Item No Halifax Regional Council January 16, 2018 January 30, 2018

Similar documents
Chair and Members of Transportation Standing Committee. Bruce Zvaniga, P.Eng., Director, Transportation and Public Works

P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No Halifax Regional Council September 18, 2018

P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No. Halifax Regional Council January 16, 2017

Item No Halifax Regional Council March 6, 2018

P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No. 6 Halifax Regional Council April 11, 2017

Item No Halifax Regional Council July 19, 2016

Item No. 8.1 Transportation Standing Committee June 28, 2018

Almon Street Bike Lane Planning

P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No Halifax Regional Council May 9, 2017

a) receiving of legal advice subject to solicitor client privilege and labour relations regarding contract negotiations

P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No Halifax Regional Council December 12, 2017

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District

P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No. 8.1(i) Transportation Standing Committee of Council November 23, 2017

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Item No Transportation Standing Committee June 23, 2016

CITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Transportation Planning and Parking Division

Cycle Track Design Best Practices Cycle Track Sections

Harbord Street and Hoskin Avenue Bicycle Lane Upgrades

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Zlatko Krstulich, P.Eng. City of O9awa

Public Works and Infrastructure Committee. General Manager, Transportation Services

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012

Welcome. If you have any questions or comments on the project, please contact:

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

South Park Street Bicycle Lane Improvements. Public Engagement. November 2017

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Alta Planning + Design

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

Blue Ribbon Commission Report Recommendations on Pedestrian and Bicycle Infrastructure Improvements

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

Living Streets Policy

Richmond-Adelaide Cycle Tracks

Item No. 8.1 Transportation Standing Committee February 1, 2018 February 22, 2018

Simulation Analysis of Intersection Treatments for Cycle Tracks

Bicycle Traffic Control Signal - St. Clair Avenue West and Poplar Plains Road

City of Charlottesville Bicycle and Pedestrian Master Plan Update

Item No Halifax Regional Council May 8, 2018

City of Seattle Edward B. Murray, Mayor

Governance and Priorities Committee Report For the July 2, 2015 Meeting

CITY OF VANCOUVER ADMINISTRATIVE REPORT

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN

AGENDA ITEM G-2 Public Works

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Pennsylvania Avenue (CR 484) Design Alternatives Study

TRANSPORTATION COMMISSION Agenda Staff Report

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

Chapter 3 DESIGN SPECIFICATIONS

Active Transportation Facility Glossary

Cyclists and Bikeways: What s your match? A guide to bikeway options for a variety of cyclists

The five potential solutions and some of their benefits and costs are listed in the following table: Ferry Patron Bike Parking Alternatives

Broad Street Bicycle Boulevard City Council Study Session Summary

Shifting Gears for a Healthier City

Winnipeg Walk Bike Projects Downtown Tire Talk - Summary

NOTES FROM JUNIOR COUNCIL ORIENTATION SESSION HELD ON MONDAY, JANUARY 22, 2018, AT 3:30 PM IN COUNCIL CHAMBERS, CITY HALL

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

NJDOT Complete Streets Checklist

Transportation Master Plan Advisory Task Force

Downey Road. Transportation Improvement Study

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

Byron Avenue. Public Meeting. Thursday June 16, Traffic Calming Design Sherbourne Road to Island Park Drive

MASTER BICYCLE AND PEDESTRIAN PLAN

Complete Streets: Policy Framework Complete Streets: Implementation Plans A more Complete Street: Laurier Bike Lane Pilot Project

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

CURBSIDE ACTIVITY DESIGN

WELCOME! To the Centennial Neighbourhoods Secondary Plan and Transportation Management Plan Information Centre. City of Hamilton

Laurier Segregated Bike Lane Pilot Project July 2013 update

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

COUNCIL POLICY NAME: COUNCIL REFERENCE: 06/119 06/377 09/1C 10llC 12/1C INDEX REFERENCE: POLICY BACKGROUND

Rebuilding Highway 7 Town Centre Boulevard to Sciberras Road

Minor Amendments to the Street and Traffic By-law 2849 and Skateboards in Protected Bike Lanes

Richmond Street and Adelaide Street Cycle Tracks

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON JANUARY 10, 2017

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Confirmation of Levels of Service for Winter Maintenance of Bikeways, Windrow Opening, Sidewalks and AODA Compliance

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

Chapter 5 Future Transportation

PROVINCIAL MAINTENANCE STANDARDS FOR MUNICIPAL HIGHWAYS AMENDMENTS 2018 RECOMMENDATION

City of Saline. Complete Streets Ordinance

REPORT. Engineering and Construction Department

CITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA

Item No. 14 Town of Atherton

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Standing Committee on Policy and Strategic Priorities. Potential Granville Bridge Connector Public Engagement

TLC GRANT K / WATER STREETSCAPE ENHANCEMENTS WILL HANDSFIELD, AICP TRANSPORTATION DIR, GEORGETOWN BID

Physical Implications of Complete Streets Policies

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

Omaha s Complete Streets Policy

May 12, 2016 Metro Potential Ballot Measure Issue Brief: Local Return

5 REQUEST FOR GRADE-SEPARATED PEDESTRIAN UNDERPASS CROSSINGS OF LESLIE STREET AND ST. JOHN S SIDEROAD TOWN OF AURORA

Public Works and Infrastructure Committee. General Manager, Transportation Services. P:\2016\Cluster B\TRA\TIM\pw16009tim.docx

CITY OF LOMITA CITY COUNCIL REPORT

Bicycling Routes on Provincial Roads Policy

BUDGET FOR RESEDA BOULEVARD, STREET RECONSTRUCTION / VISION ZERO PROGRAM, REPORT BACK, COUNCIL FILE

Transcription:

P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No. 9.2.1 Halifax Regional Council January 16, 2018 January 30, 2018 TO: Mayor Savage and Members of Halifax Regional Council Original Signed SUBMITTED BY: Councillor Tim Outhit, Chair, Transportation Standing Committee DATE: December 8, 2017 SUBJECT: Protected Bicycle Lane Hollis Street ORIGIN December 7, 2017 meeting of the Transportation Standing Committee, Item No. 12.1.1. LEGISLATIVE AUTHORITY Administrative Order 1, Respecting the Procedures of the Council, Schedule 7, Transportation Standing Committee Terms of Reference, section 7 (c) which states: The Transportation Standing Committee shall promote and encourage coordination of construction and initiatives that serve to support the development of Active Transportation initiatives throughout the municipality in the most cost effective manner possible. RECOMMENDATION The Transportation Standing Committee recommends that Halifax Regional Council direct staff to continue to plan the development of a permanent all ages and abilities on-road bicycle lane running north-south through downtown Halifax and return to Transportation Standing Committee and Regional Council in 2018 with a recommended option for implementation in 2019.

Council Report - 2 - January 16, 2018 BACKGROUND A staff report dated October 11, 2017 pertaining to a protected bicycle lade for Hollis Street was before the Transportation Standing Committee for consideration at its meeting held on December 5, 2017. For further information, please refer to the attached staff report dated October 11, 2017. DISCUSSION The Transportation Standing Committee reviewed the staff report dated October 11, 2017 at its meeting held on December 7, 2017 and forwarded the recommendation to Halifax Regional Council as outlined in this report. FINANCIAL IMPLICATIONS As outlined in the attached staff report dated October 11, 2017. RISK CONSIDERATION As outlined in the attached staff report dated October 11, 2017. COMMUNITY ENGAGEMENT The Transportation Standing Committee meetings are open to public attendance, a live webcast is provided of the meeting, and members of the public are invited to address the Committee for up to five minutes at the end of each meeting during the Public Participation portion of the meeting. The agenda, reports, video, and minutes of the Transportation Standing Committee are posted on Halifax.ca. ENVIRONMENTAL IMPLICATIONS As outlined in the attached staff report dated October 11, 2017. ALTERNATIVES The Transportation Standing Committee ATTACHMENTS 1. Staff report dated October 11, 2017 A copy of this report can be obtained online at halifax.ca or by contacting the Office of the Municipal Clerk at 902.490.4210. Report Prepared by: Liam MacSween, Legislative Assistant, 902.490.6521

P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Attachment 1 Transportation Standing Committee December 7, 2017 TO: Chair and Members of Transportation Standing Committee SUBMITTED BY: ORIGINAL SIGNED Bruce Zvaniga, P.Eng., Director, Transportation and Public Works DATE: October 11, 2017 SUBJECT: Protected Bicycle Lane Hollis Street ORIGIN July 21, 2016 Transportation Standing Committee, MOVED by Councillor Mason, seconded by Councillor Rankin THAT the Transportation Standing Committee requests a staff report to evaluate the Hollis Street Bicycle Lane protected pilot project in spring of 2017 and include a staff comment in regard to a long-term strategy for an all ages and abilities biking facility out of the downtown. LEGISLATIVE AUTHORITY The Motor Vehicle Act (section 90) allows the Traffic Authority to mark lanes on a street and control their use. Clause 79 (1) (aa) of the Halifax Regional Municipality Charter provides that Council may expend money required by the Municipality for streets, culverts, retaining walls, sidewalks, curbs and gutters. RECOMMENDATION It is recommended that the Transportation Standing Committee recommend that Halifax Regional Council direct staff to continue to plan the development of a permanent all ages and abilities on-road bicycle lane running north-south through downtown Halifax and return to Transportation Standing Committee and Regional Council in 2018 with a recommended option for implementation in 2019.

Transportation Standing Committee Report - 2 - November 23, 2017 BACKGROUND Installation of the Hollis Street Bike Lane was approved by Regional Council on June 23, 2015 (Item No. 11.1.7) and was installed in fall 2015. This report stated that Hollis Street will be due for pavement resurfacing in the next two to four years. In the interim, there will be an opportunity to monitor how the street operates with the bicycle lane and to make adjustments, if needed, in the future. Hollis Street has been identified as a candidate route for a bike lane in municipal plans going back to 2001 and is a candidate route in the 2014 Active Transportation Priorities Plan. As one of the key employment destinations in the Municipality, providing bicycle infrastructure in downtown Halifax is key to attaining municipal objectives to increase the modal share of bicycling. The Hollis Street-Lower Water Street corridor is identified in the current drafts of the Integrated Mobility Plan as a location of a northsouth all ages and abilities bicycling facility. Implementation of the current Hollis Street bike lane was part of the Downtown Street Network Plan from the Downtown Halifax Secondary Municipal Planning Strategy (DHSMPS). This also included installation of a painted bicycle lane on Lower Water Street between Terminal Road and Sackville Street. The Lower Water Street bike lane is intended to be the complementary northbound bike lane to move bikes through downtown Halifax. The fact that it ends at Sackville Street means that it is not providing a complete bike lane to the north end of downtown Halifax (Cogswell Interchange area). The Hollis Street bike lane is a painted buffered bike lane that extends for just over one kilometre, one way, from the Cogswell Interchange, south to Terminal Road. The bike lane is on the left-hand (east) side of the street. The buffer is a 60cm wide hatched area between the bike lane and the vehicle travel lane. There are no stopping restrictions for vehicles in the bike lane from 7:00-9:00am and from 4:00 6:00pm from the beginning of the bike lane at the Cogswell Interchange through to Morris Street. At all other times, the bike lane operates as a typical painted bike lane as regulated by the Nova Scotia Motor Vehicle Act. As such, it is legal for vehicles to enter the bike lane to stop for the purposes of loading and unloading. In summer 2017, a small section of the Hollis Street bike lane was protected from vehicle traffic by a concrete barrier between Sackville and Salter Streets. This is due to a temporary encroachment with an adjacent land owner that requires the sidewalk to be moved into the street travel way. A protected bike lane is an exclusive bicycle facility that is physically separated from motor vehicle traffic, and distinct from the sidewalk. Methods of separation may include curbs, bollards, planters, rows of parked vehicles, or any other type of physical barrier. Regional Council has directed staff to develop a plan for a redesigned road network to replace the Cogswell Interchange. While planning for this is still underway, initial plans include a network of all ages and abilities protected bike lanes that would provide bikeway connections to downtown from the north via the Barrington Greenway and west via Cogswell Street. These would be connected to improve downtown bike lanes. In summer 2017, Halifax initiated a planning process to determine the optimal location and facility type for protected bike lanes that would connect the Seaport Market and Train and Bus Stations in the south to the new protected bike lane facilities being proposed for the redesigned Cogswell Interchange area in the north. This planning work is expected to extend to spring 2018. The Provincial Government s Connect2 program has approved $30,000 in funding to support this planning work. The balance of costs is covered in the approved HRM Capital Budget. The request for this report originated with a discussion at the Active Transportation Advisory Committee (ATAC) in June 2016. At that meeting the Halifax Cycling Coalition led a discussion that resulted in ATAC passing a motion requesting that the Transportation Standing Committee request this staff report.

Transportation Standing Committee Report - 3 - November 23, 2017 DISCUSSION The Hollis Street bike lane does not operate as an all ages and abilities facility that is comfortable for a wide range of bicyclists. The main reason is that it is regularly blocked by stopped motor vehicles. Furthermore, there is no corresponding all ages and abilities facility feeding the bike lane from the north (i.e. the existing Cogswell Interchange). These factors, combined with the fact that Hollis Street has high traffic volumes and high truck traffic means that it is mainly suitable for experienced bicyclists who can operate in mixed traffic. Newer professional guidelines to assist with the selection of the appropriate bicycle facility type for a particular corridor, indicate that a protected bike lane (i.e. with some type of curb or barrier) should be considered for an environment such as Hollis Street. Monitoring of the bike lane in 2016 included bike counts at George, Sackville and Morris Streets and observations on loading. Bikes were counted from 7-9am, 11:30am-1:30pm, and 4-6pm and the full results are in Attachment A. The most bicyclists per hour that were recorded during these observations was 23 per hour and the least was one per hour. The number of bicyclists on Hollis Street is lower than other streets with bike lanes on the peninsula such as South Park Street and Windsor Street. Vehicles stopped in the Hollis Street bike lane were regularly observed. Due to several factors (the above conditions, the Cogswell redevelopment planning process, the forthcoming IMP, and the commitment in the June 2015 report to Council to monitor and make adjustments), staff decided to initiate a planning process to identify a better north/south bicycle facility in downtown. This process is just starting and will result in a report to the Transportation Standing Committee and Regional Council in 2018 with a recommended solution. This planning process is considering both Lower Water and Hollis Streets and is considering both bidirectional protected bike lanes and unidirectional protected bike lanes. This planning process recognizes there are a wide range of issues and demands on a downtown street such as Hollis Street. The planning process will include public and stakeholder consultations and is taking a complete streets perspective in trying to understand and accommodate a wide range of factors such as safety, loading, parking, transit, accessibility, pedestrian needs, goods movement, vehicle movements, aesthetics, and more. The goal of this planning process is to have a recommended facility type that could be implemented in 2019 subject to budget and other potential project co-ordination issues. The motion that is the origin of this report requests consideration of a pilot protected bike lane on Hollis Street. However, it is not clear that a pilot project would provide information that is not already evident. As noted above, staff have concluded that if there is to be a bike lane on Hollis Street, it should be protected and there is a planning process underway to determine how best to achieve this. Therefore, rather than a pilot project, staff have considered whether an interim protected bike lane on Hollis Street is worth pursuing in 2018. The main factors to consider in whether an interim protected bike lane could and should be installed in 2018 include the following: Technical Feasibility The fact that the bike lane has a buffer provides space for some type of device such as plastic bollards, as used on University Avenue and Rainnie Drive or precast concrete curb segments (or a combination of the two) to provide protection. Further design and formal approval by the Traffic Authority for signage and pavement markings would be required, but there is space for some type of barrier. This could probably not be used on the block of Hollis Street south of Morris Street as there is on-street parking between the curb and the bike lane on this block. Impact to Street Operations The main impact would be the bike lane could no longer be used for loading. Messengers, couriers and other vehicles currently using the bike lane to serve adjacent buildings would need to find another location. There may be an option to open up additional space for loading on some of the blocks on the west side of Hollis Street, which would decrease on-street parking. The needs of people with disabilities to access the front doors of buildings abutting an interim protected

Transportation Standing Committee Report - 4 - November 23, 2017 bike lane would need to be considered. On University Avenue, this has been accommodated by providing gaps in the protected bike lane where cars can enter and stop next to the curb and sidewalk. Staff Resources Implementation of an interim protected bike lane on Hollis Street would require a reallocation of staff resources away from other current planning and capital implementation priorities. Permanent protected bikeways are currently being considered for implementation on a number of Regional Centre streets in 2018. It would also involve resources from other groups in HRM such as Traffic and Municipal Operations. Cost The cost to purchase and install plastic bollards or precast concrete curbs could be accommodated within typical existing capital budgets. Ability to Achieve Protection Along the Entire Corridor There would likely be a break in the protected facility at a hotel with a loading bay. Also, there would likely be a break at a construction encroachment just south of Bishop Street. As noted above, there may also need to be some gaps where vehicles could still enter the facility to load and unload for accessibility reasons and south of Morris Street it would be a challenge to provide an interim protected bike lane due to the existing parking configuration. Value in Testing the Potential of Protected Bike Lanes to Attract more Bicyclists This is difficult to predict. One factor that diminishes the potential value is that there is no all ages and abilities access to Hollis Street from the north. This will likely change with the Cogswell Redevelopment project. Safety for Bicyclists The full safety benefit of an interim protected bike lane is difficult to predict. A physical barrier that inhibits vehicles from entering the bike lane along the corridor would reduce the number of times that bicyclists need to exit the bike lane to move around stopped vehicles. As noted above, there may still need to be some gaps in the barrier, where vehicles could enter and stop for a short period. Modern bikeway treatments at intersections (green paint to indicate conflict zones) would likely not be feasible as part of a temporary interim configuration. FINANCIAL IMPLICATIONS The budget for the current planning process is covered by existing HRM Capital Budget (CTU00420) and by a $30,000 contribution from the Provincial Connect2 program. Should the Transportation Standing Committee request further consideration of an interim protected bike lane in 2018 as per the alternative below, the costs would be factored into the 2018-19 capital budget request to Council. Budget Summary: Project Account No. CTU00420 Active Transportation Strategic Projects Cumulative Unspent Budget $3,176,480 Pending budget increase $ 30,000 $3,206,480 A Directors Report will be submitted shortly to obtain the approval of increasing the project to reflect the $30,000 contribution from the provincial Connect2 program.

Transportation Standing Committee Report - 5 - November 23, 2017 RISK CONSIDERATION There are no significant risks associated with the recommendation in this Report. The risks considered rate low. To reach this conclusion, consideration was given to financial, legal and compliance, and service delivery risks. COMMUNITY ENGAGEMENT There was significant community engagement as part of the original process to install the existing bike lane on Hollis Street. There will be further engagement as part of the planning process for a permanent facility. There has been no specific engagement on the concept of an interim protected bike lane in 2018 although this could be raised in forthcoming engagement on the planning for a permanent facility (anticipated for early in 2018). ENVIRONMENTAL IMPLICATIONS The development of a network of all ages and abilities bicycle facilities will provide a healthier and less polluting transportation option for residents to travel. ALTERNATIVES The Transportation Standing Committee could recommend that Halifax Regional Council direct staff to return to the Transportation Standing Committee with a report on how to pursue the implementation of an interim protected bicycle lane on Hollis Street in spring or summer 2018. As noted above, this option has potential benefits, but there are impacts and design considerations that would need further study. This would place priority on developing an interim solution for Hollis Street compared to other potential 2018 corridors for protected bikeway implementation. ATTACHMENT Attachment A 2016 Hollis Street Bicycle Counts A copy of this report can be obtained online at www.halifax.ca or by contacting the Office of the Municipal Clerk at 902.490.4210. Report Prepared by: David MacIsaac, Active Transportation Supervisor, 902.490.1665

Attachment A 2016 Hollis Street Bicycle Counts George St George St Sackville St Sackville St Morris St Morris St Date May 31, 2016 Sep 29, 2016 June 1, 2016 Sep 29, 2016 June 9, 2016 Sep 27, 2016 Weather Cloudy Partly Cloudy Sunny Overcast Clear Light Rain Mean Temp C 15.1 12 12.9 12 11.8 11.3 AM 7:00-8:00 7 8 11 4 3 1 8:00-9:00 17 16 11 6 6 9 NOON 11:30-12:30 10 4 9 5 7 4 12:30-1:30 5 5 9 5 2 4 PM 4:00-5:00 13 11 23 9 13 5 5:00-6:00 9 11 14 7 19 6 Six hour total bicyclists 61 55 77 36 50 29