ECONORESS ELECTRONIC EPS & EPT - ENHANCED PRESSURISATION SET INSTALLATION OPERATION & MAINTENANCE DOCUMENTATION

Similar documents
Installation, Operation and Maintenance Instructions for Electronically Controlled Pressurisation Units

Installation, Operation and Maintenance Instructions for Electronically Controlled Pressurisation Units Digital Range

Installation, Operation and Maintenance Instructions for Electronically Controlled Pressurisation Units

Electronic Single and Twin Pump System Pressure Managers

System Pressure Manager Standard & System Pressure Manager Plus

Budget Range Operators Handbook

matrix installation guide

Installation Instructions / Operating & Maintenance Manual Midi-Fill Digital Pressurisation Unit Models MFD15 & MFD22

1. PARTS INTRODUCTION ELECTRICAL NOTES INSTALLATION 5/6. 5. START UP 6/7. 6. MAINTENANCE 7/8/9. 7. PRESSURE SWITCH ADJUSTMENTS 9/10.

PressVal Pressurisation Units. Packaged Pressurisation Units with expansion vessels for heating systems.

JET Mini Mechanical Pressurisation Equipment

TABLE OF CONTENTS TECHNICAL DOCUMENTATION 03

Ventam 85 Installation & Commissioning Instructions

AUTOMATIC GAS MANIFOLDS

VERTICAL AIR COMPRESSORS

VERTICAL AIR COMPRESSORS

100L AIR COMPRESSOR MODEL NO: TIGER 16/1010 PART NO: OPERATION & MAINTENANCE INSTRUCTIONS LS01/13

Chesil - Electronic Pressurisation Unit

MD R a n g e O p e r a t o r s H a n d b o o k

USER S MANUAL BASIC HORIZONTAL OIL-LUBRICATED MICROCOMPRESSOR Reference: RCMPBH

24L OIL FREE AIR COMPRESSOR MODEL NO: TIGER 7/250 PART NO: OPERATION & MAINTENANCE INSTRUCTIONS LS10/13

AIR COMPRESSOR OPERATION & MAINTENANCE INSTRUCTIONS MODEL NO: CHAMP 3 PART NO: LS0115

COMPRESSOR OPERATION & MAINTENANCE INSTRUCTIONS MODEL NO: WARRIOR 55 PART NO: (110V) , (230V) , LS0512

24L AIR COMPRESSOR OPERATION & MAINTENANCE INSTRUCTIONS MODEL NO: RANGER 7/240 PART NO: LS0913

SHHH AIR COMPRESSOR Model Nos. SHHH5/24 - SHHH5/50 - SHHH7/100

24L AIR COMPRESSOR MODEL NO: TIGER 11/250 PART NO: OPERATION & MAINTENANCE INSTRUCTIONS LS01/13

Installation, Operating, Maintenance and Safety Instructions for. Pressurised water systems for boats

24L AIR COMPRESSOR MODEL NO: TIGER 8/260 PART NO:

Installation, Operation & Maintenance Instructions

Installation and commissioning instructions 255 series and 256 series

Operation & Maintenance Manual

100C Air Compressor Kit

AutoChanger Installation & User Guide Issue 2

IMPORTANT SAFETY INSTRUCTIONS

200L BELT DRIVEN AIR COMPRESSOR

200 PSI COMPRESSORS - MODEL NUMBERS

Booster Set (Vertical Twin) Installation, Operation & Maintenance Instructions

BUBBLER CONTROL SYSTEM

400H HARDMOUNT AIR COMPRESSOR KIT PART NO H HARDMOUNT AIR COMPRESSOR KIT PART NO

mikrofill PRESSURISATION UNIT

420C AIR COMPRESSOR KIT PART NO C AIR COMPRESSOR KIT PART NO

Installation, operating and maintenance Instructions for Seemag bypass level indicator

OWNER S GUIDE DUAL CONTROL THERMOSTATIC SHOWER VALVE. Shower Control. may differ depending on choice of Model. Concealing Plate. Handles and ISSUE 01

AIR COMPRESSOR OPERATING INSTRUCTION AND PARTS LIST

Data sheet Pressure switch type CS December 2001 DKACT.PD.P10.A B1119

Quantum Contract Pressurisation Unit Operation & Maintenance Manual. Model: QC-35

Spirax Compact FREME Flash Recovery Energy Management Equipment

TECHNICAL MANUAL HEAVY DUTY HORIZONTAL MICRO-COMPRESSOR Reference: RCMPH

Flamco Pressurisation/Dosing/Degasser Equipment PressDS Plus

250C-IG COMPRESSOR KIT 12V PART NO C-IG COMPRESSOR KIT 24V PART NO

250C-IG COMPRESSOR KIT 12V PART NO C-IG COMPRESSOR KIT 24V PART NO

INSTALLATION. and INSTRUCTION MANUAL. for QUALITY AIR BREATHING SYSTEMS. Model 50 Systems Outfitted with ABM-725 Monitor C O M P A N Y

SEQUENTIAL SHOWER VALVE INSTRUCTION MANUAL PLEASE LEAVE THIS MANUAL WITH THE END USER

Installation, Operating, Maintenance and Safety Instructions for MAXI-SYSTEM Pressurised water systems for boats

Flamco Flamco-Fill STA Flamco-Fill STM

SPECIFICATIONS ATTENTION

444C DUAL PERFORMANCE VALUE PACK

Water Mist Systems Inspection, Testing, and Maintenance of Water Mist Systems

Universal Valve Company Inc

Air Eliminator Series

REGISTRATION EXAMINATION, NOVEMBER 2015 LICENSED PLUMBER ANSWER SCHEDULE

Universal Valve Company Inc

ServicePlus S21R & S27R Series 2 Installation Instructions

400C & 450C DUAL PERFORMANCE VALUE PACKS

Duplex Commercial Softeners

TECHNICAL DATA MAINTENANCE AIR COMPRESSOR MODEL G-1

GW DRY PIPE VALVE INSTALLATION & OPERATION 100mm (4 ) 150mm (6 )

Flamco Flexcon M-P Pump automat

Hydro Dome GRUNDFOS INSTRUCTIONS

97C COMPRESSOR KIT 12V PART NO C COMPRESSOR KIT 24V PART NO C COMPRESSOR KIT PART NO

AIR COMPRESSOR MANUAL INSTALLATION, OPERATION AND MAINTENANCE GUIDE

42045 Heavy Duty ADA Base Model Kit: 85/105 PSI (ADA Compressor Only) Heavy Duty ADA Base Model Kit: 110/145 PSI (ADA Compressor Only)

1020 Industrial Drive, Orlinda, TN fax

Differential pressure switch / Lube oil protection control MP 54 and MP 55

Installation and Maintenance Manual. ECO Filtration Unit with 6-way-Top-Mount-Valve. Art. Nr

GRUNDFOS DATA BOOKLET. Hydro Solo-E. Complete pressure boosting systems 50/60 Hz

Sterisil Ac+ Installation & Operating Manual

50L BELT DRIVEN AIR COMPRESSOR

IMPORTANT SAFETY INSTRUCTIONS

BUBBLER CONTROL SYSTEM

COMPRESSOR PACK SUCTION CONTROLLER TYPE: LP41x

Commercial Softeners. Installation, Operation & Maintenance Guide. Manual 002.1

M03 WUNDATRADE. Heat Pump Manifold. Before you start: Check the contents. Optional. ...a division of WUNDA GROUP PLC

Concentrate Distribution System (Stand Mounted) A-CDS-70-X & A-CDS-TANK-X-ST Industrial Drive, Orlinda, TN 37141

Model PSI Compressor with 3-Gallon Air Tank 12VDC

DUPLEX PRESSURE REDUCING SET

Pressure switches for air and water CS

R E D I C O N T R O L S

MANUAL GAS MANIFOLDS

NGP-250/500 Nitrogen Generator Quick Start Guide

CONGRATULATIONS ON YOUR PURCHASE OF YOUR THUNDER COMPRESSOR For your personal safety please read, understand and follow the information provided in

Pressure switch KP-E. Data sheet

AMP Oil Free Manual AMP 50-8-TC AMP 50-6-D AMP General User and Maintenance Instructions

Experiment Instructions. Circulating Pumps Training Panel

PIONEER 205 OPERATING & MAINTENANCE INSTRUCTIONS

200 PSI HIGH-FLOW AIR SOURCE KIT

200 PSI FAST-FILL AIR SOURCE KIT

Renewables. Tribune HE Unvented Hot Water Cylinders Installation and Maintenance Instructions. Issue 17 July 2012

Twin & Triple Control Concealed Thermostatic Shower Valve

TANKTRONIC. STANDARD CONFIGURATION Single Tank. ADVANCED CONFIGURATION Multiple Tanks. Twin Tank (common valve) Twin Tank (separate valves) Vent box

Transcription:

ECONORESS ELECTRONIC EPS & EPT - ENHANCED PRESSURISATION SET INSTALLATION OPERATION & MAINTENANCE DOCUMENTATION OCT2010 STOKVIS ENERGY SYSTEMS 96R WALTON ROAD EAST MOLESEY SURREY KT8 0DL TEL: 020 87833050 / 08707 707 747 FAX: 02087833051 / 08707 707 767 E-MAIL:info@stokvisboilers.com WEBSITE:www.stokvisboilers.com

General Installation Introductory notes These pressurisation units operate in a single pump, (duty) or two pump, (duty standby) format. These units together with the individually sized expansion vessel/s are employed to maintain the ambient cold fill pressure and accommodate the volume changes that occur in sealed heating and chilled water systems. Each unit is individually supplied, any system alterations may require a design or setting change. The full system should be pressure tested and flushed BEFORE connection to the unit or vessel to prevent any damage from metal particles, dirt etc., and to eliminate all leaks. Under no circumstances must any treatment be introduced into the system via any part of the unit. The unit can be used to fill the system using its FILL MODE feature, although this may be slower than other usual means of manual filling. Please refer to FILL MODE later in the instructions. Site Location The unit location should be undercover, dry and freely ventilated. Protection from frost must be ensured. Reasonable access to all parts of the set and adequate service work space must be provided. A minimum clearance of 500mm above the unit is required if placed back to a wall. The floor base should be firm and level in all directions. Base holes are provided if uni-strut structures or wall brackets are used to mount the brackets off the floor. If unit is to be wall-mounted, refer to the diagrams on the following page for wall fixing dimensions. Mechanical Connect the cold water mains supply via a stop tap and union connector to the break tank ball valve (½ BSPM). Arrange the overflow to discharge away to a suitably noticeable position (22mm compression). Using the ½ BSPF outlet, link into the system on the return side of the boiler, and the suction side of the pump incorporating a minimum two metre anti-gravity loop fitted with automatic air vent. A branch should be taken off of the same part of the loop and piped to the expansion vessel or vessels ensuring that each is supplied with a lock shield valve, drain cock and a union connection for any future service work. Please locate at least one vessel close to the pressurisation unit (i.e. within 2 metres) to assist the controls of the unit. All pipework links should be suitably sized with a minimum of 22 mm up to 6 metres, and 28 mm for up to 12 metre runs (larger sizes are required above 300 litre vessels or multiples). Please refer to schematic installation diagram. ALL MUST BE LEFT UNLAGGED IF PRACTICAL TO PRESERVE VESSEL MEMBRANES FROM PREMATURE TEMPERATURE INDUCED AGEING

WALL MOUNTED OPTION DIAGRAM

Schematic Installation Diagram Single System Pressurisation Unit & Vessel(s) Automatic Air Vent LSV System Return Mains Water Supply IV Union 22mm Over Flow Anti Gravity Loop System Expansion Vessel Possible Additional Expansion Vessel(s) Union Union Union LSV IV Drain Cock LSV IV Drain Cock Notes: If practical do not lag pipework from unit to system or vessel. Ensure all isolation and drain valves are included in the installation to assist maintenance. Follow wiring diagrams for electrical connections.

Electrical Connections to unit The supply should be brought to the set with suitable trunking or armoured cable, with trunking we recommend that the final metre is converted to flexible conduit to avoid any undue stress or fatigue to the unit. All supply cables should be sized according to accommodate any voltage drop due to long cable runs. Voltage at the unit should be single phase, 230 volt, 50 Hz. A neutral supply is required. The pump rating 0.37kW and 2.5amps FLC. On twin pumps allow for both to run together. (high pressure versions (EPS-ENH-HP / EPT-ENH-HP) 0.37 kw and 3.41 amps FLC) The volt free contacts are rated at 5 Amps, 230 volt. It is strongly recommended that a local isolator is installed within one metre of the unit incorporating sufficient contacts to isolate both the mains supply and all control cables being used. The supply fuses should be rated to run one pump or a pair in a duty standby unit. All equipment should be earthed. IT IS STRONGLY RECOMMENDED THAT ANY SUPPLY FEEDING THE VOLT FREE CONTACTS FOR ALARMS OR CUT OUTS, IS DISCONNECTED BY THE INDEPENDENT ISOLATOR. All connections should be performed by a competent electrician conversant with the wiring diagram provided and all current regulations. Care should be taken when connecting to terminals on the circuit board and excess pressure should be avoided on terminals.

WIRING DIAGRAM Models: EPS-ENH, EPT-ENH, EPS-ENH-HP, EPT-ENH-HP

Commissioning These notes are guide lines to engineers who are conversant with sealed systems and pressurisation units. Flow Mech Products can provide a commissioning service for customers where required. If the unit has been factory set, no adjustments after pump priming should be necessary. NOTE: All pump(s) must be vented prior to any running using the vent plug situated adjacent to the discharge valve. If water is not present, check the filters are clean in the tank and try again, replace the vent plug and tighten after venting. Settings We base our setting on the following:- 1) The cold fill pressure is worked as:- The static height of the system in metres + 4 metres = cold fill pressure e.g. 9 metres static + 4 metres = 1.3bar (10 metres = 1 bar approx.) The minimum setting should be 1.0 bar, this allows up to 6 metres of pipework height. 2) The low pressure setting is to be set 0.4 below cold fill pressure e.g. cold fill 1.5 bar, LP = 1.1 bar. 3) The high pressure setting should be set at 0.3 bar below the system safety valve setting e.g. safety valve set at 4.0 bar, HP = 3.7 bar. To program the unit if it has not been factory set, proceed using the control instructions on the following pages. Vessel Air Pressure If not factory set, the vessel air pressure must be set to 0.1 bar below the cold fill pressure (e.g. cold fill of 1.0 bar, vessel pressure 0.9 bar). All vessels have to be empty of all water prior to setting the air pressure. The air valve for the vessel is located below the black cap, which should be replaced after checking/adjusting the air pressure. Note: We are able to provide a full commissioning service if you require this.

IMPORTANT: VENT PUMPS BEFORE PROGRAMMING Initial Procedure 1) Fill with water 2) Vent pumps 3) Turn power on 4) PUMP OFF lamp(s) should be lit. Display should be lit with manufacturers details. 5) After 5 seconds a high/low pressure fault may indicate if so mute with the red ALARM MUTE button To Access Parameters:- Press the red button alongside (+) or (-) for 3 seconds View parameters (+) (if selecting, hold the button for 3 seconds) Set parameters (-) (if selecting, hold the button for 3 seconds) Setting Parameters Enter Customer Password (your password is: 2852) as follows:- Use the red button(s) alongside the arrows ( ) to reach the 1 st figure on the LCD display Press the red button alongside (ALARM MUTE) to Enter The LCD display will indicate it is ready for the 2 nd figure to be entered Repeat the same method to enter the 2 nd, 3 rd and 4 th figures (note: Use button if figure is too high). Cold Fill Pressure 1.0 Bar Use the arrow buttons ( ) to adjust the pressure Enter with (ALARM MUTE) Duty Pump Delay 2 seconds (Range 2 180 secs) Factory Set 2 Seconds (Use feature with large chilled water circulators) Adjust time using buttons and enter with (ALARM MUTE) Support Pump Delay (Only applicable in twin pumps selected) Factory set at 20 seconds (Range 15 180 secs) Adjust with to required time Enter with (ALARM MUTE) Low Pressure 0.6 bar (Factory setting 0.6 bar) Alter range in conjunction with cold fill setting. Minimum differential setting 0.4 Bar below cold fill setting Adjust with to required setting Enter with (ALARM MUTE) (continued overleaf)

Low Pressure Delay 5 secs (Factory setting is 5 secs) Range 5 240 secs Note: If system goes to low pressure, the fault is not shown for 5 secs. Adjust using buttons and enter with (ALARM MUTE) High Pressure 2.5 bar (Factory setting is 2.5 bar) Range 0.4 bar above cold up to 10 bar Adjust using buttons and enter with (ALARM MUTE) High Pressure Delay 0.0 secs (Factory setting is 5 secs) Range 5 240 secs Note: If system goes to high pressure, the fault is not shown for 5 secs. Adjust using buttons and enter with (ALARM MUTE) Frequency of Starts ON or OFF Select using and confirm with (ALARM MUTE) Note: The frequency of starts alarm is provided to give early indication of a system leak. It does this by counting how many times the pump(s) start in a 10 minute period. If the unit starts 20 times in 10 minutes or runs continuously to 2 minutes the frequency of starts alarm is activated. Support Pump Started ON or OFF Note: If only one pump is present, screen reads support pump alarm OFF. Use this for selecting the alarm feature if required. (Only available on twin pump units) Factory set to ON Select with and confirm with (ALARM MUTE) Flood Protection ON or OFF Select using and confirm with (ALARM MUTE) Note: The flood alarm works in the same way as the frequency of starts alarm but is activated after 40 starts in 10 minutes. If the alarm is activated the unit switches off both pumps and its boiler relay in order to protect the system. This alarm may only be reset by switching off the unit waiting 10 seconds then switching the unit back on Shows hours mins secs To reset press or skip with (Leave to change to next screen) Shows hours mins secs To reset press or skip with Pump 1 Hours Run Pump 2 Hours Run Note: ONLY ON TWIN PUMP MODELS. PROGRAM COMPLETE THE UNIT WILL NOW RETURN TO NORMAL OPERATION PUT THE PUMP(S) INTO AUTO POSITION

FILL MODE Hold ALARM MUTE button for 3 seconds Use to reset Use to skip Service Reminder Fill Mode OFF or ON Press to enter fill mode and enter with (ALARM MUTE). Press pump No.1 and No.2 (if applicable) into Auto position. Fill mode overrides all features with the exception of low water & pump trip. After filling press ALARM RESET button to return to standard pressurisation mode. IMPORTANT NOTE: ONLY USE THE PUMP HAND POSITION FOR TESTING. NEVER LEAVE PUMPS IN HAND POSITION, ONLY LEAVE PUMPS IN THE OFF OR AUTO POSITION.

Maintenance Six monthly checks should be made on the expansion vessels. The air charge should be checked after the vessel is isolated and drained using the local valve and drain cock. Note: You cannot check these vessels unless drained. Use an oil free compressor or foot pump to inflate and check with a good quality gauge for the air pressure. Yearly checks should proceed as above followed by running the pumps to check operation, mechanical seals and electronic controls. This can be performed by isolating the system with the unit isolation valve, connecting a hose from the unit drain cock and placing the other hose end back into the units water tank. As you open the drain cock the pressure should fall and start a pump, this can be run for 5-10 minutes after which you should close the drain cock allowing the unit to build pressure and stop and then repeat the operation for the second pump if fitted. After maintenance, ensure you open the unit back up to the system. Other checks consist of testing for noisy bearings, faulty ball valve or float, float switch operation, electrical connections and general operation and condition of the unit. All maintenance should be carried out by a competent person conversant with sealed system pressurisation units. A full maintenance programme is available on request Please contact our Service Department (details on front page)