SHEET NUMBERS L-8 L-9 L-10 L-11 L-12 L-13 L-14 L-15 L-16 L

Similar documents
Bulletin Swimming pool, hot tub and spa installations Rules , , , , , and

MV-105 MEDIUM VOLTAGE CABLE. 5kV, 8kV, 15kV, 25kV & 35kV

DESIGN CRITERIA DIVISION 4900 TRAFFIC SIGNALS

SWIMMING POOL REQUIREMENTS

PART I. GENERAL REQUIREMENTS FOR PERMANENTLY INSTALLED POOLS, STORABLE POOLS, OUTDOOR SPAS, OUTDOOR HOT TUBS, OR FOUNTAINS

Swimming Pool Requirements

Florida Building Code 6 th Edition (2017) Residential. Broward County Edition Loose-leaf Supplement


SWIMMING POOL & SPA DOCUMENT SUBMITTAL LIST

kēlo LED Light Installation Instructions

Residential Swimming pools

I.H.S INSTALLATION INSTRUCTIONS

CHAPTER 8 STAKING SIGNALS AND LIGHTING FIELD GUIDE. 8.1 Staking Traffic Control Signal Systems

Full Internal Relief Valves Instruction Manual

PVC Electrical Fittings & Accessories Price List

Definitions for swimming pools, fountains, and similar installations in article 680

Check with local zoning official for property line distance requirements.

1 Overview. Pressure Measurement Single-range transmitters for general applications. 1/22 Siemens FI US Edition

PRODUCT SPECIFICATION

STAKING TRAFFIC CONTROL SIGNAL SYSTEMS

MEASUREMENT OF DYNAMIC STRESSES ON CARRIERS WITH DETACHABLE GRIP AT STATION ENTRANCE: LA.T.I.F. EXPERIENCES AND FUTURE PROSPECTS

Pre-Installation Manual. A-2 CPO Pinsetters. with Brunswick Bowling Equipment. March 2006 / B

MEMORANDUM. TNC Fisher Slough Final Design and Permitting Subject: Large Wood Debris Design. Jenny Baker (TNC) Dave Olson (DD3)

TOWN of CHEEKTOWAGA Permit Application for Swimming Pools, Hot Tubs, or Personal Spas

1 Overview. Pressure Measurement Single-range transmitters for general applications. 1/22 Siemens FI

TABLE OF WHITE PAVEMENT LETTERS ITEM ALIGN CL STATION SIDE DESCRIPTION C RT BIKE THROUGH ARROW 1

$ Plan Review Fee when Permit Application is submitted HOT TUBS AND SPAS BUILDING PERMIT APPLICATION. COST: $80.

General Requirements of the NEC Advanced Course. Building Officials and Inspectors Educational Association

Nottingham Township 909 Sugar Run Road Eighty Four PA (724) Fax (724)

AMITY TWP POOL REQUIREMENTS

Project Development & Environment (PD&E) Study JUNE 22, SR 90 (SW 8th Street and SW 7th Street) SW 8 th Street/SW 7 th Street PD&E Study 1

Secondary System Albemarle County Construction Program Estimated Allocations

Wire Buddy Manual IOpath Software

Pool / Hot Tub Permit

Part 3: Safety Rules for the Installation and Maintenance of Underground Electric Supply and Communication Lines

Performance Outline Specifications

Secondary System Albemarle County Construction Program Estimated Allocations

SWIMMING POOL PERMITS ARE ABOUT HEALTH AND SAFETY

Swimming Pool Requirements Packet

RESIDENTIAL SWIMMING POOL REQUIREMENTS

Swimming Pool Electrical Safety

ENSLEY LEVEE CLEARING

GENERAL LEGEND 12"CMP

generator's nameplate - Datasheet generator's nameplate - Datasheet

Engineering Design Criteria & Standard Drawings

TECHNICAL BULLETIN PINPOINT CONDUIT COUPLING AND SPLICING RECOMMENDATIONS

Swimming Pool Permits are About Health and Safety

Safe Routes to School Engineering Study

City of Crystal Lake Community Development Department

BARRIER OFFSET 0" A 6" 6" A 12" 12" A 26" A 26" 3A OR 4A L OR S * ** L OR S L OR S

Optimization for Bus Stop Design Based on Cellular Automaton Traffic Model

TRUCK ROUTE NOT TO SCALE. Mercy St LEGEND. Truck Route During Construction. Church St & Castro St, Mountain View, CA PRIME CONTRACTOR:

Pressure Measurement Single-range transmitters for general applications

Position switches FP series

Address: South Elgin, IL Phone: ( ) - Fax: ( ) - Cell: ( ) - Phone: ( ) - Fax: ( ) - Cell: ( ) - Contact Type:

RESIDENTIAL SWIMMING POOL

Memo FROM THE DESK OF THE ZONING ADMINISTRATOR

Operating Instructions

Nonmetallic T&B Surface Raceway

draft 5.2 CITY OF LARKSPUR

FEASIBILITY STUDY. Image Concepts

City of DuBois PERMIT APPLICATION P. O. Box 408, 16 West Scribner Ave - DuBois, PA Phone: Fax:

Turning templates shall be shown on the signal plan for review during preliminary plan submittals.

VDOT 2016 Road and Bridge Standards Section Traffic Control Devices

CHAPTER 42 SWIMMING POOLS

GENERAL APPLICATION NOTES

SWIMMING POOLS CHAPTER 41

Socket P2RF-05-S P2RF-08-S Clip & Release Lever Nameplate R99-11

Product Data. FB4CS, FB4CQ (50 Hz) Direct Expansion Fan Coil R- 410A Refrigerant Sizes 018 thru 060 AIR HANDLER TECHNOLOGY AT ITS FINEST

WEDGE-ALL Wedge Anchors

CONTINUING EDUCATION FOR WISCONSIN ELECTRICIANS NEC Article Hours

Project: Consultant : MEP Contractor: PREPARED BY: DORMAN SMITH SWITCHGEAR - DUBAI REVIEWED BY CONSULTANT : Page 1 of 15

CONDUCTIVITY POINT/S LEVEL SWITCH JAYCEEAQUA 4000 SERIES

Bids MAY 24, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $7,500,000.00)

Field Installed Options: * Louvered or non-louvered ceiling access panels. * Time delay relay.

Pool Permit Application

INSTALLATION INFORMATION

SEISMIC RESPONSE ANALYSIS OF LONG-SPAN CONTINUOUS RIGID-FRAMED BRIDG

Zelio Relays RSL Slim Interface Plug-In Relays

GFCIs and Swimming Pools A Natural Fit

CITY OF ROSEVILLE DESIGN AND CONSTRUCTION DETAILS

C&G 2395 Exam Paper April Section A - All questions carry equal marks. Answer all three questions. Show all calculations.

City of Lockport Above Ground Pool Regulations

SWIMMING POOL, SPA, & HOT TUB GUIDELINES

MODELS YCAS0130, 0140, 0150, 0160, 0170, 0180, 0200, 0210 and YCAS0230 STYLE "G"

EPIC Rectangular Connector Inserts. HBE Series. Technical Data Number of Contacts:

C-Line Electrical Connectors

2010 STANDARD SPECIFICATIONS STANDARD DRAWINGS

Evaporator (DX) Freon Applications 1 12 Tons MHF

Bids DECEMBER 21, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $4,700,000.00)

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications

Address: South Elgin, IL Phone: ( ) - Fax: ( ) - Cell: ( ) - Phone: ( ) - Fax: ( ) - Cell: ( ) - Contact Type:

GENERAL NOTES FOR SWIMMING POOLS AND SPAS

Channel Bracket Support Cable Bracket Bearer Locking Pin Foundation Bolt Iron Anchor Step Manhole Sump Grill PVC/Steel Ladder Ladder Support & Hook

CITY OF RICHMOND, VIRGINIA

MEMORANDUM: INTERIM CONCEPTS

Forza Operating, LLC, South Hammock Prospect Galveston County, Texas February 24, 2012 Lighting Plan For

Non-stop quality and efficiency. LINEA ENCAPSULATION SYSTEMS

Acknowledgement must be given for the assistance provided by Barry Hutchens, Kenji Iwanaga, and AJ Murguia in preparing this booklet.

SAFETY QUALITY TECHNOLOGY. Guidance on Safe Isolation Procedures

Transcription:

PAY ITEM UNIT HEET NUMBER L8 L9 L L L L3 L4 L5 L6 L7 TOTAL THI HEET GRAND TOTAL REF. HEET 63 Conduit (F&I) (Underground) 49 699 699 68 74 7 38 4 8 663 45 634 Conduit (F&I) (Aboveground) 635 Pull & plice Box (F&I) (3" x 4") 8 3 58 639 Electrical Power ervice (F&I) (UG) (Meter Purch.) A 639 Electrical ervice Wire (F&I) 75 Lighting Conductors (F&I) (No. or smaller) 69 75 8 74 75 Lighting Conductors (F&I) (No. 8 to No. 6) 438 97 97 46 79 5 59 6 64 895 753 Lighting Conductors (F&I) (No. 4 to No. ) 4353 3639 598 4533 8453 754 Light Pole Complete (F&I) (3 MPH) (4') 7 7 754 Light Pole Complete (F&I) (3 MPH) () 6 7 5 757 Load Center (F&I) econdary Voltage 756 Luminaire (F&I) (Underdeck) (Pendant hung) 755 Lighting Inside Box Girder L 755 Light Pole Cable Distribution ystem (Conventional) 6 7 9 7553 Light Pole Cable Distribution ystem (Wall mount) 755545 Light Pole Comp.p. Design (F&I)(Bridge Mt.)(Al)() REVIION AMBAR DIAZLOZANO, P.E. P.E. LICENE NUMBER 765 5 E. ROBINON T., UITE 3 ORLAND, FL 38 CERTIFICATE OF AUTHORIZATION 393 EXPREWAY AUTHORITY ROAD PROJECT R 49 493 TABULATION OF QUANTITIE HEET L $UER$ $$ $TIME$ $FILE$

PAY ITEM UNIT HEET NUMBER L8 L9 L L L L3 L4 L5 L6 L3 TOTAL THI HEET GRAND TOTAL REF. HEET 63 Conduit (F&I) (Underground) 4 73 54 537 487 83 537 4 643 688 634 Conduit (F&I) (Aboveground) 7 5 7 9 539 539 635 Pull & plice Box (F&I) (3" x 4") 8 6 3 5 5 8 7 3 5 73 639 Electrical Power ervice (F&I) (UG) (Meter Purch.) A 639 Electrical ervice Wire (F&I) 5 8 78 78 75 Lighting Conductors (F&I) (No. or smaller) 4 39 783 3 763 93 9737 75 Lighting Conductors (F&I) (No. 8 to No. 6) 498 76 9 87 75 976 45 94 753 Lighting Conductors (F&I) (No. 4 to No. ) 337 9 379 39 74 767 488 557 336 754 Light Pole Complete (F&I) (3 MPH) (4') 6 6 5 7 3 7 34 754 Light Pole Complete (F&I) (3 MPH) () 5 757 Load Center (F&I) econdary Voltage 756 Luminaire (F&I) (Underdeck) (Pendant hung) 4 6 6 755 Lighting Inside Box Girder L 755 Light Pole Cable Distribution ystem (Conventional) 6 6 5 7 3 7 49 7553 Light Pole Cable Distribution ystem (Wall mount) 755545 Light Pole Comp.p. Design (F&I)(Bridge Mt.)(Al)() REVIION AMBAR DIAZLOZANO, P.E. P.E. LICENE NUMBER 765 5 E. ROBINON T., UITE 3 ORLAND, FL 38 CERTIFICATE OF AUTHORIZATION 393 EXPREWAY AUTHORITY ROAD PROJECT R 49 493 TABULATION OF QUANTITIE HEET L3 $UER$ $$ $TIME$ $FILE$

CONVENTIONAL LIGHTING DEIGN CRITERIA AVERAGE INITIAL INTENITY IDEWALK AND HARED UED PATH AVERAGE INITIAL INTENITY UNIFORMY RATIO AVG./MIN. MAX./MIN. VEILING LUMINANCE RATIO WIND PEED.5 F.C. (DEIRED).5 F.C. (DEIRED) 4: OR LE : OR LE.3: OR LE 3 MPH (ORANGE COUNTY) UNDERDECK LIGHTING DEIGN CRITERIA AVERAGE INITIAL INTENITY UNIFORMY RATIO AVG./MIN. WIND PEED MAX./MIN. VEILING LUMINANCE RATIO.5 F.C. (DEIRED) 4: OR LE : OR LE.3: OR LE 3 MPH (ORANGE COUNTY) OVERHD IGN LIGHTING DEIGN CRITERIA AVERAGE INITIAL INTENITY 5 F.C. MIN. TO F.C. MAX POLE NUMBER EE GENERAL NOTE " B 3 LOAD CENTER DEIGNATION CIRCUIT NUMBER FATEN WITH RIVET (NO CREW) LIGHTING CKT. LOCAL DICONNECT WITCH (TYP.) IGN TRUCTURE # #(G) # #(G) # #(G) # #(G) UNIFORMY RATIO MAX./MIN. 6: OR LE HEET LEGEND POLE IDENTIFICATION TAG DETAIL N.T.. LIGHTING CKT. ROADIDE PULL BOX LIGHTED IGN WIRING DETAIL N.T.. YMBOL YMBOL R 493A (PHAE II) FUTURE LIGHT POLE COMPLETE AEMBLY. CONCRETE LAB AND PULL BOX TO BE INTALLED IN R 493 (PHAE I) AND HALL BE PAID FOR UNDER ITEM 635 PULL & PLICE BOX. THE CONCRETE LAB I INCLUDED IN THE PRICE OF THE PULL BOX. PULL BOX (EE INDEX 75 DEIGN TANDARD BOOKLET D JANUARY 4). PULL BOXE WITH CONCRETE LAB REQUIRED AT BOTH END OF THE CONDUIT AT ROADWAY CROING AND A NECRY FOR COMPLETION OF THE PROJECT. PULL BOX COVER HALL HAVE HOULDER MOUNTED 4 WATT HIGH PREURE ODIUM (HP) LIGHT POLE COMPLETE DEIGNED FOR MEDIUM CUTOFF, TYPE III DITRIBUTION, AUTO REGULATOR TYPE BALLAT WIRED FOR 48 VOLT OPERATION. "TREET LIGHTING" LOGO. YMBOL INCLUDE PULL BOX CONCRETE LAB WHICH I PAID FOR IN THE PRICE OF THE PULL BOX. MOUNTING HEIGHT OF. GE MODEL M4 ERIE LUMINAIRE PHOTOMETRIC CURVE #3545 OR AUTHORITY APPROVED EQUAL. YMBOL INCLUDE CONCRETE LAB, PULL BOX, AND POLE CABLE DITRIBUTION YTEM. THE CONCRETE LAB I INCLUDED IN THE PRICE OF THE LIGHT POLE COMPLETE AND THE PULL BOX AND POLE CABLE DITRIBUTION YTEM ARE PAID FOR A EPARATE PAY ITEM. WALL OR BRIDGE EMBEDDED PULL BOX INTEGRAL TO TRUCTURE ('6" X '6" X 8" MAX.) PAID AND INTALLED UNDER TRUCTURAL CONTRACT. EMBEDDED PULL BOXE HALL OPEN FROM THE BACK IDE OF THE TRAFFIC RAILING/BARRIER PER FDOT PECIFICATION. 4' HOULDER MOUNTED 5 WATT HIGH PREURE ODIUM (HP) LIGHT POLE COMPLETE DEIGNED FOR MEDIUM CUTOFF, TYPE III DITRIBUTION, AUTO REGULATOR TYPE BALLAT WIRED FOR 48 VOLT OPERATION. MOUNTING HEIGHT OF 4'. GE MODEL M4 ERIE LUMINAIRE PHOTOMETRIC CURVE #354545 OR AUTHORITY APPROVED EQUAL. YMBOL INCLUDE CONCRETE LAB, PULL BOX, AND POLE CABLE DITRIBUTION YTEM. THE CONCRETE LAB I INCLUDED IN THE PRICE OF THE LIGHT POLE COMPLETE AND THE PULL BOX AND POLE CABLE URFACE MOUNT PULL BOX (EE ROADWAY AND TRAFFIC DEIGN TANDARD BOOKLET D JANUARY 4). URFACE MOUNT CONDUIT LAYOUT IN I CHEMATIC IN NATURE, AND MAY BE MODIFIED THE CONTRACTOR. THE TYPE AND IZE OF PULL BOXE TO BE CONITENT WITH CONDUIT AND LAYOUT OF CONDUIT PROPOED CONTRACTOR. MINIMUM PULL BOX DIMENION I 5" X 5" X ". DITRIBUTION YTEM ARE PAID FOR A EPARATE PAY ITEM. " RG GALVANIZED CONDUIT URFACE MOUNT WITH TYPE THWN TRANDED COPPER CONDUCTOR INIDE BRIDGE MOUNTED 4 WATT HIGH PREURE ODIUM (HP) LIGHT POLE COMPLETE DEIGNED FOR CONVENTIONAL LIGHTING OR TYPE RHW OR THW TRANDED COPPER CONDUCTOR INIDE FOR UNDERDECK FOR MEDIUM CUTOFF, TYPE III DITRIBUTION, AUTO REGULATOR TYPE BALLAT WIRED FOR 48 VOLT OPERATION. LIGHTING (CONDUCTOR AND GROUND WIRE IZE HOWN ON HEET) AND INULATED GREEN TRANDED MOUNTING HEIGHT OF. GE MODEL M4 ERIE LUMINAIRE PHOTOMETRIC CURVE #3545 OR AUTHORITY CU BOND WIRE CONNECTING ALL POLE AND INULATED TRANDED COPPER CIRCUIT CONDUCTOR. APPROVED EQUAL. YMBOL INCLUDE EMBEDDED PULL BOX AND POLE CABLE DITRIBUTION YTEM; HOWEVER, THEE ITEM ARE PAID FOR A EPARATE PAY ITEM. EE TRUCTURAL REGARDING INTALLATION DETAIL. PROPOED " CHEDULE 4 P.V.C. UNDERGROUND CONDUIT WITH TYPE THWN TRANDED COPPER CONDUCTOR EXITING ROADWAY LIGHT POLE COMPLETE TO REMAIN. INIDE (CONDUCTOR AND GROUND WIRE IZE HOWN ON HEET) AND INULATED GREEN TRANDED CU BOND WIRE CONNECTING ALL POLE AND INULATED TRANDED COPPER CIRCUIT CONDUCTOR. UNDERDECK LED LUMINAIRE BAI OF DEIGN I CREE LIGHTING THE EDGE CANOPY LUMINAIRE TYPE V MEDIUM, MODEL NUMBER CANEDG5MPDDUHBK3543K OR AUTHORITY APPROVED EQUAL WITH BIRD PIKE. FIXTURE HALL BE PENDANT HUNG (EE DETAIL HEET L64). YMBOL INCLUDE URFACE MOUNT PULL BOX. PROPOED " CHEDULE 4 HDPE UNDERGROUND CONDUIT WITH TYPE THWN TRANDED COPPER CONDUCTOR (CONDUCTOR AND GROUND WIRE IZE HOWN ON HEET) AND INULATED GREEN TRANDED CU BOND WIRE CONNECTING ALL POLE AND INULATED TRANDED COPPER CIRCUIT CONDUCTOR. ONE CONDUIT ERVICE POINT. FOR REQUIREMENT EE INDEX 754 OF DEIGN TANDARD. PROVIDED FOR CONDUCTOR AND ONE CONDUIT PROVIDED A A PARE. CONDUIT TO BE PLACED IN OPEN TRENCH PRIOR TO CONTRUCTION OF NEW ROADWAY PAVEMENT. PROPOED " P.V.C. CONDUIT EMBEDDED IN CONCRETE BRIDGE RAIL OR WALL WITH TYPE THWN TRANDED COPPER CONDUCTOR INIDE FOR CONVENTIONAL LIGHTING OR TYPE RHW OR THW TRANDED COPPER CONDUCTOR INIDE FOR UNDERDECK LIGHTING (CONDUCTOR AND GROUND WIRE IZE HOWN ON HEET) AND INULATED GREEN TRANDED CU BOND WIRE CONNECTING ALL POLE AND INULATED TRANDED COPPER CIRCUIT CONDUCTOR. PAID FOR IN TRUCTURAL. REVIION AMBAR DIAZLOZANO, P.E. P.E. LICENE NUMBER 765 5 E. ROBINON T., UITE 3 ORLAND, FL 38 CERTIFICATE OF AUTHORIZATION 393 EXPREWAY AUTHORITY ROAD PROJECT R 49 493 HEET LEGEND HEET L6 $UER$ $$ $TIME$ $FILE$

R 49 POLE DATA RAMP B POLE DATA POLE CIRCUIT TATION DIT. LUMINAIRE MOUNTING POLE ETBACK PAY ITEM OR ARM WATTAGE HEIGHT POLE CIRCUIT TATION DIT. LUMINAIRE MOUNTING POLE ETBACK PAY ITEM OR ARM WATTAGE HEIGHT A 8+. 5' 4 W 754 3 A 97+38.99 5 W 4' 754 A 83+6. 5' 4 W 754 3 A3 98+43.4 5 W 4' 754 A 84+. 5' 4 W 754 3 A3 99+44. 5 W 4' 754 3 A 85+4. 5' 4 W 754 33 A3 3+43.45 5 W 4' 754 4 A 85+98. 5' 4 W 754 34 A3 3+54.94 5 W 4' 754 5 A 86+9. ' 4 W BRIDGE MOUNTED 755545 35 A3 3+58.99 5 W 4' 754 6 A 87+86. ' 4 W BRIDGE MOUNTED 755545 36 A3 33+63. 5 W 4' 754 7 A 88+79.99 5' 4 W 754 37 A3 34+67. 5 W 4' 754 8 A 89+74. 5' 4 W 754 38 A3 35+7. 5 W 4' 754 9 A 9+68. 5' 4 W 754 39 A3 36+75. 5 W 4' 754 A 9+6. 5' 4 W 754 3 A3 37+79. 5 W 4' 754 A 9+56. 5' 4 W 754 3 A3 38+8.94 5 W 4' 754 A 93+5. 5' 4 W 754 3 A3 39+86.86 5 W 4' 754 3 A 94+44. 5' 4 W 754 33 A3 3+9.8 5 W 4' 754 4 A 95+38. 5' 4 W 754 34 A3 3+95.8 5 W 4' 754 5 A 96+3. 5' 4 W 754 35 A3 3+88.88 5 W 4' 754 6 A 96+69.7 5' 4 W 754 36 A3 33+93. 5 W 4' 754 37 A3 34+93.66 5 W 4' 754 POLE RAMP A POLE DATA CIRCUIT TATION DIT. LUMINAIRE MOUNTING POLE ETBACK PAY ITEM OR ARM WATTAGE HEIGHT A 97+8. 5 W 4' 754 LUM. CIRCUIT TATION R 49 UNDERDECK LIGHT LUMINAIRE MOUNTING LUMINAIRE/PENDANT OFFET WATTAGE HEIGHT PAY ITEM A 98+84.3 5 W 4' 754 UD A4 33+5.5 3 W 6'6" 6.' RT R 49 756 A 99+88.6 5 W 4' 754 UD A4 33+5.6 3 W 6'6" 6.' LT R 49 756 3 A 3+9.99 5 W 4' 754 UD3 A4 87+53.4 3 W 6'6" 5.' LT R 49 756 4 A 3+96. 5 W 4' 754 UD4 A4 86+93.4 3 W 6'6" 5.' LT R 49 756 5 A 33+. 5 W 4' 754 UD5 A4 87+53.4 3 W 6'6" 5.' RT R 49 756 6 A 34+3.97 5 W 4' 754 UD6 A4 86+93.4 3 W 6'6" 5.' RT R 49 756 7 A 35+7.94 5 W 4' 754 8 A 36+.6 5 W 4' 754 9 A A 37+6.3 38+. 5 W 5 W 4' 4' 754 754 LIGHTED IGN 3 4 5 A A A A A 39+4. 3+8. 3+3. 3+36. 33+4. 5 W 5 W 5 W 5 W 5 W 4' 4' 4' 4' 4' 754 754 754 754 754 IGN 4 6 CIRCUIT A4 A4 A TATION 4+4.4 R 49 368+65. NB R 49 95+9. RAMP B LUMINAIRE WATTAGE 4 W 4 W 4 W OF LUM. ARM L. (FT) 4 4 4 IGN DIM. (WxH) "x7'" / "x3'" "x7'" / "x3'" '6"x5'6" / '6"x3'" TR. OC OC3 OC4 3 A 78+8. KELLY PARK RD 4 W 4 5'"x4'" / 5'"x3'" OC9 5 B 86+. KELLY PARK RD 4 W 4 5'"x5'6" / 5'"x3'" OC REVIION AMBAR DIAZLOZANO, P.E. P.E. LICENE NUMBER 765 5 E. ROBINON T., UITE 3 ORLAND, FL 38 CERTIFICATE OF AUTHORIZATION 393 EXPREWAY AUTHORITY ROAD PROJECT R 49 493 POLE DATA HEET HEET L7 $UER$ $$ $TIME$ $FILE$

N 5 METAL BEGIN LIGHTING 493 TA. 4+4.4 { CONT. R 49 R 49 OUTHBOUND 4 4 4 43 44 45 46 R 49 (WEKIVA PKWY) 4 4 4 43 44 45 46 47 34 34 343 R 49 NORTHBOUND METAL 344 345 346 347 MATCHLINE TA. 47+. R 49 (WEKIVA PKW Y.) #, A4 # (G) #6, A4 #6 (G) TA. 4+4.4 IGN OC, CKT. A4 REVIION AMBAR DIAZLOZANO, P.E. P.E. LICENE NUMBER 765 5 E. ROBINON T., UITE 3 ORLAND, FL 38 CERTIFICATE OF AUTHORIZATION 393 EXPREWAY AUTHORITY ROAD PROJECT R 49 493 LIGHTING R 49 HEET L8 $UER$ $$ $TIME$ $FILE$

N 5 MATCHLINE TA. 47+. R 49 (WEKIVA PKW Y.) 47 48 R 49 OUTHBOUND 49 5 5 5 47 48 49 5 5 5 R 49 (WEKIVA PKWY) 348 349 35 35 35 353 354 R 49 NORTHBOUND 53 MATCHLINE TA. 54+. R 49 (WEKIVA PKW Y.) 53 54 #6, A4 #6 (G) #6, A4 #6 (G) REVIION AMBAR DIAZLOZANO, P.E. P.E. LICENE NUMBER 765 5 E. ROBINON T., UITE 3 ORLAND, FL 38 CERTIFICATE OF AUTHORIZATION 393 EXPREWAY AUTHORITY ROAD PROJECT R 49 493 LIGHTING R 49 HEET L9 $UER$ $$ $TIME$ $FILE$

N MATCHLINE TA. 54+. R 49 (WEKIVA PKW Y.) 54 55 56 METAL 54 55 56 57 R 49 (WEKIVAPKWY) R 49 OUTHBOUND 57 58 59 6 58 59 6 6 355 356 357 358 359 36 36 5 MATCHLINE TA. 6+. R 49 (WEKIVA PKW Y.) R 49 NORTHBOUND #6, A4 #6 (G) #6, A4 #6 (G) REVIION AMBAR DIAZLOZANO, P.E. P.E. LICENE NUMBER 765 5 E. ROBINON T., UITE 3 ORLAND, FL 38 CERTIFICATE OF AUTHORIZATION 393 EXPREWAY AUTHORITY ROAD PROJECT R 49 493 LIGHTING R 49 HEET L $UER$ $$ $TIME$ $FILE$

N 5 MATCHLINE TA. 6+. R 49 (WEKIVA PKW Y.) 6 6 63 6 6 63 64 R 49 (WEKIVA PKWY) R 49 OUTHBOUND 64 65 66 67 36 36 363 364 365 366 65 66 67 68 367 MATCHLINE TA. 68+. R 49 (WEKIVA PKW Y.) R 49 NORTHBOUND #6, A4 #6 (G) REVIION AMBAR DIAZLOZANO, P.E. P.E. LICENE NUMBER 765 5 E. ROBINON T., UITE 3 ORLAND, FL 38 CERTIFICATE OF AUTHORIZATION 393 EXPREWAY AUTHORITY ROAD PROJECT R 49 493 LIGHTING R 49 HEET L $UER$ $$ $TIME$ $FILE$

N 5 MATCHLINE TA. 68+. R 49 (WEKIVA PKW Y.) 68 69 7 68 69 7 R 49 (WEKIVA PKWY) 7 7 73 74 7 7 73 74 75 368 369 37 37 37 373 374 R 49 NORTHBOUND R 49 OUTHBOUND MATCHLINE TA. 75+. R 49 (WEKIVA PKW Y.) #6, A4 #6 (G) #6, A4 #6 (G) #, A4 # (G) #6, A4 #6 (G) TA. 368+65. IGN 4 OC3, CKT. A4 REVIION AMBAR DIAZLOZANO, P.E. P.E. LICENE NUMBER 765 5 E. ROBINON T., UITE 3 ORLAND, FL 38 CERTIFICATE OF AUTHORIZATION 393 EXPREWAY AUTHORITY ROAD PROJECT R 49 493 LIGHTING R 49 HEET L $UER$ $$ $TIME$ $FILE$

N 5 MATCHLINE TA. 75+. R 49 (WEKIVA PKW Y.) R 49 OUTHBOUND 75 76 77 78 79 8 8 75 76 77 78 79 8 8 8 375 376 377 378 379 38 38 R 49 NORTHBOUND R 49 (WEKIVA PKWY) MATCHLINE TA. 8+. R 49 (WEKIVA PKW Y.) #6, A4 #6 (G) REVIION AMBAR DIAZLOZANO, P.E. P.E. LICENE NUMBER 765 5 E. ROBINON T., UITE 3 ORLAND, FL 38 CERTIFICATE OF AUTHORIZATION 393 EXPREWAY AUTHORITY ROAD PROJECT R 49 493 LIGHTING R 49 HEET L3 $UER$ $$ $TIME$ $FILE$

N 5 MATCHLINE TA. 8+. R 49 (WEKIVA PKW Y.) TA. 8+. POLE, CKT. A #4, A TA. 85+98. TA. 84+. POLE 4, CKT. A TA. 87+86. POLE, CKT. A POLE 6, CKT. A #4, A #4 (G) #4 (G) #4 (G) #4 (G) R 49 OUTHBOUND 8 83 84 85 86 87 88 89 #6, A4 #6 (G) #4, A #4 (G) PARE #4, A #4 (G) PARE #4, A #4 (G) R 49 (WEKIVA PKWY) R 49 NORTHBOUND #4, A #4 (G) #4, A #4, A #4, A #6, A4 #4 (G) MATCHLINE TA. 89+. R 49 (WEKIVA PKW Y.) TA. 83+6. POLE, CKT. A #4, A #6, A4 #4 (G) TA. 85+4. POLE 3, CKT. A #4, A #6, A4 #4 (G) #4, A #6, A4 #4 (G) TA. 86+9. POLE 5, CKT. A #4, A #6, A4 #4 (G) TA. 88+79.99 POLE 7, CKT. A #4, A #6, A4 #4 (G) NOTE: EE HEET L5 FOR UNDERDECK LIGHTING DETAIL. REVIION AMBAR DIAZLOZANO, P.E. P.E. LICENE NUMBER 765 5 E. ROBINON T., UITE 3 ORLAND, FL 38 CERTIFICATE OF AUTHORIZATION 393 EXPREWAY AUTHORITY ROAD PROJECT R 49 493 LIGHTING R 49 HEET L4 $UER$ $$ $TIME$ $FILE$

N 5 MATCHLINE TA. 89+. R 49 (WEKIVA PKW Y.) TA. 89+74. TA. 9+6. TA. 93+5. POLE 8, CKT. A POLE, CKT. A POLE, CKT. A TA. 95+38. POLE 4, CKT. A #, A #4, A #, A #, A # (G) #4 (G) # (G) # (G) #4, A #4 (G) R 49 OUTHBOUND 89 9 9 9 93 94 95 96 R 49 NORTHBOUND R 49 (WEKIVA PKWY) 95 94 95 3 #, A # (G) MATCHLINE TA. 96+. R 49 (WEKIVA PKW Y.) 96 96 #4, A #4, A #6, A4 #6, A4 #4 (G) TA. 9+68. POLE 9, CKT. A #6, A4 #4 (G) TA. 9+56. POLE, CKT. A #6 (G) TA. 94+44. POLE 3, CKT. A #4, A #6, A4 #4 (G) #4, A #6, A4 #4 (G) TA. 95+9. IGN 6 OC4, CKT. A REVIION AMBAR DIAZLOZANO, P.E. P.E. LICENE NUMBER 765 5 E. ROBINON T., UITE 3 ORLAND, FL 38 CERTIFICATE OF AUTHORIZATION 393 EXPREWAY AUTHORITY ROAD PROJECT R 49 493 LIGHTING R 49 HEET L5 $UER$ $$ $TIME$ $FILE$

MATCHLINE TA. 96+. R 49 (WEKIVA PKW Y.) TA. 3+9.99 POLE 3, CKT. A TA. 98+84.3 POLE, CKT. A #, A TA. 99+88.6 # (G) TA. 97+8. POLE, CKT. A POLE, CKT. A 5 #, A RAMP A # (G) #, A # (G) #, A #, A # (G) # (G) TA. 96+69.7 POLE 6, CKT. A #4, A3 #4 (G) #, A # (G) PHAE II (POLE ) FUTURE INTALLATION PHAE II (POLE ) #4, A3 PHAE II (POLE 8) #4, A3 FUTURE INTALLATION #4 (G) FUTURE INTALLATION #4 (G) #4, A3 #4 (G) 96 97 98 99 3 3 96 97 98 99 3 3 3 33 96 97 PHAE II (POLE 7) FUTURE INTALLATION #4, A #4, A #6, A4 #6, A4 #4 (G) #4 (G) #4, A3 RAMP B #4, A #6, A4 PARE #4 (G) TA. 96+3. #4, A POLE 5, CKT. A #6, A4 #4 (G) #4, A 98 #4 (G) PARE #4, A3 #4 (G) RAMP A 99 #6, A4 TA. 97+38.99 #4 (G) POLE 3, CKT. A #4, A3 TA. 98+43.4 #4 (G) POLE 3, CKT. A3 TA. 99+44. POLE 3, CKT. A3 R 49 OUTHBOUND #4, A3 #4 (G) R 49 (WEKIVA PKWY) PARE R 49 NORTHBOUND #4, A #6, A4 #4, A3 #4 (G) #4 (G) PHAE II (POLE 9) PHAE II (POLE ) PARE FUTURE INTALLATION FUTURE INTALLATION RAMP B #6, A3 #6 (G) 3 MATCH LINE TA. 3+. RAMP B, EE HEET L RAMP A, EE HEET L9 MATCH LINE TA. 3+. N #4, A #6, A4 #4 (G) MATCHLINE TA. 33+. R 49 (WEKIVA PKW Y.) REVIION AMBAR DIAZLOZANO, P.E. P.E. LICENE NUMBER 765 5 E. ROBINON T., UITE 3 ORLAND, FL 38 CERTIFICATE OF AUTHORIZATION 393 EXPREWAY AUTHORITY ROAD PROJECT R 49 493 LIGHTING R 49 HEET L6 $UER$ $$ $TIME$ $FILE$

N 5 PHAE II (POLE 4) FUTURE INTALLATION #4, A3 #4, A3 #4 (G) #4, A3 #4 (G) PHAE II (POLE 6) FUTURE INTALLATION #4, A3 #4 (G) PHAE II (POLE 8) FUTURE INTALLATION #4, A3 #4 (G) #4 (G) MATCHLINE TA. 33+. R 49 (WEKIVA PKW Y.) R 49 OUTHBOUND 33 34 35 36 37 38 39 3 R 49 NORTHBOUND #4, A #4, A #6, A4 #6, A4 #4 (G) #4 (G) PHAE II (POLE 5) FUTURE INTALLATION PHAE II (POLE 3) FUTURE INTALLATION PHAE II FUTURE IGN INTALLATION (OC6 IGN ) R 49 (WEKIVA PKWY) PHAE II FUTURE IGN INTALLATION (OC5 IGN 7) #4, A #6, A4 #4, A #4 (G) #6, A4 #4 (G) PHAE II (POLE 7) FUTURE INTALLATION RAMP B #4, A #6, A4 #4 (G) PARE 538 #4, A #6, A4 #4 (G) 539 #6, A4 #6, A4 #6 (G) #6 (G) PHAE II (POLE 9) FUTURE INTALLATION MATCHLINE TA. 3+. R 49 (WEKIVA PKW Y.) 53 537 #4, A #4 (G) PHAE II (POLE 48) FUTURE INTALLATION PHAE II (POLE 47) FUTURE INTALLATION #4, A #4 (G) #4, A #4 (G) MATCHLINE TA. 536+., RAMP B, EE L 536 PHAE II (POLE 46) FUTURE INTALLATION REVIION AMBAR DIAZLOZANO, P.E. P.E. LICENE NUMBER 765 5 E. ROBINON T., UITE 3 ORLAND, FL 38 CERTIFICATE OF AUTHORIZATION 393 EXPREWAY AUTHORITY ROAD PROJECT R 49 493 LIGHTING R 49 HEET L7 $UER$ $$ $TIME$ $FILE$

MATCHLINE TA. 8+, KELLYPARK RD., EE HEET L MATCHLINE TA. 3+. R 49 (WEKIVA PKW Y.) #4, A3 #4, A3 #4 (G) #4 (G) PHAE II (POLE 3) FUTURE INTALLATION R 49 OUTHBOUND 589 59 59 59 3 3 3 33 34 35 36 37 R 49 NORTHBOUND CKT. A3 53 53 53 #4, A3 #, A #6, A4 # (G) #4 (G) PHAE II FUTURE IGN INTALLATION CKT. A4 CKT. A3 CKT. A4 (OC IGN 4) #, A # (G) #, A #6, A4 # (G) #6 (G) #6, A4 #6 (G) PHAE II (POLE 3) FUTURE INTALLATION #6, A4 #6 (G) #6, A4 #6, A4 #6 (G) PHAE II (POLE 33) #6 (G) FUTURE INTALLATION PHAE II (POLE 4) PHAE II (POLE 3) FUTURE INTALLATION FUTURE INTALLATION RAMP B #, A # (G) CKT. A MATCHLINE TA. 59+. RAMP B, EE HEET L3 45 46 47 48 OHD CABLE KELLY PARK RD 8 83 84 85 PHAE II (POLE 4) FUTURE INTALLATION KELLY PARK RD. #6, A4 #6 (G) PHAE II (POLE 34) FUTURE INTALLATION #6, A4 6#6, B4 #6 (G) #6, A4 MATCHLINE TA. 85+6., KELLYPARK RD., EE HEET L4 6#6, B4 #6 (G) #6, A4 6#6, B4 #6 (G) #6, A4 6#6, B4 #6 (G) 6#, B4 #4, B # (G) 6#6, B4 #4 (G) #6, A4 #6 (G) N 5 #6, A4 6#6, B4 #6 (G) R 49 (WEKIVA PKWY) NOTE: EE HEET L6 FOR UNDERDECK LIGHTING DETAIL AND HEET L3 FOR MAINTENANCE LIGHTING DETAIL. REVIION AMBAR DIAZLOZANO, P.E. P.E. LICENE NUMBER 765 5 E. ROBINON T., UITE 3 ORLAND, FL 38 CERTIFICATE OF AUTHORIZATION 393 EXPREWAY AUTHORITY ROAD PROJECT R 49 493 LIGHTING R 49 HEET L8 $UER$ $$ $TIME$ $FILE$

N 5 +83.84 94.' LT. MATCHLINE TA. 3+. RAMP A, EE HEET L6 TA. 3+96. POLE 4, CKT. A #, A # (G) TA. 34+3.97 TA. 33+. POLE 6, CKT. A POLE 5, CKT. A #, A #, A # (G) #, A # (G) # (G) 3 3 33 34 RAMP A RAMP A TA. 35+7.94 POLE 7, CKT. A 35 #, A # (G) TA. 36+.6 POLE 8, CKT. A 36 #, A # (G) TA. 37+6.3 POLE 9, CKT. A #, A # (G) 3738 MATCH LINE TA. 38+. RAMP A EE HEET L REVIION AMBAR DIAZLOZANO, P.E. P.E. LICENE NUMBER 765 5 E. ROBINON T., UITE 3 ORLAND, FL 38 CERTIFICATE OF AUTHORIZATION 393 EXPREWAY AUTHORITY ROAD PROJECT R 49 493 LIGHTING RAMP A HEET L9 $UER$ $$ $TIME$ $FILE$

MATCH LINE TA. 38+. RAMP A 38 39 CIRCUIT A A3 EE HEET L9 A A4 N FIXTURE WATTAGE 4 5 3 4 4 5 3 4 4 5 3 4 4 5 3 4 #, A # (G) 5 TA. 38+. POLE, CKT. A OF FIXTURE 5 5 7 6 4 #, A # (G) AMPACITY (AMP) 6.5.5.6..4.6.9.8. REVIION RAMP A (VOLT) V 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 TA. 39+4. POLE, CKT. A VA LOAD 79 54 88 56 67 88 57 864 576 BRANCH CIRCUIT BRKER (AMP) 45 45 35 5 #, A # (G) TA. 3+8. A 45A, CKT. A3 35A, AND CKT. A4 5A). POLE, CKT. A #, A # (G) TA. 3+36. POLE 4, CKT. A TA. 3+3. POLE 3, CKT. A #, A # (G) #, A #, A #4, A3 #6, A4 # (G) LOAD CENTER 'A' TA. 78+94.35, 98.5' RT, CONT. KELLY PARK ROAD 4/48V, INGLE PHAE, 3WIRE UNDERGROUND ERVICE, 75A MAIN CIRCUIT BRKER, 4 BRANCH CIRCUIT (CKT. A & TA. 33+4. POLE 5, CKT. A #, A # (G) 3 3 3 33 MAIN CIRCUIT BRKER (AMP) LOAD CENTER VA LOAD 75,46 RAMP A AMBAR DIAZLOZANO, P.E. P.E. LICENE NUMBER 765 5 E. ROBINON T., UITE 3 ORLAND, FL 38 CERTIFICATE OF AUTHORIZATION 393 EXPREWAY AUTHORITY ROAD PROJECT R 49 493 PARE #, A #4, A3 #6, A4 # (G) #, A # (G) #4, A3 #6, A4 #4 (G) #, A #, A #4, A3 #6, A4 # (G) #, A #4, A3 #6, A4 # (G) PHAE II (POLE 4) FUTURE INTALLATION CKT. A3 CKT. A4 CKT. A CKT. A4 CKT. A3 CKT. A 4 4 43 44 45 433 CKT. A 588 78 79 8 8 8 TA. 78+8. IGN 3 OC9, CKT. A 34 KELLY PARK ROAD MATCHLINE TA. 8+., #, A # (G) CONT. KELLY PARK RD. EXIT. POWER ERVICE #, A #4, A3 #6, A4 # (G) KELLYPARK RD, EE HEET L8 LIGHTING RAMP A HEET L $UER$ $$ $TIME$ $FILE$

N 5 RAMP B, EE HEET L6 MATCH LINE TA. 3+. 3 #4, A3 3 #4, A3 #4 (G) TA. 3+43.45 POLE 33, CKT. A3 3 RAMP B 33 34 35 RAMP B #4, A3 #6, A3 #4, A3 #4 (G) #6 (G) #4 (G) #4, A3 TA. 34+67. #4 (G) POLE 37, CKT. A3 TA. 3+58.99 TA. 3+54.94 POLE 35, CKT. A3 TA. 33+63. POLE 34, CKT. A3 POLE 36, CKT. A3 MATCH LINE TA. 35+4. RAMP B EE HEET L #4 (G) REVIION AMBAR DIAZLOZANO, P.E. P.E. LICENE NUMBER 765 5 E. ROBINON T., UITE 3 ORLAND, FL 38 CERTIFICATE OF AUTHORIZATION 393 EXPREWAY AUTHORITY ROAD PROJECT R 49 493 LIGHTING RAMP B HEET L $UER$ $$ $TIME$ $FILE$

MATCH LINE TA. 35+4. RAMP B, EE HEET L 533 536 MATCHLINE TA. 536+. RAMP B, EE HEET L7 #4, A #4 (G) PHAE II (POLE 45) FUTURE INTALLATION N 5 #4, A #4 (G) PHAE II (POLE 48) FUTURE INTALLATION MATCHLINE TA. 598+. RAMP B, EE HEET L3 598 TA. 3+88.88 POLE 35, CKT. A3 535 PHAE II (POLE 44) FUTURE INTALLATION #4, A #4 (G) PHAE II (POLE 49) FUTURE INTALLATION #4, A #4 (G) MATCH LINE TA. 3+6. RAMP B, EE HEET L3 #4, A #4 (G) 599 534 PHAE II (POLE 43) FUTURE INTALLATION PHAE II (POLE 4) FUTURE INTALLATION PHAE II (POLE 4) FUTURE INTALLATION PHAE II (POLE 4) FUTURE INTALLATION #4, A #4, A #4 (G) 3 #4 (G) 53 53 53 3 #4, A #4 (G) #6, A3 #6 (G) RAMP B #6, A3 #6 (G) #6, A3 #6 (G) RAMP B #6, A3 #6 (G) 39 3 #6 (G) TA. 3+9.8 #6, A3 POLE 33, CKT. A3 TA. 3+95.8 POLE 34, CKT. A3 36 37 RAMP B 38 TA. 39+86.86 POLE 3, CKT. A3 TA. 35+7. POLE 38, CKT. A3 #6, A3 #6 (G) TA. 36+75. POLE 39, CKT. A3 #6, A3 #6 (G) TA. 37+79. POLE 3, CKT. A3 #6, A3 #6 (G) TA. 38+8.94 POLE 3, CKT. A3 REVIION AMBAR DIAZLOZANO, P.E. P.E. LICENE NUMBER 765 5 E. ROBINON T., UITE 3 ORLAND, FL 38 CERTIFICATE OF AUTHORIZATION 393 EXPREWAY AUTHORITY ROAD PROJECT R 49 493 LIGHTING RAMP B HEET L $UER$ $$ $TIME$ $FILE$

MATCH LINE TA. 59+. 59 593 594 RAMP B, EE HEET L8 #, A # (G) #, A # (G) PHAE II (POLE 43) #, A FUTURE INTALLATION # (G) PHAE II (POLE 44) RAMP B FUTURE INTALLATION PHAE II (POLE 45) FUTURE INTALLATION N 5 595 596 #, A # (G) PHAE II (POLE 46) FUTURE INTALLATION #, A # (G) PHAE II (POLE 47) FUTURE INTALLATION #, A # (G) 597 598 TA. 34+93.66 POLE 37, CKT. A3 #6, A3 #6 (G) RAMP B TA. 33+93. POLE 36, CKT. A3 #6, A3 #6 (G) TA. 3+88.88 POLE 35, CKT. A3 MATCHLINE TA. 598+. MATCHLINE TA. 35+4. RAMP B, EE HEET L4 #6, A3 #6 (G) RAMP B, EE HEET L 33 34 35 RAMP B MATCHLINE TA. 3+6. RAMP B, EE HEET L REVIION AMBAR DIAZLOZANO, P.E. P.E. LICENE NUMBER 765 5 E. ROBINON T., UITE 3 ORLAND, FL 38 CERTIFICATE OF AUTHORIZATION 393 EXPREWAY AUTHORITY ROAD PROJECT R 49 493 LIGHTING RAMP B HEET L3 $UER$ $$ $TIME$ $FILE$

MATCH LINE TA. 85+6. CONT. KELLY PARK RD., EE HEET L8 334 335 336 LOAD CENTER 'B' TA. 9+., 45.' LT, CONT. KELLY PARK ROAD N 4/48V, INGLE PHAE, 3WIRE UNDERGROUND ERVICE, 5A MAIN CIRCUIT BRKER, BRANCH CIRCUIT (CKT. B 3A, 5 CKT. B4 5A). TA. 86+. IGN 5 OC, CKT. B PHAE II (POLE 5) FUTURE INTALLATION #4, B 6#6, B4 #4 (G) #4, B 6#6, B4 #4 (G) PHAE II FUTURE IGN INTALLATION (OC IGN 6) #4, B 6#6, B4 #4 (G) #4, B 6#6, B4 #4 (G) #4, B 6#6, B4 EXIT. #, B # (G) #4 (G) PARE #4, B 6#6, B4 #4 (G) POWER ERVICE 86 87 88 89 9 9 9 49 5 5 5 53 54 55 36 MATCHLINE TA. 35+4. CIRCUIT FIXTURE WATTAGE OF FIXTURE AMPACITY (AMP) V (VOLT) VA LOAD BRANCH CIRCUIT BRKER (AMP) MAIN CIRCUIT BRKER (AMP) LOAD CENTER VA LOAD RAMP B, EE HEET L3 B 4 48 3 5 48 3 48 4.6 48 88 B4 4 48 48 5 5 3,744 5 48 3 48 4 48 4 7. 48 3456 REVIION AMBAR DIAZLOZANO, P.E. P.E. LICENE NUMBER 765 5 E. ROBINON T., UITE 3 ORLAND, FL 38 CERTIFICATE OF AUTHORIZATION 393 EXPREWAY AUTHORITY ROAD PROJECT R 49 493 LIGHTING KELLY PARK ROAD HEET L4 $UER$ $$ $TIME$ $FILE$

N 5 TA. 86+93.4, 5.' LT UD4, CKT. A4 TA. 87+53.4, 5.' LT UD3, CKT. A4 #, A4 # (G) #, A4 # (G) #, A4 # (G) R 49 (WEKIVA PKWY.) #, A4 # (G) 86 87 88 TA. 86+93.4, 5.' RT UD6, CKT. A4 TA. 87+53.4, 5.' RT UD5, CKT. A4 #, A4 # (G) #, A4 # (G) #, A4 # (G) NOTE: THI HEET I ONLY INTENDED TO CLRLY DEPICT AND LABEL UNDERDECK LIGHTING. QUANTITIE FOR THI HEET ONLY INCLUDE THE CONDUIT, CONDUCTOR, AND PULL BOXE UTILIZED FOR UNDERDECK LIGHTING A WELL A THE PENDANT HUNG LUMINAIRE. ALL OTHER LIGHTING HOWN HALL BE QUANTIFIED IN THE PRECEDING HEET. #, A4 # (G) #, A4 # (G) REVIION AMBAR DIAZLOZANO, P.E. P.E. LICENE NUMBER 765 5 E. ROBINON T., UITE 3 ORLAND, FL 38 CERTIFICATE OF AUTHORIZATION 393 EXPREWAY AUTHORITY ROAD PROJECT R 49 493 UNDERDECK LIGHTING HEET L5 $UER$ $$ $TIME$ $FILE$

OOD OOD N 5 TA. 33+5.6, 6.' LT UD, CKT. A4 #, A4 # (G) 59 59 47 48 3 33 34 35 NOTE: THI HEET I ONLY INTENDED TO CLRLY DEPICT AND LABEL UNDERDECK LIGHTING. QUANTITIE FOR THI HEET ONLY INCLUDE THE CONDUIT, CONDUCTOR, AND PULL BOXE UTILIZED FOR UNDERDECK LIGHTING A WELL A THE PENDANT HUNG LUMINAIRE. ALL OTHER LIGHTING HOWN HALL BE QUANTIFIED IN THE PRECEDING HEET. MAINTENANCE LIGHTING HALL BE QUANTIFIED ON HEET L3. REVIION RAMP B TA. 33+5.5, 6.' RT UD, CKT. A4 AMBAR DIAZLOZANO, P.E. P.E. LICENE NUMBER 765 5 E. ROBINON T., UITE 3 ORLAND, FL 38 CERTIFICATE OF AUTHORIZATION 393 ROAD 84 85 EXPREWAY AUTHORITY PROJECT R 49 493 #, A4 # (G) CONT. KELLY PARK RD. UNDERDECK LIGHTING R 49 (WEKIVA PKWY.) HEET L6 $UER$ $$ $TIME$ $FILE$

DETAIL A PARCEL 97 BRIDGE UNDERDECK LED LUMINAIRE N.T.. '6 " 6'" '" '" '" '" '6 " HLDR. LANE LANE LANE HLDR. 8" LAB lope:. Ft/Ft " LAB ~ " PVC UTILITY CONDUIT PER FDOT INDEX (TYP.) FLORIDA U 48 BM (TYP.) " RG URFACE MOUNT CONDUIT TO UNDERDECK LIGHTING URFACE MOUNT JBOX " RG CONDUIT THRDED BOTH END REFER TO L5 FOR UNDERDECK LUMINAIRE CONDUIT RUN AND MOUNTING LOCATION KELLY PARK ROAD BRIDGE UNDERDECK LED LUMINAIRE N.T.. " RG URFACE MOUNT CONDUIT TO UNDERDECK LIGHTING URFACE MOUNT JBOX '6 " 6'" '" '" '" '" '6 " ~ " PVC UTILITY CONDUIT (TYP.) EE FDOT INDEX HLDR. LANE LANE LANE HLDR. lope:. Ft/Ft 8 " " 8 " LAB NOTE:. ALL UNDERDECK LED LUMINARIE AND RELATED HARDWARE HALL BE PAID FOR ON HEET L5 AND L6 IN THE COT OF PAY ITEM 756.. CONTRACTOR HALL CONNECT PROPOED CONDUCTOR TO PROPOED ERVICE POINT. CONTRACTOR HALL INTALL ALL CONDUCTOR AND ERVICE POINT CONNECTION NECRY FOR COMPLETE ERVICE TO UNDERDECK LED LUMINARIE. ALL URFACE MOUNTED CONDUIT I REQUIRED TO GO FROM UNDERDECK ERVICE POINT, UP PIER TO PIER CAP AND OVER TO LED LUMINAIRE LOCATION. NEW " RG URFACE MOUNTED CONDUIT HALL BE CONCLED AND INTALLED WITH RUN PARALLEL OR PERPENDICULAR TO WALL AND TRUCTURAL MEMBER. 3. CONTRACTOR HALL UBMIT HOP DRAWING DETAILING MEMBER AND CONNECTION ELEMENT IZE FOR ROADWAY UNDERDECK LED LIGHTING FIXTURE. 4. CONTRACTOR HALL PROVIDE ADEQUATE UPPORT MURE TO PREVENT THE PENDANT HUNG UNDERDECK LUMINAIRE FROM WAYING. CONTRACTOR HALL UBMIT HOP DRAWING DETAILING THE UPPORT MURE. COT OF UPPORT MURE HALL BE INCLUDED IN PAY ITEM 756. 5. BOTTOM OF UNDERDECK LED LUMINAIRE NOT TO BE HUNG BELOW BM, 6'6" MINIMUM MOUNTING HEIGHT. REVIION AMBAR DIAZLOZANO, P.E. P.E. LICENE NUMBER 765 5 E. ROBINON T., UITE 3 ORLAND, FL 38 CERTIFICATE OF AUTHORIZATION 393 EXPREWAY AUTHORITY ROAD PROJECT R 49 493 " RG CONDUIT THRDED BOTH END REFER TO L6 FOR UNDERDECK LUMINAIRE CONDUIT RUN AND MOUNTING LOCATION UNDERDECK LIGHTING DETAIL HEET L7 $UER$ $$ $TIME$ $FILE$

. THE CONTRACTOR HALL UBMIT HOP DRAWING TO THE ENGINEER OF RECORD DETAILING THE LAYOUT OF THE MAINTENANCE LIGHTING YTEM FOR THE ENTIRE TRUCTURE. THE HOP DRAWING MUT INCLUDE, BUT NOT BE LIMITED TO, THE FOLLOWING ITEM: A. CONDUIT LAYOUT AND INTALLATION DETAIL THROUGH DIAPHRAGM, AROUND POTTENIONING (PT) DUCT, LATERAL BRACING AND CRO FRAME A NECRY. B. CONDUIT ACCE THROUGH BOX GIRDER END DIAPHRAGM WITH MINIMUM I" CLRANCE IN ALL DIRECTION. C. CONDUIT EXPANION FITTING DETAIL. D. FATENER DETAIL FOR THE INTERIOR ELECTRICAL YTEM. E. INGLE LINE DIAGRAM HOWING MINI POWER CENTER, WITCHE, CONTACTOR, TIMER, ETC. F. MINI POWER CENTER DETAIL INCLUDING CIRCUIT BRKER DETAIL. G. MINI POWER CENTER MOUNTING DETAIL IF REQUIRED. H. FEEDER CHEDULE.. ENURE INTALLATION MEET ALL REQUIREMENT OF THE LATET EDITION OF THE NATIONAL ELECTRICAL CODE (NEC) AND LOCAL ORDINANCE. INTALL GROUNDING IN ACCORDANCE WITH NEC ARTICLE 5. MAINTAIN EPARATION BETWEEN 48V AND V CONDUCTOR/ CONDUIT THROUGHOUT. 3. THE CONTRACTOR HALL FURNIH ALL LABOR, EQUIPMENT, MATERIAL, AND INCIDENTAL REQUIRED FOR A COMPLETE AND FUNCTIONAL INTALLATION. 4. UE ONLY NEW, UNUED AND UNDERWRITER LABORATORIE (UL) LITED EQUIPMENT AND MATERIAL FOR OUTDOOR UE. 5. FURNIH AND INTALL POLYVINYL CHLORIDE (PVC) CONDUIT IN CONFORMANCE WITH UL ECTION 65, NEC ECTION 347 AND THE NATIONAL ELECTRIC MANUFACTURER AOCIATE (NEMA) TC, UVREITANT AND CHEDULE 8. BEND CONDUIT A NECRY TO CONNECT TO LOAD. 6. PROVIDE PVC LEEVE " BIGGER IN DIAMETER THAN CONDUIT TO ACCOMMO CONTRUCTION TOLERANCE. 7. INTALL A UL LABELED EXPANION FITTING FOR PECIFIED PVC CONDUIT AT ALL TRUCTURE EXPANION JOINT. PROVIDE CERTIFICATION THAT THE EXPANION FITTING MEET THE FOLLOWING MINIMUM REQUIREMENT: COMPATIBILITY WITH THE CONNECTED CONDUIT, WATERPROOF, UV PROTECTED AND ALLOW LONGITUDINAL MOVEMENT EQUAL TO THAT OF THE EXPANION JOINT. 8. UE ONLY ALLOY 36 TAINLE TEEL UPPORTING HARDWARE. PROVIDE MINIMUM 3/6" DIAMETER FATENER. FOR CONCRETE OR IP FORM MOUNTING, PROVIDE ANCHOR BOLT (EXPANION, DROPIN OR ADHEIVE) UITABLE FOR DYNAMIC LOADING (DUE TO VIBRATION CAUED TRAFFIC. INTALL FATENER TO AVOID CONFLICT WITH REINFORCING TEEL AND PT DUCT. FOR TRUCTURAL TEEL MOUNTING, DO NOT ATTACH FATENER TO MAIN MEMBER, I.E. WEB AND FLANGE. 9. FURNIH POWER DITRIBUTION AT 48V AC, I PHAE, WITH TEP DOWN TRANFORMER AT REGULAR INTERVAL. FURNIH 7.5 KVA MINI POWER CENTER WITH EIGHT AMP BRKER A THE TEP DOWN TRANFORMER, FEEDING A MAXIMUM OF LAMP AND RECEPTACLE. CH MINI POWER CENTER WILL PROVIDE POWER TO NO MORE THAN ' OF BRIDGE, PREFERABLY 5' ON CH IDE OF THE MINI POWER CENTER. 48V TOP FEED, V BOTTOM FEED TO MAINTAIN EPARATION.. FURNIH AND INTALL LIGHTING CONTACTOR TO WITCH THE 48V AC FEEDING THE MINI POWER CENTER.. FURNIH AND INTALL COPPER CONDUCTOR, TYPE XHHW. DO NOT UE ANY CONDUCTOR LARGER THAN #4 AWG IN A FIXTURE OUTLET TATION (FO).. PROVIDE ENOUGH LACK IN ALL INTERIOR CABLE TERMINATION TO ALLOW FOR MINOR HIFTING OF THE TRUCTURE. 3. FURNIH AND INTALL NATIONAL ELECTRIC MANUFACTURER AOCIATION (NEMA) TYPE 4X (NONMETALLIC) URFACE MOUNTED BOXE IZED IN CONFORMANCE WITH THE NEC. 4. FURNIH AND INTALL V DUPLEX RECEPTACLE (GFI, NEMA TYPE 5R), IN NONMETALLIC OUTLET BOXE AT 5' MAXIMUM ON CENTER. PROVIDE CH RECEPTACLE WITH A GAKETED WTHERPROTECTIVE OUTDOOR PLATE. MAXIMUM WIRE IZE TO CONNECT TO RECEPTACLE I # AWG. 5. FURNIH AND INTALL URFACE MOUNTED, FULLY ENCLOED, INCANDECENT LIGHT FIXTURE WITH GAKETED CLR GLOBE AND WIRE GUARD AT 5' MAXIMUM ON CENTER. PROVIDE WATT, 3 VOLT, VIBRATION REITANT AND BRA BAE INCANDECENT LAMP. 6. LOCATE WITCHE AT CH END OF CH PAN AND AT EVERY ACCE DOOR. 7. PROVIDE IX HOUR REET TIMER FOR CH CIRCUIT TO TURN OFF THE LIGHTING YTEM AUTOMATICALLY. 8. THEE DRAWING ARE NOT INTENDED TO HOW THE EXACT LOCATION OF CONDUIT RUN. COORDINATE THEE WITH THE OTHER TRADE TO AVOID CONFLICT. COORDINATE ALL LIGHTING FIXTURE AND EQUIPMENT LOCATION WITH THE TRUCTURE. 9. INCLUDE THE COT OF THE BOX MAINTENANCE LIGHTING YTEM IN THE PAY ITEM FOR LIGHTING INIDE BOX GIRDER, 755. THI ITEM INCLUDE PAYMENT FOR ALL ITEM, INCLUDING THE ITEM LITED IN THE BOX GIRDER MAINTENANCE LIGHTING TABULATION OF QUANTITIE AND ANY INCIDENTAL, NECRY FOR A COMPLETE AND ACCEPTED INTALLATION. '" '" 4'" 4'" 4'" '" 3'" HLDR. LANE LANE LANE HLDR. GIRDER BRIDGE GIRDER TRANVERE TIFFENER NONMETALLIC JUNCTION BOX ATTACH WITCH TO CONDUIT PVC CHEDULE 8 IN BOX TRANVERE TIFFENER GIRDER NONMETALLIC CEILING MOUNTED LIGHTING FIXTURE OUTLET BOX 6" ABOVE 3/4" CONDUIT V DUPLEX RECEPTACLE, GFI, NEMA BOTTOM FLANGE MPC CONFIGURATION 5R URFACE WALL MOUNTED IN NONMETALLIC OUTLET BOX, WATERPROOF BOX 7.5 KVA MINI POWER CENTER (MPC) 48V, /4V NONMETALLIC OUTLET BOX 6" ABOVE BOTTOM FLANGE ACCE HATCH LID CEILING MOUNTED LIGHTING FIXTURE CONDUIT RACK REMOTE WITCHE FOR 48V C CONTACTOR WITH 6 HOUR REET TIMER 48V CONTACTOR WITH REMOTE WITCH CONTROL FOR MPC ACTIVATION BOTTOM FLANGE ' 6" BOTTOM FLANGE G G3 DC 48V DICONNECT WITCH FOR POWER UPPLY TO MPC ACCE HATCH LID (OR ACCE DOOR) WITCH LOCATION AT THE BEGIN/END OF CH MPC G ACCE HATCH WITCH CRO ECTION HOWING TYPICAL FO AND ACCE DOOR WITCHE NOTE: FO = FIXTURE OUTLET TATION REVIION AMBAR DIAZLOZANO, P.E. P.E. LICENE NUMBER 765 5 E. ROBINON T., UITE 3 ORLAND, FL 38 CERTIFICATE OF AUTHORIZATION 393 EXPREWAY AUTHORITY ROAD PROJECT R 49 493 MAINTENANCE LIGHTING GENERAL NOTE AND DETAIL HEET L8 $UER$ $$ $TIME$ $FILE$

* CKT. TATION LUM. WATTAGE NOTE * CKT. TATION LUM. WATTAGE NOTE * CKT. TATION LUM. WATTAGE NOTE FO # & 3+56.6 FO #5 & 3+56.6 FO #9 & 3+56.6 FO # & 33+6.6 FO #6 & 33+6.6 FO # & 33+6.6 FO #3 & 33+56.6 FO #7 & 33+56.6 FO # & 33+56.6 FO #4 & 34+6.6 FO #8 & 34+6.6 FO # & 34+6.6 * MINI POWER CENTER B FIXTURE OUTLET TATION (FO) CIRCUIT I FOR LIGHTING FIXTURE AND CIRCUIT I FOR OUTLET RECEPTACLE. * MINI POWER CENTER B FIXTURE OUTLET TATION (FO) CIRCUIT I FOR LIGHTING FIXTURE AND CIRCUIT I FOR OUTLET RECEPTACLE. * MINI POWER CENTER B3 FIXTURE OUTLET TATION (FO) CIRCUIT I FOR LIGHTING FIXTURE AND CIRCUIT I FOR OUTLET RECEPTACLE. * CKT. TATION LUM. WATTAGE NOTE * CKT. TATION LUM. WATTAGE NOTE * CKT. TATION LUM. WATTAGE NOTE FO #3 & 3+56.6 FO #7 & 3+56.6 FO # & 3+56.6 FO #4 & 33+6.6 FO #8 & 33+6.6 FO # & 33+6.6 FO #5 & 33+56.6 FO #9 & 33+56.6 FO #3 & 33+56.6 FO #6 & 34+6.6 FO # & 34+6.6 FO #4 & 34+6.6 * MINI POWER CENTER B4 FIXTURE OUTLET TATION (FO) CIRCUIT I FOR LIGHTING FIXTURE AND CIRCUIT I FOR OUTLET RECEPTACLE. * MINI POWER CENTER B5 FIXTURE OUTLET TATION (FO) CIRCUIT I FOR LIGHTING FIXTURE AND CIRCUIT I FOR OUTLET RECEPTACLE. * MINI POWER CENTER B6 FIXTURE OUTLET TATION (FO) CIRCUIT I FOR LIGHTING FIXTURE AND CIRCUIT I FOR OUTLET RECEPTACLE. KELLY PARK RD. BRIDGE ITEM UNIT L3 TOTAL LIGHTING CONDUCTOR (F&I, ) 7,3 7,3 " CONDUIT (F&I IN BOX GIRDER) 95 95 3/4" CONDUIT (F&I IN BOX GIRDER) 95 95 MINI POWER CENTER ** 6 6 FIXTURE OUTLET TATION (FO) *** 4 4 ** INCLUDE THE COT AND INTALLATION OF THE 7.5 KVA MINI POWER CENTER, 48 CONTACTOR AND REMOVE WITCHE, 48 V DICONNECT WITCH, AND OTHER EQUIPMENT FOR A COMPLETE AND OPERATIONAL MAINTENANCE LIGHTING YTEM A PECIFIED IN THEE. *** INCLUDE THE COT AND INTALLATION OF THE CEILING MOUNTED LIGHT FIXTURE, WALL MOUNTED JUNCTION BOX, DUPLEX RECEPTACLE WITH OUTLET BOX, 3/4" PVC CHEDULE 8 CONDUIT CONNECTING THEE 3 ITEM, 3 # INULATED CONDUCTOR FOR ELECTRICAL CONNECTION TO THE MPC CIRCUIT CONDUCTOR IN THE JUNCTION BOX, AND ANY OTHER EQUIPMENT OR MATERIAL NECRY TO MAKE A COMPLETE AND OPERATIONAL FIXTURE OUTLET TATION (FO) A PECIFIED IN THEE. PAY ITEM 755: THI ITEM INCLUDE PAYMENT FOR ALL ITEM LITED IN TABULATION OF QUANTITIE ABOVE AND ANY INCIDENTAL NECRY FOR A COMPLETE AND ACCEPTED INTALLATION. REVIION AMBAR DIAZLOZANO, P.E. P.E. LICENE NUMBER 765 5 E. ROBINON T., UITE 3 ORLAND, FL 38 CERTIFICATE OF AUTHORIZATION 393 EXPREWAY AUTHORITY ROAD PROJECT R 49 493 MAINTENANCE LIGHTING DATA HEET L9 $UER$ $$ $TIME$ $FILE$

TYP. FO CONDUIT N 3/4" COND. REMOTE WITCHE (3 #) " COND. MPC CIRCUIT (3 #) 5 R 49 OUTHBOUND 589 59 59 59 3 3 3 33 34 35 36 37 R 49 NORTHBOUND BEGIN BRIDGE TA. 3+5.63 53 53 53 FO #7 FO # FO # FO #5 TYP. FO FO #9 FO #3 FO # FO #7 FO #6 FO #4 FO #8 FO # FO #3 FO #5 FO #9 FO #3 FO #6 FO # FO #4 FO #4 FO #8 FO # FO # FO # 45 46 47 48 49 KELLY PARK RD OHD CABLE 8 83 84 85 86 BEGIN BRIDGE TA. 34+.63 C C MPC DC CKT #B4 LOAD CENTER B R 49 (WEKIVA PKWY) " COND. TO 48V ERVICE PANEL DC MPC MINI POWER CENTER B: +/ TA. 34+3, 3' LT B: +/ TA. 34+3, 5' LT B3: +/ TA. 34+3, 7' LT WITH DICONNECT AND CONTACTOR. WITCH I PLACED ACCE HATCH MINI POWER CENTER B4: +/ TA. 34+3, 3' RT B5: +/ TA. 34+3, 5' RT B6: +/ TA. 34+3, 7' RT WITH DICONNECT AND CONTACTOR. WITCH I PLACED ACCE HATCH CONDUIT 3/4" COND. REMOTE WITCHE (3 #) " COND. MPC CIRCUIT (3 #) " COND. TO 48V ERVICE PANEL CKT #B4 LOAD CENTER B FO= FIXTURE OUTLET TATION. EE MAINTENANCE LIGHTING DATA HEET FOR TATION AND CIRCUIT. CH FO HA A RECEPTACLE AND A CEILING MOUNTED LIGHTING FIXTURE REVIION AMBAR DIAZLOZANO, P.E. P.E. LICENE NUMBER 765 5 E. ROBINON T., UITE 3 ORLAND, FL 38 CERTIFICATE OF AUTHORIZATION 393 EXPREWAY AUTHORITY ROAD PROJECT R 49 493 MAINTENANCE LIGHTING KELLY PARK RD. BRIDGE HEET L3 $UER$ $$ $TIME$ $FILE$

#6, B4 #6 (G) *ERVICE FEED FROM LOAD CENTER IN " CONDUIT AT END OF CKT DC C MPC #, B4 # (G) #, B4 # (G) CKT CKT ALL BOX GIRDER: #6 / #6 GROUND FROM LOAD CENTER TO MINI POWER CENTER. CEILING MOUNTED LIGHTING FIXTURE. MINI POWER CENTER FIXTURE OUTLET TATION (FO) CIRCUIT I FOR LIGHTING FIXTURE. CIRCUIT I FOR OUTLET RECEPTACLE.. UE " CONDUIT FOR 48V ERVICE FEED TO MPC'. V DUPLEX RECEPTACLE, GFI, NEMA CONFIGURATION 5R URFACE WALL MOUNTED IN NONMETALLIC OUTLET BOX, WATERPROOF BOX 3 3. UE 4" CONDUIT AND # CONDUCTOR FOR REMOTE WITCH CIRCUIT. 4. EXTEND CIRCUIT FOR WITCHE TO CH END OF THE BOX GIRDER TO PROVIDE CONNECTION TO THE WITCH AT THE ACCE HATCH LID. NOTE THERE ARE ADDITIONAL ACCE HATCH LID WITH WITCHE AT INTERMEDIATE POINT WITHIN THE BOX GIRDER. THEE WITCHE ARE IN ADDITION TO THOE HOWN ON THI HEET. 5. UE " CONDUIT AND # CONDUCTOR FOR ALL MPC CIRCUIT. 6. EE INDEX 4 FOR FURTHER INFORMATION. MPC C DC 7.5 KVA MINI POWER CENTER (MPC) 48V, /4V REMOTE WITCHE FOR 48V CONTACTOR WITH 6 HOUR REET TIMER 48V CONTACTOR WITH REMOTE WITCH CONTROL FOR MPC ACTIVATION 48V DICONNECT WITCH FOR POWER UPPLY TO MPC REVIION AMBAR DIAZLOZANO, P.E. P.E. LICENE NUMBER 765 5 E. ROBINON T., UITE 3 ORLAND, FL 38 CERTIFICATE OF AUTHORIZATION 393 EXPREWAY AUTHORITY ROAD PROJECT R 49 493 MAINTENANCE LIGHTING ELECTRICAL CHEMATIC HEET L3 $UER$ $$ $TIME$ $FILE$