páöåáåö=äéåçë= qê~ññáå=ëáöåáåö

Similar documents
Basic Road Safety Knowledge

NETWORK SAFETY MANAGEMENT FROM CASE STUDY TO APPLICATION

DUNBOW ROAD FUNCTIONAL PLANNING

SH1, Karo Drive Wellington Crash Reduction Study

PAEKĀKĀRIKI HILL ROAD / BEACH ROAD / SH1 INTERSECTION PROGRESS REPORT

1.3.4 CHARACTERISTICS OF CLASSIFICATIONS

Proposal for amendments to Regulation No. 79 to include ACSF > 10 km/h

TRAFFIC SIGNALS AND SIGNALISED ROUNDABOUTS

Technical Guide p~ñéíó=~í=äéîéä=åêçëëáåöë== Case of proximity to a roundabout. pééíéãäéê=omms q ê~åëä~íé=^ìöìëí=ommt

Capacity of transport infrastructure networks

Copy of my report. Why am I giving this talk. Overview. State highway network

RIGHT-OF-WAY INTERSECTIONS

IMPLEMENTATION PROCESS OF DIRECTIVE 2008/96/EC IN SLOVENIA

NMT SAFE STUDY APPROACH

TABLE OF CONTENTS LIST OF FIGURES. Figure Title

ROUNDABOUTS IN AUSTRALIA Views of Australian Professionals

Road safety on motorways

ROUNDABOUT CAPACITY: THE UK EMPIRICAL METHODOLOGY

Highway Safety Workforce Development Committee

Interim Report on the Development of Road Safety Infrastructure Facility Design Standard for the Asian Highway Network

Reporting on progress made since 2009 on the attainment of the Amsterdam Goals

Figure 1: Graphical definitions of superelevation in terms for a two lane roadway.

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design

Proposed: Temporary Traffic Management Design Guidance

Appendix 5B Accessway standards and guidelines Appendix 5B Accessway standards and guidelines

DESIGN BULLETIN #66/2010

Planning and Design of Proposed ByPass Road connecting Kalawad Road to Gondal Road, Rajkot - Using Autodesk Civil 3D Software.

Local Highway Panels Members Guide. 5 Crossing Facilities

Our Approach to Managing Level Crossing Safety Our Policy

Average speed is calculated by taking the total distance travelled and dividing it by the total time:

Accident Causation Analysis and the Evaluation of the Safety Benefits of Technologies: The TRACE Project

SECTION 12 ROAD MARKINGS AND DELINEATION

FORM A PASCO COUNTY ACCESS CONNECTION PERMIT APPLICATION

Exemplary Conditional Automation (Level 3) Use Case Description Submitted by the Experts of OICA as input to the IWG ITS/AD

Introduction. You may find detailed information about the network from the EuroVelo website: Page 1/5

To position power poles a safe distance from the road to minimise the likelihood of being accidentally hit by vehicles.

UPDATE AND IMPROVEMENT OF THE TRAFFIC ACCIDENT DATA COLLECTION PROCEDURES IN SPAIN. THE METRAS METHOD OF SEQUENCING ACCIDENT EVENTS

TRIM Queue, Vejle N Denmark. Evaluation report

Risk Assessment on Danube Area Roads: RADAR project

Keywords: Highway Intersection, Intersection Accidents, Crash Type, Crash Contributing, Statistical Analysis, Design Factors

Frascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation

Journée d étude consacrée à la sécurité routière des deux roues. European Commission's view of cycling safety. Casto López Benítez

Management of Multi-Lane Highways in Jordan (Case Study)

Road safety in Greece Ministry of Infrastructure, Transport and Networks Dr Evi Blana Secretariat of Bi-ministerial Committee of Road Safety

Questionnaire for reporting on progress made since 2009 on the attainment of the Amsterdam Goals

City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines

Reduction of Speed Limit at Approaches to Railway Level Crossings in WA. Main Roads WA. Presenter - Brian Kidd

INTERIM ADVICE NOTE 93/07 DRIVER LOCATION SIGNS INTERIM PERFORMANCE SPECIFICATION

HUMAN (DRIVER) ERRORS

1 VicRoads Access Management Policies May 2006 Ver VicRoads Access Management Policies May 2006 Version 1.02

INTERSECTIONS AT GRADE INTERSECTIONS

Geometric Design Tables

Title of the proposed project Development of a Toolbox for Evaluation and Identification of Urban Road Safety Improvement Measures

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION

BUILDING CHINARAP. Zhang Tiejun Research Institute of Highway (RIOH) Beijing, China

MEMORANDUM TERESA MCCLISH, COMMUNITY DEVELOPMENT DIRECTOR SUBJECT: CONSIDERATION OF RESTRICTING PARKING ADJACENT TO 170 AND 171 BRISCO ROAD

SIDRA INTERSECTION 6.1 UPDATE HISTORY

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21

Safer Verges and the Strategic Road Network

Scaling up of ADAS Traffic Impacts to German Cities

NRA New Divided Road Types: Type 2 and Type 3 Dual-carriageways

RIGHT TURNS AT INTERSECTIONS: ARE THERE ALTERNATIVES?

10 SHERFORD Town Code

3-13 UFC - GENERAL PROVISIONS AND GEOMETRIC DESIGN FOR ROADS, STREETS, WALKS, AND OPEN

Government Accelerators

Grover 1 EMERGENCY LANE KEEPING (ELK) SYSTEM TEST DEVELOPMENT. Colin, Grover Matthew, Avery Thatcham Research UK. Paper Number ABSTRACT

Bicycle climate test. Benchmarking. supported by

Supplementary Appendix to ARTC Track & Civil Code of Practice. Establishing Minimum Protective Measures at Level Crossings ETF-16-01

EUROPEAN MOBILITY WEEK September 2015

PLACEMENT OF SIGNS RECOMMENDED PRACTICES SUB-SECTION

Using Computer Modelling to Identify Road Safety Risks Vecovski, P. 1, Mak, J. 1, Brisbane, G. 1

NRA New Divided Road Types: Type 2 and Type 3 Dual - Carriageways

i Experience and what can Finland learn ETSC Road Safety PIN Talk in Estonia Veli-Pekka Kallberg VTT Technical Research Centre of Finland

Application of Dijkstra s Algorithm in the Evacuation System Utilizing Exit Signs

Traffic Calming Rosemount Avenue, between Ralph Street and Queenslea Avenue

Effects of Geometry on Speed Flow Relationships for Two Lane Single Carriageway Roads Othman CHE PUAN 1,* and Nur Syahriza MUHAMAD NOR 2

Lincolnshire JSNA: Road Traffic Accidents

Introduction Methodology Study area and data collection Results and recommendation Conclusion References

Traffic Calming St. Clarens Avenue between Brandon Avenue and Davenport Road

MICROSCOPIC ROAD SAFETY COMPARISON BETWEEN CANADIAN AND SWEDISH ROUNDABOUT DRIVER BEHAVIOUR

Road safety and bicycle usage impacts of unbundling vehicular and cycle traffic in Dutch urban networks

Enabling Automation-Ready Transport Planning

SECTION 12 ROAD MARKINGS AND DELINEATION

Tools for safety management Effectiveness of risk mitigation measures. Bernhard KOHL

Sight Distance. The availability of sufficient sight distance for the driver to see ahead is critical to the design of a safe highway.

How to fight wrong way driving accidents

M9/A90/M90 Edinburgh to Fraserburgh Trunk Road. A90 Tealing. Moving Cursor Programme Junction Study

The key to achievement of a sustainable, safe traffic system lies in the systematic and consistent application of safety principles.

The Ambition Hockey 2024 Project An ambitious outlook to be shared with all of the stakeholders of French hockey

The Value of Technical Peer Reviews

Introduction to Roadway Design

Road to the future What road users want from Highways England s Route Strategies Summary report November 2016

Determining Minimum Sightlines at Grade Crossings: A Guide for Road Authorities and Railway Companies

Tallinn Region Sustainable Urban Mobility Plan 2035

Operational Ranking of Intersections: A Novel Prioritization Methodology

Progress with the Road Investment Strategy

RE: Pedestrian crossing Stanley/Ballarat St

Road Traffic Management Procedures In China

National States, Regions and Local Governments: Association and Competition How can safety be taken into account in such complexity?

6. BREENS/GARDINERS/HAREWOOD INTERSECTION - SAFETY IMPROVEMENT PROJECT

Transcription:

gìäó=ommo q ê~åëä~íé=gìåé=ommv Practical guide páöåáåö=äéåçë= qê~ññáå=ëáöåáåö

Technical Department of the Ministry of Ecology, Energy Sustainable Development and the Sea, Sétra, is an engineering and expertise reference in the fields of transport, road infrastructure and engineering structures. The Sétra supports the public owner The Sétra supplies State agencies and local communities (counties, large cities and urban communities) with informations, methodologies and tools suited to the specificities of the networks in order to: improve the projects quality; help with the asset management; define, apply and evaluate the public policies; guarantee the coherence of the road network and state of the art; put forward the public interests, in particular within the framework of European standardization; bring an expertise on complex projects. The Sétra, producer of the state of the art Within a very large scale, beyond the road and engineering structures, in the field of transport, intermodality, sustainable development, the Sétra: takes into account the needs of project owners and prime contractors, managers and operators; fosters the exchanges of experience; evaluates technical progress and the scientific results; develops knowledge and good practices through technical guides, softwares; contributes to the training and information of the technical community. The Sétra, a work in partnership The Sétra associates all the players of the French road community to its action: operational services; research organizations; Scientific and Technical Network (Réseau Scientifique et Technique de l'équipement RST), in particular the Public Works Regional Engineering Offices (Centres d'études Techniques de l'équipement CETE), companies and professional organizations; motorway concessionary operators; other organizations such as French Rail Network Company (Réseau Ferré de France RFF) and French Waterways Network (Voies Navigables de France - VNF); Departments like the department for Ecology and Sustainable Development The Sétra regularly exchanges its experience and projects with its foreign counterparts, through bilateral cooperations, presentations in conferences and congresses, by welcoming delegations, through missions and expertises in other countries. It takes part in the European standardization commissions and many authorities and international working groups. The Sétra is an organization for technical approval, as an EOTA member (European Organisation for Technical Approvals).

Practical guide páöåáåö=äéåçë== qê~ññáå=ëáöåáåö This document is the translation of the work "Comment signaler les virages" published in July 2002 under the reference E0225

The following people have contributed to the preparation of this guide: CETE Normandie Centre (Regional Public Works Engineering Agency Normandie-Centre) Guy Dupré Olivier Floris Conseil Général de Seine-Maritime (Seine-MaritimeGeneral Council) / Direction Départementale des Infrastructures (DDI) (Local Infrastructures Department) Patrick CHAUVIN Jean-Luc CLERET DDE de Seine-Maritime CDES (Seine-Maritime Local Public Works Department Road safety division) Guénaëlle BERNARD Sétra - Direction d études sécurité routière (Road safety study department) Françoise PIERIBATTESTI DSCR R1 (Directorate for Road Traffic and Safety) Bernard MOUQUOT Acknowledgements Conseil Général de Seine-Maritime DDI whichkindly allowed us to reproduce large sections of their booklet [3]. Eric Rillardon (Sétra): Graphic design. 4 June 2009

Contents 1 - Bends: A significant stake... 7 2 - Proposed method to be applied in each direction of route... 8 3 - Scope... 9 4 - Data collection... 9 5 - Automatic calculation of the speed difference... 10 6 - Determining the classification... 11 7 - Site visit report form... 12 8 - Legibility of the bend... 13 9 - Visibility approaching the bend... 14 10 - Visibility in the bend... 15 11 - Radius of curvature... 16 12 - Classification rules... 17 13 - Hints and tips... 18 14 - References... 18 5 June 2009

Introduction This practical guide is based on the report entitled Méthode de sélection des virages à signaler et niveau de signalisation à implanter (Method for selecting bends to be signed and type of signing to be installed) published in May 2000 [1]. It is intended as a guide to the implementation of the method described in the report by agencies responsible for the installation of road signing. The practical aspects of this guide are based on our initial experiments. These show that, in order to apply the method correctly, it is necessary to have a general understanding of road signing and the criteria used to assess the safety of a particular site. These include: Legibility. Visibility. The factors contributing to accidents on bends. A training module has been organised to coincide with the publication of this guide. This training is strongly recommended. A software package is included with this guide to format the necessary data and calculate the speed differences. L'instruction interministérielle de la signalisation routière (The inter-ministerial enquiry on road signing) [2] now takes account of the hierarchical structure used to determine the signing of bends (see the Decree dated 8 April 2002 modifying the conditions applying to the installation of road signing - NOR EQUS 0200683A). The method described improves signing, ensures that it is applied consistently in all areas, and supports efforts currently underway to fight against the inflation of unnecessary road signs. 6 June 2009

2 - Bends: A significant stake Forty percent of all fatal accidents on rural roads occur on bends. The following factors contribute to accidents on bends: The difference between the speed of approach and the speed in the bend. A progressively reducing radius of curvature. The legibility of the bend. The visibility of the bend. The length of the bend. 7 June 2009

3 - Proposed method to be applied in each direction of route Collection of basic data. Automated calculation of the speed of approach and the speed in the bend. The difference between these two speeds is used to : Select which bends to sign. Start and end kilometre mark Radius Alignment Gradient Determine the theoretical signing to be installed. Identify those bends lying close to the boundary between two classes. Site visit to confirm or correct the results given by the model. Additional visit at night If required. Application of the classification upgrading and downgrading rules according to criteria of: Legibility. Visibility approaching the bend. Visibility in the bend. Reducing radius of curvature. Compatibility with the previous bend. Length of the bend. Accident of the bend. Calculation of speed differences Theoretical signing level Site survey Legibility Visibility Reducing radius of curvature Length of bend Number of accidents Confirmation or modification of the theoretical signing level 8 June 2009

4 - Scope This method may be applied to the following: An entire road section rather than a single bend (route approach). Major roads. Two-way two-lane roads, with or without overtaking gaps. Slip roads and dual carriageway roads are excluded. 5 - Data collection Create an EXCEL database containing the following: Start and end kilometre marks. Radius of curvature of the bend, taking the minimum radius over a distance of 10 metres. Length of all straight sections. Gradient approaching the bend (in %), negative for a descent and positive for an ascent. This data does not have a great effect on the result of the calculation. If the gradient is unknown, assume it is zero. This data may be taken from VISAGE 1 if it can be guaranteed to be reliable. The use of heavy duty measuring equipment is recommended. 1 Computer aided road management software package 9 June 2009

6 - Automatic calculation of the speed difference Calculating the speed in the bend where: V d = 102 / (1+346 / R 1.5 ) V d is the speed in the bend in km/h (maximum speed attained by 85 % of drivers under freely flowing traffic conditions). R is the radius of curvature of the bend. Calculating the approach speed where: V a = [V d-1 2 + 2 x (0,8 - g x Pe / 100) x (min [Aldroit, Distagglo] - 75)] 1/2 V a is the approach speed in m/s. V d-1 is the speed in the previous bend in m/s. g is the acceleration due to gravity equal to 9.8 m/s 2. Pe is the gradient approaching the bend, negative for a descent and positive for an ascent (in m). min is the minimum of the two values. Aldroit is the length of the approaching straight section in metres. If Aldroit or Distagglo 75 m, then (min [Aldroit, Distagglo] 75) = 0, i.e. V a = V d-1. Distagglo is the distance back to the nearest built-up area prior to the bend in metres. The approach speed is estimated from the calculated speed in the previous bend with an acceleration of 0.8 m/s 2 in the straight section of up to 75 metres prior to the bend. To convert m/s to km/h, multiply by 3.6. To convert km/h to m/s, divide by 3.6. The approach speed (V d ) and the speed in the bend (V a ) are limited to 102 km/h. 10 June 2009

7 - Determining the classification Speed difference Signing Classe A V a - V d < 8 km/h No signing required. Install a sign type A1 if the visibility approaching the bend is poor. Classe B 8 km/h < = V a - V d < 16 km/h Posts type J1 and sign type A1 if the visibility around the bend is poor. Classe C 16 km/h < = V a - V d < 40 km/h Sign type A1 + posts type J1 + posts type J4 with triple chevron sign. Classe D V a - V d = > 40 km/h Sign type A1 + posts type J4 with single chevron signs along the full extent of the bend. 11 June 2009

8 - Site visit report form Road: Start kilometre mark Radius of curvature of the bend: Municipality: End kilometre mark Length of the bend: County: Direction of the bend: Gradient: Date of visit: day night Forward Backward Reducing radius of curvature: Yes No Successive bends with R(-1) / R > 1.3: Yes No Length of straight section: Va-Vd calculated by the model: Accident data over the past five years: (in the direction concerned) Personal injury accidents: Classification: Damage accidents: Signing None Other A1 J1 B14 J4 (triple chevrons) J4 (single chevron) Existing: Model: Decision: Legibility of the bend: Very good Good Poor Very poor Visibility approaching the bend: Good Average Poor Visibility in the bend: Good Average Poor Comments: Result of the visit: - Model classification accepted - Bend upgraded - Bend downgraded 12 June 2009

9 - Legibility of the bend Can the driver assess the environment quickly and easily in order to drive appropriately? Very good legibility Good legibility The driver is in no doubt that there is a bend ahead as the environment (vegetation, slopes, etc.) is consistent with the bend. The driver is fairly sure that there is a bend ahead. Poor legibility Very poor legibility The driver is not at all sure where the road is going. The road appears to go straight ahead. Main road Secondary road 13 June 2009

10 - Visibility approaching the bend Does the driver have sufficient time to react on first seeing the bend? Good visibility Average visibility The driver sees the bend sufficiently far ahead to reduce speed. The start of the bend is visible within the necessary distance, but with no time to spare, especially if approaching at high speed. Poor visibility The start of the bend is seen too late for the driver to reduce speed under good road conditions. 14 June 2009

11 - Visibility in the bend More accidents tend to occur in longer bends. Is It possible to assess the length of the bend? Good visibility Average visibility The driver sees the end of the bend. The driver can only see half the bend. Poor visibility The driver can only see the start of the bend. The road markings should be maintained in good condition. 15 June 2009

12 - Radius of curvature Reducing radius of curvature If the radius of curvature suddenly becomes smaller, the driver may make a sudden adjustment to the steering and lose control of the vehicle. This configuration is very hazardous and the road layout should be modified. Ratio R(-1)/R Are successive bends similar? A driver exiting from one bend does not necessarily expect to enter another bend with a very much smaller radius of curvature. GOOD: R(-1) / R < 1.3 BAD: R(-1) / R > 1.3 NB: R(-1): Radius of curvature of the previous bend. R: Radius of curvature of the bend under consideration. This calculation is only performed for adjacent bends where Aldroit < 500 metres between the two bends. 16 June 2009

13 - Classification rules Bend downgraded Following the site visit, the bend is less hazardous than predicted by the model: Good or very good legibility. Good visibility approaching the bend. Good visibility in the bend. The bend extends over a short distance. There are many bends on the approach. The classification of this bend is downgraded. Its signing may be at a lower level than that demanded by the model. Bend upgraded Following the site visit, the bend is more hazardous than predicted by the model: Poor or very poor legibility. Poor visibility approaching the bend. Poor visibility in the bend. Reducing radius of curvature. Incompatibility between two adjacent bends. The bend extends over a long distance. History of personal injury accidents. Bend located within or just after an overtaking gap. Long straight section approaching the bend (> 5 km). This long straight section may result in a lack of concentration on the part of the driver. Bend located at the exit from a relatively open built-up area. In this case, the model will under-estimate the speed. The classification of this bend is upgraded. Its signing may be at a higher level than that demanded by the model. NB: The legibility, visibility, reducing radius of curvature, and accident data should be accorded more weight when deciding whether to upgrade or downgrade a bend. One criterion with a very low score (e.g. poor visibility in the bend) may be cancelled out by another criterion with a good score (e.g. good legibility). In this case, no modifications are required. 17 June 2009

14 - Hints and tips In the office: Complete as much of the site visit report sheet as possible. On site, the aim of the site visit is to confirm or modify the suggestions from the model. Assess all the bends from the start to the end kilometre mark, and then again in the opposite direction. Existing signing. Legibility. Visibility approaching and in the bend. Comments. Signing level selected. Signing level selected Avoid focusing solely on legibility and visibility and take all the criteria into account, especially the radius of curvature, any straight sections, and the length of the bend. Section with many bends After the first bend in a series, drivers expect further bends of varying difficulty. It is therefore possible to downgrade some bends. However, try to keep the individual bends in a series as uniform as possible. Overtaking gap Consider upgrading a bend according to its difficulty if there is possibility that drivers may be accelerating to overtake and may not be concentrating on the radius of curvature of the bend. In case of doubt Suggest an expert site visit. 15 - References [1] Méthode de sélection des virages à signaler et niveau de signalisation à implanter. (Method for selecting bends to be signed and type of signing to be installed) Report. Sétra, May 2000. [2] Instruction interministérielle sur la signalisation routière (Interministerial instruction on road signing). Published in the Official Journal of the French Government Reference 5346. [3] Méthode de sélection des virages à signaler et niveau de signalisation à implanter. (Method for selecting bends to be signed and type of signing to be installed) Practical guide. Conseil général de Seine Maritime, February 2001, 16 p. 18 June 2009

19 June 2009

This guide is intended to serve as a methodological aid to achieving consistency in the signing of bends along a route with the aim of helping drivers to improve their perception of the level of difficulty of these bends. The method is based on a knowledge of the approach speeds, the legibility and visibility of the bend, and other accident contributory factors. The aim of the method is to improve signing and to ensure that it is applied consistently in all areas. This document provides departments responsible for signing with the evidence they need to fight against the inflation of unnecessary road signs. Service d'études sur les transports, les routes et leurs aménagements 46 avenue Aristide Briand BP 100 92225 Bagneux Cedex France Phone: 33 (0)1 46 31 53 Fax: 33 (0)1 46 11 33 55 This document is awailable and can be downloaded on Sétra website: http://www.setra.developpement-durable.gouv.fr/ The Sétra belongs to the scientific and technical network of the French Public Work Ministry (RST) Reference: 0929A This document may not be reproduced even partially without Sétra's prior consent. 2009 Sétra ISRN No.: EQ-SETRA--09ED13--FR+ANG