Fleur Drive Reconstruction

Similar documents
Water Street Promenade Engineering and Design Services

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

Appendix 3 Roadway and Bike/Ped Design Standards

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

GWINNETT COUNTY DEPARTMENT OF TRANSPORTATION

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Active Transportation Facility Glossary

Roadway Classification Design Standards and Policies. Pueblo, Colorado November, 2004

Progress Report on the Design and Planning of an Infrastructure Improvement Project for the Sunnyside TIF District (Phase II)

122 Avenue: 107 Street to Fort Road

Multimodal Design Guidance. October 23, 2018 ITE Fall Meeting

Making Great Urban Streets Confessions of a Highway Engineer. Timothy R. Neuman.. P.E. Chief Highway Engineer CH2M HILL

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study

Multimodal Through Corridors and Placemaking Corridors

TRASBURG RANSPORTATION

Lawrence Avenue Streetscape Concepts August 30, 2011

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

5. RUNNINGWAY GUIDELINES

Route 47 (North Main Street) Reconstruction

Safety Impacts: Presentation Overview

Geometric Design Tables

Hennepin Avenue Reconstruction Washington Avenue to 12 th Street

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT

SD Highway 50 in Yankton (4 TH Street) Reconstruction Project NH 0050(99)381 PCN By Josh Larson McLaury Engineering Inc.

Application of a Complete Street

North Avenue Corridor Study

C C C

forwarddallas! Implementation Proposed Chapter 43 Code Amendment On-Street Parking

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

Project Description Form 8EE

Figure 1: Vicinity Map of the Study Area

Washington St. Corridor Study

On Road Bikeways Part 1: Bicycle Lane Design

Report. Typical Sections. City of Middleton, WI

DISTRICT BICYCLE PROGRAM

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

RIVERSIDE DRIVE: 21st to 41st

Section 3A.04 Colors. Section 3B.10 Approach Markings for Obstructions

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

Project Overview. Rolling Road Widening Fairfax County. Get Involved. Design Public Hearing. Contact Information

This Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans.

City of Seattle Edward B. Murray, Mayor

Downey Road. Transportation Improvement Study

Access Location, Spacing, Turn Lanes, and Medians

South Carolina Department of Transportation. Engineering Directive

Everyone is a Pedestrian

CONTEXT SENSITIVE STREETS STANDARDS COMMITTEE

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

City of Margate, Florida. Neighborhood Traffic Management Manual

Balancing Operation & Safety for Motorized and Non-Motorized Traffic

Board of Supervisors February 27, 2017

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

Information on display. Inside this handout. Triangle Area revisions. Project need displays. Preferred alternative on aerial maps

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications

Design Criteria. Design Criteria

5 CIRCULATION AND STREET DESIGN

DOT Policy and Procedure Integrity Excellence Respect

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

Glenn Avenue Corridor Traffic Operational Evaluation

NJDOT Complete Streets Checklist

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

Driveway Design Criteria

2.0 LANE WIDTHS GUIDELINE

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Mandan Commission Meeting August 2, 2016 Mandan City Hall

BLOSSOM AT PICKENS SIGNALIZED INTERSECTION IMPROVEMENT STUDY

College Street Improvements Final Report

Road Diets FDOT Process

Albany Shaker Road Corridor Study Public Meeting # 2

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.

ROUNDABOUTS/TRAFFIC CIRCLES

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Donahue Drive Corridor Traffic Operational Evaluation

Montgomery County Life Sciences Center Loop Trail

City of Saline. Complete Streets Ordinance

On-Street Bicycle Facilities

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

Financial Project ID No(s).: and ETDM No(s).: and 14181

Pavement Rehabilitation & Buffered Bike Lane

PROJECT OBJECTIVES. Improve vehicle capacity for the intersection. Improve pedestrian and bicycle access

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

Complete Streets. Designing Streets for Everyone. Sarnia

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

INDOT Complete Streets Guideline & Policy

Water Street Promenade. Engineering and Design Services. Public Information Meeting No. 2. Education / Infrastructure / Innovation. Maplewood Avenue &

Tonight is an opportunity to learn about the Study and ask questions of the Study Team members.

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS

Access Management in the Vicinity of Intersections

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

WELCOME Public Information Centre

Frequently Asked Questions

Roadway Design Manual

Transcription:

Fleur Drive Reconstruction October 29, 2018 1

Agenda: Fleur Drive Reconstruction Project Scope & Cost Overview Fleur Drive Cross Section Elements - Travel Lane Widths - Sidewalk Widths - Parkway Widths - Review Sample Cross Sections Project Schedule 2

Scope of Project: Complete Reconstruction of Pavement with new Hot-Mix Asphalt Pavement (Full depth removal of pavement and constructing 9 Hot-Mix Asphalt over 12 Granular Base) New Curb and Gutter for Outside Lanes; Medians will Remain Water Main Replacement in Northbound Lanes (Phase 1) Installation of Sidewalks 3

Proposed Sidewalk Red = Phase 1 (NB) Blue = Phase 2 (SB) Yellow = Acquisition for Future Sidewalk 4

Estimated Construction Costs Phase 1 - northbound lanes, Bell Avenue to Watrous Avenue $4.2 Million (w/out Water Main) Phase 2 southbound lanes, Bell Avenue to Watrous Avenue $4 Million Phase 3 Watrous Avenue to McKinley Avenue $4 Million 5

Reasons for proposed 11 travel lane widths: 11 lane-widths meet the Statewide Urban Design and Specifications (SUDAS) Acceptable criteria for single-lane widths along urban arterials. The lane-width reduction along the NB lanes provides additional space to construct sidewalks. Without the lanewidth reduction, new sidewalks would impact numerous trees and require additional right-of-way adjacent to the project. AASHTO s A Policy on the Geometric Design of Highways and Streets (6 th Edition), states that 10 ft lanes should generally be used on roadways that have little or no truck traffic, and recommends 11 ft lanes for urban Arterials and 12 ft lanes for higher speed (over 45 mph), free-flowing principal Arterials. 6

Reasons for proposed 11 travel lane widths (continued): Use of National Association of City Transportation Officials (NACTO) guidelines has recently been encouraged to make City streets more walkable and pedestrian-friendly. NACTO indicates the following: o o Lanes greater than 11 feet should not be used as they may cause unintended speeding and assume valuable right of way at the expense of other modes. Travel lane widths of 10 feet generally provide adequate safety in urban settings while discouraging speeding. Cities may choose to use 11-foot lanes on designated truck and bus routes (one 11-foot lane per direction) or adjacent to lanes in the opposing direction. 7

Reasons for proposed 11 travel lane widths (continued): Don t correlate between lane widths and traffic volumes, increased Lane Widths don t necessarily provide increased roadway capacity for urban environments. o Measured saturation traffic flow rates have been shown to be similar for lane widths between 10 feet and 12 feet (National Association of City Transportation Officials and Florida DOT study) o So long as all other geometric and traffic signalization conditions remain constant, there is no measurable decrease in urban street capacity when through lane widths are narrowed from 12 feet to 10 feet. 8

Reasons for proposed 5 wide sidewalks: The minimum width of the pedestrian access route is 4 feet. 5 foot sidewalks are encouraged and may be required by Jurisdiction (Iowa DOT will design 5 foot sidewalks). When the clear width of the pedestrian access route is less than 5 feet, passing spaces (5 x 5 minimum) are required at maximum intervals of 200 feet. Typically, a five foot wide sidewalk supports two people walking side by side or two wheel chairs passing each other. City s recent and current practice is to build 5 sidewalks and require site developments to build 5 sidewalks. 9

Reasons for proposed 5 wide sidewalks: SUDAS identifies three classes of sidewalks. Class A sidewalks are typical in downtown. Class B and C sidewalks provide a grass strip between the back of curb and the sidewalk, often referred to as the parking or parkway. 10

Reasons for proposed 4 minimum parkway: The preferred minimum width of the parkway (sometimes called parking ) is 5 feet, however, there is no written standard for parkways in SUDAS, so 4 has been proposed in conjunction with the 18 curb and gutter as a buffer between the sidewalk and travel lane. A pedestrian s safety and comfort in the roadway environment is largely dependent on the width of the buffer/parkway between the sidewalk and roadway. The width provides: Buffer zone between motorists and pedestrians. Improved site distance at driveways. Adequate width for landscaping and utilities. 11

Reasons for proposed 4 minimum parkway (continued): E University Avenue (east of E 22 nd Street, north parkway) 12

Reasons for proposed 4 minimum parkway (continued): E University Avenue (east of E 22 nd Street, south parkway) 13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

Current Schedule 2019 northbound lanes, Bell Avenue to Watrous Avenue 2020 southbound lanes, Bell Avenue to Watrous Avenue 2021 Watrous Avenue to McKinley Avenue Google Street View Photo Fleur Drive along Wakonda Country Club looking north (Aug 2017) 29

Current ROW Status 2019 northbound lanes, Bell Avenue to Watrous Avenue 14 Total Number of Parcels Needing Some Acquisition 2 Number of Parcels Signed Agreements for Acquisition 9 Number of Parcels Verbally Accepted Acquisition 3 Number of Parcels Still in Negotiation 30

Current Schedule 2019 northbound lanes, Bell Avenue to Watrous Avenue December 26, 2018 January 14, 2019 January 29, 2019 February 11, 2019 Spring 2019 Spring 2020 Contracts Due Council Order Construction Bid Date Hearing Date (Award) Start Construction - Targeted Completion 2020 southbound lanes, Bell Avenue to Watrous Avenue 2021 Watrous Avenue to McKinley Avenue 31

32