OFFICE OF THE WATERFRONT July 6, 2015 KING COUNTY METRO

Similar documents
Federal Way City Center Access Study Comment Log Summary

Lamb Boulevard Safety Management Plan Between E. Desert Inn Rd. to Lake Mead Blvd. Clark County, NV

Comments Heard PUBLIC INFORMATION CENTRE #1: SUMMARY

Working Group Meeting #2. One Financial Plaza 1350 Main Street 3rd Floor, Community Room A Springfield, Massachusetts

COMPLETE STREETS HANDBOOK CHECKLIST Philadelphia City Planning Commission

PUBLIC OPEN HOUSE. Preliminary Engineering Study to Upgrade the Pembina Highway Underpass MAY 9, 2012

Technical Briefing Rapid Transit

CHAPTER 4 VISION, GOALS AND OBJECTIVES

Project No.: Notes taken by:

3 ways to build a healthy future for NSW

EXECUTIVB SUMMARY Regular Board Action Item 98 Approval of Revised Regional Roadway Network M"p, Revised Criteria and Joint Resolution

2017 Active Allegheny Grant Program Program Guidelines

Appendix C. Travel Demand Forecasting Technical Memorandum

Completed Project Justification Package Example

Advisory Group Meeting #7. March 9, Transcribed Breakout Group Discussion Notes.

Binghamton Metropolitan Transportation Study Pedestrian & Bicycle Advisory Committee Meeting Minutes April 14, 2008

C C C

PSOMAS MEMORANDUM. North Santa Monica Boulevard Resonsturction PROJECT: 1BEVO PSOMAS Project No.

Presented by: Presented to:

Project Advisory Team Existing Conditions Meeting Agenda

PUBLIC OPEN HOUSE. Panet Road / Molson Street Reconstruction. April 24, 2013

FY 2018 Transportation Alternatives Instructions

DRAFT - TRANSPORTATION AND PUBLIC HEALTH

Newmarket Level Crossing

2.0 VISIONING DIRECTION

Highway Construction

South Portland Public Input Meeting Summary Notes and Public Comments

Jobs in Green and Healthy Transport

Alaskan Way, Promenade, and Overlook Walk Final EIS

Deer harvest objective for the Deer Plan

Subject: Recommended Updates to Transportation Development Parameters

Highway Construction

Sellwood Bridge AM Traffic Evaluation

Demonstrate the capability to carry out emergency response functions in an unannounced exercise or drill.

IMPLEMENTATION OF PROTECTIVE ACTIONS - USE OF KI FOR EMERGENCY WORKERS, INSTITUTIONALIZED INDIVIDUALS, AND THE GENERAL PUBLIC

West Seattle and Ballard Link Extensions Neighborhood Forums Summaries May 16, 2018

Atherton Middlefield Road Bicycle Lane Improvements Public Meeting

The Facts About Brentwood School s Expansion Plans

CITY of LOMPOC 2030 General Plan

Alternative Ways to Improve Traffic on Loop 360 Paul Schumann 1

SANDYFORD BUSINESS DISTRICT SUMMARY OF AREA WIDE MOBILITY MANAGEMENT PLAN.

PUBLIC SCOPING Ryan Ranch Wetland Restoration Project Bend/ Fort Rock Ranger District, Deschutes National Forest Deschutes County, Oregon

Right-of-Way Control through Fees

City of London Transport Strategy

The timelines for the proposed short-term, medium-term, and long-term improvements to the corridor be accelerated.

CITY OF STEVENS POINT AGENDA

Parking Committee Report to Commissioners AUGUST 17, 2018

Active and Safe Routes to School Surveu Summary Program

MEASURE K BICYCLE, PEDESTRIAN, AND SAFE ROUTES TO SCHOOL AND SMART GROWTH INCENTIVE PROGRAM GUIDELINES

American Association of State Highway and Transportation Officials

E25 FATIGUE MANAGEMENT

Phase 1: Station Area Planning. Golden Valley Road Parking Management Strategies Assessment. Purpose. Context. Parking Management Options

SCENTRE GROUP JULY 2018 REF: 10869/1

18. DISASTER AND EMERGENCY PLANNING

Sasan Amini Becky Alper

HAZMAT Hazardous Material Release or Spill. HAZMAT Hazardous Material Release or Spill EMERGENCY ACTION. Evacuate the release or spill area

Plain Language Summary

Mission Bay Loop Project. Operations & Customer Service Committee August 9, 2016

Owner: USA Division Safety Revision No: 00 Date last revised: 01/14/2013

DRAFT Active Transportation Work Plan

Liquid Nitrogen (LIN) Supply and Safety Plan. May 30, 2018

International Military Sports Council. Sports Committee CYCLING. Rules and Regulations

CARLSON BOULEVARD CARLSON BOULEVARD CORRIDOR OVERVIEW EXISTING CONDITIONS. Maine Avenue to El Cerrito Plaza BART Station

Department of Transportation Project No Rehabilitation of Bridge No Towns of East Haddam and Haddam, Connecticut

City of Ottawa. Transit Solutions. O c t o b e r

LAND 2 Aesthetic Resources Technical Study Plan Kaweah Project (FERC Project No. 298)

Users Requirements Statement

TRANSPORTATION IMPACT ASSESSMENT. Executive Summary

CITYCOUNCIL. CITY OF KENMORE Public Works Department PO Box Kenmore, WA David Baker, Mayor Allan VanNess, Deputy Mayor

Cycling Strategy Group. Terms of Reference

Moura State School Executive Summary

Long-Term Transportation Plan

Opportunity for Public Participation. Plain Language Summary

Meeting 2 Workshop Summary

Bicycle Mechanic Programmes

Session A3-10:00am AND THE MONEY CAME ROLLING IN: REGIONAL INFRASTRUCTURE UPDATE ROADWAYS & TRANSPORTATION

Technical Memorandum #18 - Transit Solutions - DRAFT

CITY OF SACRAMENTO. Regulatory Compliance Program

V O L L E Y B A L L C A R N I V A L

Neighborhood Discussion and Walk Notes Prepared by RBF and Lamphier-Gregory employees.

Lamorinda Action Plan

Traffic & Safety Update

TRANSPORTATION DISCUSSION GROUP Laptop notes (as projected on screen during the meeting) Monday, June 10, 2013

Transportation Border Working Group Portland March 3-4, CBSA Infrastructure Project Update

Exploration of Consolidation and Opportunities: MAP-21 7/11/2012

Additional Investigation Report for a Second Bridge Across the Ashburton River

Union National Bank records first-half 2014 profit of over AED 1 billion

Rail Safety Week August 2017 Toolkit. Page 1

Equipment Strategy For Earthing Transformers Strategy

Stakeholder Working Group (SWG) Meeting #2 Summary

ELLERSLIE AFC OPERATIONAL PLAN (Game Development and Football Success)

A template mass rescue operations plan

PEDESTRIAN AND BICYCLE COMMITTEE MEETING MINUTES July 11, :30 p.m. at City Hall

JUNETEENTHKC PARADE 2018 KANSAS CITY, MISSOURI

Technical Appendices Transportation Appendix. Transportation Contents

TECHNICAL MEMORANDUM

Advisory Group Meeting Notes

Oregon s Transportation System Planning Integration and Consistency

Richmond District Strategy Community Conversation December 10th Meeting Notes. Table #1 Facilitator and Note Taker: Brittany Bendix and Victoria Chong

TRANSPORTATION SYSTEM PLAN ADVISORY COMMITTEE (Transportation Advisory Board / Technical Advisory Committee) Minutes April 11, 2012

Transcription:

OFFICE OF THE WATERFRONT July 6, 2015 KING COUNTY METRO 1

Briefing Outline Review f Waterfrnt Seattle prjects Alaskan Way, Prmenade, and Overlk Walk ( AWPOW ) AWPOW Draft Envirnmental Impact Statement (Draft EIS) 2

A PARK FOR ALL 4

WATERFRONT SEATTLE OVERVIEW 5

WATERFRONT SEATTLE OVERVIEW 6

CYCLE TRACK

IMPROVED INTERSECTIONS

PEDESTRIAN PROMENADE

PHASING APPROACH 10

PIKE PLACE MARKET S MARKETFRONT

OVERLOOK WALK

SEATTLE AQUARIUM EXPANSION

ALASKAN WAY, PROMENADE, AND OVERLOOK WALK Main Crridr: Imprve travel between dwntwn and Belltwn fr all mdes f transprtatin Prmenade: Prvide public pen space and amenities t strengthen the city s cnnectin t the waterfrnt Overlk Walk: Grade separated pedestrian crssing, views and pen space between Pike Place Market and waterfrnt East West Cnnectins: Imprve key east west pedestrian cnnectins between waterfrnt and dwntwn 14

MAP OF AWPOW PROJECTS 15

DRAFT EIS OVERVIEW Alaskan Way, Prmenade and Overlk Walk Draft Envirnmental Impact Statement (EIS) released June 29 45 day public cmment perid (June 29 August 12) Multiple tls t ntify public f DEIS release Public meeting n July 22, Bertha Knight Landes Rm (hsted by Office f the Waterfrnt) Builds n public engagement frm EIS scping and cmment perid in fall 2013 Final EIS by end f 2015/early 2016 16

PUBLIC COMMENTS Public cmments must be submitted via fficial channels and included in the prject recrd Multiple ways t submit cmments: Cmment nline at waterfrntseattle.rg Email cmments t deis@waterfrntseattle.rg Mail written cmments t City: AWPOW Draft EIS Cmments Mark Mazzla, Envirnmental Manager Seattle Department f Transprtatin PO Bx 34996, Seattle, WA 98124 4996 Cmment at the July 22 public meeting via curt reprter r written cmment frm 17

WHAT IS NOT INCLUDED IN AWPOW? Waterfrnt Park Pier 62/63 Pike/Pine imprvements Prjects cvered under separate envirnmental reviews: Alaskan Way Viaduct Prject Ellitt Bay Seawall Prject Seattle Multi Mdal Terminal at Clman Dck Prject Pike Place MarketFrnt Seattle Aquarium 18

DRAFT EIS CONTENT AWPOW (Actin Alternative): evaluates ptential cnstructin and peratin impacts; discusses mitigatin strategies N Actin Alternative: baseline t cmpare ptential AWPOW impacts Cmpared acrss key tpics: Transprtatin Parking Public services & utilities Land Use Nise Aesthetics Water quality Air quality Vegetatin and wildlife Histric resurces Archelgical resurces Hazardus materials Energy resurces 19

TRANSPORTATION IMPACTS OF AWPOW: Traffic cngestin during cnstructin, including Alaskan Way and east west streets Temprary clsure f Alaskan Way near Pine Street is expected After AWPOW cmpletin, imprved/additinal facilities fr peple driving, taking transit, riding a bicycle r walking HOW WE COULD ADDRESS THESE IMPACTS: Keep rads mstly pen during cnstructin and schedule clsures at ff peak hurs Maintain business access Develp Traffic Cntrl Plan t reduce traffic impacts fr all mdes 20

ACCESS STRATEGIES Clman Dck transit hub Prmenade and east west cnnectins Cycle track Lcal waterfrnt transit Center City Cnnectr East west pedestrian cnnectins, including Overlk Walk Cycle track 470 Madisn St. rapid transit Transit: Lcal n Alaskan Way, Center City Cnnectr n First Avenue, Clman Dck transit hub, Madisn Street rapid transit

PARKING IMPACTS OF AWPOW: Cnstructin activities will temprarily impact n street parking Cnstructin may temprarily blck sme access rutes r lading znes fr intermittent time perids Permanent remval f 673 parking spaces (apprximately 6% f all n and ff street parking supply in the prject area) HOW WE COULD ADDRESS THESE IMPACTS: Maintain parking t extent feasible during cnstructin in rder t help ensure cnvenient parking fr waterfrnt businesses Enfrce shrt term parking limits; use e Park Add apprximately 250 new permanent parking stalls 22

PARKING IMPACTS 15 166 Alaskan Way Spring Street 100 119 Secnd Avenue Pike Street 273 Ttal f 10,746 n and ff street spaces in study area Lss f 673 spaces (484 n street and 189 ff street) Mitigatin includes apprximately 250 new spaces as part f MarketFrnt develpment Net lss apprximately 423 spaces

QUESTIONS? 24