Segregation Weir Placement, Monitoring and Objective

Similar documents
Draft Central Valley Salmon and Steelhead Recovery Plan

Shasta Dam Fish Passage Evaluation. Public Stakeholder Webinar

Meeting Summary Fisheries Management Technical Feedback Group Meeting Friday, November 2, 2012

California Steelhead: Management, Monitoring and Recovery Efforts

Attachment 6. Public Correspondence. Public correspondence received as of July 2, 2008

NATIVE FISH CONSERVATION PLAN FOR THE SPRING CHINOOK SALMON ROGUE SPECIES MANAGEMENT UNIT

California Steelhead: Management, Monitoring and Recovery Efforts

Appendix D. Analysis of Potential Spring-run and Fall-run Chinook Salmon Genetic Introgression July 7, 2015

Fisheries Framework: Spring-run and Fall-run Chinook Salmon

Volume I: Ecological Attributes of the San Francisco Bay-Delta Watershed

Tuolumne River Gravel Introduction

Spring-run Chinook Salmon Reintroduction Experimental Population Designation Elif Fehm-Sullivan National Marine Fisheries Service

San Joaquin River Chinook Salmon Trap and Haul Donald E. Portz, PhD Bureau of Reclamation Fisheries & Wildlife Resources Group

Colusa Basin Drain Watershed Fish Stranding Tour Concept Paper Mike Hendrick and Brycen Swart NMFS

PRE- PROPOSAL FORM - 1. Applicant organization. USDA Forest Service Gifford Pinchot National Forest & WDFW Region 5

THE CONFEDERATED TRIBES OF THE WARM SPRINGS RESERVATION OF OREGON

Agenda Item E.2.g Supplemental Public Comment 2 April 2012

Hatchery Scientific Review Group Review and Recommendations

Chinook Salmon Spawning Study Russian River Fall 2005

FISH PASSAGE IMPROVEMENT in California s Watersheds. Assessments & Recommendations by the Fish Passage Forum

29.0 CALIFORNIA CENTRAL VALLEY STEELHEAD ESU

Burns Paiute Tribe Fisheries Department. Evaluate The Life History Of Native Salmonids Within The Malheur Subbasin Project #

Yakima River Basin Coho Reintroduction Feasibility Study

Potlatch River Drainage: Salmonid Presence: Largest lower Clearwater River tributary

Executive Summary. Map 1. The Santa Clara River watershed with topography.

Don Pedro Project Relicensing

Feather-Yuba River Interactions and Management Implications. Yuba Accord River Management Team 5 th Annual Symposium

STEELHEAD SURVEYS IN OMAK CREEK

Hatchery Reform and our Pacific Region National Fish Hatcheries. Presented by Doug Olson

AMERICAN FISHERIES SOCIETY HUMBOLDT CHAPTER CALIFORNIA-NEVADA CHAPTER 1990 NORTHEAST PACIFIC CHINOOK & COHO SALMON WORKSHOP PROCEEDINGS

SONAR ESTIMATION OF ADULT STEELHEAD: VARIOUS METHODS TO ACCOUNT FOR KELTS IN DETERMINING TOTAL ESCAPEMENT

Salmon resurgence in Butte County

A.23 RIVER LAMPREY (LAMPETRA

COLUMBIA LAKE DAM REMOVAL PROJECT

Abundance of Steelhead and Coho Salmon in the Lagunitas Creek Drainage, Marin County, California

THREATENED, ENDANGERED, AND SENSITIVE SPECIES 2010 ANNUAL REPORT

Yakima/Klickitat Fisheries Project

Addressing Critical Uncertainties in the Reintroduction of Chum Salmon to Oregon Tributaries of the Columbia River. Kris Homel

Hatchery and Genetic Management Plan

Attachment 2 PETITIONERS

Jamie Laatsch, Conservation & Outreach Coordinator Christina Morrisett, Research Assistant Dr. Rob Van Kirk, Senior Scientist

Okanagan Sockeye Reintroduction

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT

Five Counties Salmonid Conservation Program - Fish Passage Design Workshop. February 2013

San Joaquin River Restoration Program, 2013 Chinook Salmon Trap and Haul Summary

1. Project Title Bull Trout Habitat Restoration Project Identification Assessment. 3. Identification of problem or opportunity to be addressed

LOWER MOKELUMNE RIVER UPSTREAM FISH MIGRATION MONITORING Conducted at Woodbridge Irrigation District Dam August 2014 through July 2015.

Reevaluation Process and Hatchery Management Alternatives Analysis

COMMENTS Draft Environmental Impact Statement McCloud Pit Hydroelectric Project (FERC No. 2106) P Applicant: Pacific Gas & Electric Company

Columbia Lake Dam Removal Project

2 nd Steelhead Summit. October 27 & 28, 2016 in San Luis Obispo, CA

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT

Redd Dewatering and Juvenile Salmonid Stranding in the Lower Feather River,

NMFS salmon management support projects presented by Steve Lindley and Pete Lawson

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT

2013 WHITE SALMON CHINOOK SALMON VSP MONITORING. Jeremy Wilson Washington Department of Fish and Wildlife

Coho. Oregon Native Fish Status Report 13

Project Report for Marsh Creek and Albion River Instream Fish Barrier Removal Flynn Creek Road, CR 135, M.P. 8.1 and 8.3

San Joaquin River Restoration Program Juvenile Salmonid Survival and Migration Preliminary Report July 2011

Fish Passage from the Tidewater to the Sierras Workshop - Fish Passage at High Dams - Part 3

Salmon fishing closed for California, Oregon

DEADWOOD CREEK FISH PASSAGE IMPROVEMENT PROJECT

PRE- PROPOSAL FORM - Lewis River Aquatic Fund

Downstream Migrant Trapping in Russian River Mainstem, Tributaries, and Estuary

Amendment to a Biological Assessment/Evaluation completed for the Coon Creek Land Disposal completed December Grand Valley Ranger District

Job Performance Report, Project F-73-R-9 Subproject II: SALMON AND STEELHEAD INVESTIGATIONS Study I: Salmon Spawning Ground Surveys

PROJECT OVERVIEW PROJECT AREA. FAHCE Fish Habitat Restoration Plan EIR

Funding Habitat Restoration Projects for Salmon Recovery in the Snake River Region SRFB Grant Round Version: 2/19/16

ASSESSMENT OF THE STATUS OF NESTUCCA RIVER WINTER STEELHEAD

Stock Selection Strategy: Spring-Run Chinook Salmon

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By:

Upper Columbia Salmon Restoration: Breakout session: Columbia River Treaty Review Conference Castlegar, BC March 22 nd, 2013

Upper Columbia Redband Trout: Conservation for the Future

WF4313/6413-Fisheries Management. Class 22

Summary of the Pilot Assessment of Three Potential Fish Barriers on Battle Creek

Up Your Creek! The electronic newsletter of the Alameda Creek Alliance

Chinook Salmon above Devils Canyon on the Susitna River: a Sink or Sustaining Population? Devils Canyon (PRM )


(Revised February,2005) CULVERTS, BRIDGES, AND FORDS

Chadbourne Dam Repair and Fish Barrier

LEAVENWORTH COMPLEX HATCHERY PROGRAMS. Presentation to the Independent Science Advisory Board

Job 1. Title: Estimate abundance of juvenile trout and salmon.

Chinook Salmon. The Yukon River Panel

***Please Note*** April 3, Dear advisory committee members:

Alaska Sustainable Salmon Fund Statement of Work

Winter Steelhead Redd to Fish conversions, Spawning Ground Survey Data

LIFE HISTORY DIVERSITY AND RESILIENCE

Covered Species Accounts Central Valley Spring-Run Chinook Salmon

Elkhorn Creek Westslope Cutthroat Restoration Efforts

Columbia Lake Dam Removal Project

UC Coho Salmon and Steelhead Monitoring Report: Summer 2016

Skagit River Basin wild steelhead fishery Public Meeting(s) Mill Creek-January 12, 2018 Sedro Woolley-January 16,2018

Big Spring Creek Habitat Enhancement and Fishery Management Plans

Nechako white sturgeon are an Endangered Species

Black Sturgeon Regional Plan

Trout Unlimited and the Kittatinny Ridge Coalition.

Applying Engineering Solutions to the Science of Invasive Aquatic Species Control Asian Carp and Sea Lamprey. Bill Holman, P.E. Stanley Consultants

Unassessed Waters Initiative ( )

Downstream Migrant Trapping in Russian River Mainstem, Tributaries, and Estuary

RIVER HERRING PROGRAM

Transcription:

Study 36 Segregation Weir Placement, Monitoring and Objective Final 2014 Monitoring and Analysis Plan November 2013

San Joaquin River Restoration Program Fall - Run Monitoring Activities Segregation Weir Placement, Monitoring and Objective 1. Statement of Need/Objective: A segregation weir is needed to separate spawning spring-run from fall-run Chinook salmon to avoid superimposition and possible hybridization. Similar methods have been used in other Central Valley streams (i.e. Clear Creek) successfully. The timing of spawning for the two runs has an overlap as spring-run are expected to spawn from September to November and fall-run should spawn from October to December. This overlap may cause hybridization due to both species being present at the same time or the fall run may superimpose previously constructed redds made by earlier spawning spring run. The objective is to adequately segregate spring-run Chinook salmon from fall-run Chinook salmon in accordance with the San Joaquin River Restoration Program settlement, allowing both species to reestablish in the restoration area. Based on the conceptual models support of the monitoring and analysis plan (MAP) it is important to try and answer the question: Will redd superimposition or genetic introgression by fall-run spawners affect spring-run salmon production? If so, will a segregation weir be effective and how and where will segregation weirs be necessary to keep fall and spring runs spatially separate? This document also addresses the needs of part IV (d) for the Implementation Plan for Brood Year 2013 Fish Reintroduction Actions (Draft in Production by FMWG for PMT). 2. Background: The San Joaquin River Restoration Program restoration goal of reintroducing spring-run Chinook salmon below Friant Dam will require the movement of out-of-basin salmon into the Restoration Area. In addition the program will begin to move fall run that are lost above Hills Ferry Barrier into the upper reaches of the Restoration Area where both spring and fall run salmon are expected to spawn. On pages 17-18 paragraph 14 (a) of the settlement it states that: In the event that competition, inadequate spatial or temporal segregation or other factors determined beyond the control of the Parties make achieving the Restoration Goal for both spring run and fall run Chinook salmon infeasible, then priority shall be given to restoring selfsustaining populations of wild spring run Chinook salmon. Implementing a segregation weir that allows spring-run Chinook salmon redds to be minimally bothered by other species until emergence should aid in prioritizing spring-run for reintroduction purposes. 3. Placement: Constructing a weir in reach 1A above the Highway 41 Bridge where most of the spawning is expected to occur could separate the runs and allow for both runs to be present in the restoration area. Previous studies suggest that temperatures are close to or slightly above the target temperature set for holding and spawning (21.1 ºC and 15.5 ºC respectively). The HEC5Q model shows that from Friant Dam to 4.1 miles downstream temperatures average below 15.5 ºC through August, and to 5.1 miles downstream starting in September through October. Looking at

previous meso-habitat data provided by CDFW suggests nearly ideal conditions at river mile 261.2. Issues with access at this location may prove difficult. Vulcan, another location within reach 1A should provide better access and is being looked at as a primary location for a segregation weir. Easy access by road is a consideration for trucking weir materials to the site. Alaskan style resistance weirs like those operated by FISHBIO on the Stanislaus would be ideal, as they work well under variable flow conditions and allow for upstream and downstream boat passage (See Figure 1). Small boats would have portage opportunities above and below the weir as well. The floating end is easily collapsible, providing a structure that is easy to maintain and clean. 4. Monitoring: Monitoring would need to be done on a daily basis if not twice daily while the weir is in place. Monitoring the site would help with vandalism issues, debris build up, and assessing the weir for structural degradation and gaps where bank erosion may have taken place. If vandalism is a large concern the use of motion sensored wildlife cameras could be used in addition to daily (bidaily) crew checks. Ideally the weir would only be in place for as short of duration as possible, most likely October through mid-november annually. USFWS and/or CDFW would be responsible for supplying field personnel responsible and properly trained in weir checks. 5. Budget as previously proposed by USFWS and CDFW: Total Equipment $75,000 Weir materials $60,000 Generators/vehicle lease $12,500 Misc. supplies (lighting, etc.) $2,500 Equipment overhead (6%) $4,500 Total Staff time $147,693.60 Bioday rate (this rate includes salary, benefits, administrative costs, use of vehicles, gasoline, office materials, etc. $750 day for technical) 10 biodays for 1 to assist with planning and design - $7,500 75 biodays to construct and operate weir (2 technical staff, $750 rate) - $112,500 0.10 FTE Field Study Coordinator for oversight of all FWS lead MAP studies - $23,693.60 Travel - (4 staff for 2 weeks (construction)) = $4,000 Study Total: $222,693.60 6. Point of Contacts/Agency Responsibilities:

Michelle Workman Anadromous Fish Restoration Program/ San Joaquin River Restoration Program U.S. Fish and Wildlife Service 850 Guild Ave., Suite 105 Lodi, CA 95240 Tel (209) 334-2968 x 404 Cell (209) 403-1457 Fax (209) 334-2171 E-mail: michelle_workman@fws.gov Responsibilities include staffing the study for USFWS, study design and implementation, monitoring equipment. Matt J. Bigelow Environmental Scientist San Joaquin River Restoration Department of Fish & Wildlife Region 4 1234 E. Shaw Ave. Fresno, CA. 93710 Office # (559)-243-4014 ext. 258 Fax # (559)-243-3004 E-mail: mbigelow@dfg.ca.gov Responsibilities include coordinating DFW staff for weir installation and maintenance, investigation of locations, and report preparation. Sierra Franks Fisheries Biologist U.S. Department of Commerce National Oceanic and Atmospheric Administration National Marine Fisheries Service Protected Resource Division 650 Capitol Mall - Suite 5-100 Sacramento, California 95814 (916)930-3720 sierra.franks@noaa.gov Responsibilities include assisting with report preparation, study design and implementation, and aiding with weir set-up and placement if feasible.

Figure 1. A motorized boat passing over a floating resistance weir.