MANERI DAM D/S VIEW. Er. SANDEEP SINGHAL Director (Projects) UJVN Limited, Dehradun, (UK)

Similar documents
Components of a Barrage

JAP Additional Information Sheet

DAIVÕES DAM SPILLWAY: A NOVEL SOLUTION FOR THE STILLING BASIN

TECHNICAL MEMORANDUM 002 EMORANNO. 001

Module 4 Hydraulic Structures for Flow Diversion and Storage

As temporary grade control facilities along waterways until final stabilization is established.

Design and Construction of Cerro Del Águila Gravity Dam in Peru

Lecture 10 : Sewer Appurtenances

LESOTHO HIGHLANDS DEVELOPMENT AUTHORITY

Outlet Structures T-12

FORMAT FOR SENDING COMMENTS. Title: CRITERIA FOR DESIGN OF CANAL HEAD REGULATORS (Second revision of IS 6531)

DESIGN OF BELL-MOUTH SPILLWAY AT BARVI DAM

Ermenek Dam and HEPP: Spillway Test & 3D Numeric-Hydraulic Analysis of Jet Collision

5th International Symposium on RCC Dams General Introduction

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY

Minimum Standards for Driveway Construction Village of Bear Creek

Exercise (3): Open Channel Flow Rapidly Varied Flow

Attached as Exhibit B-2 is BC Hydro's presentation from the Stave Falls Spillway Gates Project Workshop held on January 18, 2010.

7.Site Note Poders in Labutta Township Labutta North Polder Shansu Sluice Gate - Shansu sluice locates in Labutta (North) polder, it is about 1.5 km n

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE

FP McCann Tunnels and Shafts 1

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY

SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA

SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA

STRUCTURAL STABILITY ASSESSMENT

pdf WATER RETICULATION STANDARD VENTILATION LOUVRE BOXES SINGLE AND DOUBLE DUCT SYSTEMS

Scott Dam Spillway Comparing Physical Model Study Results

19.1 Problem: Maximum Discharge

Design and Installation of two Permanent Booms at La Romaine-2 to resist Ice, retain Debris and serve as Safety Booms.

Design a grit chamber for population with water consumption of 135 LPCD.

Homework of chapter (3)

BARRIER OFFSET 0" A 6" 6" A 12" 12" A 26" A 26" 3A OR 4A L OR S * ** L OR S L OR S

VORTEX REGULATOR Type WAB (UCY / CY-F / CE/V)

Annex E Bridge Pier Protection Plan

COST EFFECTIVE STORAGE CAPACITY INCREASE FOR ALUMINA TAILINGS DISPOSAL AREA THROUGH SPILLWAY OPTIMISATION

Ajay Industrial Corporation Limited. Since 1961 AFRIDEV DEEP WELL HAND PUMP. A basic need of the community

Bids MAY 24, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $7,500,000.00)

The SAG type flat, rubber-steel, balance ropes

MF ER

ADA Training Standard Plans

Hours / 100 Marks Seat No.

22. Specialty Valves.

BEACH NOURISHMENT BY RAINBOWING FOR THE VISAKHAPATNAM PORT TRUST BY DCI. Capt. MVR MURTHY ABSTRACT

The basic patterns of drill holes employed in opencast mines are

EXAMPLES (OPEN-CHANNEL FLOW) AUTUMN 2018

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 4 OVER THE BEAVER RIVER ST. LOUIS COUNTY

STRUCTURE 65-B PURPOSE SPILLWAY OPERATION

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 1 PINE COUNTY

The Challenge of Wave Scouring Design for the Confederation Bridge

CLAIBORNE LOCK AND DAM PERTINENT DATA

Perched Box Caisson Overview. January 2014

Self-drilling hollow anchor bolts and accessories

Chutes Part 2: Synthetic linings

NOVEMBER 2006 FLOOD DOWNSTREAM OF THE KATSE DAM STRUCTURE

Sediment Basin 7E-12. Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures BENEFITS.

VSL MINING & TUNNELING SYSTEMS VSL. mining and tunneling

Operations and Instruction Manual Might Swivel Model # Concrete and Steel Anchorage Connector ANSI Z ,000 lbs / 44kn

Greenup Lock Filling and Emptying System Study

TCML operate and control the 146 Km Railway line from Lake Magadi to Konza.

Anchor Component Material Standard Mechanical Properties

FITTINGS AND VALVES Düker Plunger Valve RKV Type 7015 Professional control of flow rates, reservoir levels and pressures Safe, hygienic and durable!

TYPICAL CONTRACTION JOINT PLAN TYPICAL EXPANSION JOINT PLAN T LOCATION AND DETAIL OF JOINTS FOR SIDEWALK

NUMERICAL AND PHYSICAL MODELING

Schedule for Culvert Works in or on the Bed or Bank of a Watercourse PLEASE READ THIS PAGE BEFORE COMPLETING THE APPLICATION FORM

Structurals Rationalised sizes of Beams/Joists, Channels and Angles

Bids DECEMBER 21, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $4,700,000.00)

A5.1 Permitted activities

THE DON DISTRICT SALMON FISHERY BOARD RIVER DON DRAFT GRAVEL MANAGEMENT PLAN NEWE DAM

Broadly speaking, there are four different types of structures, each with its own particular function:

Made in the USA. For Fall Protection Only. SafeLok Part Description

ROLLER COMPACTED CONCRETE DESIGN AND CONSTRUCTION FOR INTERMODAL TERMINALS

NORDEX. Foundations. Nordex N117/3000

coolaroo.com Protection all year round Installing your new Coolaroo all weather sail is simple, following our step-by-step instructions.

Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS

Brick & Concrete. Expandet ESI Xtreme Pro Injection Mortar ADVANTAGES. ACCESSORIES Wide range of accessories. INSTALLATION:

WYDOT CONCRETE MIX DESIGN PROCEDURE

Spillway with improved dissipation efficiency - side dissipation beams

Suitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam.

Dredging Keeping Our Underwater Highways Open

1 SafeClaw Anchorage Connectors

User Instruction Manual

Evaluating Surge Potential in CSO Tunnels

International Journal of Advanced Engineering Technology E-ISSN

Logue Brook Dam Outlet Works Upgrade Sofia Vargas, Dams Engineer, GHD, Perth WA Robert Wark, Technical Director Dams, GHD, Perth WA

Wave Energy. ME922/927 Wave energy

STRUCTURE S-65 PURPOSE SPILLWAY OPERATION

h o l l o w poles for foundat i o n s

Reinstatement of sub-base and base (roadbase) in non-bituminous materials

CAISSONS SECTION Section CAISSONS. Part 1-GENERAL

CVEN 311 Fluid Dynamics Fall Semester 2011 Dr. Kelly Brumbelow, Texas A&M University. Final Exam

Grit chambers are basin to remove the inorganic particles to prevent damage to the pumps, and to prevent their accumulation in sludge digestors.

Digester Processes. 1. Raw Sludge Pumping System

Angela Lane, Lowe Environmental Impact / Karen Akuhata (WDC) The Wairoa wastewater treatment system requires a replacement consent by May 2019.

PUSH PIER SYSTEMS STABILITY. SECURITY. INTEGRITY. Push Pier Systems PN #MBPPT

Hoover Dam. Hoover Dam A Reading A Z Level M Leveled Book Word Count: 527 LEVELED BOOK M

RoadNews 14 // September VÖGELE pavers rehabilitate race track in Brno, Czech Republic. Paving at Top Speed

Paper RCC Jack Jetty and Bamboo Submerged Vanes Application for Navigation Fairway in Ganga River of India

Transcription:

COMPREHENSIVE REHABILITATION / REPAIR OF MANERI DAM IN DIST. UTTARKASHI MANERI DAM D/S VIEW Er. SANDEEP SINGHAL Director (Projects) UJVN Limited, Dehradun, (UK) sandysinghal14@hotmail.com

ABSTRACT Severe floods in the rivers of Uttarakhnad in August 2012 and June 2013 badly damaged some hydro-electric power projects mainly in Bhagirathi and Alaknanda river valleys. Spillway of Maneri Bhali Stage I dam was damaged severely due to rolling boulders which resulted in heavy leakages downstream. In order to arrest leakages, temporary arrangements such as caulking of gates were undertaken. After the monsoon of 2014, comprehensive rehabilitation/repair of Maneri Dam was planned after studying damages of similar nature and treatment measures at other hydro electric projects. The spillway no-01 & 02 were extremely damaged, therefore the repair works of these spillways were planned on priority basis in two phases:

Repair work from the sill beam of stop log gates to the 2.00 mts downstream of sill beam of radial gates were planned by taking minimum shutdown of Power House. Repair work in entire spillway glacis from 2.00 mts downstream of sill beam of radial gate were planned in running power house condition. Repair of entire roller bucket and realignment of the downstream training wall were also planned subsequently. PROJECT BRIEF Maneri Bhali Stage-I (90 MW) Hydro electric scheme was planned in 1960s to harnesses the potential energy of water flowing down river Bhagirathi between Maneri and Uttarkashi. The power house of this project is generating approx. 455 MU energy annually (average generation from 2004-05 to 2014-15) since October, 1984.

This Scheme comprises of:- A 39 m high and 127 m long Concrete Gravity Dam across river Bhagirathi near Maneri with four numbers spillways gates of size 13 m width & 14.55 m high separated by 2m thick piers. The spillway gates are radial type fitted with electrically operated hoists. The energy dissipation is allowed by providing slotted roller bucket. Intake structure comprises of three bays 9.00 m. wide with all weather channel on the left flank. A sedimentation tank with 08 hoppers 15.00m wide x 15.70 m length X 5.75 m deep, in 2 rows is provided to remove silt particles which are passed back to the river downstream of the dam through silt flushing tunnel.

A 8.631 km long and 4.75 m diameter circular concrete lined power tunnel. A 69 m high and 11 m diameter underground surge shaft of restricted office type along with 316 m long and 6m diameter upper expansion chamber, 89.5 m long and 6m diameter lower expansion chamber. About 456 m long single steel lined penstock of 3.8 m diameter having three branches of 2.5 m diameter just upstream of the power house A surface power station near Uttarkashi, housing three Francis turbines of 30 MW capacity each, i.e. total installed capacity of 90 MW. The firm power is 38.23 MW.

The design discharge of the power station is 71.4m 3 /s. The difference in elevation between the barrage and the power station affords a design head of 147.5 metres and gross head of 180 metres. Open tailrace channel about 120 m long joins river Bhagirathi at Uttarkashi EXTENT OF DAMAGES i ) Damages observed in Spillway gate no. 01 & 02:- The sill beam of stop log gate and radial gate were washed out in approximately 6.00 m & 8.00 m length (out of 13 m) respectively. The flange of the remaining sill beams was completely damaged.

As both the sill beam were washed out in some length, therefore a cavity of about 6 m-7 m in length (along the piers) having a depth upto 2.00 m was created in between radial gate and stop log gate. The flood also damaged the spillway glacis on the right side and in the d/s of radial gate beam throughout its length & upto roller bucket in 3.00 m width with a varying depth of maximum 13.00 m. ii ) Damages observed in Spillway gate no. 03 & 04:- Third National Dam Safety Conference The concrete in between stop log gate and radial gate was eroded due to high flood. The maximum depth of the erosion was in range of 0.25 m to 0.70 m. The profile of spillway glacis was also damaged from 0.25 m to 0.80 m in depth.

Photograph 01 (Damages in gate no-1) Third National Dam Safety Conference

STUDY OF DAMAGES Considering the past history of damages in Maneri Bhali Stage-I dam following were the major reasons of damages: i. There is no check dam or hydro power project dam upstream of Maneri Dam, due to these rolling boulders in monsoon period hit the Maneri dam directly. ii. Third National Dam Safety Conference In the upstream side there is a turn in the river and shortest radius of the turn is towards the gate no.1. Due to this rolling boulders in monsoon season pass more through bay no. 1 in comparison to other spillways bays. iii. The width of roller bucket is converging towards downstream, therefore the training walls obstruct the desirable flow pattern and consequently damages occurred in the spillway structure and roller bucket.

REHABILITATION/REPAIR WORKS EXECUTED IN GATE NO. 01&02 The damaged sill beams of bay no 01, 02 & 03 were removed and replaced with the new ones of the same size. The spillway glacis were repaired with M60 grade concrete and 20 mm thick MS steel plate was fixed over the repaired surface. Activities Performed During Closure Period Third National Dam Safety Conference Detailed planning of execution of repair works of three spillway bays from sill beam of stoplog gate to 2m d/s of sill beam of radial gate within minimum possible time was done. A period 36 days starting from 02/12/2014 to 07/01/2015 was finalized for closing the Power House of MB-I HEP located at Tiloth in District Uttarkashi. Following activities were performed in sequential order to complete the works: Creation of bund in front of spillway bay 1, 2 & 3 to divert water through spillway no. 4.

Dismantling damaged mild steel sheets previously placed over spillway concrete profile. Damaged & remaining sill beams of stop log gate and radial gate were removed. Dismantling of concrete so as to get a minimum thickness of 250 mm of new concrete and a cover of 200 mm over the reinforcement. Drilling hole of 600 mm depth and 32 mm dia in staggered manner in parent concrete for fixing anchors. Fixing 25 mm dia Fe 500 TMT bars in drill hole with grouting material for anchorage of reinforcement as well as dowel bars for fixing of MS plates. The reinforcement was laid with 20 mm dia bars @ 150 c/c keeping the top cover of 200 mm. Where the cavity was more than 80 cm deep, reinforcement was provided in intermediate layers also keeping the top cover & bottom cover of 200 mm.

Applying bonding coat (BASF make) between old and new concrete. Laying of concrete (ACC make Drycrete of M80 grade) in cavity between sill beam of stoplog gate and radial gate. Fixing sill beams i.e. ISMB 300 (300 X 140) confirming to IS: 2062 (E250) with 20mm SS plate for Stop Log gates and Radial gates. Laying concrete (ACC make Drycrete of M80 grade) up to final level as per the profile. Fixing MS sheet (20mm thick with yield strength of 450 MPA) over the prepared concrete surface. Grouting between steel plate and concrete by cutting notes through the steel plate & fixing the cut plate after grouting.

To complete the repair works of spillway no 01 & 02 within stipulated period, all the pre-requisites such as manpower, material etc. were arranged before start of work. The works were taken up in 3 shifts continuously. The works were completed within 36days and Power House was restarted thereafter. Repair Works in Spillway Glacis Repair works in spillway glacis is carried out from 2m d/s of radial gates during power house running condition. All activities were same as stated above only instead of M80 Drycrete, M-60 grade concrete was used. Concrete Mix Design Adopted For Works Based on IS: 10262-2009 and IS: 456-2000 mix design for concrete is derived as below: a) Cement = 450 kg/m3 b) Water = 157 kg/m3 c) Silica fume = 25 kg/m3 d) Fine Aggregate = 598 kg/m3

e) Coarse Aggregate = 1269 kg/m3 f) Chemical Admixture = 7.125 kg/m3 Third National Dam Safety Conference The 28 days crushing strength of trial mix proportions for target M-60 grade of concrete was achieved as 68.9 N/mm 2. Photograph 02 (Temporary Bund for channelization of river)

Photograph 03 (Laying concrete in gate no-02) Photograph 04 (Grouting of MS Plate of gate no-2)

REHABILITATION/REPAIR WORKS PROPOSED IN SPILLWAYS NO 03 & 04; ENTIRE ROLLER BUCKET AND TRAINING WALLS:- During execution of repair work of spillway no.1&2, the entire slotted type roller bucket and training walls were also examined and it was found that the slots of roller buckets are completely damaged. Both side training wall were also found damaged very badly (Photograph no.05). Photograph 05 (Training wall)

Deep cavities ranging between 1.00 m to 4.00 m in front of all the four bays of roller bucket were also found, Photograph no. 6 Photograph 06 (Cavity in Roller Bucket)

Proposed Repair of Spillway Glacis No 03 & 04 It has been proposed by CWC and World Bank to repair one spillway glacis with M90 grade concrete and the other with M90 grade concrete along with steel fibres. The remaining procedure of repairing will be same as executed in spillway no. 1&2. Mix design for M90 grade concrete will be provided by National Council for Cement and Building Materials (NCCBM), Ballahabgargh (Haryana). Proposed Repair of Roller Bucket It has been proposed by CWC and World Bank to repair the entire roller bucket with M90 grade concrete along with steel fibres as per the actual profile. The repair work will be started as soon as mix design is available from NCCBM.

CONCLUSIONS AND DISCUSSION Repairing works of spillway glacis no. 1&2 were carried out by using M-60 grade concrete and fixing MS steel plate over prepared profile followed by cement grouting. The MS plates of spillway glacis no.1&2 are found intact after passing the monsoon of 2015 & 2016 The repair works of spillway glacis no 03 & 04 as proposed above are in progress and the performance of M 90 grade concrete with and without steel fibres will be examined after the monsoon of 2017. On examination of these three different types of repair works conclusion can be drawn as to which method is the most suitable for repairing of spillway glacis and for roller bucket.

The repair work of training wall is also in progress and the obstruction in water paths will be removed to get the desirable flow conditions so as to reduce the impact of rolling boulder. REFRENCES i. Indian Standard code 10262-2009. ii. Indian Standard code 456-2000. iii. Indian Standard code 383-2016. iv. Indian Standard code 269-2015. v. Indian Standard code 2386-1963.