Site Induction Document & Site Rules

Similar documents
Site Induction Document & Site Rules

Site Induction Document & Site Rules

Site Induction Document & Site Rules

Bitumen Delivery Driver Inductions Eurobitume UK

UCAS shell scheme event organiser risk assessment

B S Glass Ltd Safety procedures- outsourced Workplaces

Method Statement Author

UCAS event organiser risk assessment

Safety and Infrastructure

CONFERENCE16. UCISA16 Exhibitor Handbook. Wednesday 16 to Friday 18 March 2016 Manchester Central

NAPFM The Emergency Fleet Exhibition

higher education exhibition 2018 Wednesday 13 June 09:30 14:30

Visitor information pack

EXHIBITION Guide. Roles and Responsibilities OS11. A handbook for exhibitors and contractors

Visitor information pack

Dorset higher education exhibition Exhibitor manual. Bournemouth University Fern Barrow Poole BH12 5BB. Wednesday 28 March :30 15:00

Visitor information pack

Contractor / Exhibitor Handbook

In this letter you will find your show build-up instructions and some other reminders. Also enclosed in this pack are:

Engine Shed & Lincoln Performing Arts Centre University of Lincoln Lincoln LN6 7TS

Safety, health and environment values that are expected of all persons who are working and visiting the Quattro Ports Port Kembla Grain Terminal,

Birmingham higher education exhibition Exhibitor manual. NEC Birmingham B40 1NT. Monday 25 June 09:30 15:00 Tuesday 26 June 09:30 15:00

SAFETY INDUCTION. Intro

CONSTRUCTSAFE TIER 1 HEALTH AND SAFETY COMPETENCY TEST FRAMEWORK

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading

South London higher education exhibition Exhibitor manual. Goldsmiths, University of London New Cross London SE14 6NW

Visitor information pack

HEALTH & SAFETY HANDBOOK. Venues/HSE/08/16

Exhibitor manual. University of Essex higher education exhibition Wednesday 20 June 09:30 14:30 Thursday 21 June 09:30 13:00

Contractor handbook. Purpose

Visitor information pack

Contractor/Visitor Safety Orientation UNBC

Bogo Operations Pollution Incident Response Management Plan

Visitor information pack

KIERNAN ELECTRICAL SITE INDUCTION. Site Supervisors: Chris Lettice

Visitor information pack

How to plan an event. Step 1: First things first. Step 2: How to make it all happen?

Contractor Control Procedures. Contractor Control Procedures. Working Together. November Borders College 24/11/2014.

(Health, Safety, and Welfare)

WHS CONTRACTOR INFORMATION PACKAGE

You must NOT touch any equipment unless you are authorised to work on or with that equipment and you have followed correct safety procedures.

A guide for contractors working on site

Cornwall higher education exhibition Exhibitor manual. Penryn Campus, Treliever Road Penryn, Cornwall, TR10 9FE. Tuesday 1st May 09:30 15:30

Safety Guidelines. National health and safety guidelines as well as worker safety act shall be considered

Code of Practice and Instructions to Contractors Working for Viridor

Health, Safety and Environment Induction. Section 1: Introduction. Section 1: Introduction. Aims & Objectives of the induction MGJV

2.0 Management Systems and Documentation

Safety Risk Assessment Driving Grey Fleet Vehicles

Visitor information pack

Contractor Code of Conduct

Unit Title: Health and Safety in a Construction Environment

Safety Guidelines. National health and safety guidelines as well as worker safety act shall be considered

IMMANUEL CHURCH, CHICHESTER HEALTH AND SAFETY POLICY

SAFETY INDUCTION. Intro

Method Statement. Method Statement Details. Signatures. Emergency Contact Details 1/5

Working at Height - MEWPS & Ladders. Your company details Address Tel: Fax: Mobile:

COGPOLY39 Meet safety, health and environmental requirements in the workplace

Visitor information pack

COREWEST DIAMOND DRILLING LTD. * ENVIROMENT, HEALTH AND SAFETY PROGRAM* APPENDIX A GENERAL WORKSAFE PRACTICES

1. What is the top priority when working on Canadian Pacific (CP) property? 2. When working on CP property what must all Contractors comply with?

Exhibitor Information Pack CONTENTS

Company Policy Health & safety for work performed at Customer premises

1.1 OHS Policy and Responsibilities

Airside Safety Airside Operational Instruction 07

TRANSPORTATION POLICY

Minimum Safety Requirements for Contractors Working on Railway Property

Safety, Health & Environment Contractor Induction. IT Contractor

Glastonbury Festival Health and Safety Policy

DEPARTMENT OF THEATRE AND DANCE CALIFORNIA STATE UNIVERSITY, FULLERTON

SWMS No 012 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 6

THE SKILLS SHOW Visitor Risk Assessment

Brunel University London Indoor Athletics Centre (IAC) Kingston Lane Uxbridge, UB8 3PH

Extreme Adventure Ltd 1.10 Safe Work Method Statement

Health & Safety Contractor rules

Harbour Town Gold Coast Site Induction

Our commitment to safety

Exhibitor manual. West Wales higher education exhibition University of Wales Trinity Saint David Carmarthen Campus Carmarthen SA31 3EP

SAFETY, HEALTH AND ENVIRONMENTAL POLICY AND MANAGEMENT SYSTEM

Exhibitor manual. Lincolnshire higher education exhibition Engine Shed and Lincoln Performing Arts Centre University of Lincoln

Health and Safety Program Inspections

Singapore Turf Club s In-House Rules and Regulations (for the Contactor)

Company Health and Safety Policy

EMPLOYEE SAFETY ORIENTATION - PHYSICAL PLANT, RESIDENCE

Working safely in an engineering environment

CONTRACTOR SAFETY RULES

TRANSPORTATION POLICY

DCHS Health and Safety Handbook

Safety, Health & Environment Contractor Induction

Eikon Exhibition Centre Sprucefield Halftown Road Lisburn BT27 5RF

SAFE WORK METHOD STATEMENT SWMS No Version

SCOUTS AUSTRALIA NSW

Exhibitor manual. Cambridge higher education exhibition Wednesday 20 June :30 14:30

Safe Work Procedure for installation of external cladding

Health, Safety & Environmental Policy

The Marlie Farm Explosion

APPENDIX A: Risk Assessment for all activities at Farm

Exhibitor manual. West and North Yorkshire higher education exhibition Leeds Beckett University Sports Arena Headingley Campus Leeds LS6 3QQ

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY ATTACHMENT M SAFETY PROVISIONS GOODS AND SERVICES CONTRACTS

SEMBIT SQA Unit Code F9JC 04 Complying with statutory regulations and organisational safety requirements

Health, Safety & Environmental Policy. Rotec Hydraulics Ltd

Transcription:

Site Induction Document & Site Rules Event Name Diabetes Professional Conference 2019 Venue ACC Liverpool, Arena & Hall 2 Build & Breakdown Times Prepared By Build; Mon 4 th March: 09:00 22:00 (space only sites) Tues 5 th March: 08:00 22:00 (space only sites) 14:00 22:00 (shell scheme sites) **Please note full CDM regulations will be in place throughout build** Breakdown; Fri 8 th March: 14:00 14:30 (shell scheme sites only) 14:30 22:00 (space only access) Ryan Daly, Operations Manager, Exhibition Services Ltd. Date 20/11/2018 **PLEASE READ & COMPLETE THIS DOCUMENT PRIOR TO ARRIVING ON SITE** *Please note, the below floorplan is accurate as of 20/11/2018, and is subject to change.

General Site Information Access into Halls & Wristbands Whilst CDM regulations are enforced Wristbands & High Vis Vests must be worn to gain entry to the Exhibition halls. Wristbands will be available to all who have read and signed this document. If you have not returned the correct documentation prior to arrival on site, you will need to complete the site induction before gaining access to the Exhibition halls. Accident reporting Please report all accidents & near misses to the Event Organising team; the Event H&S manager will then be able to ensure correct procedures are followed. Welfare Arrangements There are no catering outlets available in the venue during build & breakdown periods. There are however, many catering outlets in the surrounding area. Drinking water is available at the many water fountains located at the venue. Toilets Both male and female toilets are available throughout the venue. Smoking & E- Cigarettes ACC Liverpool is a non-smoking venue; designated smoking areas can be found outside of the building. Organisers Office The organisers office can be found in the backstage rooms at the rear of the arena. Personal Protective Equipment (PPE) High visibility clothing and safe sensible footwear must be worn at all times whilst in the loading bay or Exhibition halls during the build-up and breakdown of the conference. All personnel must adhere to any safety signage displayed at ACC Liverpool. Please note, PPE is not available to purchase on site. Please ensure your team is made aware of this and bring a sufficient stock with them.

Waste All waste materials produced from build-up and breakdown must be removed from site. Anyone leaving waste materials at the venue will be charged for its removal. This includes carpets, graphics, vinyl s, literature etc. Traffic Drivers must follow the instructions of the venues traffic marshals at all times when they are driving in the loading bay or exhibition halls. Drivers must adhere to all signage within the loading bay or exhibition halls. Drivers must give way to pedestrians within the exhibition halls. Pedestrians must use the protected walkways at all times within the loading bay. Pedestrians must give way to vehicles within the loading bay. The speed limit within the loading bay & exhibition halls is 5mph. High vis vests must be worn at all times in the loading bay & exhibition halls. Emergency Procedures Evacuation In the event that the building needs to be evacuated the following announcement is broadcast over the Public Address System: Attention please Attention please! We have an emergency within the building. Please leave by the nearest available exit! Do not use the lifts! In the event of an evacuation of ACC Liverpool, all delegates, exhibitors and the event organiser s staff are requested to muster on the piazza outside the restaurant near Jury s Inn (please see plan at the end of this document). No one is to return to the building, and should remain at the muster point until further information or official announcements have been made by ACC Liverpool. Fire Safety ACC Liverpool has a comprehensive fire alarm system and firefighting equipment. Should an emergency arise you should immediately contact any member of the ACC Liverpool team on 0151 703 7299, informing them of the nature and location of the fire. Please see Evacuation procedures for further information. First Aid Should first aid assistance be required, please contact a member of the ACC Liverpool team. The two first aid rooms are located on the Arena side of the building and ACC employees will be able to escort you to these rooms. Alternatively, first aid assistance can be called to your location in the building. In an emergency contact security control on 0151 703 7299.

SITE RULES Whilst working at the Diabetes UK Professional Conference 2019, it is important that you are aware of the safety rules, procedures and arrangements that are in place for your safety and that of your colleagues. All of your employees and contractors are required to read these Site Rules prior to working at The Diabetes UK Professional Conference 2019 the following apply to all staff, organisers, contractors and exhibitors: You must Comply with Venue Traffic Rules and follow the instruction of venue traffic marshals at all times Any Vehicle access into the halls has to be approved by the Venue/Organisers of the event in advance Any vehicle or plant driven within the exhibition halls & loading bay must adhere to the 5MPH speed limit and operate with hazards/lights turned on. Drivers must give way to pedestrians within the exhibition halls and pedestrians must give way to vehicles within the loading bay No persons are permitted to operate plant or machinery (including fork lift trucks) unless they have received adequate training Appropriate management and safe methods of working at height is required at all times in any areas where working at height is being carried out, the immediate area must be controlled and hard hats worn if appropriate Ladder work must only be conducted for short work periods - you must NOT stand on the top two tiers of your ladders -any unsafe ladder work may result in the employee being ejected from the venue. Ladders MUST be off an industrial type No hazardous or toxic substances are to be used in the hall which have not been pre-agreed by the venue and event organiser Contractor wristbands must be worn at all times during build and breakdown Any person suspected to be under the influence of drugs or alcohol will be ejected from the venue Hi Vis Jackets must be worn at all times when working in the venue s loading bay & exhibition halls. Appropriate footwear should be worn whilst working in the venue flip-flops, open-toed sandals, etc. are NOT acceptable No hot works can take place in the venue without a Hot Works Permit being issued All contractor accidents, incidents & near misses must be reported immediately to the organiser and venue staff Work Tidy - during build and breakdown, you must ensure aisles are kept clear at all times and there is no undue obstruction to fire evacuation routes. All waste is to be disposed of in an appropriate manner & is The Exhibitor/Contractors responsibility. THE ABOVE RULES MUST BE ADHERED TO IN ADDITION TO THE RULES SET OUT IN THE AEV E-GUIDE. www.aev.org.uk/e-guide

SITE INDUCTION DECLARATION CDM (Construction, Design, Management) 2015 Regulations are enforced in the exhibition and events sector (with effect from the 6th April 2015). A requirement of CDM is that in order to gain access to the site during build up and breakdown periods, all persons must have completed a Site Induction prior to their arrival. To comply with this requirement, you should read the Site Induction document and distribute this to all persons who will be attending site during these periods. Please complete the form below, by checking the box relevant to your organisation, as confirmation that you have read the Site Induction Document and understand your requirements under the regulations. TO BE COMPLETED BY ALL EXHIBITIORS & CONTRACTORS 1. Exhibitor: We have received a copy of the Site Induction document and confirm that all company representatives who will be working on-site during the build-up and breakdown periods will read this information prior to their arrival on-site 2. Stand Contractor: We have received a copy of the Site Induction document and confirm that all contractors, sub-contractors and workers who will be working on-site during the build-up and breakdown periods will read this information prior to their arrival onsite Company Name: Stand Number: On-site Contact Name: Contact Telephone No: Our out of hours number is: Please return to: events@exhibitionservices.com