Rev B Medivators Inc.

Similar documents
INSTALLATION INSTRUCTIONS

Gema s OptiColor System

Management: Shop Coordinator, Shop Supervisor and Fire Safety Staff

Concept 305 P. Pre-installation Guide IMPORTANT!

Plain Language Summary

Fume Hood User Guidelines

MODELS. 2 & 4 Versions. SUITABLE FOR WET LOCATIONS in the following locations or unclassified locations:

UCT OPERATING MANUAL UCT POSITIVE PRESSURE MANIFOLD.

Technical Documentation

VOLTMAX Design Specifications

Weather Balloon Altitude Control System. Tim Basta, Trevor Clark, Scott Miller Date: 9/15/2014

How to Install a Toilet By See Jane DrillTM Copyright 2013, All Rights Reserved

Large Diameter TECTITE Installation and Specifications Manual

Nordson AP-300/600 Plasma Systems Operational Manual July 2017

Who s Your School Breakfast Star? Writing Contest Official Rules

Opportunity for Public Participation. Plain Language Summary

WORKSTATIONS mysite User Guide. mysite Workstation System User Guide

Technical Data Sheet DW1 Undercoats

Technical Data Sheet EW1 Top coats

175 knm Torque Tool and Calibration Unit

PRE-FILL INSPECTION OF CUSTOMER OWNED CYLINDERS

Hot Work Policy and Procedures

Installation Manual for VersaScreen Pro and VersaScreen IceBlaster Gutter Protection Products. Table of Contents

Standard Operating Procedure

Demonstrate the capability to carry out emergency response functions in an unannounced exercise or drill.

Eastern Kentucky University and Chemical Stockpile Emergency Preparedness Program

General Industry Toolbox Talks. Providing Excellence in Regulatory Compliance Management Systems

RESPIRATORY PROTECTION PROGRAM UW-GREEN BAY

Warranty & Service Information Proprietary Notice: Limited Warranty: Service Support:

URGENT MEDICAL DEVICE RECALL : /29/ C Z

Lab rotation on vacuum techniques and thermal imaging

AUTOMATIC WATERING SYSTEMS

Process Safety Management Program for Contractors

LIGHTING & POWER UNIT TYPE LPU57

Autoclear Superior Pack

patient education program 4156 South 52 nd Street, Omaha, NE ChildrensOmaha.org/HomeHealthcare

STIOffice Summer School Grade Setup and Entry

Instructions for use. turbomax pro 24 E 28/2 E

Table of Contents. I. General Instructions. Task Information. Operator Qualification Checklist. Railroad Commission/Employer Record

CONFINED SPACES SAFETY & HEALTH ISSUES AND REGULATORY COMPLIANCE

Kennecott Utah Copper Corporation Safety and Health Standards

Installing the ACT D MAND KONTROLS Systems

HYDROGEN SULFIDE (H2S)

USTA Atlanta Combo Doubles Registration Information Play begins in late April

Precautionary Statement ( )

Document Name WORK HEALTH AND SAFETY RISK MANAGEMENT POLICY AND PROCEDURE

Health and Safety Policy for Groups Policy

District 6 and Unit 190 (D4) STaC - Conditions of Contest & Reporting Instructions Fall 2018

Glide into Spring Beyond the Basics Figure Skating Club of Southern Maryland (FSCSM) Saturday, May 20, 2017

Black Brant Vb. Please read and understand all instructions before building!

Autoclear Superior 250

Sponge-Jet Media Recycler User Manual

Wabo Crete FlexFoam Armorless closed-cell joint seal and elastomeric concrete expansion joint system

Sponge-Jet Continuous VAC- Recovery System User Manual

Demonstrate the adequacy of vehicles, equipment, procedures, and personnel for transporting contaminated, injured, or exposed individuals.

Users Requirements Statement

IMPLEMENTATION OF PROTECTIVE ACTIONS - USE OF KI FOR EMERGENCY WORKERS, INSTITUTIONALIZED INDIVIDUALS, AND THE GENERAL PUBLIC

Method statement for the erection of temporary inflatable structures that do not require a Temporary Structure Licence

2017 Chili Bowl Classic 5k. FAQ s. About the Race

A Guide to Relocating Hazardous Materials

Grade 11 Performance Task

Down and Out Mount Assembly & Installation Directions

PMI Advanced Media Bubble Point Tester

Biochrom Libra S50, S60, S70 & S80. UV Visible Spectrophotometers Health & Safety Manual

COMPLETE STREETS HANDBOOK CHECKLIST Philadelphia City Planning Commission

Urinalysis Collection Odyssey House of Utah

H&S. The ASA - Risk Assessment Guidance for Swimming Competition Events. Guidance and Information Document

If you have any questions please contact us at the (preferred) or numbers below.

Kennecott Utah Copper Corporation Safety and Health Standards

Exposure Control Plan

STANDING OPERATING PROCEDURES (SOP) CLEARING LOCAL SCHOOLS CHILD, YOUTH AND SCHOOL SERVICES (CYSS)

243 Service Regulators

SENIOR STARS HOCKEY LEAGUE

2012 IRe S\VimDling Pools

Description: Model Number: Robinhood Canopy RHCVI9G

TELUS WISE footprint comic contest Create your own comic strip and enter for a chance to win

A Quick Guide to Laboratory Safety Inspections At NMT

University of Delaware

REGIONAL ADMINISTRATORS. PATRICK J. KAPUST Acting Director, Directorate of Enforcement Programs DATE: October 19, 2017

Exercise 2: Reviewing the Workplace Inspection Checklist (30 min) p

Hydraulic accumulator cut-off and protection unit type B20

SETTING UP A CLUB. Westmorland County Football Association Limited. Contacts. Chief Executive Peter Ducksbury

R15 MEMBER USER GUIDE

Running a Raffle. There are 3 types of Legal Wisconsin Raffles

ZF* REFRIGERATION SCROLL COMPRESSORS USING R407A, R407F, R448A OR R449A IN LOW TEMPERATURE APPLICATIONS

NORTH-EAST WALES NETBALL ASSOCIATION LEAGUE RULES

HYDROGEN SULFIDE (H2S)

Field Instruction. Covers laid for mechanical protection of cables must always be removed by hand.

Business Requirements Specification

PXY88. Reference & Maintenance Manual. PXY88 Series Linear Positioning Stages (PLG110, PLG160, PLG210) S E R I E S

Visit Leader Emergency Action Card

Standards of Practice Confined Space

Training Teams and Selection Criteria:

Year 1 for New School Counselors

GALENA FIRE DEPARTMENT Standard Operating Guideline ICE AND WATER RESCUE. Fire Chief Signature

ATHLETICS AUSTRALIA SELECTION POLICY WORLD CROSS COUNTRY CHAMPIONSHIPS AARHUS, DENMARK 30 MARCH 2019

MAINTENANCE, SERVICE & INSPECTION OF AIR RECEIVERS & COMPRESSORS

Come Back to Ground! 1. Introduction

W R E S T L I N G B C B r i t i s h C o l u m b i a W r e s t l i n g A s s o c i a t i o n

Fatality 3 or more hospitalizations due to one incident Inpatient hospitalizations (Overnight stay) Amputations Loss of an eye

Transcription:

Site Requirements

MEDIVATORS, RAPICIDE, and ADVANTAGE are registered trademarks f Medivatrs Inc. ADASPOR is a registered trademark f Medivatrs Inc. Windws is a registered trademark f Micrsft Crpratin. 50098-731 Rev B 2015 Medivatrs Inc. All rights reserved. This publicatin is prtected by cpyright. Cpying, disclsure t thers r the use f this publicatin is prhibited withut the express written cnsent f Medivatrs Inc. Medivatrs reserves the right t make changes in the specificatins shwn herein withut ntice r bligatin. Cntact yur Medivatrs representative r Medivatrs custmer service fr mre infrmatin. 2

SITE REQUIREMENTS The purpse f this dcument is t prvide the custmer with requirements that need t be met t ensure the ADVANTAGE PLUS Pass-Thru Endscpe Reprcessing System will be prperly installed. Applicable Dcuments ADVANTAGE PLUS Endscpe List and Operatr ID Frm (PN 50092-380) ADVANTAGE PLUS Pass-Thru User Manual (PN 50098-704) It is the respnsibility f the custmer t meet these requirements t ensure prper installatin f the ADVANTAGE PLUS Pass-Thru Endscpe Reprcessing System. It is the respnsibility f the custmer t prvide qualified persnnel t prvide the facility cnnectins fr the ADVANTAGE PLUS Pass-Thru Endscpe Reprcessing System t the building supply (Water, Electrical, Drain, Air and Netwrk/Internet) during the installatin prcess. Medivatrs will make the physical cnnectins between the facility cnnectins and the ADVANTAGE PLUS Pass-Thru Endscpe Reprcessing System. Any deviatin frm these specificatins may cause peratinal issues that wuld nt be cvered by the Warranty. Wall Preparatin Refer t the included installatin diagram. Wall pening: 1. 1 reprcessr: 1340mm wide x 2025mm high 2. 2 reprcessrs: 2655mm wide x 2025mm high 3. 3 reprcessrs: 3970mm wide x 2025mm high 4. 4 reprcessrs: 5285mm wide x 2025mm high The wall pening can remain rugh, a trim kit will be installed t finish and seal the pening nce the ADVANTAGE PLUS Pass-Thru is installed. The trim extends 63mm frm the sides and tp f the reprcessr. The interface between the wall pening and the flr must nt have a cve r fillet. Optimal wall thickness is 125mm t 155mm. The facility cnnectins are made inside the wall, access panels (facility supplied) will be required t prvide access t these cnnectins. The facility cnnectins must nt be mre than 1000mm abve the tp f the ADVANTAGE PLUS Pass- Thru Endscpe Reprcessing System. The facility cnnectins are divided int three grups: 1. Water and Air 2. Electrical 3. Netwrk and Ventilatin 3

Three access hles in the underside f the wall are required t make the cnnectins between the facility and the ADVANTAGE PLUS Pass-Thru Endscpe Reprcessing System. Access hles need t be free f sharp edges. See the attached installatin diagram fr the measurements. Flr The flr must be level t allw fr the prper leveling and sealing f the reprcessr. IMPORTANT D nt place reprcessr n surfaces which culd cause a fire r fumes if ht items fall frm the reprcessr. Water Supply Facility supplied cnnectin, 3/4 G male r 1/2 NPT female with a shutff valve and pressure gauge lcated in the wall behind an access panel. The supplied water must meet these requirements: Ptable water is the minimum standard, RO water is preferred. The incming water needs t be filtered t 1 micrn. A water pressure f 2 t 6 bar is required, with a minimum dynamic pressure f 2 bar at 5L/min flw. A minimum flw rate f 5 L/min is required. The incming waterline must be a minimum f 13 mm ID. Disinfectant water temperature requirements: RAPICIDE PA 30 : 35 C ± 2ºC, RAPICIDE PA 20 : 25 C ± 2ºC, ADASPOR SS: 25 C ± 2ºC The water supply must be able t prvide an n-demand water temperature t meet the requirements fr the disinfectant chemistry used. A thermstatic mixing valve (TMV) r an inline heater may be needed t supply the required water temperature. Water cnsumptin is apprximately 30 liters/cycle fr a standard endscpe disinfectin cycle, 43 liters/cycle fr an endscpe disinfectin cycle with a detergent wash, and 57 liters/cycle fr an endscpe disinfectin cycle with tw detergent washes. Water cnsumptin fr the ADVANTAGE PLUS Pass-Thru Endscpe Reprcessing System will vary depending n the incming water temperatures. The reprcessr will extend the initial flush t allw the water t cme up t temperature t meet the minimum required temperature f the disinfectant. Ensure water hardness is less than 200 ppm CaCO3 (200 mg/l CaCO3) fr ptimal perfrmance. T meet CFPP 01-06 requirements, water hardness shuld nt exceed 50 ppm CaCO3 (50 mg/l CaCO3) and have a chlride cncentratin f less than 10 mg/l. When using ptable water, t cmply with EN 1717 a break tank with a type AA r AB air gap needs t be placed in the water supply befre the device and its filters. The Medivatrs endscpe reprcessrs d nt require backflw prtectin fr the incming water supply, nr is a backflw prtectin device installed in the reprcessr. If building r plumbing cdes require backflw prtectin, then please cnsult yur lcal cdes, standards and/r guidelines, fr applicable requirements. 4

Drain The drain must be lcated in the flr in the lcatin indicated in the installatin diagram. The drain system must be capable f draining 40 L/min. Facility supplied cnnectin, a flush flr drain with a minimum diameter f 100mm. Air Supply Facility supplied cnnectin, 1/4 NPT female with a shutff valve and pressure gauge lcated in the wall behind an access panel. The supplied cmpressed air must meet these requirements: 4 t 10 bar with a minimum flw vlume f 0.71 L/s Filtered t 5 micrns The maximum dew pint is 7 C The maximum il cncentratin is 5 mg/m 3 Electrical Supply 230 VAC ± 10%, single phase, 50 Hz, 1800 watts Facility supplied cnnectin, a RCD prtected CEE 7 utlet lcated in the wall behind an access panel. Fr ther cuntry specific electrical requirements cntact Medivatrs. Pwer cnsumptin: 270 watts at idle, 720 watts during a cycle in ne basin, 1080 watts during a cycle in bth basins, and a nminal peak f 1800 watts. Heat Lad Idle: 270 watts (900 BTU/hr) Cycle (1 basin): 720 watts (2400 BTU/hr) Cycle (2 basins): 1080 watts (3600 BTU/hr) Ventilatin It is the custmer s respnsibility t ensure the rm is in cmpliance with this requirement. This is nt a requirement f the ADVANTAGE PLUS Pass-Thru Endscpe Reprcessing System but f the chemicals that are used fr disinfectin. It is a health and safety requirement t have a minimum f 10 air changes per hur in the rm. During cycle peratin and the chemical heating prcess, chemical vapr may be prduced. The air exchange will minimize staff expsure t chemical vaprs. Facility supplied cnnectin, a 100 mm rund duct r 110mm x 54mm duct lcated in the wall behind an access panel. A minimum f 12 L/s at 62 PA static pressure is required t prperly vent the ADVANTAGE PLUS Pass-Thru Endscpe Reprcessing System. 5

Netwrk Facility supplied cnnectin, RJ45 receptacle lcated in the wall behind an access panel. The ADVANTAGE PLUS Pass-Thru Endscpe Reprcessing System is equipped with a PC based cmputer running Windws 7 which will allw full netwrking alng with the capability f remte diagnstics. T allw fr remte diagnstics an internet cnnectin is required. This is highly recmmended. Dimensins The physical dimensins are 1316mm Wide x 2000mm High x 792mm Deep. The weight is 400 kgs. Endscpe & User Infrmatin T ensure a smth and truble-free installatin, the custmer must supply a cmplete list f users and endscpes that will be reprcessed in the ADVANTAGE PLUS Pass-Thru Endscpe Reprcessing System. Fill ut the ADVANTAGE Endscpe List & Operatr ID frm (PN 50092-380). The included checklist shuld be utilized t ensure the installatin site meets the required specificatins. If all specificatins are met, the site is suitable fr the installatin and use f the MEDIVATORS ADVANTAGE PLUS Pass-Thru Endscpe Reprcessing System. 6

SITE REQUIREMENTS Wall pening meets specificatin fr the number f reprcessrs Wall Preparatin Facility cnnectins are in the prper lcatins and are accessible Openings in underside f the wall are the prper size and in the prper lcatins 3/4 G male r 1/2 NPT female cnnectin with shutff valve and pressure gauge Ptable water r RO water Water Supply Filtered t 1 micrn Pressure f 2 t 6 bars, minimum f 2 bar at 5L/min flw Minimum flw rate f 5 L/min Supplied water temperature meets disinfectant requirements Drain Flr drain meets requirements and is installed in the prper lcatin Capable f draining 40 L/min 1/4 NPT female cnnectin with shutff valve and pressure gauge Pressure f 4 t 10 bar Air Supply A minimum flw rate f 0.71 L/s @ 8 bar Air dry and il free per specificatins Filtered t 5 micrns Electrical Supply 230 VAC ±10%, single phase, 50 Hz, 1800 Watts RCD prtected CEE 7 receptacle Minimum f 10 rm air exchanges per hur Ventilatin 100mm rund r 110mm x 55mm duct A minimum f 12 L/s at 62 PA static pressure at duct Netwrk RJ45 receptacle Internet access By signing belw Custmer acknwledges that (1) Custmer reviewed these Site Requirements fr the Medivatrs Reprcessr(s) listed n the face f this dcument; (2) Custmer is slely respnsible fr meeting each f the specificatins and requirements set frth in these Site Requirements t ensure prper installatin and perfrmance f the reprcessr(s); (3) Custmer is able t meet each f these specificatins and requirements; and (4) the failure f Custmer t cmply with these Site Requirements and any deviatin frm the specificatins set frth herein may cmprmise the functinality f the reprcessr(s) and/r may cause peratinal issues, which will nt be cvered by the Medivatrs warranty and are hereby disclaimed by Medivatrs. Facility Representative Signature Title Date Email 7

9