) B (m) D (m) GT (t) Contractor Status (Start) Picture 3) WTG Installation Vessel MPI Discovery NL PCFF/246741000 138 40 5.9 19533 Eon WTG Installation Start 01/03/2017 MPI Adventure NL PCKV/245924000 136.4 40 5.4 19533 Eon WTG Installation Start 08/06/2017 4) Array cable burial Vessel Fugro Saltire BS LOD/258401000 111 24 6.1 9603 Fugro Array Cable Burial start 2 nd phase 22/05/2017 5) Hotel vessel Wind Solution UK 2AR07/235062382 122 19 5.1 8893 Eon Flotel Start 25/04/2017 Page 4 of 14

Weekly Notice of Name Flag Call Sign/MMSI Contact Info L (m) B (m) D (m) GT (t) Contractor Status (Start) Picture 6) Substation works Pacific Osprey CY 5BUF3/210286000 161.3 49.03 5.1 24586 Eon Substation jack up start 15/05/17 till October 17 7) Export Cable Vessel NP289 (NL) PCBG/244750587 80 28 2.3 4102 VBMS Jointing of Export Cable Start 10/07/17 Bever (NL) PDAA/244536000 35.6 11.6 4.3 607 VBMS Support Tug for NP289 Sir Jeske B (NL) PDCJ/244870247 239 24 8 78 VBMS Support Tug for NP289 8) Survey Vessel RRV Audrey (UK) 2CTN7/235075634 13 6 1.1 13.5 Turbine Transfers Survey s. Working out of Brighton Start 01/11/2016 Page 5 of 14

Weekly Notice of Name Flag Call Sign/MMSI Contact Info L (m) B (m) D (m) GT (t) Contractor Status (Start) Picture Husky (UK) 2EQ17/235087309 9) Installation Vessels Fibre Optic Cable 21.59 6,51 2.6 72 GMSL Excavation works Start 29-06-2017 Beluga (NL) NA 45.11 17.07 2.9 700 GMSL Excavation works Start 29-06-2017 MPTI Trifaldi (UK) 2HFK6/235103214 19 8 1.3 46 GMSL Guard Vessel for Beluga START 18-07-2017 CRC Argosy (UK) 2IHL8/235109792 9 3.1 0.8 3.8 GMSL Crew change Vessel for Beluga C-Fenna (UK) MBAH3/232008023 24.68 11 2.7 255 GMSL Dive Support Start 08-07-2017 Phoenix (UK) 2IUR3/235112943 14 5 0.8 36 GMSL Crew Change vessel for C- Fenna Start 16-07-2017 CS Recorder (UK) MATL3/232007052 105.5 20 6.2 6292 GMSL Nearshore cable lay Start 12-07-2017 Jif Challenger (FR) FIYA/228074700 34 14 3.1 499 GMSL Nearshore cable lay Start 10-07-2017 Page 6 of 14

Weekly Notice of Name Flag Call Sign/MMSI Contact Info L (m) B (m) D (m) GT (t) Contractor Status (Start) Picture 10) Guard Vessels Choice (UK) MYYW2 /235078077 24. 6.0 3.5 122 Choice Marine Guard Boat Duties 24/7 Commodore P (UK) 2GIR2/235097729 18 6 0.9 27 Offshore Turbine Services Fast Response Guard Vessel Start 24/04/2017 11) Crew Transfer Vessels Rix Tiger (UK) 2GGY4/235097309 Rix Panther (UK) 2FRT9/235093688 Windcat 6 (UK) MXFD/235057789 CH 16/P1 19 9 1.8 42 Rix Sea Shuttle 19 8 1.5 42 Rix Sea Shuttle 16 6 2 40 Windcat CTV and Ad-hoc Inspections Working out of Newhaven Start 01/08/2016 CTV and Ad-hoc Inspections Working out of Newhaven Start 15/03/2016 Site CTV Working out of Newhaven Windcat 10 (UK) 2BAN2/235064453 22 6 2 36 Windcat Bolt Tensioning CTV Working out of Newhaven Start 29/07/2016 Windcat 17 (UK) 2BYDS/235070402 18 6 2.5 35 Windcat MVOW WTG Commissioning Start 19/09/2016 Windcat 19 (UK) 2CUS9/235075935 22 6.5 1.9 40 Windcat MVOW WTG Commissioning Start 06/03/2017 Page 7 of 14

Weekly Notice of Name Flag Call Sign/MMSI Contact Info L (m) B (m) D (m) GT (t) Contractor Status (Start) Picture Porth Eilian (UK) 2GNX8/235099056 CH 16/P1 18 8 1.9 55 Turbine Transfers WTG M&E completion Start 11/03/2017 Windcat 22 (UK) 2CUS9/235075935 22 6.5 2.1 40 Windcat Bolt Tensioning CTV Working out of Newhaven Start 11/01/2016 Njord Snipe (UK) 2HGH2/235103431 20 8 1.8 65 Njord Offshore Terminations Package Working out of Newhaven Start 26/09/2016 Sure Pride (UK) 2FUM/235094357 Gaillion (UK) 2EON7/235086878 CH 16/P1 20 8 2 67 CH 16/P1 Surewind 19 8 1.8 60 Gardline WTG Commissioning Start 15/05/2017 OSP CTV Working out of Newhaven Start 16/07/2017 Porth Nefyn (UK) 2IRQ8/235112231 19 8 1.6 48.1 Turbine Transfers WTG M&E completion Start 07/04/2017 Sure Pilgrim (UK) 2GEJ9/235096669 CH 16/P1 20 8 2 67 Surewind WTG Commissioning Start 06/03/2017 Dalby Swale (UK) 2HNA5 /235104985 CH 16/P1 23 7 1.2 67 VBMS Assisting Export cable Vessels Page 8 of 14

Weekly Notice of 12) Upcoming (following 7 days) Operation Location Vessel Operational Notes WTG Installation Load out 9: B08,A09,A10,C10,D10,C11,D11,I15 MPI Discovery Installing Load Out 9 WTG Installation Load out 10: D12,E12,F12,D13,E13,F13,D09,E10 MPI Adventure In Esbjerg Load out 10 Array Cable Terminations F11,E09,O09,G05,F04,F05, Rix Panther Njord Snipe are due to be completed by September 2017 Array Cable Burial OSP-E08,D13-E13,F13-OSP,F13-F12,D13- E14,G15-H15,E13-F13,G15-OSP Fugro Saltire due to commence 22/05/17 till end of August Export cable joint KP11 Export cable joint NP289 Tug Bever Dalby Swale On Going WTG M&E completion/ commissioning I07,L08,J08,I08,L07,I05,M10,N09,N10,F06,N06 O07,M09,F15 Windcat 19, Windcat 17, Sure Pilgrim, Sure Pride, Porth Nefyn Ongoing Servicing / Snagging / Crew Change All Locations Windcat 10 Rix Tiger Inspection Snagging Painting cleaning Foundation Bolt tensioning D13,G10,B10,B09,C09,B07,K06 Windcat 22 Ongoing due to complete end July 17 Project Guard vessels Site 24hr Guard Vessels Choice, Commodore P, Guarding Windfarm and Export cable route OSS works Offshore sub station Gaillion ongoing OSS Flotel Accommodation jack up vessel Pacific Osprey East of OSP Survey Multibeam Surveys Audrey Ongoing operations until end of construction Start Sept 16 Page 9 of 14

Weekly Notice of Flotel Anchored outside field Anchorage No 5 Wind Solution Start 26/04/2017 Fibre Optic cable installation Export cable route CS recorder Jiff Challenger Start10/07/17 Dive works OSP FO cable installation OSP Fenna C CRC Island Phoenix Installation of J tubes and cable clamps Start 06/07/17 Nearshore excavations FO cable Beach to KP 4.5 MPI Trifaldi Beluga Husky CRC Argosy Ongoing due to complete by end of July 17 All Mariners Operating in the Vicinity of Rampion Offshore Wind Farm are advised to familiarise themselves with MGN 372 https://www.gov.uk/government/uploads/system/uploads/attachme nt_data/file/440734/mgn_372.pdf 13) Summary of (previous 7 days) Guard vessel offshore 24/7 Completed Array Cable installation WTG installation MVOW mechanical completions. Ongoing surveys Terminations Bolting Palfinger works OSP Commissioning Pacific Osprey OSP commissioning 14) Looking further ahead (beyond 7 days) (new activities starting) Installation of Fibre optic cable Page 10 of 14

15) Project Met mast details Weekly Notice of (WNoO) Weekly Notice of The current lattice structure has failed and will be replaced in due course. Currently on the sea bed at coordinates below: ID Latitude Longitude Met mast 50 41.287'N 0 20.594'W 16) Project Wave Rider ID Latitude Longitude Status Wave Rider No1 50 o 41.675 N 000 o 16.299 W As Laid Wave Rider No2 50 o 40.219 N 000 o 12.949 W As Laid Wave Rider No3 50 o 39.037 N 000 o 19.644 W As Laid 17) As Laid Cardinal Buoy Positions Cardinal Name Light Signature Deployed Latitude Deployed Longitude North 1(AIS) Q 50 41.377 N 0 21.898 W North 2 V Q 50 42.072 N 0 17.098 W North 3 (AIS) Q 50 42.771 N 0 12.286 W East 1 Q (3) 10s 50 41.050 N 0 11.311 W South 1(AIS) Q (6) + L Fl 15s 50 39.172'N 0 11.363'W South 2 V Q (6)+L Fl 10s 50 38.398 N 0 16. 147 W South 3 (AIS) Q (6) + L Fl 15s 50 37.631 N 0 20.931 W West 1 Q (9) + 15s 50 39.439 N 0 21.930 W 18) Contact details Marcus Moore Offshore Site Manager Tel: +44 (0) 7447 013684 Email: marcus.moore@rampionoffshore.com Gordon Bain Lead Marine Coordinator Tel: +44 (0) 7816 648082 Email: leadmc@rampionoffshore.com. Duty Marine Coordinator Tel: +44 (0) 7557 942945 Email: traffic@rampionoffshore.com Page 11 of 14

Weekly Notice of 19) Export Cable Coordinates East Export Cable Route West Export Cable Route LATITUD LONGITUD KP LATITUD LONGITUD KP 50 49.0411453' N 0 20.1491986' W 0 50 49.0392569' N 0 20.1559728' W 0 50 49.0383954' N 0 20.1471673' W 0.006 50 49.0365229' N 0 20.1541776' W 0.005 50 48.8450241' N 0 20.0043473' W 0.401 50 48.8321138' N 0 20.0213010' W 0.415 50 48.5435783' N 0 19.7817419' W 1.019 50 48.5312412' N 0 19.8257254' W 1.019 50 47.5754360' N 0 19.0671645' W 3 50 47.5283632' N 0 19.1741222' W 3.03 50 47.0619271' N 0 18.8052062' W 4.001 50 46.9242174' N 0 18.9365803' W 4.184 50 46.7959655' N 0 18.7318572' W 4.502 50 46.8710244' N 0 18.9223825' W 4.284 50 46.6611182' N 0 18.7172942' W 4.752 50 46.5838764' N 0 18.8887138' W 4.818 50 46.1228324' N 0 18.7778840' W 5.753 50 46.0611405' N 0 18.9565559' W 5.791 50 45.4028104' N 0 18.9771812' W 7.108 50 45.4302627' N 0 19.1313961' W 6.978 50 45.3447367' N 0 18.9859594' W 7.216 50 45.3274051' N 0 19.1548573' W 7.171 50 45.2907955' N 0 18.9871717' W 7.316 50 45.1830551' N 0 19.1582731' W 7.439 50 45.2264755' N 0 18.9803895' W 7.436 50 45.0807508' N 0 19.1340815' W 7.631 50 43.8545862' N 0 18.5755551' W 10.024 50 44.4092272' N 0 18.9209074' W 8.901 50 43.5353821' N 0 18.4567545' W 10.632 50 44.2370203' N 0 18.8760834' W 9.225 50 43.4067649' N 0 18.3879768' W 10.884 50 43.7399867' N 0 18.7176892' W 10.165 50 43.3218335' N 0 18.3272998' W 11.057 50 43.4531794' N 0 18.5891475' W 10.718 50 43.2482600' N 0 18.2567879' W 11.216 50 43.3127411' N 0 18.5123192' W 10.994 50 43.2046700' N 0 18.2066487' W 11.316 50 43.2634912' N 0 18.4778397' W 11.094 50 43.0451085' N 0 17.9882516' W 11.708 50 43.2007868' N 0 18.4231791' W 11.227 50 42.8969501' N 0 17.7661912' W 12.088 50 43.1559313' N 0 18.3757412' W 11.327 50 42.4324193' N 0 16.8658103' W 13.453 50 42.8176502' N 0 17.8872884' W 12.179 50 41.9317806' N 0 15.9784611' W 14.851 50 42.4145324' N 0 17.1150045' W 13.356 50 41.7220852' N 0 15.6528737' W 15.397 50 41.9242877' N 0 16.2156689' W 14.752 50 41.7133732' N 0 15.6394384' W 15.42 50 41.6643728' N 0 15.6559910' W 15.568 50 41.7133732' N 0 15.6394384' W 15.42 50 41.6643728' N 0 15.6559910' W 15.568 50 41.6218602' N 0 15.5819279' W 15.602 50 41.6269395' N 0 15.6136011' W 15.654 50 41.6218602' N 0 15.5819279' W 15.602 50 41.6269395' N 0 15.6136011' W 15.654 50 41.5681136' N 0 15.5889815' W 15.702 50 41.5677536' N 0 15.5919882' W 15.766 Page 12 of 14

20) Flotel Anchorage Position Weekly Notice of (WNoO) Weekly Notice of ID Latitude Longitude New Anchorage Position 2 50 o 42.690 N 000 o 10.539 W 21) Site Chart Page 13 of 14

Weekly Notice of 22) WTG Coordinates in LAT and LON Page 14 of 14