Cordova Harbor Page 2 of 9

Similar documents
1-44. SITKA HARBOR, ALASKA (Western Channel, Crescent Bay Basin, Channel Rock Breakwaters) (CWIS NOS , 16840, 10322, 55030, 13787)

Condition of Improvements 30 December 2014 Wrangell Harbors, Alaska (CWIS No , )

Juneau Aurora Harbor

Juneau Douglas Harbor

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, & 10422) Condition of Improvement 30 September 2009

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, 12270, & 10422) Condition of Improvement 30 September 2012

Ninilchik Harbor Page 2 of 11

Nome Harbor Page 2 of 12

1-22. KETCHIKAN, ALASKA (Thomas and Bar Point Basins) (CWIS NOS & 87071) Condition of Improvement 30 September 2007

Ketchikan Harbors Thomas Basin and Bar Point Harbor

Grays Harbor O&M and Deepening Dredging

Grays Harbor Federal Project

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE 8-FOOT CHANNEL OF THE FEDERAL NAVIGATION PROJECT IN KENNEBUNK RIVER KENNEBUNK & KENNEBUNKPORT, ME

Mouth of the Columbia River Jetties Three-Phase Construction Plan

CORPS FACTS. Harbor Dredging U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG

VIDEO AUDIO Slide 1. Slide 2 Old timey 18 th century map of east coast

Pacific Ocean Division. Navigation Program Overview. Association of Pacific Ports 2016 Winter Conference Waikaloa, Hawaii.

APPENDIX M DREDGED MATERIAL MANAGEMENT PLAN (DMMP) FINAL INTEGRATED FEASIBILITY REPORT AND ENVIRONMENTAL ASSESSMENT

DRAFT. October 17, 2014 File No Mr. Brendhan Zubricki Town Administrator Essex Town Hall 30 Martin Street Essex, MA.

MOREHEAD CITY HARBOR, NC. Dredged Material Management Plan (DMMP)

APPENDIX D REAL ESTATE PLAN

The proper location of the mouth of the Salinas River is a very difficult problem. - U.S. Surveyor General for California (1879)

Nearshore Dredged Material Placement Pilot Study at Noyo Harbor, CA

MILE POINT TRAINING WALL JACKSONVILLE, FL. Geotextile Tube Installation

US Beach Nourishment Experience:

Public Notice U.S. Army Corps In Reply to Application Number CENAB-OP-RMS (NATIONAL HARBOR (FORMERLY PORT Baltimore District AMERICA])

Beach Nourishment Impact on Beach Safety and Surfing in the North Reach of Brevard County, Florida

Assateague Island National Seashore North End Restoration Project Timeline

UNITED NEW YORK SANDY HOOK PILOTS BENEVOLENT ASSOCIATION AND UNITED NEW JERSEY SANDY HOOK PILOTS BENEVOLENT ASSOCIATION

X.B WETLANDS ROGUE RIVER ESTUARY

An Example of a Unique Partnership for Contaminated Sediment Management The Port Hueneme Experience

Redondo Beach Boat Launch Ramp Facility

Port Sections Guide Section 01

SACO RIVER AND CAMP ELLIS BEACH SACO, MAINE SECTION 111 SHORE DAMAGE MITIGATION PROJECT APPENDIX F ECONOMIC ASSESSMENT

PEASE DEVELOPMENT AUTHORITY DIVISION OF PORTS & HARBORS ANNUAL DREDGE REPORT

FINAL ENVIRONMENTAL IMPACT STATEMENT ON BROWARD COUNTY SHORE PROTECTION PROJECT SEGMENTS II AND III BROWARD COUNTY, FLORIDA

Dauphin Island East End Beach and Barrier Island Restoration Project. Beau Buhring South Coast Engineers

ST. JOSEPH PENINSULA, GULF COUNTY, FLORIDA Beach Re-Nourishment and Environmental Enhancement Project RECOMMENDATIONS

V. HARBOR DEPTHS, CHANNEL DESIGN AND PROPOSED CONSTRUCTION AND DREDGING

UTAH RECLAMATION MITIGATION AND CONSERVATION COMMISSION [RC0ZCUPCA0, 155R0680R1, RR ]

PNWA Conference Update

Sediment Management Plan Rehoboth Bay

La Quinta Channel Extension Port of Corpus Christi Ingleside, Texas. Mark Coyle

PORT OF SEATTLE TERMINAL 91 UNDERWATER REGRADING

ROOK COMPANY PANAMA CANAL BANCROFT LIBRARY

BEFORE THE ENVIRONMENTAL PROTECTION AUTHORITY JOINT STATEMENT OF EXPERTS IN THE FIELD OF MARINE MAMMALS

TOWN OF DENNIS 10 YR COMPREHENSIVE DREDGE PERMIT SEPTEMBER 10, 2013

ADL Attachment 1

Water Resources Report RKLD Annual Meeting July 30, 2016

DEPARTMENT OF THE ARMY GALVESTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1229 GALVESTON, TEXAS CESWG-CDR (1145)

Maltester Channel Dredging. Shoreline Marina Committee. November 18, 2008

Cat Island Chain Restoration

UPPER BEACH REPLENISHMENT PROJECT RELATED

Dredging Engineering Short Course Texas A&M University January 2016

First Annual RCRA CCR Unit Inspection Report January 2016 RESTRICTED WASTE TYPE I LANDFILL OPERATING PERMIT NUMBER 37-01

Northern Indiana Public Service Company (NIPSCO) 2723 East 1500 North, Wheatfield, Indiana, USA Golder Associates Inc.

BIG RIVER COALITION RED RIVER VALLEY ASSOCIATION Sean M. Duffy, Sr. Executive Director

OYSTER REEF RESTORATION; RESTORING ECOLOGICAL FUNCTION

SHORE PROTECTION AND HABITAT CREATION AT SHAMROCK ISLAND, TEXAS ABSTRACT

Planning Considerations for Nearshore Placement of Mixed Dredged Sediments

Final Waterways Assets and Resources Survey Master Plan for Dredging and Beach Nourishment

ST. LOUIS SECTION PROJECT OF THE YEAR AWARD

Estimated on-the-ground start and end dates: 1 June October 2018

Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M)

2018 INSPECTION REPORT

CLARIFICATION PAPER DREDGED MATERIAL VOLUME ESTIMATES

NAVIGATION STUDY FOR LAKE WORTH INLET, FLORIDA DRAFT INTEGRATED FEASIBILITY REPORT AND ENVIRONMENTAL IMPACT STATEMENT APPENDIX A ENGINEERING

Dredged Material Management Plan Atlantic Intracoastal Waterway Port Royal Sound, South Carolina to Cumberland Sound, Georgia November 2015

Ohio Shipwreck Inventory Data Entry Instructions

CCR Landfill 2017 Annual Inspection Report NC1 Ash Disposal Area

Attachment A. Pertinent Correspondence

JUNEAU SECOND CHANNEL CROSSING WATERWAY USER SURVEY RESULTS

DEPARTMENT OF THE ARMY JACKSONVILLE DISTRICT CORPS OF ENGINEERS P.O. BOX 4970 JACKSONVILLE, FLORIDA FINDING OF NO SIGNIFICANT IMPACT

HARBOR INFRASTRUCTURE INVENTORIES Lorain Harbor, Ohio

FY-16 Ongoing Contracts FY-16 Scheduled Contracts

BEACH NOURISHMENT COMBINED WITH SIC VERTICAL DRAIN IN MALAYSIA. Claus Brøgger 1 and Poul Jakobsen 2

Dredging Keeping Our Underwater Highways Open

FINDING OF NO SIGNIFICANT IMPACT

EPA R6 Dive Team Operations Report. San Jacinto Waste Pits Channelview, TX December 9-10, 2015

Ecosystem Func-on and Value in the Columbia River Basin

The 2017 Panama City Beaches Beach Interim Renourishment Project. Answers to Common Questions

SPECIAL SPRING 2018 STORM REPORT ON THE CONDITION OF THE MUNICIPAL BEACHES FOR THE BOROUGH OF STONE HARBOR, CAPE MAY COUNTY, NEW JERSEY

Figure 1 Example feature overview.

Unalaska Navigation Channel Improvements

Impact of Dredging the Lower Narrow River on Circulation and Flushing

COUPLED MANAGEMENT STRATEGY LAKE CATHIE ESTUARY & COAST

Long Term Success and Future Approach of the Captiva and Sanibel Islands Beach Renourishment Program

2016 Annual Inspection Report

New Jersey Beach Profile Network Atlantic County Profile Site Locations

Feasibility Report and Environmental Impact Statement. Coastal Storm Damage Reduction SURF CITY AND NORTH TOPSAIL BEACH, NORTH CAROLINA.

LaSalle Park Marina Wave Break

AD-A II~lllII I I 7

Texas passes, longshore transport, hurricanes, beach erosion and sea level

CLAM PASS ANNUAL RESTORATION & MANAGEMENT PLAN TIDAL ANALYSIS ELEMENT REPORT NO. 13

PLAQUEMINES PARISH BARRIER ISLAND RESTORATION & SUSTAINABILITY. MVD/Gulf Coast Regional Dredging Meeting November 5, 2013

SECTION XI - COAST PILOT UPDATING. 1. To acquire a general knowledge of the responsibilities of the Auxiliary in COAST PILOT UPDATING activities.

North Shore of Long Island, Feasibility Study

DEAD-ENDCHANNELFLUSHINGINHARBORS

New Jersey Coastal Zone Overview. The New Jersey Beach Profile Network (NJBPN) 3 Dimensional Assessments. Quantifying Shoreline Migration

ELIZABETH RIVER FACTS

Transcription:

Cordova Harbor

Cordova Harbor Page 2 of 9

Condition of Improvements 30 December 2017 Cordova Harbor, Alaska (CWIS No. 087136, 087186, 087711) Authorization Rivers and Harbors Act, 30 August 1935 (R & H Committee Doc. 33, 73rd Congress, 2nd Session) as adopted, provides for a sheltered small boat harbor of 8.26 acres with a depth of -10 feet MLLW protected by north and south breakwaters of 1,100 feet and 1,400 feet respectively. Under the River and Harbor Act of 14 July 1960, Section 107, P.L. 86-645, authorized by the Chief of Engineers, 29 June 1978, harbor expansion is approved to 20 acres by the removal of the 1,400 foot breakwater, the construction of a 1,902 foot breakwater, and an increased depth for the entrance and access channel to -16 feet MLLW. Table 1 Existing Project Length ft. Width ft. Depth ft. Entrance & Access Channel 1750 125-16 North Breakwater 1100 Entrance Breakwater 183 Western Breakwater 1902 Silt Barrier (contained) 1450 650 Mooring Basin (maintained by others) 19.55 acres Varies Project Usage Cordova is a community on Prince William Sound in the Gulf of Alaska. The project is used as a base of operations for commercial fishing and provides moorage for 727 vessels, making it one of Alaska s largest single-basin harbors. Seaplane moorage is also available. The Cordova canning season is one of the longest and most diversified in the state. In 2011, nearly 400 residents held commercial fishing permits and nearly half of all households had someone working in the industry. Progress of Work 1938 The original basin and breakwaters are completed in October of this year. 1951 Maintenance dredging is accomplished to a depth of -12 feet MLLW. 1962 Dredging to -12 feet from September October removes 41,347 cubic yards of material from the harbor. Cordova Harbor Page 3 of 9

Progress of Work 1964 The area is uplifted 6.2 feet by the 27 March 1964 earthquake causing major damage to the project. Restoration work begins in June. Basin expansion is approved on 19 August 1964 and begins in November. 1965 Restoration and expansion phases are completed in June. 1966 Contract for construction of the 183 foot entrance breakwater is awarded in September and completed in October. 1968 13,170 cubic yards of material are dredged in February. 1970 A shoal at the entrance channel is dredged to -15 feet MLLW. 1972 The entrance channel and basin are dredged from September to October with 13,646 cubic yards removed. 1977 Maintenance dredging removes 11,313 cubic yards from September to October. 1981 Under the River and Harbor Act of 14 July 1960, Section 107, P.L. 86-645, authorized by the Chief of Engineers, 29 June 1978, harbor expansion is approved to 20 acres by the removal of the 1,400 foot breakwater, the construction of a 2,000 foot breakwater, and an increased depth for the entrance and access channel to -16 feet MLLW. 1983 Harbor expansion contract is successfully completed. 1991 Sampling and testing is carried out followed by maintenance dredging in December 1991 with 3,900 cubic yards removed from the Federal project. 2000 A condition survey of the harbor is completed in June. 2002 Vertical aerial photography is obtained of the harbor in June. 2003 A condition survey of the harbor is conducted in June. 2006 The most recent condition survey is completed in May. E&D begins for a new maintenance dredging contract to be awarded in 2008. Contaminated sediments found in both the entrance channel and maneuvering area require upland disposal. 2008 A Department of the Army permit authorizing the construction of a breakwater extension and to raise the height of the north breakwater is issued. 2009 Maintenance dredging of the small boat basin from September to November removed 33,206 cubic yards of material. Contaminated material was disposed at the city landfill and non-contaminated material was disposed using the in-water site. 2010 A Project Condition Survey was conducted in June. 2014 A Project Condition Survey was conducted in May. Harbor expansion contract is successfully completed. Cordova Harbor Page 4 of 9

Table 2 Cost to Date Project Description Cost $ 087136 O&M Appropriations 2,516,670 O&M Costs 2,513,716 O&M ARRA Appropriations 1,221,613 O&M ARRA Costs 1,221,613 Project Description Cost $ 087186 CG Appropriations 10,341,656 CG Costs 10,341,656 CG Contributed Appropriations 4,811,891 CG Contributed Costs 4,811,891 Rehab Appropriations 675,000 Rehab Costs 675,000 Table 3 Range of Tides in feet Tide Station Mean Range Diurnal Range Extreme Range 945 4050 Cordova AK 10.17 12.59 22.36 Controlling Depth A depth of -15.7 feet MLLW controls along the centerline at the mouth of the entrance channel; a depth of -9.0 feet MLLW controls along the northern toe of fill/rock placed near the channel. Depths along the transient float are adequate with some soundings directly beneath the float above project depth. Nearly all the north basin (local) is above project depth and approximately half of the south basin (local) is above project depth. Conditions are based on the 2014 survey. Approximately 1-2 feet of shoaling has occurred throughout the entrance channel since the 2010 survey. Maintenance Dredging Supplement A. General 1. The Federal access and entrance channel requires dredging activity approximately every 12 years, as indicated by our records. Cordova Harbor Page 5 of 9

2. The harbor entrance is subject to shoaling activity, is within the Federal project, and thus requires periodic survey and ultimately dredging. 3. Sediments are typically removed with a clamshell and barge during the open dredging window from 8 September to 1 April. B. Sampling & Testing Seven samples (including a duplicate) were collected from six locations within the Federal project area in July 2006. A summary of the sampling activities is provided in the following table. Table 5 Chemical Testing Method Chemical analysis Results SW846 8270C Semi-Volatile Organic Compounds (SVOCs) Low 0.97 to 19,000 ppb (35 analytes detected) Level SW846 8260B Volatile Organic Compounds 2.1 to 120 ppb (10 analytes detected) (VOCs) AK-101 Gasoline Range Organics 0.61 to 0.76 ppm (GRO) AK-102 Diesel Range Organics (DRO) 9.9 to 75 ppm AK-103 Residual Range Organics 20 to 68 ppm (RRO) SW846 8082 Polychlorinated Biphenyls Non-Detected (PCBs) SW846 8081A Pesticides (PEST) 0.20 to 25 ppb SW846 6010, 6020 CLP Target Analyte Metals 23 Metals detected or 7471 EPA 160.4 Total Volatile Solids (TVS) 2.3 to 2.8 % [sediment only] SW846 9060 Total Organic Carbon (TOC) 1.8 to 7.5 g/kg EPA 350.3 Ammonia N 62 to 120 ppm EPA 376.2 Sulfides 210 to 560 ppm ASTM D422 Grain Size Distribution (Sediment Only) *See Cordova Harbor Report 2007 (06-059) for complete analytical data 7.1 to 11.8 % Sand 88.2to 92.9 % Silt/Clay C. Disposal 1. Dredged material is transported by barge and tug to a deep water site, dumped, and dispersed by tidal activity. Cordova Harbor Page 6 of 9

2. A rectangular site is located approximately 500 yards west of Spike Island. Corners have the following geographic coordinates: Table 6 Disposal Area Corner Latitude (N) Longitude (W) 24 60 33 04.7 145 46 37.5 25 60 33 03.0 145 46 30.3 26 60 32 55.9 145 46 46.2 27 60 32 54.1 145 46 39.0 3. The previous disposal site has met the approval of various agencies; other options may be available for future operations. D. Environmental Permits and Reports 1. The most recent Environmental Assessment (EA) was completed by the Corps in February 2008 for maintenance dredging that was conducted the following year. An EA was also completed by the Corps in July 1991. A Final Environmental Impact Statement (FEIS) was previously circulated in 1979 for harbor expansion. A Finding of No Significant Impact (FONSI) was signed in May 2008 and September 1991 for the most recent maintenance dredging events. 2. The following permits or authorizations are listed by agency below: Table 7 Environmental Permits Agency Name Date of Issue Date of Expiration US Fish and Wildlife Service January 25, 2008 n/a AK Department of Natural Resources (ACMP) April 25, 2008 n/a AK Department of Environmental Conservation May 12, 2008 May 12, 2013 AK State Historic Preservation Office February 14, 2008 n/a 3. Water Quality: Four physical parameters were measured through the water column at three locations in the federal project and one location at the disposal site, May 1991; temperature, ph, oxidation reduction potential (ORP), and conductivity were measured in the field. No chemical analysis was conducted. Cordova Harbor Page 7 of 9

Cordova Small Boat Harbor, Cordova, Alaska Aerial of the Cordova Small Boat Harbor, April 2014 Cordova Small Boat Harbor, 20 May 2014 Cordova Small Boat Harbor Page 8 of 9

Cordova Small Boat Harbor, Cordova, Alaska View of the entrance breakwater extension in May, 2014 Condition of the western breakwater during May, 2014 Cordova Small Boat Harbor Page 9 of 9