THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

Similar documents
THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

ASBESTOS INSPECTION PLANT BIOLOGY BUILDING 178 MICHIGAN STATE UNIVERSITY

ASBESTOS INVENTORY CONTROL

Asbestos Operations and Maintenance Plan

Asbestos Regulation and Compliance

Hazard Communication Program

WILL NOT DISTURB ASBESTOS CONTAINING MATERIAL!

WAYNE COUNTY BOARD OF EDUCATION. Asbestos Operations and Maintenance Program

FINAL Designated Substances Survey Report Women s Residence 674 Dundas Street West, Toronto, Ontario

Control of Work. Introduction This procedure describes the management of Asbestos. Definitions

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 1 PINE COUNTY

TATTVAM ENVIRONMENTAL AND ENGINEERING SOLUTIONS, LLC. Indoor Air Quality Report for Weston Public Schools Weston, CT.

Escondido Union High School District. Hazard Communication Plan

Asbestos Management Plan

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

ASBESTOS OPERATIONS AND MAINTENANCE SAFETY PROGRAM

The Children s Hospital of Philadelphia Committee for the Protection of Human Subjects Policies and Procedures. Cooperative Agreements

BSR GPTC Z TR GM References and Reporting Page 1 of 8

Chapter 7 Inspector Safety

RISK MANAGEMENT AND SAFETY COURSE DESCRIPTION CATALOG & CONTACT INFORMATION

BEGINNING THE MEETING

Safe Work Practices / Procedures / Instruction ASBESTOS. (See also Asbestos Exposure Control Plan )

ACCREDITATION OF ON-LINE LEAK SEAL ORGANIZATIONS

SILICA EXPOSURE CONTROL PLAN

University of Tennessee Safety Program

CSU Channel Islands Lead Operations and Maintenance Program

Standards of Practice Emergency Shower/Eyewash Installation, Use, Testing & Maintenance

PLEASE DO NOT WRITE ON THIS EXAM

PLEASE DO NOT WRITE ON THIS EXAM

Hazardous Energy Program Lockout/Tagout

UNDERWATER BRIDGE INSPECTION REPORT METRO DISTRICT - ANOKA COUNTY

Slips, Trips and Falls

HAZARD ASSESSMENT FOR ORANGE COUNTY SCHOOLS

Estates & Facilities Management - Management and Control of Asbestos Policy and Procedures

ELECTRICAL (COMPREHENSIVE) SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR CFR , ,

Steam System Best Practices 14 Best Practices for Guide Lines for Boiler Plant Log Books

2018 INSPECTION REPORT

Pressure Relief Device Investigation Testing Lessons Learned

HAZARDOUS WASTE OPERATIONS AND EMERGENCY RESPONSE

Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop San Antonio, Texas Project No

SAMPLE WRITTEN PROGRAM for Control of Hazardous Energy LOCKOUT TAGOUT

SILICA WEBINAR. Chris Chipponeri Chief Operations Officer Hazard Management Services, Inc.

1811G/H PITOT-STATIC TEST SET

Procedure: Pressure equipment safety

CONTROL OF HAZARDOUS ENERGY IN THE WORKPLACE

HAZARD COMMUNICATION PROGRAM

MANUFACTURING TECHNICAL INSTRUCTIONS - SAFETY FALL HAZARD CONTROL REQUIREMENTS SERIES & NO. SMI - 157

Hazardous Energy Control

Confined Space Entry Written Program

Standard Pneumatic Test Procedure Requirements for Piping Systems

SWIM POOL MANAGEMENT City of Blue Springs, Missouri

ADA TRANSITION PLAN 2013

Control of Hazardous Energy Program (Lockout/Tagout)

B. Diagnostic Equipment Information 01 Number of Manometers Used to Measure Home Pressurization Manometer Make. Manometer Serial Number

TABLE OF CONTENTS PART 2 - CONFINED SPACES

UNIVERSITY OF NOTRE DAME CONFINED SPACE ENTRY POLICY

Hazard Communication Program

Testing Procedures of Watertight Compartments

New Licensed Asbestos Operative Training

1.0 PURPOSE 2.0 SCOPE 3.0 DEFINITIONS. ANSI: American National Standards Institute. CCC: Chemical Control Centre

Arizona Swimming Inc Long Course Age Group State Championships July 19-22, 2018

Lockout Tagout Program

FAQs: Confined Spaces in Residential Construction

CCR Certification: Fugitive Dust Control Plan (b) for the. West Ash Pond. at the. F. B. Culley Generating Station.

GARDENS POINT CAMPUS

SECTION LEAD-BASED PAINT REMOVAL AND DISPOSAL

Laboratory results indicate all short-term radon tests at Glencoe High School tested below 4.0 pci/l.

C&G 2395 Exam Paper April Section A - All questions carry equal marks. Answer all three questions. Show all calculations.

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY

ontario regulation 629/05 made under the occupational health and safety act

Removal of Lead-Based Paint

CHAPTER 8 STAKING SIGNALS AND LIGHTING FIELD GUIDE. 8.1 Staking Traffic Control Signal Systems

New Licensed Asbestos Manager Training

OPERATIONAL GUIDELINE P R O C E D U R E

THE CORPORATION OF THE MUNICIPALITY OF STRATHROY-CARADOC BY-LAW NUMBER 24-09

In addition to the responsibility for managing the elements of the respiratory protection program, he/she will be responsible for:

CONFINED SPACE ENTRY WRITTEN PLAN

Requirements for Reduced Supervision of Power Plants, Thermal Liquid Heating Systems, and Heating Plants

Sample Written Program for The Control of Hazardous Energy (Lockout/Tagout)

FedRAMP Plan of Actions and Milestones (POA&M) Template Completion Guide. Version 2.0

Laboratory Ventilation. Environmental, Health, and Safety

OSHA Respirable Crystalline Silica Standard: Tips for Developing a Compliance Strategy June 2016

Arizona Swimming 2018 Short Course Age Group State Championship March 8-11th

BASKETBALL 11. Rules In This Section Shall Pertain To Both Boys And Girls Basketball Unless Otherwise Specified.

CURI Pierside Stainless Diesel Tank

Transcription:

SCHOOL DISTRICT OF PHILADELPHIA Asbestos Hazard Emergency Response Act AHERA THREE-YEAR RE-INSPECTION 2015-2016 and ASBESTOS MANAGEMENT PLAN for the Theodore Roosevelt Elementary School ULCS# 6110 Building # B611001-1 430 Washington Lane Philadelphia, Pennsylvania 19144 December 2015 Conducted By: Accredited Environmental Technologies, Incorporated Batta Environmental Associates, Incorporated Criterion Laboratories, Incorporated Environmental Testing Consultants, LLC G & C Environmental Services, Incorporated KEM Partners, Incorporated Synertech, Inc. TTI Environmental, Inc. USA Environmental Management, Inc. The Vertex Companies, Inc. Management Plan Prepared By: Criterion Labs, Inc and Synertech Inc. This report must remain in the Main Office as mandated by the US EPA AHERA Regulations.

AHERA THREE-YEAR REINSPECTION VOLUME IX Table of Contents Transmittal Letter Executive Summary I. Summary list of Confirmed Asbestos Containing Building Materials II. Summary list of Assumed Asbestos Contain Building Materials III. Summary list of Non-Asbestos Containing Building Materials IV. Summary list of Non Suspect Asbestos Containing Building Materials V. Summary List of Auditorium DATA for this location VI. Summary list of Attic and/or Crawlspace DATA for this location VII. Summary list of Pipe Chase/Pipe Shaft DATA for this location Section I Report of Re-Inspection A. Introduction B. Three-Year Re-inspection IX Overview C. Post- Management Plan Activities and Changes C.1 - Sampling and Analysis C.2 - New Floor Tile Sampling C.3 - Abatement Activity C.4 - Periodic (Six-Month) Surveillance (Damaged Materials) Section II Re-Inspection Data A. Introduction B. Re-Inspection Key Definitions C. Room by Room Location Log Report Section III Certificates A. Management Planner/Building Inspector Certificates Section IV Cross Reference Table Page 1-8 Asbestos Management Program Page 9-19

SCHOOL DISTRICT OF PHILADELPHIA EDUCATIONAL CENTER 440 NORTH BROAD STREET PHILADELPHIA, PENNSYLVANIA 19130 OFFICE OF ENVIRONMENT AL MANAGEMENT A ND SERVICES PHONE (215)-400-4750 January 2016 TO: All Principals All Building Administrators FROM: Fran Burns Chief Operating Officer Francine Locke, M.S., Director Office of Environmental Management and Services SUBJECT: AHERA Three (3) Year Re-inspection IX report In order to comply with the provisions of the Asbestos Hazard Emergency Response Act (AHERA) the attached report is submitted to you. The law requires that this report be kept in the Main/Principal's office. It cannot be removed from these locations. If the school (program) is relocated to a different building, these environmental documents are to be safely retained for the next school/building occupants. All asbestos reports must be available to the public and Federal EPA upon request. Fran Burns Chief Operation Officer Francine Locke, M.S., Director Office of Environmental Management and Services AHERA-2d Revised 12/14/15

Executive Summary This Asbestos Hazard Emergency Response Act (AHERA) Three-Year Re-inspection Volume # IX Management Plan at this location, has been completed and the report of re-inspection submitted to the School District of Philadelphia. The re-inspections in all School District of Philadelphia buildings of 2015-2016 were conducted and completed between October 5 th, 2015 through March 30 th, 2016 as a joint project by Accredited Environmental Technologies, Inc., Batta Environmental Associates, Inc., Criterion Laboratories, Inc., Environmental Testing Consultants, LLC, G & C Environmental Services, Inc., KEM Partners, Inc., Synertech, Inc., TTI Environmental, Inc., USA Environmental Management, Inc. and The Vertex Companies, Inc. In general, the School District of Philadelphia Office of Environmental Management and Services conducts Environmental Impact Evaluations and provides Asbestos Inspection Reports prior to any renovation, demolition and/or maintenance activities. The AHERA report must be reviewed prior to any renovation, demolition and/or maintenance activities in order to avoid the unknowing disturbance to Asbestos Containing Building Materials identified within this location. In addition, prior to work activities above all drop ceilings this report should be reviewed to avoid potential disturbances to Asbestos Containing Materials. Refer to Section IV of the Cross Reference Table, for additional Asbestos Management Program information. Contact the Office of Environmental Management and Services to have an Environmental Impact Evaluation conducted prior to any renovation, demolition and/or maintenance activities within this facility. The information contained in this report was obtained from the original Asbestos Management Plan for the school, from update reports on changes and activities since the completion of the 1 st Management Plan for each location and from all prior inspections performed and documented in Volume # I through Volume VIII (dated respectively 1992, 1995, 1998, 2001, 2004, 2007, 2010 or 2013) (if applicable) - and by this Three-Year Re-inspection of this school. The re-inspection report/management Plan of 2015-2016 were reviewed and prepared collectively by Management Planner Megan Vala, Mary Anne Lerro of Criterion Laboratories, Inc. and/or Monique Causley, of Synertech Inc. 2015/2016 Asbestos Hazard Emergency Response Act (AHERA) Management Report Theodore Roosevelt Elementary School

The 2015-2016 inspection process included the addition of a comprehensive Room by Room Inventory of all Thermal (T), Surfacing (S) and Miscellaneous (M) Materials specific to each room of this facility. Inspections of each room s thermal, ceilings, walls, floors and miscellaneous items regardless of Asbestos Content are categorized on the Room by Room Location Log Report for this location. Rooms or areas of the facility that were not accessible at the time of the inspection are marked with an X. The Room by Room Location Log Report is found in Section II C of this Management Plan. All Presumed or Suspect Asbestos Containing Building Materials (ACBMs), listed in the following summary charts are categorized as Confirmed, Assumed, Non-Asbestos, and/or Non- Suspect (ACBMs) were identified in the original Management Plan, or in the Volume I through Volume VIII AHERA Three-Year Re-inspection reports, and were re-inspected as part of this project. As mandated by the U S EPA AHERA regulations, periodic Six-Month inspections and Three- Year Re-inspections of this location will be performed and the Inspection Data in this report will be updated accordingly. Please feel free to contact the School District of Philadelphia s Office of Environmental Management and Services (OEMS) regarding any comments, questions, or concerns regarding this report or any Environmental related topic. OEMS staff can be reached at (215) 400 4750, via fax at (215) 400 4751 or via e-mail at flocke@philasd.org and/or gfjunod@philasd.org. Additional information can be found on our website. Here is the link to the OEMS website. http://webgui.phila.k12.pa.us/offices/e/environmental 2015/2016 Asbestos Hazard Emergency Response Act (AHERA) Management Report Theodore Roosevelt Elementary School

I. Summary list of Confirmed Asbestos Containing Building Materials within this facility These charts are to be used for a quick reference* in order to avoid the unknowing disturbance of Asbestos Containing Materials during any and all Operations, Maintenance, Renovation, and/or Demolition activities at this location. These materials have been sampled and Laboratory Analysis has CONFIRMED the presence of Asbestos. Contact OEMS prior to the disturbance of any of the following materials. Confirmed Asbestos Containing Building Materials for this location Floor Tile VAT 9" x 9" Pipe Fitting Insulation Pipe Insulation 2-6 inch * Always refer to the Room by Room Logs for each specific material classification as the material classification findings may be different in various rooms throughout this facility. ** Some Materials may have multiple classifications (Confirmed, Assumed, NAD and Non Suspect) within this facility. 2015/2016 Asbestos Hazard Emergency Response Act (AHERA) Management Report Theodore Roosevelt Elementary School

II. Summary list of Assumed Asbestos Containing Building Materials within this facility These charts are to be used for a quick reference* in order to avoid the unknowing disturbance of Asbestos Containing Materials during any and all Operations, Maintenance, Renovation, and/or Demolition activities at this location. These materials have not been sampled and should not be disturbed until verification of Asbestos Content. Contact OEMS for assessment and sampling prior to the disturbance of these materials. Assumed Asbestos Containing Building Materials for this location Ceiling Tile 1' x 1' Cove Base Adhesive Floor Tile VAT 12" x 12" Floor Tile VAT 24" x 24" Glue Dots Metal Pan Ceiling Insulation Pipe Fitting Insulation Pipe Insulation > 6 inch Plaster Ceiling Radiator Insulation Sheetrock Wall Transite Electrical Panel Transite Sills Transite Stalls Vibration Damper Cloth * Always refer to the Room by Room Logs for each specific material classification as the material classification findings may be different in various rooms throughout this facility. ** Some Materials may have multiple classifications (Confirmed, Assumed, NAD and Non Suspect) within this facility. 2015/2016 Asbestos Hazard Emergency Response Act (AHERA) Management Report Theodore Roosevelt Elementary School

III. Summary list of Non-Asbestos Containing Building Materials within this facility These charts are to be used for a quick reference* in order to avoid the unknowing disturbance of Asbestos Containing Materials during any and all Operations, Maintenance, Renovation, and/or Demolition activities at this location. These materials have been sampled and Laboratory Analysis has indicated NO Asbestos present or NO ASBESTOS DETECTED (NAD). Non- Asbestos Containing Building Materials for this location Ceiling Tile 1' x 1' Plaster Ceiling Plaster Walls * Always refer to the Room by Room Logs for each specific material classification as the material classification findings may be different in various rooms throughout this facility. ** Some Materials may have multiple classifications (Confirmed, Assumed, NAD and Non Suspect) within this facility. 2015/2016 Asbestos Hazard Emergency Response Act (AHERA) Management Report Theodore Roosevelt Elementary School

IV. Summary list of Non-Suspect Asbestos Containing Building Materials within this facility These charts are to be used for a quick reference* in order to avoid the unknowing disturbance of Asbestos Containing Materials during any and all Operations, Maintenance, Renovation, and/or Demolition activities at this location. These materials are not typically known to contain Asbestos. Non-Suspect Asbestos Containing Building Materials for this location Ceiling Tile 2' x 4' Cement Floor Ceramic Tile Floors Ceramic Tile Walls Concrete Block Wall Concrete Ceiling Fiberglass Boiler Insulation Fiberglass Boiler Rope Fiberglass Ceiling Tile 2' x 4' Fiberglass Pipe Fitting Insulation Fiberglass Pipe Insulation Marble Floors Marble Walls Metal Ceiling Panels Metal Pan Ceiling Tile 1' x 1' Metal Wall Sheeting Wood Floor * Always refer to the Room by Room Logs for each specific material classification as the material classification findings may be different in various rooms throughout this facility. ** Some Materials may have multiple classifications (Confirmed, Assumed, NAD and Non Suspect) within this facility. 2015/2016 Asbestos Hazard Emergency Response Act (AHERA) Management Report Theodore Roosevelt Elementary School

V. Summary list of Auditorium DATA for this location These charts are to be used for a quick reference of the Auditorium DATA within this facility. Sampling of the Auditorium Ceilings throughout the District is more difficult because of the various ceiling heights. As sampling occurs this information is updated on a case by case basis for each specific location and facility. This is a list of known sampling information for this locations Auditorium Auditorium Auditorium Balcony Plaster Ceiling Assumed Auditorium Balcony Fiberglass Pipe Insulation Non Suspect ACM Auditorium Balcony Radiator Insulation Assumed Auditorium Wood Floor Non Suspect ACM Auditorium Plaster Walls NAD Auditorium Plaster Ceiling Assumed * Always refer to the Room by Room Logs for each specific material classification as the material classification findings may be different in various rooms throughout this facility. ** Some Materials may have multiple classifications (Confirmed, Assumed, NAD and Non Suspect) within this facility. 2015/2016 Asbestos Hazard Emergency Response Act (AHERA) Management Report Theodore Roosevelt Elementary School

VI. Summary list of Attic and/or Crawlspace DATA for this location These charts are to be used for a quick reference regarding the Attics and/or Crawlspaces inspection DATA within this facility. Contact OEMS prior to entering any attic or crawlspace within this facility and refer to the below chart and legend for Category Rank determination. The Data relative to these spaces is updated as conditions change regarding Abatement or Renovation activity on a case by case basis for each specific location and facility. In general, Crawlspaces are below the basement or 1 st floor and Attics are above the floor space. Category Rank Legend "A" - No Asbestos Containing Materials - Sample Results indicate NO ACM on pipes, fittings, elbows, or equipment located within this functional space, and NO VISIBLE DEBRIS or DAMAGE observed at time of this inspection. "B" - Asbestos Containing Materials Exist - Sample Results indicate ACM on pipes, fittings, elbows, or equipment located within this functional space, HOWEVER, NO VISIBLE DEBRIS or DAMAGE observed at time of this inspection. "C" - Asbestos Containing Materials Exist - Sample Results indicate ACM on pipes, fittings, elbows, or equipment located within this functional space, and LOCALIZED VISIBLE DEBRIS or DAMAGE observed at time of this inspection. "D" - Asbestos Containing Materials Exist - Sample Results indicate ACM on pipes, fittings, elbows, or equipment located within this functional space and DISTRIBUTED VISIBLE DEBRIS or SIGNIFICANT DAMAGE observed at time of this inspection. "E" - No Bulk Sample Results Available SUSPECT ACM OBSERVED. Contact OEMS immediately for additional instructions. Attic/Crawlspace Access Area Floor Surface Category Rank Comments Auditorium Attic Third Floor Hallway Wire Lathe A X Main Attic Third Floor Hallway Wire Lathe/Concrete A 1000 LF Fiberglass Piping Crawlspace Fan Room Concrete A X 2015/2016 Asbestos Hazard Emergency Response Act (AHERA) Management Report Theodore Roosevelt Elementary School

VII. Summary list of Pipe Chase/Pipe Shaft DATA for this location These charts are to be used for a quick reference regarding the information known about the Pipe Chases and/or Pipe Shafts inspection DATA within this facility. Contact OEMS prior to performing renovation activities any Pipe Chase and/or Pipe Shaft within this facility and refer to the below chart and legend for Asbestos Content of various materials identified within each space. The Data relative to these spaces is updated as conditions change regarding Inspection, Abatement and/or Renovation activity on a case by case basis for each specific location and facility. In general, Pipe Chases are horizontal spaces and Pipe Shafts are vertical spaces. Pipe Chases and Pipe Shafts need to be assessed. 2015/2016 Asbestos Hazard Emergency Response Act (AHERA) Management Report Theodore Roosevelt Elementary School

Section I Report of Re-inspection A. Introduction B. Three-Year Re-inspection IX Overview C. Post-Management Plan Activities and Changes 2015/2016 Asbestos Hazard Emergency Response Act (AHERA) Management Report Theodore Roosevelt Elementary School

Section I - A Introduction Report of Re-inspection The Three-Year Re-inspection IX was performed to fulfill the requirements of 40 CFR Part 763 - the Asbestos Hazard Emergency Response Act (AHERA). As required by AHERA, each Local Education Agency (LEA) must re-inspect all known confirmed or assumed Asbestos Containing Building Material (ACBM) located in the LEA's facilities. This re-inspection is intended to update the original Asbestos Management Plan for the LEA's facilities. Multiple Building Inspectors of several firms performed the 2015/2016 re-inspection. The reinspection report/management Plan of 2015-2016 were reviewed and prepared collectively by Management Planner Megan Vala, Mary Anne Lerro of Criterion Laboratories, Inc. and Monique Causley, of Synertech Inc. All of the certificates can be found in Section III. During the re-inspection of each School District of Philadelphia facility, all of the Management Plans for that facility were reviewed. Information from the conclusions section of that report is included in this report. Additionally, information on activities such as abatements, cleanings, sampling and inspections, which have taken place since the completion of the original Management Plan, were reviewed during the re-inspection. Information on those activities is included in this report. As mandated by the U S EPA AHERA regulations, all future periodic Six-Month inspections and Three-Year Re-inspections of this location will be performed and the Inspection Data in this report will be updated accordingly. 2015/2016 Asbestos Hazard Emergency Response Act (AHERA) Management Report Theodore Roosevelt Elementary School

Section I - B Three-Year Re-inspection IX Overview Each homogeneous area of Asbestos Containing Building Material (ACBM) listed in the original Management Plan or in the 1992, 1995, 1998, 2001, etc., Three-Year Reinspection reports were inspected for the AHERA Three-Year Re-inspection Volume IX, and the information for that material verified. Any changes to a homogeneous area listed in the updates to the Management Plans were verified. Any area of suspected ACBM found in the course of the re-inspection, and not listed in the Management Plan or updates, were either assumed to contain asbestos or sampled and analyzed to determine their asbestos content. Any such new areas either assumed to contain asbestos or determined through analysis to contain asbestos were included in the report of the Three- Year Re-inspection. The results of the AHERA Three-Year Re-inspection IX are tabulated in the Room by Room log reports located in Section II-C of this report. As previously noted, all future periodic Six-Month inspections and Three-Year Reinspections of this location will be performed and the Inspection Data in this report will be updated accordingly. 2015/2016 Asbestos Hazard Emergency Response Act (AHERA) Management Report Theodore Roosevelt Elementary School

Section I C.1 Post Management Plan Activities/Changes Information on activities affecting Asbestos Containing Building Materials (ACBMs) at this location is contained in updates to the Management Plan. These updates are kept on file by the School District of Philadelphia and were reviewed for this project. Updates to the Management Plan include the following: Sampling and Analysis, New Tile Installation, Abatement Activity and Periodic Six-Month Surveillance Data. Sampling and Analysis Date Floor Room Type Location Material Color Results 12/15/2015 2 Auditorium Balcony Plaster Ceiling Debris White NAD 2015/2016 Asbestos Hazard Emergency Response Act (AHERA) Management Report Theodore Roosevelt Elementary School

Section I C.2 Information on the installation of new floor tiles/renovation activities affecting Asbestos Containing Building Materials (ACBMs) at this location is contained in updates to the Management Plan. These updates are kept on file by the School District of Philadelphia and were reviewed for this project. Updates to the Management Plan include the following: New Floor Tile Sampling In the event that new tile is installed, the material must be tested prior to installation. 2015/2016 Asbestos Hazard Emergency Response Act (AHERA) Management Report Theodore Roosevelt Elementary School

Section I C.3 Information on the Asbestos Abatement and renovation activities affecting Asbestos Containing Building Materials (ACBMs) at this location is contained in updates to the Management Plan. These updates are kept on file by the School District of Philadelphia and were reviewed for this project. Updates to the Management Plan include the following: Abatement Activity In the event that Abatement occurs, data will be listed here. 2015/2016 Asbestos Hazard Emergency Response Act (AHERA) Management Report Theodore Roosevelt Elementary School

Floor Element Section I C.4 Information on the AHERA inspection that noted damage to various Building Materials at this location is contained in updates to the Management Plan. These updates are kept on file by the School District of Philadelphia and were reviewed for this project. Work orders are created for Corrective Action responses and tracked for completion. Updates to the Management Plan include the following: Periodic (Six-Month) Surveillance (Damaged Materials) Amount of Material Amount of Damage Date On Site Room Name Material 7/20/2016 1 3 Classroom 311 and 312 Closet Floor Tile VAT 9" x 9" 300 SF 4 SF 7/20/2016 1 3 Classroom 312 Floor Tile VAT 12" x 12" 350 SF 1 SF 7/20/2016 1 3 Women's Restroom next to Classroom 316 Floor Tile VAT 12" x 12" 35 SF 35 SF 7/20/2016 1 3 Elevator Floor Tile VAT 9" x 9" 65 SF 65 SF 7/20/2016 1 2 Office 206C Floor Tile VAT 12" x 12" 250 SF 1 SF 7/20/2016 1 2 Conference Room near Main Office Floor Tile VAT 12" x 12" 500 SF 7 SF 7/20/2016 1 2 Auditorium Balcony Plaster Ceiling 1800 SF 10 SF 7/20/2016 1 2 Classroom 211 Floor Tile VAT 12" x 12" 500 SF 30 SF 7/20/2016 1 2 Classroom 211 Storage Floor Tile VAT 9" x 9" 300 SF 250 SF 7/20/2016 1 2 Classroom 221B Floor Tile VAT 9" x 9" 450 SF 3 SF 7/20/2016 1 2 Classroom 221C Floor Tile VAT 9" x 9" 450 SF 3 SF 7/20/2016 1 2 Men's Restroom next to Classroom 202 Floor Tile VAT 12" x 12" 50 SF 20 SF 7/20/2016 1 1 Cafeteria closest to Washington Lane Floor Tile VAT 12" x 12" 1800 SF 4 SF 7/20/2016 1 1 Cafeteria closest to Washington Lane Pipe Insulation 2-6 inch 325 LF 1 LF 7/20/2016 1 1 Cafeteria closest to Washington Lane Pipe Fitting Insulation 12 EA 1 EA 7/20/2016 1 1 Kitchen Floor Tile VAT 12" x 12" 800 SF 5 SF 7/20/2016 1 1 Cafeteria at Corner of Building near Parking Lot Pipe Insulation 2-6 inch 300 LF 1 LF 7/20/2016 1 1 Room C next to Classroom 103 Floor Tile VAT 9" x 9" 200 SF 2 SF 7/20/2016 1 1 Classroom 102 Floor Tile VAT 9" x 9" 450 SF 10 SF Custodial Closet across from Classroom 7/20/2016 1 1 100/101 Pipe Fitting Insulation 4 EA 1 EA 7/20/2016 2 1 Girl's Gymnasium Locker Room Floor Tile VAT 12" x 12" 800 SF 50 SF 2015/2016 Asbestos Hazard Emergency Response Act (AHERA) Management Report Theodore Roosevelt Elementary School

Section II Re-inspection Data A. Introduction B. Re-inspection Key Definitions C. Room by Room Asbestos Location Log 2015/2016 Asbestos Hazard Emergency Response Act (AHERA) Management Report Theodore Roosevelt Elementary School

Section II - A Introduction Re-inspection Data The following information documents the Three-Year Re-inspection IX of the subject school/facility. The Homogeneous Area Reports were produced using the building inspector's field data on the facility. The key to the Homogeneous Area Report is outlined in the following pages of this report. 2015/2016 Asbestos Hazard Emergency Response Act (AHERA) Management Report Theodore Roosevelt Elementary School

Section II - B (page 1 of 4) SCHOOL DISTRICT OF PHILADELPHIA AHERA THREE YEAR RE-INSPECTION IX ITEM DEFINITION ULCS# HOMOGENEOUS AREA ID# Individual identification number assigned to each school within the School District of Philadelphia. Identification number assigned to each homogeneous area in a school/facility. Each section of the homogeneous area ID is significant. 1010/01/01/01 A B C D A. Is the ULCS# for the school. B. Designates the specific building/building area within the school. C. Designates the floor or level within the building/building area. D. Designates the homogeneous material within that floor or level. Note: Item D may be a number or a letter. SYSTEM AFFECTED ITEM AFFECTED Corresponds to the AHERA system for classifying materials. T : Thermal System S : Surfacing System M : Miscellaneous Is a description of the homogeneous material. ORIGINAL This section contains the information found in the original INSPECTION Management Plan (1988-1989). DATA AMOUNT OF MATERIAL/ UNIT Quantity of material, and measuring unit. Units include: Square Feet (SF) Each (EA) Linear Feet (LF) Cubic Feet (CF). 2015/2016 Asbestos Hazard Emergency Response Act (AHERA) Management Report Theodore Roosevelt Elementary School

(page 2 of 4) SCHOOL DISTRICT OF PHILADELPHIA AHERA THREE YEAR RE-INSPECTION IX RE-INSPECTION FORM KEY ITEM DEFINITION CND Condition DP Damage Potential ASMD Assumed Asbestos Corresponds to AHERA condition rating for materials. 0 : No Damage 1 : Damage 2 : Significant Damage Corresponds to the AHERA material assessment system. 1 : Potential for Damage 2 : Potential for Significant Damage This means that a material was not sampled for asbestos content during the original Management Plan inspection. RA This corresponds to the AHERA system of response action rating for materials. Response Action 1 : Establish O&M Program 2 : Repair and Establish O&M Program 3 : Enclose 4 : Encapsulate 5 : Remove 6 : Partial Removal and Establish O&M Program CHANGES This section describes changes to the homogeneous material in the twenty-four years since the original AHERA inspection. The abbreviations are defined below. RMVD : Removed ENCL : Enclosed ENCP : Encapsulated DMGD : Damaged SMPLD : Sampled MTRL : Material RPRD : Repaired N/L : None Located RPLCD : Replaced 2015/2016 Asbestos Hazard Emergency Response Act (AHERA) Management Report Theodore Roosevelt Elementary School

(page 3 of 4) SCHOOL DISTRICT OF PHILADELPHIA AHERA THREE-YEAR RE-INSPECTION IX RE-INSPECTION FORM KEY ITEM DEFINITION THREE YEAR RE-INSPECTION DMGD AMT Amount Damaged NF Newly Friable RA Response Action This section contains the information obtained from the Three-Year Re-inspection IX. With three exceptions, the information categories are identical in format and meaning to those found in the original inspection data section. The three exceptions are defined below. This section gives the quantity of damaged material in a homogeneous area. The quantity is shown in the same format as the amount of material/unit section. This section identifies materials in the original Management Plan which have since become friable. This rating is based on the AHERA regulations, and is comparable to the RA rating found in the "Original Inspection Data" section. The following table details the response actions. 1. Establish O&M Program 2. Repair and Establish O&M Program 3. Enclose 4. Encapsulate 5. Remove 6. Partial Removal and Establish O&M Program a. High Priority Response The homogeneous material has been scheduled for abatement or other response action. b. Medium Priority Response The homogeneous material will be scheduled for abatement or other response action as soon as the high priority responses have been addressed. c. Low Priority Response The homogeneous material will be scheduled for abatement or other response action as soon as the medium priority responses have been addressed. d. On-Going Response/Operations and Maintenance The homogeneous material does not require abatement or other response action at present, and should be included in the facility's on-going operations and maintenance program. 2015/2016 Asbestos Hazard Emergency Response Act (AHERA) Management Report Theodore Roosevelt Elementary School

(page 4 of 4) SCHOOL DISTRICT OF PHILADELPHIA AHERA THREE-YEAR RE-INSPECTION IX RE-INSPECTION FORM KEY The information presented in the changes section has been compiled from a variety of sources, including the Re-inspection and the following: * Quality Control/Quality Assurance Reports of asbestos abatement projects, prepared by consultants to the School District. * Permit and Notification Forms for asbestos abatement projects. * Periodic Surveillance Forms * Operations and Maintenance activities performed by School District personnel. * Verbal information from School District personnel. * Reports of sampling and analysis of suspected materials by both School District personnel and outside consultants. ROOM BY ROOM LOCATION LOG REPORT This section gives information, including damage amount and location, for a specific homogeneous material on a room-by-room basis and follows the Re-inspection form. NOTE: The disparate nature of the above sources of information prohibits the verification of much information within the scope of the AHERA Three-Year Re-inspection. Discrepancies and omissions may exist in this information, and therefore is included on an "as is" basis. The inspectors for the Three-Year Re-inspection IX evaluated homogeneous areas based on the materials current condition and location, as evidenced during the inspector's site visit.. 2015/2016 Asbestos Hazard Emergency Response Act (AHERA) Management Report Theodore Roosevelt Elementary School

Section II - C Room by Room Location Log Report These charts are to be used for a quick reference* in order to avoid the unknowing disturbance of Asbestos Containing Materials during any and all Operations, Maintenance, Renovation, and/or Demolition activities at this location. NOTE: Contact OEMS prior to the disturbance of any of the materials that are listed as Confirmed and/or Assumed. The quantities listed for (NAD) non-asbestos containing materials and/or Non-Suspect Materials are only estimated and were not measured for the purpose of this report. Field verification of quantities for renovation purposes would be necessary.

6110 Theodore Roosevelt ES 2015-2016 AHERA Three-Year Report.xls School District of Philadelphia AHERA Three-Year Reinspection 2015-2016 Reinspection Date: 12/10/2015-12/11/2015 Theodore Roosevelt Elementary School Room by Room Location Log Report Building Inspector: Mary Anne Lerro 430 Washington Lane Certificate Number: 740092 Philadelphia, PA 19144 Management Planner: Monique Causley ULCS# 6110 Certificate Number: ACC-0215-8-010 E le m en F l o o r On Site Room Name System Affected Material Description HID# Color required for VAT Comments/Description/Notes Inspector- please break out all Hallway during Spring 2017 inspection Confirmed, Assumed, NAD, Amount of SF LF Amount of SF LF Attic Crawlspace Damage Newly Friable t Non Suspect ACM Material EA Damage EA Ranking Potential (DP) (NF) 1 3 Classroom 303 N/A Wood Floor Non Suspect ACM 700 SF 0 N/A N/A N/A 1 3 Classroom 303 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 6 SF Are these Tiles Fiberglass?/ Stained N/A N/A N/A 1 3 Classroom 303 N/A Plaster Walls NAD 1400 SF 5 SF N/A N/A N/A 1 3 Classroom 303 M Blackboard Glue Dots 6110/01/03/CLI/ML/2600 Assumed 20 SF 0 1 No 1/D 1 3 Classroom 303 M Transite Sills 6110/01/03/JJ Assumed 20 SF 0 1 No 1/D 1 3 Classroom 303 N/A Fiberglass Pipe Insulation Non Suspect ACM 15 LF 0 N/A N/A N/A 1 3 Stairwell across from Classroom 305 N/A Cement Floor Non Suspect ACM 300 SF 0 N/A N/A N/A 1 3 Stairwell across from Classroom 303 N/A Plaster Walls NAD 700 SF 0 N/A N/A N/A 1 3 Stairwell across from Classroom 303 N/A Brick Wall Non Suspect ACM 300 SF 0 N/A N/A N/A 1 3 Stairwell across from Classroom 303 N/A Plaster Ceiling NAD 300 SF 0 N/A N/A N/A 1 3 Stairwell across from Classroom 303 N/A Fiberglass Pipe Insulation Non Suspect ACM 8 LF 0 N/A N/A N/A 1 3 Custodial Closet across from Classroom 303 N/A Plaster Walls NAD 200 SF 0 N/A N/A N/A 1 3 Custodial Closet across from Classroom 303 N/A Cement Floor Non Suspect ACM 35 SF 0 N/A N/A N/A 1 3 Custodial Closet across from Classroom 303 N/A Plaster Ceiling NAD 35 SF 0 N/A N/A N/A 1 3 Custodial Closet across from Classroom 303 T Pipe Insulation 2-6 inch 6110/01/03/05 Confirmed 9 LF 0 1 No 1/D 1 3 Custodial Closet across from Classroom 303 T Pipe Fitting Insulation 6110/01/03/06 Assumed 2 EA 0 1 No 1/D 1 3 Boy's Restroom across from Classroom 303 N/A Cement Floor Non Suspect ACM 450 SF 0 N/A N/A N/A 1 3 Boy's Restroom across from Classroom 303 N/A Plaster Walls NAD 800 SF 4 SF N/A N/A N/A 1 3 Boy's Restroom across from Classroom 303 N/A Brick Wall Non Suspect ACM 500 SF 0 N/A N/A N/A 1 3 Boy's Restroom across from Classroom 303 N/A Fiberglass Pipe Insulation Non Suspect ACM 44 LF 11 LF N/A N/A N/A 1 3 Boy's Restroom across from Classroom 303 N/A Plaster Ceiling NAD 450 SF 2 SF N/A N/A N/A 1 3 Boy's Restroom across from Classroom 303 N/A Fiberglass Pipe Fitting Insulation Non Suspect ACM 1 EA 0 N/A N/A N/A 1 3 Room next to Restroom across from Classroom 303 X X X X X X X X X No Access X X X 1 3 Room next to Stairwell across from Classroom 305 X X X X X X X X X No Access X X X 1 3 Classroom 304 N/A Wood Floor Non Suspect ACM 700 SF 0 N/A N/A N/A 1 3 Classroom 304 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 0 Are these Tiles Fiberglass? N/A N/A N/A 1 3 Classroom 304 N/A Plaster Walls NAD 1400 SF 0 N/A N/A N/A 1 3 Classroom 304 M Blackboard Glue Dots 6110/01/03/CLI/ML/2600 Assumed 20 SF 0 1 No 1/D 1 3 Classroom 304 N/A Fiberglass Pipe Insulation Non Suspect ACM 15 LF 0 N/A N/A N/A 1 3 Classroom 304 M Transite Sills 6110/01/03/JJ Assumed 20 SF 0 1 No 1/D 1 3 Classroom 305 N/A Wood Floor Non Suspect ACM 700 SF 0 N/A N/A N/A 1 3 Classroom 305 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 0 Are these Tiles Fiberglass? N/A N/A N/A 1 3 Classroom 305 N/A Plaster Walls NAD 1400 SF 0 N/A N/A N/A 1 3 Classroom 305 M Blackboard Glue Dots 6110/01/03/CLI/ML/2600 Assumed 20 SF 0 1 No 1/D 1 3 Classroom 305 N/A Fiberglass Pipe Insulation Non Suspect ACM 15 LF 0 N/A N/A N/A 1 3 Classroom 305 M Transite Sills 6110/01/03/JJ Assumed 20 SF 0 1 No 1/D 1 3 Stairwell across from Classroom 305 N/A Cement Floor Non Suspect ACM 300 SF 0 N/A N/A N/A 1 3 Stairwell across from Classroom 305 N/A Plaster Walls NAD 700 SF 0 N/A N/A N/A 1 3 Stairwell across from Classroom 305 N/A Brick Wall Non Suspect ACM 300 SF 0 N/A N/A N/A 1 3 Stairwell across from Classroom 305 N/A Plaster Ceiling NAD 300 SF 0 N/A N/A N/A 1 3 Stairwell across from Classroom 305 N/A Fiberglass Pipe Insulation Non Suspect ACM 8 LF 0 N/A N/A N/A 1 3 Classroom 306 N/A Wood Floor Non Suspect ACM 700 SF 0 No access N/A N/A N/A 1 3 Classroom 306 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 4 SF Are these Tiles Fiberglass? N/A N/A N/A 1 3 Classroom 306 N/A Plaster Walls NAD 1400 SF 0 N/A N/A N/A 1 3 Classroom 306 M Blackboard Glue Dots 6110/01/03/CLI/ML/2600 Assumed 20 SF 0 1 No 1/D 1 3 Classroom 306 N/A Fiberglass Pipe Insulation Non Suspect ACM 15 LF 0 N/A N/A N/A 1 3 Classroom 306 T Pipe Insulation 2-6 inch 6110/01/03/05 Confirmed 8 LF 0 1 No 1/D 1 3 Classroom 307 N/A Wood Floor Non Suspect ACM 700 SF 0 N/A N/A N/A 1 3 Classroom 307 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 0 Are these Tiles Fiberglass? N/A N/A N/A 1 3 Classroom 307 N/A Plaster Walls NAD 1400 SF 0 N/A N/A N/A 1 3 Classroom 307 M Blackboard Glue Dots 6110/01/03/CLI/ML/2600 Assumed 20 SF 0 1 No 1/D 1 3 Classroom 307 N/A Fiberglass Pipe Insulation Non Suspect ACM 8 LF 0 N/A N/A N/A 1 3 Classroom 308 M Floor Tile VAT 12" x 12" 6110/01/03/SS Assumed 700 SF 0 Blue 1 No 1/D 1 3 Classroom 308 N/A Ceiling Tile 1' x 1' NAD 700 SF 2 SF N/A N/A N/A 1 3 Classroom 308 N/A Plaster Walls NAD 1400 SF 0 N/A N/A N/A 1 3 Classroom 308 M Blackboard Glue Dots 6110/01/03/CLI/ML/2600 Assumed 20 SF 0 1 No 1/D 1 3 Classroom 308 N/A Fiberglass Pipe Insulation Non Suspect ACM 8 LF 0 N/A N/A N/A 1 3 Classroom 309 N/A Wood Floor Non Suspect ACM 700 SF 1 SF N/A N/A N/A 1 3 Classroom 309 N/A Fiberglass Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 0 N/A N/A N/A 1 3 Classroom 309 N/A Plaster Walls NAD 1400 SF 4 SF N/A N/A N/A 1 3 Classroom 309 M Blackboard Glue Dots 6110/01/03/CLI/ML/2600 Assumed 20 SF 0 1 No 1/D 1 3 Classroom 309 N/A Fiberglass Pipe Insulation Non Suspect ACM 28 LF 0 N/A N/A N/A 1 3 Classroom 309 M Transite Sills 6110/01/03/JJ Assumed 19 SF 0 1 No 1/D 1 3 Classroom 309 T Pipe Fitting Insulation 6110/01/03/06 Assumed 2 EA 0 1 No 1/D 1 3 Classroom 309 Closet N/A Wood Floor Non Suspect ACM 40 SF 0 N/A N/A N/A 1 3 Classroom 309 Closet N/A Plaster Walls NAD 175 SF 30 LF N/A N/A N/A 1 3 Classroom 309 Closet N/A Plaster Ceiling NAD 40 SF 20 SF N/A N/A N/A Response Action (RA) 1

6110 Theodore Roosevelt ES 2015-2016 AHERA Three-Year Report.xls School District of Philadelphia AHERA Three-Year Reinspection 2015-2016 Reinspection Date: 12/10/2015-12/11/2015 Theodore Roosevelt Elementary School Room by Room Location Log Report Building Inspector: Mary Anne Lerro 430 Washington Lane Certificate Number: 740092 Philadelphia, PA 19144 Management Planner: Monique Causley ULCS# 6110 Certificate Number: ACC-0215-8-010 E le m en F l o o r On Site Room Name System Affected Material Description HID# Color required for VAT Comments/Description/Notes Inspector- please break out all Hallway during Spring 2017 inspection Confirmed, Assumed, NAD, Amount of SF LF Amount of SF LF Attic Crawlspace Damage Newly Friable t Non Suspect ACM Material EA Damage EA Ranking Potential (DP) (NF) 1 3 Classroom 309 Closet M Transite Sills 6110/01/03/JJ Assumed 4 SF 0 1 No 1/D 1 3 Classroom 309 Closet N/A Fiberglass Pipe Insulation Non Suspect ACM 40 LF 0 N/A N/A N/A 1 3 Classroom 310 N/A Wood Floor Non Suspect ACM 700 SF 0 N/A N/A N/A 1 3 Classroom 310 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 0 Are these Tiles Fiberglass? N/A N/A N/A 1 3 Classroom 310 N/A Plaster Walls NAD 1400 SF 0 N/A N/A N/A 1 3 Classroom 310 M Blackboard Glue Dots 6110/01/03/CLI/ML/2600 Assumed 20 SF 0 1 No 1/D 1 3 Classroom 310 N/A Fiberglass Pipe Insulation Non Suspect ACM 8 LF 0 N/A N/A N/A 1 3 Classroom 310 M Transite Sills 6110/01/03/JJ Assumed 20 SF 0 1 No 1/D 1 3 Classroom 310 Closet N/A Wood Floor Non Suspect ACM 40 SF 0 N/A N/A N/A 1 3 Classroom 310 Closet N/A Plaster Walls NAD 175 SF 0 N/A N/A N/A 1 3 Classroom 310 Closet N/A Plaster Ceiling NAD 40 SF 6 SF N/A N/A N/A 1 3 Classroom 310 Closet M Transite Sills 6110/01/03/JJ Assumed 4 SF 0 1 No 1/D 1 3 Classroom 310 Closet T Pipe Insulation 2-6 inch 6110/01/03/05 Confirmed 20 LF 0 1 No 1/D 1 3 Classroom 311 M Floor Tile VAT 12" x 12" 6110/01/03/SS Assumed 350 SF 0 Black 1 No 1/D 1 3 Classroom 311 N/A Fiberglass Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 0 N/A N/A N/A 1 3 Classroom 311 N/A Plaster Walls NAD 1400 SF 0 N/A N/A N/A 1 3 Classroom 311 M Blackboard Glue Dots 6110/01/03/CLI/ML/2600 Assumed 20 SF 0 1 No 1/D 1 3 Classroom 311 N/A Fiberglass Pipe Insulation Non Suspect ACM 16 LF 2 SF New damage N/A N/A N/A 1 3 Classroom 311 M Transite Sills 6110/01/03/JJ Assumed 20 SF 0 1 No 1/D 1 3 Classroom 311 M Floor Tile VAT 12" x 12" 6110/01/03/SS Assumed 350 SF 0 White 1 No 1/D 1 3 Classroom 311 and 312 Closet M Floor Tile VAT 9" x 9" 6110/01/03/04 Confirmed 300 SF 4 SF Grey No access- Fill out additional damage columns 1 No 6/C 1 3 Classroom 311 and 312 Closet N/A Ceiling Tile 2' x 4' Non Suspect ACM 300 SF 2 SF Are these Tiles Fiberglass? N/A N/A N/A 1 3 Classroom 311 and 312 Closet N/A Plaster Walls NAD 650 SF 4 SF N/A N/A N/A 1 3 Classroom 312 M Floor Tile VAT 12" x 12" 6110/01/03/SS Assumed 350 SF 0 Black 1 No 1/D 1 3 Classroom 312 N/A Fiberglass Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 0 N/A N/A N/A 1 3 Classroom 312 N/A Plaster Walls NAD 1400 SF 0 N/A N/A N/A 1 3 Classroom 312 M Blackboard Glue Dots 6110/01/03/CLI/ML/2600 Assumed 20 SF 0 1 No 1/D 1 3 Classroom 312 N/A Fiberglass Pipe Insulation Non Suspect ACM 16 LF 2 LF N/A N/A N/A 1 3 Classroom 312 M Floor Tile VAT 12" x 12" 6110/01/03/SS Assumed 350 SF 1 SF White Fill out additional damage columns 1 No 6/C 1 3 Classroom 312 M Transite Sills 6110/01/03/JJ Assumed 20 SF 0 1 No 1/D 1 3 Classroom 313 M Floor Tile VAT 12" x 12" 6110/01/03/SS Assumed 700 SF 0 Tan 1 No 1/D 1 3 Classroom 313 N/A Fiberglass Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 4 SF N/A N/A N/A 1 3 Classroom 313 N/A Plaster Walls NAD 1400 SF 8 SF N/A N/A N/A 1 3 Classroom 313 N/A Fiberglass Pipe Insulation Non Suspect ACM 16 LF 0 N/A N/A N/A 1 3 Classroom 313 M Transite Sills 6110/01/03/JJ Assumed 40 SF 0 1 No 1/D 1 3 Classroom 314 N/A Wood Floor Non Suspect ACM 700 SF 1 SF N/A N/A N/A 1 3 Classroom 314 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 0 Are these Tiles Fiberglass? N/A N/A N/A 1 3 Classroom 314 N/A Plaster Walls NAD 1400 SF 0 N/A N/A N/A 1 3 Classroom 314 M Blackboard Glue Dots 6110/01/03/CLI/ML/2600 Assumed 20 SF 0 1 No 1/D 1 3 Classroom 314 N/A Fiberglass Pipe Insulation Non Suspect ACM 15 LF 0 N/A N/A N/A 1 3 Classroom 314 M Transite Sills 6110/01/03/JJ Assumed 20 SF 0 1 No 1/D 1 3 Stairwell across from Classroom 314 N/A Cement Floor Non Suspect ACM 300 SF 0 N/A N/A N/A 1 3 Stairwell across from Classroom 314 N/A Plaster Walls NAD 700 SF 0 N/A N/A N/A 1 3 Stairwell across from Classroom 314 N/A Brick Wall Non Suspect ACM 300 SF 0 N/A N/A N/A 1 3 Stairwell across from Classroom 314 N/A Plaster Ceiling NAD 300 SF 0 N/A N/A N/A 1 3 Stairwell across from Classroom 314 N/A Fiberglass Pipe Insulation Non Suspect ACM 8 LF 0 N/A N/A N/A 1 3 Classroom 324A N/A Fiberglass Ceiling Tile 2' x 4' Non Suspect ACM 450 SF 0 N/A N/A N/A 1 3 Classroom 324A M Floor Tile VAT 9" x 9" 6110/01/03/04 Confirmed 450 SF 0 Brown 1 No 1/D 1 3 Classroom 324A N/A Concrete Block Wall Non Suspect ACM 800 SF 0 N/A N/A N/A 1 3 Classroom 324A N/A Fiberglass Pipe Insulation Non Suspect ACM 17 LF 0 N/A N/A N/A 1 3 Classroom 324B N/A Fiberglass Ceiling Tile 2' x 4' Non Suspect ACM 450 SF 0 Limited Access due to Storage N/A N/A N/A 1 3 Classroom 324B M Floor Tile VAT 9" x 9" 6110/01/03/04 Confirmed 450 SF 0 Brown 1 No 1/D 1 3 Classroom 324B N/A Concrete Block Wall Non Suspect ACM 800 SF 0 N/A N/A N/A 1 3 Classroom 324B N/A Fiberglass Pipe Insulation Non Suspect ACM 17 LF 0 N/A N/A N/A 1 3 Classroom 324C N/A Fiberglass Ceiling Tile 2' x 4' Non Suspect ACM 450 SF 0 N/A N/A N/A 1 3 Classroom 324C M Floor Tile VAT 9" x 9" 6110/01/03/04 Confirmed 450 SF 0 Brown 1 No 1/D 1 3 Classroom 324C N/A Concrete Block Wall Non Suspect ACM 800 SF 0 N/A N/A N/A 1 3 Classroom 324C M Sheetrock Wall 6110/01/03/KK Assumed 400 SF 0 1 No 1/D 1 3 Classroom 324C T Pipe Insulation 2-6 inch 6110/01/03/05 Confirmed 8 LF 0 1 No 1/D 1 3 Classroom 315 N/A Wood Floor Non Suspect ACM 700 SF 0 N/A N/A N/A 1 3 Classroom 315 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 0 Are these Tiles Fiberglass? N/A N/A N/A 1 3 Classroom 315 N/A Plaster Walls NAD 1400 SF 0 N/A N/A N/A 1 3 Classroom 315 M Blackboard Glue Dots 6110/01/03/CLI/ML/2600 Assumed 20 SF 0 1 No 1/D 1 3 Classroom 315 N/A Fiberglass Pipe Insulation Non Suspect ACM 15 LF 0 N/A N/A N/A 1 3 Classroom 315 M Transite Sills 6110/01/03/JJ Assumed 20 SF 0 1 No 1/D 1 3 Classroom 316 N/A Wood Floor Non Suspect ACM 700 SF 0 N/A N/A N/A 1 3 Classroom 316 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 0 Are these Tiles Fiberglass? N/A N/A N/A Response Action (RA) 2

6110 Theodore Roosevelt ES 2015-2016 AHERA Three-Year Report.xls School District of Philadelphia AHERA Three-Year Reinspection 2015-2016 Reinspection Date: 12/10/2015-12/11/2015 Theodore Roosevelt Elementary School Room by Room Location Log Report Building Inspector: Mary Anne Lerro 430 Washington Lane Certificate Number: 740092 Philadelphia, PA 19144 Management Planner: Monique Causley ULCS# 6110 Certificate Number: ACC-0215-8-010 E le m en F l o o r On Site Room Name System Affected Material Description HID# Color required for VAT Comments/Description/Notes Inspector- please break out all Hallway during Spring 2017 inspection Confirmed, Assumed, NAD, Amount of SF LF Amount of SF LF Attic Crawlspace Damage Newly Friable t Non Suspect ACM Material EA Damage EA Ranking Potential (DP) (NF) 1 3 Classroom 316 N/A Plaster Walls NAD 1400 SF 0 N/A N/A N/A 1 3 Classroom 316 M Blackboard Glue Dots 6110/01/03/CLI/ML/2600 Assumed 10 SF 0 1 No 1/D 1 3 Classroom 316 N/A Fiberglass Pipe Insulation Non Suspect ACM 15 LF 0 N/A N/A N/A 1 3 Classroom 316 M Transite Sills 6110/01/03/JJ Assumed 20 SF 0 1 No 1/D 1 3 Girl's Restroom across from Classroom 316 N/A Cement Floor Non Suspect ACM 450 SF 0 N/A N/A N/A 1 3 Girl's Restroom across from Classroom 316 N/A Plaster Walls NAD 800 SF 4 SF N/A N/A N/A 1 3 Girl's Restroom across from Classroom 316 N/A Brick Wall Non Suspect ACM 500 SF 0 N/A N/A N/A 1 3 Girl's Restroom across from Classroom 316 N/A Fiberglass Pipe Insulation Non Suspect ACM 44 LF 8 SF N/A N/A N/A 1 3 Girl's Restroom across from Classroom 316 N/A Fiberglass Pipe Fitting Insulation Non Suspect ACM 4 EA 0 N/A N/A N/A 1 3 Girl's Restroom across from Classroom 316 N/A Plaster Ceiling NAD 450 SF 3 LF N/A N/A N/A 1 3 Custodial Closet across from Classroom 316 N/A Plaster Walls NAD 200 SF 16 SF N/A N/A N/A 1 3 Custodial Closet across from Classroom 316 N/A Cement Floor Non Suspect ACM 35 SF 0 N/A N/A N/A 1 3 Custodial Closet across from Classroom 316 N/A Plaster Ceiling NAD 35 SF 1 SF N/A N/A N/A 1 3 Custodial Closet across from Classroom 316 T Pipe Insulation 2-6 inch 6110/01/03/05 Confirmed 9 LF 0 1 No 1/D 1 3 Custodial Closet across from Classroom 316 T Pipe Fitting Insulation 6110/01/03/06 Assumed 2 EA 0 1 No 1/D 1 3 Stairwell across from Classroom 316 N/A Cement Floor Non Suspect ACM 300 SF 0 N/A N/A N/A 1 3 Stairwell across from Classroom 316 N/A Plaster Walls NAD 700 SF 0 N/A N/A N/A 1 3 Stairwell across from Classroom 316 N/A Brick Wall Non Suspect ACM 300 SF 0 N/A N/A N/A 1 3 Stairwell across from Classroom 316 N/A Plaster Ceiling NAD 300 SF 0 N/A N/A N/A 1 3 Stairwell across from Classroom 316 N/A Fiberglass Pipe Insulation Non Suspect ACM 8 LF 0 N/A N/A N/A 1 3 Women's Restroom next to Classroom 316 N/A Wood Floor Non Suspect ACM 350 SF 0 No access N/A N/A N/A 1 3 Women's Restroom next to Classroom 316 N/A Ceiling Tile 2' x 4' Non Suspect ACM 350 SF 0 Are these Tiles Fiberglass? N/A N/A N/A 1 3 Women's Restroom next to Classroom 316 N/A Plaster Walls NAD 800 SF 0 N/A N/A N/A 1 3 Women's Restroom next to Classroom 316 T Pipe Fitting Insulation 6110/01/03/06 Assumed 3 EA 0 1 No 1/D 1 3 Women's Restroom next to Classroom 316 T Pipe Insulation 2-6 inch 6110/01/03/05 Confirmed 28 LF 0 1 No 1/D 1 3 Women's Restroom next to Classroom 316 N/A Fiberglass Pipe Insulation Non Suspect ACM 12 LF 3 EA N/A N/A N/A 1 3 Women's Restroom next to Classroom 316 M Floor Tile VAT 12" x 12" 6110/01/03/SS Assumed 35 SF 35 SF White Fill out additional damage columns 1 No 6/C 1 3 Women's Restroom next to Classroom 316 N/A Fiberglass Pipe Fitting Insulation Non Suspect ACM 2 EA 0 N/A N/A N/A 1 3 Women's Restroom next to Classroom 316 M Transite Stalls 6110/01/03/JJ Assumed 175 SF 0 1 No 1/D 1 3 Women's Restroom next to Classroom 316 M Transite Sills 6110/01/03/JJ Assumed 8 SF 0 1 No 1/D 1 3 Classroom 317 N/A Wood Floor Non Suspect ACM 700 SF 0 N/A N/A N/A 1 3 Classroom 317 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 0 Are these Tiles Fiberglass? N/A N/A N/A 1 3 Classroom 317 N/A Plaster Walls NAD 1400 SF 5 LF N/A N/A N/A 1 3 Classroom 317 M Blackboard Glue Dots 6110/01/03/CLI/ML/2600 Assumed 20 SF 0 1 No 1/D 1 3 Classroom 317 N/A Fiberglass Pipe Insulation Non Suspect ACM 15 LF 0 N/A N/A N/A 1 3 Classroom 317 M Transite Sills 6110/01/03/JJ Assumed 20 SF 0 1 No 1/D 1 3 Classroom 318 N/A Wood Floor Non Suspect ACM 700 SF 0 N/A N/A N/A 1 3 Classroom 318 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 2 LF stained N/A N/A N/A 1 3 Classroom 318 N/A Plaster Walls NAD 1400 SF 5 SF N/A N/A N/A 1 3 Classroom 318 M Blackboard Glue Dots 6110/01/03/CLI/ML/2600 Assumed 20 SF 0 1 No 1/D 1 3 Classroom 318 N/A Fiberglass Pipe Insulation Non Suspect ACM 15 LF 0 N/A N/A N/A 1 3 Classroom 318 M Transite Sills 6110/01/03/JJ Assumed 20 SF 0 1 No 1/D 1 3 Fire Stairwell near Classroom 316 N/A Brick Wall Non Suspect ACM 800 SF 0 N/A N/A N/A 1 3 Fire Stairwell near Classroom 316 N/A Cement Floor Non Suspect ACM 300 SF 0 N/A N/A N/A 1 3 Fire Stairwell near Classroom 316 N/A Concrete Ceiling Non Suspect ACM 300 SF 0 N/A N/A N/A 1 3 Classroom 319 N/A Wood Floor Non Suspect ACM 700 SF 0 N/A N/A N/A 1 3 Classroom 319 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 0 Are these Tiles Fiberglass? N/A N/A N/A 1 3 Classroom 319 N/A Plaster Walls NAD 1400 SF 0 N/A N/A N/A 1 3 Classroom 319 M Blackboard Glue Dots 6110/01/03/CLI/ML/2600 Assumed 20 SF 0 1 No 1/D 1 3 Classroom 319 N/A Fiberglass Pipe Insulation Non Suspect ACM 15 LF 0 N/A N/A N/A 1 3 Classroom 319 M Transite Sills 6110/01/03/JJ Assumed 20 SF 0 1 No 1/D 1 3 Classroom 320 N/A Wood Floor Non Suspect ACM 700 SF 0 N/A N/A N/A 1 3 Classroom 320 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 0 Are these Tiles Fiberglass? N/A N/A N/A 1 3 Classroom 320 N/A Plaster Walls NAD 1400 SF 0 N/A N/A N/A 1 3 Classroom 320 M Blackboard Glue Dots 6110/01/03/CLI/ML/2600 Assumed 20 SF 0 1 No 1/D 1 3 Classroom 320 N/A Fiberglass Pipe Insulation Non Suspect ACM 8 LF 0 N/A N/A N/A 1 3 Classroom 320 M Transite Sills 6110/01/03/JJ Assumed 20 SF 0 1 No 1/D 1 3 Classroom 320 T Pipe Insulation 2-6 inch 6110/01/03/05 Confirmed 18 LF 0 1 No 1/D 1 3 Classroom 321 N/A Wood Floor Non Suspect ACM 700 SF 0 N/A N/A N/A 1 3 Classroom 321 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 4 SF stained N/A N/A N/A 1 3 Classroom 321 N/A Plaster Walls NAD 1400 SF 0 N/A N/A N/A 1 3 Classroom 321 M Blackboard Glue Dots 6110/01/03/CLI/ML/2600 Assumed 20 SF 0 1 No 1/D 1 3 Classroom 321 N/A Fiberglass Pipe Insulation Non Suspect ACM 15 LF 0 N/A N/A N/A 1 3 Classroom 321 M Transite Sills 6110/01/03/JJ Assumed 20 SF 0 1 No 1/D 1 3 Classroom 322 N/A Wood Floor Non Suspect ACM 700 SF 0 N/A N/A N/A 1 3 Classroom 322 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 0 N/A N/A N/A 1 3 Classroom 322 N/A Plaster Walls NAD 1400 SF 0 N/A N/A N/A Response Action (RA) 3

6110 Theodore Roosevelt ES 2015-2016 AHERA Three-Year Report.xls School District of Philadelphia AHERA Three-Year Reinspection 2015-2016 Reinspection Date: 12/10/2015-12/11/2015 Theodore Roosevelt Elementary School Room by Room Location Log Report Building Inspector: Mary Anne Lerro 430 Washington Lane Certificate Number: 740092 Philadelphia, PA 19144 Management Planner: Monique Causley ULCS# 6110 Certificate Number: ACC-0215-8-010 E le m en F l o o r On Site Room Name System Affected Material Description HID# Color required for VAT Comments/Description/Notes Inspector- please break out all Hallway during Spring 2017 inspection Confirmed, Assumed, NAD, Amount of SF LF Amount of SF LF Attic Crawlspace Damage Newly Friable t Non Suspect ACM Material EA Damage EA Ranking Potential (DP) (NF) 1 3 Classroom 322 M Blackboard Glue Dots 6110/01/03/CLI/ML/2600 Assumed 20 SF 0 1 No 1/D 1 3 Classroom 322 T Pipe Insulation 2-6 inch 6110/01/03/05 Confirmed 22 LF 0 1 No 1/D 1 3 Classroom 322 M Transite Sills 6110/01/03/JJ Assumed 20 SF 0 1 No 1/D 1 3 Fire Stairwell near Classroom 301 N/A Brick Wall Non Suspect ACM 800 SF 0 N/A N/A N/A 1 3 Fire Stairwell near Classroom 301 N/A Cement Floor Non Suspect ACM 300 SF 0 N/A N/A N/A 1 3 Fire Stairwell near Classroom 301 N/A Concrete Ceiling Non Suspect ACM 300 SF 0 N/A N/A N/A 1 3 Classroom 301 M Floor Tile VAT 24" x 24" 6110/01/03/CLI/ML/2080 Assumed 700 SF 0 Unknown 1 No 1/D 1 3 Classroom 301 N/A Metal Wall Sheeting Non Suspect ACM 500 SF 0 N/A N/A N/A 1 3 Classroom 301 T Pipe Insulation 2-6 inch 6110/01/03/05 Confirmed 28 LF 0 1 No 1/D 1 3 Classroom 301 M Transite Sills 6110/01/03/JJ Assumed 20 SF 0 1 No 1/D 1 3 Classroom 301 N/A Fiberglass Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 4 SF stained N/A N/A N/A 1 3 Classroom 301 N/A Plaster Walls NAD 1800 SF 50 SF N/A N/A N/A 1 3 Classroom 302 N/A Wood Floor Non Suspect ACM 700 SF 0 N/A N/A N/A 1 3 Classroom 302 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 8 SF stained N/A N/A N/A 1 3 Classroom 302 N/A Plaster Walls NAD 1400 SF 20 SF N/A N/A N/A 1 3 Classroom 302 M Blackboard Glue Dots 6110/01/03/CLI/ML/2600 Assumed 20 SF 0 1 No 1/D 1 3 Classroom 302 N/A Fiberglass Pipe Insulation Non Suspect ACM 15 LF 2 SF N/A N/A N/A 1 3 Classroom 302 M Transite Sills 6110/01/03/JJ Assumed 20 SF 0 1 No 1/D 1 3 Elevator M Floor Tile VAT 9" x 9" 6110/01/03/04 Confirmed 65 SF 65 SF White Fill out additional damage columns 1 No 6/C 1 3 Men's Restroom next to Classroom 302 M Floor Tile VAT 12" x 12" 6110/01/03/SS Assumed 350 SF 0 White 1 No 1/D 1 3 Men's Restroom next to Classroom 302 N/A Ceiling Tile 2' x 4' Non Suspect ACM 350 SF 8 SF Are these Tiles Fiberglass? N/A N/A N/A 1 3 Men's Restroom next to Classroom 302 N/A Plaster Walls NAD 800 SF 0 N/A N/A N/A 1 3 Men's Restroom next to Classroom 302 T Pipe Fitting Insulation 6110/01/03/06 Assumed 2 EA 0 1 No 1/D 1 3 Men's Restroom next to Classroom 302 N/A Fiberglass Pipe Insulation Non Suspect ACM 48 LF 0 N/A N/A N/A 1 3 Men's Restroom next to Classroom 302 N/A Fiberglass Pipe Fitting Insulation Non Suspect ACM 8 EA 3 SF N/A N/A N/A 1 3 Men's Restroom next to Classroom 302 M Transite Stalls 6110/01/03/JJ Assumed 60 SF 0 1 No 1/D 1 3 Men's Restroom next to Classroom 302 M Transite Sills 6110/01/03/JJ Assumed 8 SF 0 1 No 1/D 1 3 Third Floor Hallways M Blackboard Glue Dots 6110/01/03/CLI/ML/2600 Assumed 5 SF 0 Combined with H317, H319, H316 1 No 1/D 1 3 Third Floor Hallways N/A Cement Floor Non Suspect ACM 10000 SF 0 Combined with H317, H319, H316 N/A N/A N/A 1 3 Third Floor Hallways N/A Ceiling Tile 2' x 4' Non Suspect ACM 10000 SF 0 Combined with H317, H319, H316 Are these Tiles Fiberglass? N/A N/A N/A 1 3 Third Floor Hallways N/A Plaster Walls NAD 20000 SF 0 Combined with H317, H319, H316 N/A N/A N/A 1 3 Third Floor Hallways N/A Marble Walls Non Suspect ACM 10000 SF 0 Combined with H317, H319, H316 N/A N/A N/A 1 3 Third Floor Hallways N/A Fiberglass Pipe Insulation Non Suspect ACM 74 LF 20 SF Combined with H317, H319, H316 N/A N/A N/A 1 3 Third Floor Hallways T Pipe Insulation > 6 inch 6110/01/03/CLI/ML/1110 Assumed 24 LF 0 Combined with H317, H319, H316 1 No 1/D 1 3 Third Floor Hallways T Pipe Insulation 2-6 inch 6110/01/03/05 Confirmed 8 LF 0 Combined with H317, H319, H316 1 No 1/D 1 2 Classroom 203 N/A Wood Floor Non Suspect ACM 700 SF 0 N/A N/A N/A 1 2 Classroom 203 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 0 Are these Tiles Fiberglass? N/A N/A N/A 1 2 Classroom 203 N/A Plaster Walls NAD 1400 SF 0 N/A N/A N/A 1 2 Classroom 203 M Blackboard Glue Dots 6110/01/02/CLI/ML/2600 Assumed 20 SF 0 1 No 1/D 1 2 Classroom 203 N/A Fiberglass Pipe Insulation Non Suspect ACM 33 LF 0 N/A N/A N/A 1 2 Classroom 203 M Transite Sills 6110/01/02/HH Assumed 20 SF 0 1 No 1/D 1 2 Stairwell across from Classroom 203 N/A Cement Floor Non Suspect ACM 300 SF 0 N/A N/A N/A 1 2 Stairwell across from Classroom 203 N/A Plaster Walls NAD 700 SF 0 N/A N/A N/A 1 2 Stairwell across from Classroom 203 N/A Brick Wall Non Suspect ACM 300 SF 0 N/A N/A N/A 1 2 Stairwell across from Classroom 203 N/A Plaster Ceiling NAD 300 SF 0 N/A N/A N/A 1 2 Stairwell across from Classroom 203 N/A Fiberglass Pipe Insulation Non Suspect ACM 16 LF 0 N/A N/A N/A 1 2 Boy's Restroom across Classroom 204 N/A Cement Floor Non Suspect ACM 450 SF 0 No Access N/A N/A N/A 1 2 Boy's Restroom across Classroom 204 N/A Plaster Walls NAD 800 SF 0 No Access N/A N/A N/A 1 2 Boy's Restroom across Classroom 204 N/A Brick Wall Non Suspect ACM 500 SF 0 No Access N/A N/A N/A 1 2 Boy's Restroom across Classroom 204 N/A Fiberglass Pipe Insulation Non Suspect ACM 25 LF 5 SF No Access N/A N/A N/A 1 2 Boy's Restroom across Classroom 204 N/A Fiberglass Pipe Fitting Insulation Non Suspect ACM 4 EA 0 No Access N/A N/A N/A 1 2 Boy's Restroom across Classroom 204 N/A Plaster Ceiling NAD 450 SF 0 No Access N/A N/A N/A 1 2 Classroom 200A N/A Ceiling Tile 2' x 4' Non Suspect ACM 450 SF 0 Are these Tiles Fiberglass? N/A N/A N/A 1 2 Classroom 200A M Floor Tile VAT 12" x 12" 6110/01/02/RR Assumed 450 SF 0 White 1 No 1/D 1 2 Classroom 200A N/A Concrete Block Wall Non Suspect ACM 800 SF 0 N/A N/A N/A 1 2 Classroom 200A N/A Fiberglass Pipe Insulation Non Suspect ACM 16 LF 0 N/A N/A N/A 1 2 Classroom 200A N/A Brick Wall Non Suspect ACM 400 SF 0 N/A N/A N/A 1 2 Classroom 200A M Sheetrock Wall 6110/01/02/II Assumed 400 SF 0 1 No 1/D 1 2 Classroom 200C N/A Ceiling Tile 2' x 4' Non Suspect ACM 450 SF 0 Are these Tiles Fiberglass? N/A N/A N/A 1 2 Classroom 200C M Floor Tile VAT 12" x 12" 6110/01/02/RR Assumed 450 SF 0 White 1 No 1/D 1 2 Classroom 200C N/A Concrete Block Wall Non Suspect ACM 800 SF 0 N/A N/A N/A 1 2 Classroom 200C N/A Fiberglass Pipe Insulation Non Suspect ACM 16 LF 0 N/A N/A N/A 1 2 Classroom 200C N/A Brick Wall Non Suspect ACM 400 SF 0 N/A N/A N/A 1 2 Classroom 200B N/A Ceiling Tile 2' x 4' Non Suspect ACM 450 SF 0 Limited Access due to Storage Are these Tiles Fiberglass? N/A N/A N/A 1 2 Classroom 200B M Floor Tile VAT 12" x 12" 6110/01/02/RR Assumed 450 SF 0 White 1 No 1/D 1 2 Classroom 200B N/A Concrete Block Wall Non Suspect ACM 800 SF 0 N/A N/A N/A 1 2 Classroom 200B N/A Fiberglass Pipe Insulation Non Suspect ACM 16 LF 0 N/A N/A N/A Response Action (RA) 4

6110 Theodore Roosevelt ES 2015-2016 AHERA Three-Year Report.xls School District of Philadelphia AHERA Three-Year Reinspection 2015-2016 Reinspection Date: 12/10/2015-12/11/2015 Theodore Roosevelt Elementary School Room by Room Location Log Report Building Inspector: Mary Anne Lerro 430 Washington Lane Certificate Number: 740092 Philadelphia, PA 19144 Management Planner: Monique Causley ULCS# 6110 Certificate Number: ACC-0215-8-010 E le m en F l o o r On Site Room Name System Affected Material Description HID# Color required for VAT Comments/Description/Notes Inspector- please break out all Hallway during Spring 2017 inspection Confirmed, Assumed, NAD, Amount of SF LF Amount of SF LF Attic Crawlspace Damage Newly Friable t Non Suspect ACM Material EA Damage EA Ranking Potential (DP) (NF) 1 2 Classroom 200B N/A Brick Wall Non Suspect ACM 400 SF 0 N/A N/A N/A 1 2 Custodial Closet across from Classroom 203 N/A Plaster Walls NAD 200 SF 0 N/A N/A N/A 1 2 Custodial Closet across from Classroom 203 N/A Cement Floor Non Suspect ACM 35 SF 0 N/A N/A N/A 1 2 Custodial Closet across from Classroom 203 N/A Plaster Ceiling NAD 35 SF 0 N/A N/A N/A 1 2 Custodial Closet across from Classroom 203 T Pipe Insulation 2-6 inch 6110/01/02/15 Confirmed 9 LF 0 1 No 1/D 1 2 Custodial Closet across from Classroom 203 T Pipe Fitting Insulation 6110/01/02/10 Confirmed 4 EA 0 1 No 1/D 1 2 Custodial Closet across from Classroom 203 N/A Fiberglass Pipe Insulation Non Suspect ACM 7 LF 4 SF N/A N/A N/A 1 2 Classroom 204 N/A Wood Floor Non Suspect ACM 700 SF 0 N/A N/A N/A 1 2 Classroom 204 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 0 Are these Tiles Fiberglass? N/A N/A N/A 1 2 Classroom 204 N/A Plaster Walls NAD 1400 SF 0 N/A N/A N/A 1 2 Classroom 204 M Blackboard Glue Dots 6110/01/02/CLI/ML/2600 Assumed 20 SF 0 1 No 1/D 1 2 Classroom 204 N/A Fiberglass Pipe Insulation Non Suspect ACM 40 LF 0 N/A N/A N/A 1 2 Classroom 204 M Transite Sills 6110/01/02/HH Assumed 20 SF 0 1 No 1/D 1 2 Classroom 205 N/A Wood Floor Non Suspect ACM 700 SF 0 N/A N/A N/A 1 2 Classroom 205 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 0 Are these Tiles Fiberglass? N/A N/A N/A 1 2 Classroom 205 N/A Plaster Walls NAD 1400 SF 0 N/A N/A N/A 1 2 Classroom 205 M Blackboard Glue Dots 6110/01/02/CLI/ML/2600 Assumed 20 SF 0 1 No 1/D 1 2 Classroom 205 N/A Fiberglass Pipe Insulation Non Suspect ACM 40 LF 0 N/A N/A N/A 1 2 Classroom 205 M Transite Sills 6110/01/02/HH Assumed 20 SF 0 1 No 1/D 1 2 Stairwell across from Classroom 205 N/A Cement Floor Non Suspect ACM 300 SF 0 N/A N/A N/A 1 2 Stairwell across from Classroom 205 N/A Plaster Walls NAD 700 SF 0 N/A N/A N/A 1 2 Stairwell across from Classroom 205 N/A Brick Wall Non Suspect ACM 300 SF 0 N/A N/A N/A 1 2 Stairwell across from Classroom 205 N/A Plaster Ceiling NAD 300 SF 0 N/A N/A N/A 1 2 Stairwell across from Classroom 205 N/A Fiberglass Pipe Insulation Non Suspect ACM 16 LF 0 N/A N/A N/A 1 2 206 Lobby to Administrative Offices M Floor Tile VAT 12" x 12" 6110/01/02/RR Assumed 450 SF 0 White 1 No 1/D 1 2 206 Lobby to Administrative Offices N/A Ceiling Tile 2' x 4' Non Suspect ACM 450 SF 0 Are these Tiles Fiberglass? N/A N/A N/A 1 2 206 Lobby to Administrative Offices M Sheetrock Wall 6110/01/02/II Assumed 400 SF 0 1 No 1/D 1 2 206 Lobby to Administrative Offices N/A Plaster Walls NAD 400 SF 0 N/A N/A N/A 1 2 Vice Principal's Office 206A N/A Ceiling Tile 2' x 4' Non Suspect ACM 250 SF 0 Are these Tiles Fiberglass? N/A N/A N/A 1 2 Vice Principal's Office 206A M Sheetrock Wall 6110/01/02/II Assumed 400 SF 0 1 No 1/D 1 2 Vice Principal's Office 206A N/A Plaster Walls NAD 400 SF 0 N/A N/A N/A 1 2 Vice Principal's Office 206A M Transite Sills 6110/01/02/HH Assumed 8 SF 0 1 No 1/D 1 2 Vice Principal's Office 206A M Floor Tile VAT 12" x 12" 6110/01/02/RR Assumed 250 SF 0 White 1 No 1/D 1 2 Vice Principal's Office 206A M Cove Base Adhesive 6110/01/02/CLI/ML/2605 Assumed 25 SF 0 Brown 1 No 1/D 1 2 Vice Principal's Office 206A N/A Fiberglass Pipe Insulation Non Suspect ACM 5 LF 0 N/A N/A N/A 1 2 Office 206B N/A Ceiling Tile 2' x 4' Non Suspect ACM 250 SF 0 Are these Tiles Fiberglass? N/A N/A N/A 1 2 Office 206B M Floor Tile VAT 12" x 12" 6110/01/02/RR Assumed 250 SF 0 Grey 1 No 1/D 1 2 Office 206B M Cove Base Adhesive 6110/01/02/CLI/ML/2605 Assumed 25 SF 0 Brown 1 No 1/D 1 2 Office 206B M Transite Sills 6110/01/02/HH Assumed 2 SF 0 1 No 1/D 1 2 Office 206B M Sheetrock Wall 6110/01/02/II Assumed 500 SF 0 1 No 1/D 1 2 Office 206B N/A Plaster Walls NAD 300 SF 4 SF N/A N/A N/A 1 2 Office 206C N/A Fiberglass Ceiling Tile 2' x 4' Non Suspect ACM 250 SF 0 N/A N/A N/A 1 2 Office 206C M Floor Tile VAT 12" x 12" 6110/01/02/RR Assumed 250 SF 1 SF White what kind of damage? 1 No 6/C 1 2 Office 206C M Cove Base Adhesive 6110/01/02/CLI/ML/2605 Assumed 25 SF 0 Brown 1 No 1/D 1 2 Office 206C M Sheetrock Wall 6110/01/02/II Assumed 500 SF 0 1 No 1/D 1 2 Office 206C M Transite Sills 6110/01/02/HH Assumed 12 SF 0 1 No 1/D 1 2 Office 206C N/A Plaster Walls NAD 300 SF 0 N/A N/A N/A 1 2 Office 206C N/A Fiberglass Pipe Insulation Non Suspect ACM 5 LF 0 N/A N/A N/A 1 2 Office 206D N/A Ceiling Tile 2' x 4' Non Suspect ACM 250 SF 2 SF stained N/A N/A N/A 1 2 Office 206D M Floor Tile VAT 12" x 12" 6110/01/02/RR Assumed 250 SF 0 White 1 No 1/D 1 2 Office 206D M Cove Base Adhesive 6110/01/02/CLI/ML/2605 Assumed 25 SF 0 Brown 1 No 1/D 1 2 Office 206D M Sheetrock Wall 6110/01/02/II Assumed 500 SF 0 1 No 1/D 1 2 Office 206D N/A Plaster Walls NAD 300 SF 1 SF what kind of damage? N/A N/A N/A 1 2 Office 206D N/A Fiberglass Pipe Insulation Non Suspect ACM 5 LF 0 N/A N/A N/A 1 2 Office 206D M Transite Sills 6110/01/02/HH Assumed 12 SF 0 1 No 1/D 1 2 Office 206E N/A Ceiling Tile 2' x 4' Non Suspect ACM 250 SF 0 Are these Tiles Fiberglass? N/A N/A N/A 1 2 Office 206E M Floor Tile VAT 12" x 12" 6110/01/02/RR Assumed 250 SF 0 Tan 1 No 1/D 1 2 Office 206E M Cove Base Adhesive 6110/01/02/CLI/ML/2605 Assumed 25 SF 0 Brown 1 No 1/D 1 2 Office 206E M Sheetrock Wall 6110/01/02/II Assumed 500 SF 0 1 No 1/D 1 2 Office 206E N/A Plaster Walls NAD 300 SF 0 N/A N/A N/A 1 2 Office 206E N/A Fiberglass Pipe Insulation Non Suspect ACM 5 LF 0 N/A N/A N/A 1 2 Office 206E M Transite Sills 6110/01/02/HH Assumed 8 SF 0 1 No 1/D 1 2 Counselor Office next to 206 Suites N/A Fiberglass Ceiling Tile 2' x 4' Non Suspect ACM 250 SF 0 N/A N/A N/A 1 2 Counselor Office next to 206 Suites M Sheetrock Wall 6110/01/02/II Assumed 500 SF 0 1 No 1/D 1 2 Counselor Office next to 206 Suites N/A Plaster Walls NAD 200 SF 0 N/A N/A N/A 1 2 Counselor Office next to 206 Suites N/A Fiberglass Pipe Insulation Non Suspect ACM 5 LF 0 N/A N/A N/A 1 2 Counselor Office next to 206 Suites M Transite Sills 6110/01/02/HH Assumed 8 SF 0 1 No 1/D Response Action (RA) 5

6110 Theodore Roosevelt ES 2015-2016 AHERA Three-Year Report.xls School District of Philadelphia AHERA Three-Year Reinspection 2015-2016 Reinspection Date: 12/10/2015-12/11/2015 Theodore Roosevelt Elementary School Room by Room Location Log Report Building Inspector: Mary Anne Lerro 430 Washington Lane Certificate Number: 740092 Philadelphia, PA 19144 Management Planner: Monique Causley ULCS# 6110 Certificate Number: ACC-0215-8-010 E le m en F l o o r On Site Room Name System Affected Material Description HID# Color required for VAT Comments/Description/Notes Inspector- please break out all Hallway during Spring 2017 inspection Confirmed, Assumed, NAD, Amount of SF LF Amount of SF LF Attic Crawlspace Damage Newly Friable t Non Suspect ACM Material EA Damage EA Ranking Potential (DP) (NF) 1 2 Counselor Office next to 206 Suites M Floor Tile VAT 12" x 12" 6110/01/02/RR Assumed 250 SF 0 Grey 1 No 1/D 1 2 Office 207 Lobby area to Left of 206 Suites M Floor Tile VAT 9" x 9" 6110/01/02/09 Confirmed 300 SF 0 Blue 1 No 1/D 1 2 Office 207 Lobby area to Left of 206 Suites M Sheetrock Wall 6110/01/02/II Assumed 400 SF 0 1 No 1/D 1 2 Office 207 Lobby area to Left of 206 Suites N/A Plaster Walls NAD 400 SF 0 N/A N/A N/A 1 2 Office 207 Lobby area to Left of 206 Suites N/A Fiberglass Ceiling Tile 2' x 4' Non Suspect ACM 300 SF 0 N/A N/A N/A 1 2 Conference Room near Main Office M Floor Tile VAT 12" x 12" 6110/01/02/RR Assumed 500 SF 7 SF White Fill out additional damage columns 1 No 6/C 1 2 Conference Room near Main Office N/A Fiberglass Ceiling Tile 2' x 4' Non Suspect ACM 200 SF 0 N/A N/A N/A 1 2 Conference Room near Main Office M Sheetrock Wall 6110/01/02/II Assumed 400 SF 0 1 No 1/D 1 2 Conference Room near Main Office N/A Plaster Walls NAD 400 SF 0 N/A N/A N/A 1 2 Conference Room near Main Office N/A Ceiling Tile 2' x 4' Non Suspect ACM 500 SF 0 Are these Tiles Fiberglass? N/A N/A N/A 1 2 Office next to Counselor's Office X X X X X X X X X No Access X X X 1 2 Second Office from Right in Conference Room M Floor Tile VAT 12" x 12" 6110/01/02/RR Assumed 250 SF 0 Blue 1 No 1/D 1 2 Second Office from Right in Conference Room M Sheetrock Wall 6110/01/02/II Assumed 250 SF 0 1 No 1/D 1 2 Second Office from Right in Conference Room N/A Plaster Walls NAD 250 SF 3 SF N/A N/A N/A 1 2 Second Office from Right in Conference Room N/A Ceiling Tile 2' x 4' Non Suspect ACM 250 SF 0 Are these Tiles Fiberglass? N/A N/A N/A 1 2 Second Office from Right in Conference Room N/A Fiberglass Pipe Insulation Non Suspect ACM 5 LF 0 N/A N/A N/A 1 2 Second Office from Right in Conference Room M Transite Sills 6110/01/02/HH Assumed 8 SF 0 1 No 1/D 1 2 Second Office from Left in Conference Room M Floor Tile VAT 12" x 12" 6110/01/02/RR Assumed 250 SF 0 White 1 No 1/D 1 2 Second Office from Left in Conference Room M Sheetrock Wall 6110/01/02/II Assumed 250 SF 0 1 No 1/D 1 2 Second Office from Left in Conference Room N/A Plaster Walls NAD 250 SF 4 SF what kind of damage? N/A N/A N/A 1 2 Second Office from Left in Conference Room N/A Ceiling Tile 2' x 4' Non Suspect ACM 250 SF 0 Are these Tiles Fiberglass? N/A N/A N/A 1 2 Second Office from Left in Conference Room N/A Fiberglass Pipe Insulation Non Suspect ACM 5 LF 0 N/A N/A N/A 1 2 Second Office from Left in Conference Room M Transite Sills 6110/01/02/HH Assumed 8 SF 0 1 No 1/D 1 2 Office next to Main Office M Floor Tile VAT 12" x 12" 6110/01/02/RR Assumed 250 SF 0 White 1 No 1/D 1 2 Office next to Main Office M Sheetrock Wall 6110/01/02/II Assumed 250 SF 0 1 No 1/D 1 2 Office next to Main Office N/A Plaster Walls NAD 250 SF 4 SF N/A N/A N/A 1 2 Office next to Main Office N/A Fiberglass Ceiling Tile 2' x 4' Non Suspect ACM 250 SF 0 N/A N/A N/A 1 2 Office next to Main Office N/A Fiberglass Pipe Insulation Non Suspect ACM 5 LF 0 N/A N/A N/A 1 2 Office next to Main Office M Transite Sills 6110/01/02/HH Assumed 8 SF 0 1 No 1/D 1 2 Main Office M Floor Tile VAT 12" x 12" 6110/01/02/RR Assumed 450 SF 0 Blue 1 No 1/D 1 2 Main Office N/A Plaster Walls NAD 400 SF 0 N/A N/A N/A 1 2 Main Office M Sheetrock Wall 6110/01/02/II Assumed 400 SF 0 1 No 1/D 1 2 Main Office N/A Fiberglass Pipe Insulation Non Suspect ACM 55 LF 0 N/A N/A N/A 1 2 Main Office N/A Fiberglass Ceiling Tile 2' x 4' Non Suspect ACM 450 SF 0 N/A N/A N/A 1 2 Main Office Storage Closet N/A Ceiling Tile 2' x 4' Non Suspect ACM 200 SF 0 Are these Tiles Fiberglass? N/A N/A N/A 1 2 Main Office Storage Closet M Floor Tile VAT 12" x 12" 6110/01/02/RR Assumed 200 SF 0 Blue 1 No 1/D 1 2 Main Office Storage Closet N/A Plaster Walls NAD 450 SF 0 N/A N/A N/A 1 2 Main Office Storage Closet N/A Fiberglass Pipe Insulation Non Suspect ACM 45 LF 0 N/A N/A N/A 1 2 Main Office Staff Restroom N/A Ceramic Tile Floors Non Suspect ACM 50 SF 0 N/A N/A N/A 1 2 Main Office Staff Restroom N/A Plaster Walls NAD 150 SF 0 N/A N/A N/A 1 2 Main Office Staff Restroom N/A Plaster Ceiling NAD 50 SF 0 N/A N/A N/A 1 2 Main Office Staff Restroom T Pipe Insulation 2-6 inch 6110/01/02/15 Confirmed 15 LF 0 1 No 1/D 1 2 Principal's Office M Floor Tile VAT 12" x 12" 6110/01/02/RR Assumed 450 SF 0 Blue 1 No 1/D 1 2 Principal's Office M Sheetrock Wall 6110/01/02/II Assumed 400 SF 0 1 No 1/D 1 2 Principal's Office N/A Plaster Walls NAD 400 SF 0 N/A N/A N/A 1 2 Principal's Office N/A Ceiling Tile 2' x 4' Non Suspect ACM 450 SF 0 Are these Tiles Fiberglass? N/A N/A N/A 1 2 Principal's Office Storage Closet X X X X X X X X X No access X X X 1 2 Stairwell Next to Main Office N/A Cement Floor Non Suspect ACM 600 SF 0 N/A N/A N/A 1 2 Stairwell Next to Main Office N/A Plaster Walls NAD 1800 SF 0 N/A N/A N/A 1 2 Stairwell Next to Main Office N/A Marble Walls Non Suspect ACM 800 SF 0 N/A N/A N/A 1 2 Stairwell Next to Main Office N/A Plaster Ceiling NAD 600 SF 25 LF N/A N/A N/A 1 2 Stairwell Next to Main Office N/A Marble Floors Non Suspect ACM 400 SF 0 N/A N/A N/A 1 2 Auditorium Balcony N/A Wood Floor Non Suspect ACM 1800 SF 0 N/A N/A N/A 1 2 Auditorium Balcony N/A Plaster Walls NAD 2200 SF 40 SF N/A N/A N/A 1 2 Auditorium Balcony S Plaster Ceiling 6110/01/01/UU Assumed 1800 SF 10 SF Plaster Ceiling debris on floor sampled NAD 12/11/2015 - Ceilings will remain Assumed- WHAT KIND OF DAMAGE? 1 Yes 2/C 1 2 Auditorium Balcony N/A Fiberglass Pipe Insulation Non Suspect ACM 6 LF 0 N/A N/A N/A 1 2 Auditorium Balcony T Radiator Insulation 6110/01/02/CLI/ML/1600 Assumed 21 0 1 No 1/D 1 2 Teacher's Lounge next to Classroom 210 M Floor Tile VAT 12" x 12" 6110/01/02/RR Assumed 550 SF 0 White 1 No 1/D 1 2 Teacher's Lounge next to Classroom 210 M Sheetrock Wall 6110/01/02/II Assumed 400 SF 0 1 No 1/D 1 2 Teacher's Lounge next to Classroom 210 N/A Plaster Walls NAD 400 SF 0 N/A N/A N/A 1 2 Teacher's Lounge next to Classroom 210 N/A Fiberglass Ceiling Tile 2' x 4' Non Suspect ACM 550 SF 0 N/A N/A N/A 1 2 Teacher's Lounge next to Classroom 210 N/A Fiberglass Pipe Insulation Non Suspect ACM 12 LF 0 N/A N/A N/A 1 2 Teacher's Lounge next to Classroom 210 M Transite Sills 6110/01/02/HH Assumed 8 SF 0 1 No 1/D 1 2 Nurse's Office M Floor Tile VAT 12" x 12" 6110/01/02/RR Assumed 550 SF 0 Blue 1 No 1/D 1 2 Nurse's Office M Sheetrock Wall 6110/01/02/II Assumed 400 SF 0 1 No 1/D 1 2 Nurse's Office N/A Plaster Walls NAD 400 SF 0 N/A N/A N/A 1 2 Nurse's Office N/A Fiberglass Ceiling Tile 2' x 4' Non Suspect ACM 550 SF 0 N/A N/A N/A Response Action (RA) 6

6110 Theodore Roosevelt ES 2015-2016 AHERA Three-Year Report.xls School District of Philadelphia AHERA Three-Year Reinspection 2015-2016 Reinspection Date: 12/10/2015-12/11/2015 Theodore Roosevelt Elementary School Room by Room Location Log Report Building Inspector: Mary Anne Lerro 430 Washington Lane Certificate Number: 740092 Philadelphia, PA 19144 Management Planner: Monique Causley ULCS# 6110 Certificate Number: ACC-0215-8-010 E le m en F l o o r On Site Room Name System Affected Material Description HID# Color required for VAT Comments/Description/Notes Inspector- please break out all Hallway during Spring 2017 inspection Confirmed, Assumed, NAD, Amount of SF LF Amount of SF LF Attic Crawlspace Damage Newly Friable t Non Suspect ACM Material EA Damage EA Ranking Potential (DP) (NF) 1 2 Nurse's Office N/A Fiberglass Pipe Insulation Non Suspect ACM 12 LF 0 N/A N/A N/A 1 2 Nurse's Office M Transite Sills 6110/01/02/HH Assumed 16 SF 0 1 No 1/D 1 2 Nurse's Office Restroom N/A Ceramic Tile Floors Non Suspect ACM 25 SF 0 N/A N/A N/A 1 2 Nurse's Office Restroom N/A Ceramic Tile Walls Non Suspect ACM 100 SF 0 N/A N/A N/A 1 2 Nurse's Office Restroom N/A Plaster Walls NAD 150 SF 0 N/A N/A N/A 1 2 Nurse's Office Restroom N/A Ceiling Tile 2' x 4' Non Suspect ACM 25 SF 0 Are these Tiles Fiberglass? N/A N/A N/A 1 2 Nurse's Office Restroom N/A Fiberglass Pipe Insulation Non Suspect ACM 6 LF 0 N/A N/A N/A 1 2 Classroom 210 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 2 LF stained N/A N/A N/A 1 2 Classroom 210 M Floor Tile VAT 12" x 12" 6110/01/02/RR Assumed 700 SF 0 Blue 1 No 1/D 1 2 Classroom 210 N/A Plaster Walls NAD 1400 SF 0 N/A N/A N/A 1 2 Classroom 210 N/A Fiberglass Pipe Insulation Non Suspect ACM 30 LF 0 N/A N/A N/A 1 2 Classroom 210 M Transite Sills 6110/01/02/HH Assumed 18 SF 0 1 No 1/D 1 2 Classroom 211 N/A Concrete Block Wall Non Suspect ACM 500 SF 0 N/A N/A N/A 1 2 Classroom 211 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 0 Are these Tiles Fiberglass? N/A N/A N/A 1 2 Classroom 211 M Floor Tile VAT 12" x 12" 6110/01/02/RR Assumed 500 SF 30 SF Tan Fill out additional damage columns 1 No 6/C 1 2 Classroom 211 N/A Fiberglass Pipe Insulation Non Suspect ACM 36 LF 3 SF N/A N/A N/A 1 2 Classroom 211 N/A Plaster Walls NAD 500 SF 0 N/A N/A N/A 1 2 Classroom 211 Storage M Floor Tile VAT 9" x 9" 6110/01/02/09 Confirmed 300 SF 250 SF Grey Fill out additional damage columns/ddc written for damage 1 No 6/C 1 2 Classroom 211 Storage M Floor Tile VAT 12" x 12" 6110/01/02/RR Assumed 250 SF 0 Grey 1 No 1/D 1 2 Classroom 211 Storage N/A Concrete Block Wall Non Suspect ACM 200 SF 0 N/A N/A N/A 1 2 Classroom 211 Storage N/A Plaster Walls NAD 400 SF 0 N/A N/A N/A 1 2 Classroom 211 Storage N/A Ceiling Tile 2' x 4' Non Suspect ACM 300 SF 6 LF stained N/A N/A N/A 1 2 Classroom 211 Storage M Transite Sills 6110/01/02/HH Assumed 8 SF 0 Grey 1 No 1/D 1 2 Classroom 212 M Floor Tile VAT 9" x 9" 6110/01/02/09 Confirmed 700 SF 0 Brown 1 No 1/D 1 2 Classroom 212 N/A Concrete Block Wall Non Suspect ACM 300 SF 0 N/A N/A N/A 1 2 Classroom 212 N/A Plaster Walls NAD 500 SF 0 N/A N/A N/A 1 2 Classroom 212 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 3 SF Are these Tiles Fiberglass? N/A N/A N/A 1 2 Classroom 212 N/A Fiberglass Pipe Insulation Non Suspect ACM 24 LF 0 N/A N/A N/A 1 2 Stairwell across from Classroom 212 N/A Cement Floor Non Suspect ACM 300 SF 0 N/A N/A N/A 1 2 Stairwell across from Classroom 212 N/A Plaster Walls NAD 700 SF 0 N/A N/A N/A 1 2 Stairwell across from Classroom 212 N/A Brick Wall Non Suspect ACM 300 SF 0 N/A N/A N/A 1 2 Stairwell across from Classroom 212 N/A Plaster Ceiling NAD 300 SF 0 N/A N/A N/A 1 2 Stairwell across from Classroom 212 N/A Fiberglass Pipe Insulation Non Suspect ACM 16 LF 0 N/A N/A N/A 1 2 Classroom 221A M Floor Tile VAT 9" x 9" 6110/01/02/09 Confirmed 450 SF 0 Brown 1 No 1/D 1 2 Classroom 221A N/A Concrete Block Wall Non Suspect ACM 400 SF 0 N/A N/A N/A 1 2 Classroom 221A N/A Brick Wall Non Suspect ACM 400 SF 0 N/A N/A N/A 1 2 Classroom 221A N/A Fiberglass Pipe Insulation Non Suspect ACM 16 LF 0 N/A N/A N/A 1 2 Classroom 221A N/A Fiberglass Ceiling Tile 2' x 4' Non Suspect ACM 450 SF 0 N/A N/A N/A 1 2 Classroom 213 N/A Wood Floor Non Suspect ACM 700 SF 0 N/A N/A N/A 1 2 Classroom 213 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 0 Are these Tiles Fiberglass? N/A N/A N/A 1 2 Classroom 213 N/A Plaster Walls NAD 1400 SF 0 N/A N/A N/A 1 2 Classroom 213 M Blackboard Glue Dots 6110/01/02/CLI/ML/2600 Assumed 20 SF 0 1 No 1/D 1 2 Classroom 213 N/A Fiberglass Pipe Insulation Non Suspect ACM 40 LF 0 N/A N/A N/A 1 2 Classroom 213 M Transite Sills 6110/01/02/HH Assumed 20 SF 0 1 No 1/D 1 2 Classroom 221B M Floor Tile VAT 9" x 9" 6110/01/02/09 Confirmed 450 SF 3 SF Brown Fill out additional damage columns 1 No 6/C 1 2 Classroom 221B N/A Ceiling Tile 2' x 4' Non Suspect ACM 400 SF 8 LF stained N/A N/A N/A 1 2 Classroom 221B N/A Brick Wall Non Suspect ACM 100 SF 0 N/A N/A N/A 1 2 Classroom 221B M Sheetrock Wall 6110/01/02/II Assumed 400 SF 0 1 No 1/D 1 2 Classroom 221C M Floor Tile VAT 9" x 9" 6110/01/02/09 Confirmed 450 SF 3 SF Brown Missing tile Fill out additional damage columns 1 No 6/C 1 2 Classroom 221C N/A Concrete Block Wall Non Suspect ACM 400 SF 0 N/A N/A N/A 1 2 Classroom 221C N/A Brick Wall Non Suspect ACM 100 SF 0 N/A N/A N/A 1 2 Classroom 221C M Sheetrock Wall 6110/01/02/II Assumed 400 SF 0 1 No 1/D 1 2 Classroom 221C N/A Fiberglass Pipe Insulation Non Suspect ACM 16 LF 0 N/A N/A N/A 1 2 Classroom 221C N/A Fiberglass Ceiling Tile 2' x 4' Non Suspect ACM 450 SF 3 SF N/A N/A N/A 1 2 Girl's Restroom across from Classroom 214 N/A Cement Floor Non Suspect ACM 450 SF 0 N/A N/A N/A 1 2 Girl's Restroom across from Classroom 214 N/A Plaster Walls NAD 800 SF 0 N/A N/A N/A 1 2 Girl's Restroom across from Classroom 214 N/A Brick Wall Non Suspect ACM 500 SF 0 N/A N/A N/A 1 2 Girl's Restroom across from Classroom 214 N/A Fiberglass Pipe Insulation Non Suspect ACM 25 LF 6 LF N/A N/A N/A 1 2 Girl's Restroom across from Classroom 214 N/A Fiberglass Pipe Fitting Insulation Non Suspect ACM 4 EA 0 N/A N/A N/A 1 2 Custodial Closet across from Classroom 214 N/A Plaster Walls NAD 200 SF 0 N/A N/A N/A 1 2 Custodial Closet across from Classroom 214 N/A Cement Floor Non Suspect ACM 35 SF 0 N/A N/A N/A 1 2 Custodial Closet across from Classroom 214 N/A Plaster Ceiling NAD 35 SF 0 N/A N/A N/A 1 2 Custodial Closet across from Classroom 214 T Pipe Insulation 2-6 inch 6110/01/02/15 Confirmed 9 LF 0 1 No 1/D 1 2 Custodial Closet across from Classroom 214 T Pipe Fitting Insulation 6110/01/02/10 Confirmed 4 EA 0 1 No 1/D 1 2 Custodial Closet across from Classroom 214 N/A Fiberglass Pipe Insulation Non Suspect ACM 7 LF 0 N/A N/A N/A 1 2 Classroom 214 N/A Wood Floor Non Suspect ACM 700 SF 0 N/A N/A N/A 1 2 Classroom 214 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 0 Are these Tiles Fiberglass? N/A N/A N/A Response Action (RA) 7

6110 Theodore Roosevelt ES 2015-2016 AHERA Three-Year Report.xls School District of Philadelphia AHERA Three-Year Reinspection 2015-2016 Reinspection Date: 12/10/2015-12/11/2015 Theodore Roosevelt Elementary School Room by Room Location Log Report Building Inspector: Mary Anne Lerro 430 Washington Lane Certificate Number: 740092 Philadelphia, PA 19144 Management Planner: Monique Causley ULCS# 6110 Certificate Number: ACC-0215-8-010 E le m en F l o o r On Site Room Name System Affected Material Description HID# Color required for VAT Comments/Description/Notes Inspector- please break out all Hallway during Spring 2017 inspection Confirmed, Assumed, NAD, Amount of SF LF Amount of SF LF Attic Crawlspace Damage Newly Friable t Non Suspect ACM Material EA Damage EA Ranking Potential (DP) (NF) 1 2 Classroom 214 N/A Plaster Walls NAD 1400 SF 0 N/A N/A N/A 1 2 Classroom 214 M Blackboard Glue Dots 6110/01/02/CLI/ML/2600 Assumed 20 SF 0 1 No 1/D 1 2 Classroom 214 N/A Fiberglass Pipe Insulation Non Suspect ACM 40 LF 0 N/A N/A N/A 1 2 Classroom 214 M Transite Sills 6110/01/02/HH Assumed 20 SF 0 1 No 1/D 1 2 Stairwell Next to Classroom 214 N/A Cement Floor Non Suspect ACM 300 SF 0 N/A N/A N/A 1 2 Stairwell Next to Classroom 214 N/A Plaster Walls NAD 700 SF 0 N/A N/A N/A 1 2 Stairwell Next to Classroom 214 N/A Brick Wall Non Suspect ACM 300 SF 0 N/A N/A N/A 1 2 Stairwell Next to Classroom 214 N/A Plaster Ceiling NAD 300 SF 0 N/A N/A N/A 1 2 Stairwell Next to Classroom 214 N/A Fiberglass Pipe Insulation Non Suspect ACM 16 LF 0 N/A N/A N/A 1 2 Women's Restroom next to Classroom 214 N/A Wood Floor Non Suspect ACM 350 SF 0 N/A N/A N/A 1 2 Women's Restroom next to Classroom 214 N/A Ceiling Tile 2' x 4' Non Suspect ACM 350 SF 4 SF Are these Tiles Fiberglass? N/A N/A N/A 1 2 Women's Restroom next to Classroom 214 N/A Plaster Walls NAD 800 SF 0 N/A N/A N/A 1 2 Women's Restroom next to Classroom 214 T Pipe Fitting Insulation 6110/01/02/10 Confirmed 2 EA 0 1 No 1/D 1 2 Women's Restroom next to Classroom 214 N/A Fiberglass Pipe Insulation Non Suspect ACM 48 LF 0 N/A N/A N/A 1 2 Women's Restroom next to Classroom 214 N/A Fiberglass Pipe Fitting Insulation Non Suspect ACM 8 EA 0 N/A N/A N/A 1 2 Women's Restroom next to Classroom 214 M Transite Stalls 6110/01/02/HH Assumed 60 SF 0 1 No 1/D 1 2 Women's Restroom next to Classroom 214 M Transite Sills 6110/01/02/HH Assumed 8 SF 0 1 No 1/D 1 2 Classroom 215 N/A Wood Floor Non Suspect ACM 700 SF 0 N/A N/A N/A 1 2 Classroom 215 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 2 SF Are these Tiles Fiberglass? N/A N/A N/A 1 2 Classroom 215 N/A Plaster Walls NAD 1400 SF 0 N/A N/A N/A 1 2 Classroom 215 M Blackboard Glue Dots 6110/01/02/CLI/ML/2600 Assumed 20 SF 0 1 No 1/D 1 2 Classroom 215 N/A Fiberglass Pipe Insulation Non Suspect ACM 18 LF 2 LF N/A N/A N/A 1 2 Classroom 215 M Transite Sills 6110/01/02/HH Assumed 20 SF 0 1 No 1/D 1 2 Classroom 216 N/A Wood Floor Non Suspect ACM 700 SF 0 N/A N/A N/A 1 2 Classroom 216 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 0 Are these Tiles Fiberglass? N/A N/A N/A 1 2 Classroom 216 N/A Plaster Walls NAD 1400 SF 0 N/A N/A N/A 1 2 Classroom 216 M Blackboard Glue Dots 6110/01/02/CLI/ML/2600 Assumed 20 SF 0 1 No 1/D 1 2 Classroom 216 N/A Fiberglass Pipe Insulation Non Suspect ACM 22 LF 0 N/A N/A N/A 1 2 Classroom 216 M Transite Sills 6110/01/02/HH Assumed 20 SF 0 1 No 1/D 1 2 Classroom 216 T Pipe Insulation 2-6 inch 6110/01/02/15 Confirmed 15 LF 0 1 No 1/D 1 2 Fire Stairwell near Classroom 216 N/A Brick Wall Non Suspect ACM 800 SF 0 N/A N/A N/A 1 2 Fire Stairwell near Classroom 216 N/A Cement Floor Non Suspect ACM 300 SF 0 N/A N/A N/A 1 2 Fire Stairwell near Classroom 216 N/A Concrete Ceiling Non Suspect ACM 300 SF 0 N/A N/A N/A 1 2 Classroom 217 N/A Wood Floor Non Suspect ACM 700 SF 0 N/A N/A N/A 1 2 Classroom 217 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 0 Are these Tiles Fiberglass? N/A N/A N/A 1 2 Classroom 217 N/A Plaster Walls NAD 1400 SF 0 N/A N/A N/A 1 2 Classroom 217 M Blackboard Glue Dots 6110/01/02/CLI/ML/2600 Assumed 20 SF 0 1 No 1/D 1 2 Classroom 217 N/A Fiberglass Pipe Insulation Non Suspect ACM 22 LF 0 N/A N/A N/A 1 2 Classroom 217 M Transite Sills 6110/01/02/HH Assumed 20 SF 0 1 No 1/D 1 2 Classroom 218 N/A Wood Floor Non Suspect ACM 700 SF 0 N/A N/A N/A 1 2 Classroom 218 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 0 Are these Tiles Fiberglass? N/A N/A N/A 1 2 Classroom 218 N/A Plaster Walls NAD 1400 SF 0 N/A N/A N/A 1 2 Classroom 218 M Blackboard Glue Dots 6110/01/02/CLI/ML/2600 Assumed 20 SF 0 1 No 1/D 1 2 Classroom 218 N/A Fiberglass Pipe Insulation Non Suspect ACM 22 LF 0 N/A N/A N/A 1 2 Classroom 218 M Transite Sills 6110/01/02/HH Assumed 20 SF 0 1 No 1/D 1 2 Storage across from Classroom 218 M Floor Tile VAT 9" x 9" 6110/01/02/09 Confirmed 200 SF 0 Blue No access 1 No 1/D 1 2 Storage across from Classroom 218 N/A Plaster Walls NAD 400 SF 0 N/A N/A N/A 1 2 Storage across from Classroom 218 N/A Fiberglass Ceiling Tile 2' x 4' Non Suspect ACM 200 SF 0 N/A N/A N/A 1 2 Classroom 219 N/A Wood Floor Non Suspect ACM 700 SF 0 N/A N/A N/A 1 2 Classroom 219 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 0 Are these Tiles Fiberglass? N/A N/A N/A 1 2 Classroom 219 N/A Plaster Walls NAD 1400 SF 0 N/A N/A N/A 1 2 Classroom 219 M Blackboard Glue Dots 6110/01/02/CLI/ML/2600 Assumed 20 SF 0 1 No 1/D 1 2 Classroom 219 N/A Fiberglass Pipe Insulation Non Suspect ACM 22 LF 0 N/A N/A N/A 1 2 Classroom 219 M Transite Sills 6110/01/02/HH Assumed 20 SF 0 1 No 1/D 1 2 Classroom 219 T Pipe Insulation 2-6 inch 6110/01/02/15 Confirmed 16 LF 0 Above exposed Drop ceiling 1 No 1/D 1 2 Classroom 219 T Pipe Fitting Insulation 6110/01/02/10 Confirmed 1 EA 0 Above exposed Drop ceiling 1 No 1/D 1 2 Storage across from Classroom 219 X X X X X X X X X No Access X X X 1 2 Classroom 220 N/A Wood Floor Non Suspect ACM 700 SF 0 N/A N/A N/A 1 2 Classroom 220 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 0 Are these Tiles Fiberglass? N/A N/A N/A 1 2 Classroom 220 N/A Plaster Walls NAD 1400 SF 0 N/A N/A N/A 1 2 Classroom 220 M Blackboard Glue Dots 6110/01/02/CLI/ML/2600 Assumed 20 SF 0 1 No 1/D 1 2 Classroom 220 N/A Fiberglass Pipe Insulation Non Suspect ACM 22 LF 2 X what kind of damage? N/A N/A N/A 1 2 Classroom 220 M Transite Sills 6110/01/02/HH Assumed 20 SF 0 1 No 1/D 1 2 Classroom 220 T Pipe Insulation 2-6 inch 6110/01/02/15 Confirmed 2 LF 0 1 No 1/D 1 2 Fire Stairwell next to Classroom 220 N/A Brick Wall Non Suspect ACM 800 SF 0 N/A N/A N/A 1 2 Fire Stairwell next to Classroom 220 N/A Cement Floor Non Suspect ACM 300 SF 0 N/A N/A N/A 1 2 Fire Stairwell next to Classroom 220 N/A Concrete Ceiling Non Suspect ACM 300 SF 0 N/A N/A N/A Response Action (RA) 8

6110 Theodore Roosevelt ES 2015-2016 AHERA Three-Year Report.xls School District of Philadelphia AHERA Three-Year Reinspection 2015-2016 Reinspection Date: 12/10/2015-12/11/2015 Theodore Roosevelt Elementary School Room by Room Location Log Report Building Inspector: Mary Anne Lerro 430 Washington Lane Certificate Number: 740092 Philadelphia, PA 19144 Management Planner: Monique Causley ULCS# 6110 Certificate Number: ACC-0215-8-010 E le m en F l o o r On Site Room Name System Affected Material Description HID# Color required for VAT Comments/Description/Notes Inspector- please break out all Hallway during Spring 2017 inspection Confirmed, Assumed, NAD, Amount of SF LF Amount of SF LF Attic Crawlspace Damage Newly Friable t Non Suspect ACM Material EA Damage EA Ranking Potential (DP) (NF) 1 2 Classroom 201 N/A Wood Floor Non Suspect ACM 700 SF 0 N/A N/A N/A 1 2 Classroom 201 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 0 Are these Tiles Fiberglass? N/A N/A N/A 1 2 Classroom 201 N/A Plaster Walls NAD 1400 SF 0 N/A N/A N/A 1 2 Classroom 201 M Blackboard Glue Dots 6110/01/02/CLI/ML/2600 Assumed 20 SF 0 1 No 1/D 1 2 Classroom 201 N/A Fiberglass Pipe Insulation Non Suspect ACM 22 LF 0 N/A N/A N/A 1 2 Classroom 201 M Transite Sills 6110/01/02/HH Assumed 20 SF 0 1 No 1/D 1 2 Classroom 201 T Pipe Insulation 2-6 inch 6110/01/02/15 Confirmed 2 LF 0 1 No 1/D 1 2 Classroom 202 N/A Wood Floor Non Suspect ACM 700 SF 0 N/A N/A N/A 1 2 Classroom 202 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 0 Are these Tiles Fiberglass? N/A N/A N/A 1 2 Classroom 202 N/A Plaster Walls NAD 1400 SF 0 N/A N/A N/A 1 2 Classroom 202 M Blackboard Glue Dots 6110/01/02/CLI/ML/2600 Assumed 20 SF 0 1 No 1/D 1 2 Classroom 202 N/A Fiberglass Pipe Insulation Non Suspect ACM 22 LF 0 N/A N/A N/A 1 2 Men's Restroom next to Classroom 202 N/A Wood Floor Non Suspect ACM 350 SF 15 LF Floor warped N/A N/A N/A 1 2 Men's Restroom next to Classroom 202 N/A Ceiling Tile 2' x 4' Non Suspect ACM 350 SF 2 SF Are these Tiles Fiberglass? N/A N/A N/A 1 2 Men's Restroom next to Classroom 202 N/A Plaster Walls NAD 800 SF 0 N/A N/A N/A 1 2 Men's Restroom next to Classroom 202 T Pipe Fitting Insulation 6110/01/02/10 Confirmed 2 EA 0 1 No 1/D 1 2 Men's Restroom next to Classroom 202 N/A Fiberglass Pipe Insulation Non Suspect ACM 48 LF 12 X N/A N/A N/A 1 2 Men's Restroom next to Classroom 202 N/A Fiberglass Pipe Fitting Insulation Non Suspect ACM 8 EA 1 SF N/A N/A N/A 1 2 Men's Restroom next to Classroom 202 M Transite Stalls 6110/01/02/HH Assumed 60 SF 0 1 No 1/D 1 2 Men's Restroom next to Classroom 202 M Transite Sills 6110/01/02/HH Assumed 8 SF 0 1 No 1/D 1 2 Men's Restroom next to Classroom 202 M Floor Tile VAT 12" x 12" 6110/01/02/RR Assumed 50 SF 20 SF Blue Fill out additional damage columns 1 No 6/C 1 2 Men's Restroom next to Classroom 202 T Pipe Fitting Insulation 6110/01/02/10 Confirmed 2 EA 0 1 No 1/D 1 2 Second Floor Hallways N/A Marble Walls Non Suspect ACM 10000 SF 0 Combined with H213, H215, H212 N/A N/A N/A 1 2 Second Floor Hallways N/A Fiberglass Pipe Insulation Non Suspect ACM 104 LF 6 SF Combined with H213, H215, H212-INSPECTOR BREAK OUT HALLWAYS N/A N/A N/A 1 2 Second Floor Hallways T Pipe Insulation > 6 inch 6110/01/02/CLI/ML/1110 Assumed 24 LF 0 Combined with H213, H215, H212 1 No 1/D 1 2 Second Floor Hallways T Pipe Insulation 2-6 inch 6110/01/02/15 Confirmed 20 LF 0 Combined with H213, H215, H212 1 No 1/D 1 2 Second Floor Hallways T Pipe Fitting Insulation 6110/01/02/10 Confirmed 1 EA 0 Combined with H213, H215, H212 1 No 1/D 1 2 Second Floor Hallways N/A Cement Floor Non Suspect ACM 10000 SF 0 Combined with H213, H215, H212 N/A N/A N/A Combined with H213, H215, H212/INSPECTOR- BREAK 1 2 Second Floor Hallways N/A Ceiling Tile 2' x 4' Non Suspect ACM 10000 SF 4 LF OUT HALLWAYS. Tiles stained N/A N/A N/A 1 2 Second Floor Hallways N/A Plaster Walls NAD 20000 SF 0 Combined with H213, H215, H212 N/A N/A N/A 1 1 Cafeteria closest to Washington Lane M Floor Tile VAT 12" x 12" 6110/01/01/PP Assumed 1800 SF 4 SF Multi Fill out additional damage columns 1 No 6/C 1 1 Cafeteria closest to Washington Lane M Ceiling Tile 1' x 1' 6110/01/01/CRI/ML/1720 Assumed 1800 SF 0 How are Cafeterias distinguished at school? Inspector please verify. 1 No 1/D 1 1 Cafeteria closest to Washington Lane N/A Brick Wall Non Suspect ACM 2700 SF 0 How are Cafeterias distinguished at school? Inspector please verify. N/A N/A N/A 1 1 Cafeteria closest to Washington Lane T Pipe Insulation 2-6 inch 6110/01/01/18 Confirmed 325 LF 1 SF what kind of damage? Incidental DDC/fill in additional damage columns 1 Yes 2/C 1 1 Cafeteria closest to Washington Lane T Pipe Fitting Insulation 6110/01/01/12 Confirmed 12 EA 1 EA what kind of damage? Incidental DDC/fill in additional damage columns 1 Yes 2/C 1 1 Kitchen M Floor Tile VAT 12" x 12" 6110/01/01/PP Assumed 800 SF 5 SF Multi Fill out additional damage columns 1 No 6/C 1 1 Kitchen N/A Metal Pan Ceiling Tile 1' x 1' Non Suspect ACM 800 SF 0 N/A N/A N/A 1 1 Kitchen T Metal Pan Ceiling Insulation 6110/01/01/CRI/IH/1721 Assumed 800 SF 0 Possible Acoustic Pillow wrapped with Poly that contained FG Batt Insulation- Insulation associated with Metal 1' x 1' Ceiling Tiles 1 No 1/D 1 1 Kitchen N/A Brick Wall Non Suspect ACM 1600 SF 0 N/A N/A N/A 1 1 Kitchen N/A Fiberglass Pipe Insulation Non Suspect ACM 56 LF 10 SF N/A N/A N/A 1 1 Kitchen M Transite Electrical Panel 6110/01/01/FF Assumed 25 SF 0 1 No 1/D 1 1 Kitchen T Pipe Insulation 2-6 inch 6110/01/01/18 Confirmed 25 LF 0 1 No 1/D 1 1 Kitchen T Pipe Fitting Insulation 6110/01/01/12 Confirmed 10 EA 0 1 No 1/D 1 1 Kitchen Storage Closet Next to Walk In X X X X X X X X X No access X X X 1 1 Cafeteria at Corner of Building near Parking Lot M Floor Tile VAT 12" x 12" 6110/01/01/PP Assumed 1800 SF 0 Multi How are Cafeterias distinguished at school? Inspector please verify. 1 No 1/D 1 1 Cafeteria at Corner of Building near Parking Lot M Ceiling Tile 1' x 1' 6110/01/01/CRI/ML/1720 Assumed 1800 SF 0 How are Cafeterias distinguished at school? Inspector please verify. 1 No 1/D 1 1 Cafeteria at Corner of Building near Parking Lot N/A Brick Wall Non Suspect ACM 2700 SF 0 How are Cafeterias distinguished at school? Inspector please verify. N/A N/A N/A 1 1 Cafeteria at Corner of Building near Parking Lot T Pipe Insulation 2-6 inch 6110/01/01/18 Confirmed 300 LF 1 SF what kind of damage? Incidental DDC/fill in additional damage columns 1 Yes 2/B 1 1 Cafeteria at Corner of Building near Parking Lot T Pipe Fitting Insulation 6110/01/01/12 Confirmed 9 EA 0 How are Cafeterias distinguished at school? Inspector please verify. 1 No 1/D 1 1 Stairwell across from Cafeteria N/A Cement Floor Non Suspect ACM 300 SF 0 N/A N/A N/A 1 1 Stairwell across from Cafeteria N/A Plaster Walls NAD 700 SF 0 N/A N/A N/A 1 1 Stairwell across from Cafeteria N/A Brick Wall Non Suspect ACM 300 SF 0 N/A N/A N/A 1 1 Stairwell across from Cafeteria N/A Plaster Ceiling NAD 300 SF 0 N/A N/A N/A 1 1 Office/Restroom to Left of Exit to Parking Lot N/A Brick Wall Non Suspect ACM 600 SF 0 N/A N/A N/A 1 1 Office/Restroom to Left of Exit to Parking Lot M Vibration Damper Cloth 6110/01/01/13 Assumed 4 SF 0 1 No 1/D 1 1 Office/Restroom to Left of Exit to Parking Lot N/A Concrete Ceiling Non Suspect ACM 300 SF 0 N/A N/A N/A 1 1 Office/Restroom to Left of Exit to Parking Lot N/A Cement Floor Non Suspect ACM 300 SF 0 N/A N/A N/A 1 1 Office/Restroom to Left of Exit to Parking Lot T Pipe Fitting Insulation 6110/01/01/12 Confirmed 2 EA 0 1 No 1/D Response Action (RA) 9

6110 Theodore Roosevelt ES 2015-2016 AHERA Three-Year Report.xls School District of Philadelphia AHERA Three-Year Reinspection 2015-2016 Reinspection Date: 12/10/2015-12/11/2015 Theodore Roosevelt Elementary School Room by Room Location Log Report Building Inspector: Mary Anne Lerro 430 Washington Lane Certificate Number: 740092 Philadelphia, PA 19144 Management Planner: Monique Causley ULCS# 6110 Certificate Number: ACC-0215-8-010 E le m en F l o o r On Site Room Name System Affected Material Description HID# Color required for VAT Comments/Description/Notes Inspector- please break out all Hallway during Spring 2017 inspection Confirmed, Assumed, NAD, Amount of SF LF Amount of SF LF Attic Crawlspace Damage Newly Friable t Non Suspect ACM Material EA Damage EA Ranking Potential (DP) (NF) 1 1 Office/Restroom to Left of Exit to Parking Lot N/A Fiberglass Pipe Insulation Non Suspect ACM 25 LF 0 N/A N/A N/A 1 1 Student Restrooms next to Classroom 110 N/A Cement Floor Non Suspect ACM 400 SF 0 Boy's or Girl's? Inspector please verify. N/A N/A N/A 1 1 Student Restrooms next to Classroom 110 N/A Fiberglass Ceiling Tile 2' x 4' Non Suspect ACM 400 SF 0 Boy's or Girl's? Inspector please verify. N/A N/A N/A 1 1 Student Restrooms next to Classroom 110 N/A Brick Wall Non Suspect ACM 700 SF 0 Boy's or Girl's? Inspector please verify. N/A N/A N/A 1 1 Student Restrooms next to Classroom 110 N/A Fiberglass Pipe Insulation Non Suspect ACM 40 LF 0 Boy's or Girl's? Inspector please verify. N/A N/A N/A 1 1 Custodial Closet adjacent to Classroom 110 N/A Plaster Walls NAD 200 SF 0 N/A N/A N/A 1 1 Custodial Closet adjacent to Classroom 110 N/A Cement Floor Non Suspect ACM 35 SF 0 N/A N/A N/A 1 1 Custodial Closet adjacent to Classroom 110 N/A Plaster Ceiling NAD 35 SF 0 N/A N/A N/A 1 1 Custodial Closet adjacent to Classroom 110 T Pipe Fitting Insulation 6110/01/01/12 Confirmed 4 EA 0 1 No 1/D 1 1 Custodial Closet adjacent to Classroom 110 T Pipe Insulation 2-6 inch 6110/01/01/18 Confirmed 9 LF 0 1 No 1/D 1 1 Classroom 110 M Floor Tile VAT 12" x 12" 6110/01/01/PP Assumed 800 SF 0 Tan 1 No 1/D 1 1 Classroom 110 N/A Fiberglass Ceiling Tile 2' x 4' Non Suspect ACM 800 SF 0 N/A N/A N/A 1 1 Classroom 110 N/A Plaster Walls NAD 1600 SF 0 N/A N/A N/A 1 1 Classroom 110 M Transite Sills 6110/01/01/FF Assumed 22 SF 0 1 No 1/D 1 1 Classroom 110 M Blackboard Glue Dots 6110/01/01/CLI/ML/2600 Assumed 20 SF 0 1 No 1/D 1 1 Classroom 110 N/A Fiberglass Pipe Insulation Non Suspect ACM 40 LF 0 N/A N/A N/A 1 1 Classroom 110 N/A Fiberglass Pipe Fitting Insulation Non Suspect ACM 3 EA 0 N/A N/A N/A 1 1 Corner Room across from Classroom 110 X X X X X X X X X No Access X X X 1 1 Classroom 109 M Floor Tile VAT 12" x 12" 6110/01/01/PP Assumed 1300 SF 0 Blue 1 No 1/D 1 1 Classroom 109 N/A Fiberglass Ceiling Tile 2' x 4' Non Suspect ACM 1300 SF 0 N/A N/A N/A 1 1 Classroom 109 N/A Brick Wall Non Suspect ACM 2000 SF 0 N/A N/A N/A 1 1 Classroom 109 M Transite Sills 6110/01/01/FF Assumed 28 SF 0 1 No 1/D 1 1 Classroom 109 M Blackboard Glue Dots 6110/01/01/CLI/ML/2600 Assumed 30 SF 0 1 No 1/D 1 1 Classroom 109 N/A Fiberglass Pipe Insulation Non Suspect ACM 60 LF 0 N/A N/A N/A 1 1 Classroom 109 N/A Fiberglass Pipe Fitting Insulation Non Suspect ACM 6 EA 0 N/A N/A N/A 1 1 Girl's Restroom next to Classroom 109 N/A Cement Floor Non Suspect ACM 450 SF 0 N/A N/A N/A 1 1 Girl's Restroom next to Classroom 109 N/A Plaster Walls NAD 800 SF 0 N/A N/A N/A 1 1 Girl's Restroom next to Classroom 109 N/A Brick Wall Non Suspect ACM 500 SF 0 N/A N/A N/A 1 1 Girl's Restroom next to Classroom 109 N/A Fiberglass Pipe Insulation Non Suspect ACM 20 LF 4 SF N/A N/A N/A 1 1 Girl's Restroom next to Classroom 109 N/A Plaster Ceiling NAD 450 SF 0 N/A N/A N/A 1 1 Girl's Restroom next to Classroom 109 N/A Fiberglass Pipe Fitting Insulation Non Suspect ACM 4 EA 0 N/A N/A N/A 1 1 Classroom 108 M Floor Tile VAT 9" x 9" 6110/01/01/14 Confirmed 800 SF 0 Grey 1 No 1/D 1 1 Classroom 108 N/A Fiberglass Ceiling Tile 2' x 4' Non Suspect ACM 800 SF 0 N/A N/A N/A 1 1 Classroom 108 N/A Plaster Walls NAD 1600 SF 0 N/A N/A N/A 1 1 Classroom 108 M Transite Sills 6110/01/01/FF Assumed 22 SF 0 1 No 1/D 1 1 Classroom 108 M Blackboard Glue Dots 6110/01/01/CLI/ML/2600 Assumed 20 SF 0 1 No 1/D 1 1 Classroom 108 N/A Fiberglass Pipe Insulation Non Suspect ACM 40 LF 0 N/A N/A N/A 1 1 Classroom 108 N/A Fiberglass Pipe Fitting Insulation Non Suspect ACM 3 EA 0 N/A N/A N/A 1 1 Stairwell across from Classroom 108 N/A Cement Floor Non Suspect ACM 300 SF 0 N/A N/A N/A 1 1 Stairwell across from Classroom 108 N/A Plaster Walls NAD 700 SF 0 N/A N/A N/A 1 1 Stairwell across from Classroom 108 N/A Brick Wall Non Suspect ACM 300 SF 0 N/A N/A N/A 1 1 Stairwell across from Classroom 108 N/A Plaster Ceiling NAD 300 SF 0 N/A N/A N/A 1 1 Classroom to Right of Classroom 107 X X X X X X X X X No Access X X X 1 1 Classroom 107 M Floor Tile VAT 9" x 9" 6110/01/01/14 Confirmed 800 SF 0 Grey 1 No 1/D 1 1 Classroom 107 N/A Fiberglass Ceiling Tile 2' x 4' Non Suspect ACM 800 SF 0 N/A N/A N/A 1 1 Classroom 107 N/A Brick Wall Non Suspect ACM 1600 SF 0 N/A N/A N/A 1 1 Classroom 107 M Transite Sills 6110/01/01/FF Assumed 22 SF 0 1 No 1/D 1 1 Classroom 107 M Blackboard Glue Dots 6110/01/01/CLI/ML/2600 Assumed 20 SF 0 1 No 1/D 1 1 Classroom 107 N/A Fiberglass Pipe Insulation Non Suspect ACM 40 LF 0 N/A N/A N/A 1 1 Classroom 107 N/A Fiberglass Pipe Fitting Insulation Non Suspect ACM 3 EA 0 N/A N/A N/A 1 1 Classroom/Office 106 M Floor Tile VAT 12" x 12" 6110/01/01/PP Assumed 1300 SF 0 Tan 45 SF of Floor Tile 12x12 is green 1 No 1/D 1 1 Classroom/Office 106 M Floor Tile VAT 9" x 9" 6110/01/01/14 Confirmed 20 SF 0 Grey 1 No 1/D 1 1 Classroom/Office 106 N/A Fiberglass Ceiling Tile 2' x 4' Non Suspect ACM 1300 SF 0 N/A N/A N/A 1 1 Classroom/Office 106 N/A Plaster Walls NAD 2000 SF 0 N/A N/A N/A 1 1 Classroom/Office 106 M Transite Sills 6110/01/01/FF Assumed 28 SF 0 1 No 1/D 1 1 Classroom/Office 106 N/A Fiberglass Pipe Insulation Non Suspect ACM 25 LF 0 N/A N/A N/A 1 1 IMC M Floor Tile VAT 12" x 12" 6110/01/01/PP Assumed 2000 SF 0 Tan 1 No 1/D 1 1 IMC N/A Fiberglass Ceiling Tile 2' x 4' Non Suspect ACM 2500 SF 12 SF stained N/A N/A N/A 1 1 IMC N/A Brick Wall Non Suspect ACM 4600 SF 0 N/A N/A N/A 1 1 IMC N/A Fiberglass Pipe Insulation Non Suspect ACM 10 LF 0 N/A N/A N/A 1 1 IMC N/A Metal Wall Sheeting Non Suspect ACM 600 SF 0 N/A N/A N/A 1 1 IMC N/A Fiberglass Pipe Fitting Insulation Non Suspect ACM 2 EA 0 N/A N/A N/A 1 1 IMC Storage M Floor Tile VAT 12" x 12" 6110/01/01/PP Assumed 800 SF 0 Tan 1 No 1/D 1 1 IMC Storage N/A Fiberglass Ceiling Tile 2' x 4' Non Suspect ACM 800 SF 0 N/A N/A N/A 1 1 IMC Storage N/A Brick Wall Non Suspect ACM 1600 SF 0 N/A N/A N/A 1 1 IMC Storage N/A Fiberglass Pipe Insulation Non Suspect ACM 20 LF 0 N/A N/A N/A 1 1 Library Office M Floor Tile VAT 12" x 12" 6110/01/01/PP Assumed 250 SF 0 Tan 1 No 1/D Response Action (RA) 10

6110 Theodore Roosevelt ES 2015-2016 AHERA Three-Year Report.xls School District of Philadelphia AHERA Three-Year Reinspection 2015-2016 Reinspection Date: 12/10/2015-12/11/2015 Theodore Roosevelt Elementary School Room by Room Location Log Report Building Inspector: Mary Anne Lerro 430 Washington Lane Certificate Number: 740092 Philadelphia, PA 19144 Management Planner: Monique Causley ULCS# 6110 Certificate Number: ACC-0215-8-010 E le m en F l o o r On Site Room Name System Affected Material Description HID# Color required for VAT Comments/Description/Notes Inspector- please break out all Hallway during Spring 2017 inspection Confirmed, Assumed, NAD, Amount of SF LF Amount of SF LF Attic Crawlspace Damage Newly Friable t Non Suspect ACM Material EA Damage EA Ranking Potential (DP) (NF) 1 1 Library Office N/A Fiberglass Ceiling Tile 2' x 4' Non Suspect ACM 250 SF 0 N/A N/A N/A 1 1 Library Office N/A Brick Wall Non Suspect ACM 500 SF 0 N/A N/A N/A 1 1 Storage on Stairwell leading to IMC X X X X X X X X X No access X X X 1 1 Classroom 105 M Floor Tile VAT 9" x 9" 6110/01/01/14 Confirmed 800 SF 0 Grey 1 No 1/D 1 1 Classroom 105 N/A Ceiling Tile 2' x 4' Non Suspect ACM 800 SF 2 SF stained N/A N/A N/A 1 1 Classroom 105 N/A Plaster Walls NAD 1600 SF 0 N/A N/A N/A 1 1 Classroom 105 M Transite Sills 6110/01/01/FF Assumed 22 SF 0 1 No 1/D 1 1 Classroom 105 M Blackboard Glue Dots 6110/01/01/CLI/ML/2600 Assumed 20 SF 0 1 No 1/D 1 1 Classroom 105 N/A Fiberglass Pipe Insulation Non Suspect ACM 40 LF 0 N/A N/A N/A 1 1 Hallway Corridor at IMC side of Auditorium M Floor Tile VAT 12" x 12" 6110/01/01/PP Assumed 500 SF 0 Grey 1 No 1/D 1 1 Hallway Corridor at IMC side of Auditorium N/A Plaster Walls NAD 1500 SF 20 EA what kind of damage? N/A N/A N/A 1 1 Hallway Corridor at IMC side of Auditorium N/A Plaster Ceiling NAD 700 SF 0 N/A N/A N/A 1 1 Hallway Corridor at IMC side of Auditorium M Floor Tile VAT 12" x 12" 6110/01/01/PP Assumed 200 SF 0 Black 1 No 1/D 1 1 Auditorium N/A Wood Floor Non Suspect ACM 3000 SF 0 N/A N/A N/A 1 1 Auditorium N/A Plaster Walls NAD 6000 SF 0 N/A N/A N/A 1 1 Auditorium S Plaster Ceiling 6110/01/01/UU Assumed 3000 SF 0 1 No 1/D 1 1 Storage to Left of Auditorium M Transite Electrical Panel 6110/01/01/FF Assumed 40 SF 0 1 No 1/D 1 1 Storage to Left of Auditorium N/A Wood Floor Non Suspect ACM 150 SF 0 N/A N/A N/A 1 1 Storage to Left of Auditorium N/A Plaster Walls NAD 350 SF 0 N/A N/A N/A 1 1 Storage to Left of Auditorium N/A Plaster Ceiling NAD 150 SF 0 N/A N/A N/A 1 1 Storage to Left of Auditorium T Pipe Insulation 2-6 inch 6110/01/01/18 Confirmed 18 LF 0 1 No 1/D 1 1 Storage to Left of Auditorium T Pipe Fitting Insulation 6110/01/01/12 Confirmed 1 EA 0 1 No 1/D 1 1 Storage to Left of Auditorium N/A Fiberglass Pipe Insulation Non Suspect ACM 15 LF 0 N/A N/A N/A 1 1 Storage to To Right of Auditorium N/A Wood Floor Non Suspect ACM 150 SF 0 N/A N/A N/A 1 1 Storage to To Right of Auditorium N/A Plaster Walls NAD 350 SF 0 N/A N/A N/A 1 1 Storage to To Right of Auditorium N/A Plaster Ceiling NAD 150 SF 0 N/A N/A N/A 1 1 Storage to To Right of Auditorium N/A Fiberglass Pipe Insulation Non Suspect ACM 15 LF 0 N/A N/A N/A 1 1 Hallway Corridor at Left side of Auditorium M Floor Tile VAT 12" x 12" 6110/01/01/PP Assumed 500 SF 0 Grey 1 No 1/D 1 1 Hallway Corridor at Left side of Auditorium N/A Plaster Walls NAD 1500 SF 0 N/A N/A N/A 1 1 Hallway Corridor at Left side of Auditorium N/A Plaster Ceiling NAD 700 SF 15 LF what kind of damage? N/A N/A N/A 1 1 Hallway Corridor at Left side of Auditorium M Floor Tile VAT 12" x 12" 6110/01/01/PP Assumed 200 SF 0 Black 1 No 1/D 1 1 Women's Restroom across from Auditorium N/A Cement Floor Non Suspect ACM 250 SF 0 N/A N/A N/A 1 1 Women's Restroom across from Auditorium N/A Plaster Walls NAD 500 SF 0 N/A N/A N/A 1 1 Women's Restroom across from Auditorium N/A Plaster Ceiling NAD 250 SF 0 N/A N/A N/A 1 1 Women's Restroom across from Auditorium N/A Fiberglass Pipe Insulation Non Suspect ACM 40 LF 4 LF N/A N/A N/A 1 1 Women's Restroom across from Auditorium N/A Fiberglass Pipe Fitting Insulation Non Suspect ACM 5 EA 0 N/A N/A N/A 1 1 Women's Restroom across from Auditorium T Pipe Fitting Insulation 6110/01/01/12 Confirmed 4 EA 0 1 No 1/D 1 1 Women's Restroom across from Auditorium T Pipe Insulation 2-6 inch 6110/01/01/18 Confirmed 55 LF 0 1 No 1/D 1 1 Men's Restroom across from Auditorium N/A Cement Floor Non Suspect ACM 250 SF 0 N/A N/A N/A 1 1 Men's Restroom across from Auditorium N/A Plaster Walls NAD 500 SF 0 N/A N/A N/A 1 1 Men's Restroom across from Auditorium N/A Plaster Ceiling NAD 250 SF 0 N/A N/A N/A 1 1 Men's Restroom across from Auditorium N/A Fiberglass Pipe Insulation Non Suspect ACM 40 LF 0 N/A N/A N/A 1 1 Men's Restroom across from Auditorium N/A Fiberglass Pipe Fitting Insulation Non Suspect ACM 5 EA 0 N/A N/A N/A 1 1 Men's Restroom across from Auditorium T Pipe Fitting Insulation 6110/01/01/12 Confirmed 4 EA 0 1 No 1/D 1 1 Men's Restroom across from Auditorium T Pipe Insulation 2-6 inch 6110/01/01/18 Confirmed 55 LF 0 1 No 1/D 1 1 Main Entrance Lobby N/A Plaster Walls NAD 2500 SF 20 LF N/A N/A N/A 1 1 Main Entrance Lobby N/A Plaster Ceiling NAD 1000 SF 8 EA N/A N/A N/A 1 1 Main Entrance Lobby N/A Marble Walls Non Suspect ACM 2000 SF 0 N/A N/A N/A 1 1 Main Entrance Lobby N/A Cement Floor Non Suspect ACM 1000 SF 0 N/A N/A N/A 1 1 Main Lobby Stairs next to Classroom 105 N/A Cement Floor Non Suspect ACM 600 SF 0 N/A N/A N/A 1 1 Main Lobby Stairs next to Classroom 105 N/A Plaster Walls NAD 1800 SF 0 N/A N/A N/A 1 1 Main Lobby Stairs next to Classroom 105 N/A Marble Walls Non Suspect ACM 800 SF 0 N/A N/A N/A 1 1 Main Lobby Stairs next to Classroom 105 N/A Plaster Ceiling NAD 600 SF 0 N/A N/A N/A 1 1 Main Lobby Stairs next to Classroom 105 N/A Marble Floors Non Suspect ACM 400 SF 0 N/A N/A N/A 1 1 Main Lobby Stairs next to Classroom 104 N/A Cement Floor Non Suspect ACM 600 SF 0 N/A N/A N/A 1 1 Main Lobby Stairs next to Classroom 104 N/A Plaster Walls NAD 1800 SF 0 N/A N/A N/A 1 1 Main Lobby Stairs next to Classroom 104 N/A Marble Walls Non Suspect ACM 800 SF 0 N/A N/A N/A 1 1 Main Lobby Stairs next to Classroom 104 N/A Plaster Ceiling NAD 600 SF 0 N/A N/A N/A 1 1 Main Lobby Stairs next to Classroom 104 N/A Marble Floors Non Suspect ACM 400 SF 0 N/A N/A N/A 1 1 Classroom 104 M Floor Tile VAT 9" x 9" 6110/01/01/14 Confirmed 800 SF 0 Brown 1 No 1/D 1 1 Classroom 104 N/A Fiberglass Ceiling Tile 2' x 4' Non Suspect ACM 800 SF 0 N/A N/A N/A 1 1 Classroom 104 N/A Brick Wall Non Suspect ACM 1600 SF 0 N/A N/A N/A 1 1 Classroom 104 M Transite Sills 6110/01/01/FF Assumed 22 SF 0 1 No 1/D 1 1 Classroom 104 M Blackboard Glue Dots 6110/01/01/CLI/ML/2600 Assumed 20 SF 0 1 No 1/D 1 1 Classroom 104 N/A Fiberglass Pipe Insulation Non Suspect ACM 40 LF 0 N/A N/A N/A 1 1 Classroom 104 Closets X X X X X X X X X No access X X X 1 1 Classroom 103 M Floor Tile VAT 12" x 12" 6110/01/01/PP Assumed 800 SF 0 Tan 1 No 1/D Response Action (RA) 11

6110 Theodore Roosevelt ES 2015-2016 AHERA Three-Year Report.xls School District of Philadelphia AHERA Three-Year Reinspection 2015-2016 Reinspection Date: 12/10/2015-12/11/2015 Theodore Roosevelt Elementary School Room by Room Location Log Report Building Inspector: Mary Anne Lerro 430 Washington Lane Certificate Number: 740092 Philadelphia, PA 19144 Management Planner: Monique Causley ULCS# 6110 Certificate Number: ACC-0215-8-010 E le m en F l o o r On Site Room Name System Affected Material Description HID# Color required for VAT Comments/Description/Notes Inspector- please break out all Hallway during Spring 2017 inspection Confirmed, Assumed, NAD, Amount of SF LF Amount of SF LF Attic Crawlspace Damage Newly Friable t Non Suspect ACM Material EA Damage EA Ranking Potential (DP) (NF) 1 1 Classroom 103 M Sheetrock Wall 6110/01/01/CLI/ML/2100 Assumed 400 SF 0 1 No 1/D 1 1 Classroom 103 N/A Brick Wall Non Suspect ACM 600 SF 0 N/A N/A N/A 1 1 Classroom 103 N/A Fiberglass Pipe Insulation Non Suspect ACM 30 LF 0 N/A N/A N/A 1 1 Classroom 103 N/A Plaster Ceiling NAD 800 SF 45 EA N/A N/A N/A 1 1 Classroom 103 M Blackboard Glue Dots 6110/01/01/CLI/ML/2600 Assumed 20 SF 0 1 No 1/D 1 1 Room C next to Classroom 103 M Sheetrock Wall 6110/01/01/CLI/ML/2100 Assumed 400 SF 0 1 No 1/D 1 1 Room C next to Classroom 103 N/A Brick Wall Non Suspect ACM 600 SF 0 N/A N/A N/A 1 1 Room C next to Classroom 103 N/A Fiberglass Pipe Insulation Non Suspect ACM 80 LF 0 N/A N/A N/A 1 1 Room C next to Classroom 103 T Pipe Fitting Insulation 6110/01/01/12 Confirmed 11 EA 0 1 No 1/D 1 1 Room C next to Classroom 103 N/A Plaster Ceiling NAD 650 SF 10 SF N/A N/A N/A 1 1 Room C next to Classroom 103 M Floor Tile VAT 9" x 9" 6110/01/01/14 Confirmed 200 SF 2 SF Grey Fill out additional damage columns 1 No 6/C 1 1 Room C next to Classroom 103 N/A Cement Floor Non Suspect ACM 450 SF 0 N/A N/A N/A 1 1 Storage area to the Left of Auditorium Front Entrance X X X X X X X X X No Access X X X 1 1 Room B N/A Brick Wall Non Suspect ACM 1100 SF 0 N/A N/A N/A 1 1 Room B N/A Fiberglass Pipe Insulation Non Suspect ACM 22 LF 0 N/A N/A N/A 1 1 Room B T Pipe Fitting Insulation 6110/01/01/12 Confirmed 3 EA 0 1 No 1/D 1 1 Room B N/A Plaster Ceiling NAD 800 SF 4 EA N/A N/A N/A 1 1 Room B N/A Wood Floor Non Suspect ACM 800 SF 0 N/A N/A N/A 1 1 Stairwell across from Classroom B N/A Cement Floor Non Suspect ACM 300 SF 0 N/A N/A N/A 1 1 Stairwell across from Classroom B N/A Plaster Walls NAD 700 SF 0 N/A N/A N/A 1 1 Stairwell across from Classroom B N/A Brick Wall Non Suspect ACM 300 SF 0 N/A N/A N/A 1 1 Stairwell across from Classroom B N/A Plaster Ceiling NAD 300 SF 0 N/A N/A N/A 1 1 Classroom 102 M Floor Tile VAT 9" x 9" 6110/01/01/14 Confirmed 450 SF 10 SF Grey Fill out additional damage columns 1 No 6/C 1 1 Classroom 102 N/A Fiberglass Ceiling Tile 2' x 4' Non Suspect ACM 450 SF 0 N/A N/A N/A 1 1 Classroom 102 N/A Brick Wall Non Suspect ACM 800 SF 0 N/A N/A N/A 1 1 Classroom 102 N/A Fiberglass Pipe Insulation Non Suspect ACM 20 LF 0 N/A N/A N/A 1 1 Classroom 102 N/A Fiberglass Pipe Fitting Insulation Non Suspect ACM 3 EA 0 N/A N/A N/A 1 1 Classroom 101 closet X X X X X X X X X No access X X X 1 1 Classroom 100/101 N/A Wood Floor Non Suspect ACM 500 SF 0 Classroom 100 and 101 on site are combined into one room N/A N/A N/A 1 1 Classroom 100/101 M Sheetrock Wall 6110/01/01/CLI/ML/2100 Assumed 300 SF 0 Classroom 100 and 101 on site are combined into one room 1 No 1/D 1 1 Classroom 100/101 N/A Brick Wall Non Suspect ACM 600 SF 0 Classroom 100 and 101 on site are combined into one room N/A N/A N/A 1 1 Classroom 100/101 N/A Fiberglass Pipe Insulation Non Suspect ACM 22 LF 0 Classroom 100 and 101 on site are combined into one room N/A N/A N/A 1 1 Classroom 100/101 N/A Plaster Ceiling NAD 500 SF 10 SF what kind of damage? N/A N/A N/A 1 1 Classroom across from Classroom 101/100 X X X X X X X X X No Access X X X 1 1 Custodial Closet across from Classroom 100/101 N/A Plaster Walls NAD 200 SF 0 N/A N/A N/A 1 1 Custodial Closet across from Classroom 100/101 N/A Cement Floor Non Suspect ACM 35 SF 0 N/A N/A N/A 1 1 Custodial Closet across from Classroom 100/101 N/A Plaster Ceiling NAD 35 SF 0 N/A N/A N/A 1 1 Custodial Closet across from Classroom 100/101 T Pipe Insulation 2-6 inch 6110/01/01/18 Confirmed 8 LF 0 1 No 1/D 1 1 Custodial Closet across from Classroom 100/101 T Pipe Fitting Insulation 6110/01/01/12 Confirmed 4 EA 1 EA 1 Yes 2/C 1 1 Boy's Restroom across from Classroom 100/101 N/A Cement Floor Non Suspect ACM 450 SF 0 N/A N/A N/A 1 1 Boy's Restroom across from Classroom 100/101 N/A Plaster Walls NAD 800 SF 0 N/A N/A N/A 1 1 Boy's Restroom across from Classroom 100/101 N/A Brick Wall Non Suspect ACM 500 SF 0 N/A N/A N/A 1 1 Boy's Restroom across from Classroom 100/101 N/A Fiberglass Pipe Insulation Non Suspect ACM 20 LF 5 LF N/A N/A N/A 1 1 Boy's Restroom across from Classroom 100/101 N/A Plaster Ceiling NAD 450 SF 0 N/A N/A N/A 1 1 Boy's Restroom across from Classroom 100/101 N/A Fiberglass Pipe Fitting Insulation Non Suspect ACM 4 EA 0 N/A N/A N/A 1 1 Stairwell across from Classroom 101/100 N/A Cement Floor Non Suspect ACM 300 SF 0 N/A N/A N/A 1 1 Stairwell across from Classroom 101/100 N/A Plaster Walls NAD 700 SF 0 N/A N/A N/A 1 1 Stairwell across from Classroom 101/100 N/A Brick Wall Non Suspect ACM 300 SF 0 N/A N/A N/A 1 1 Stairwell across from Classroom 101/100 N/A Plaster Ceiling NAD 300 SF 0 N/A N/A N/A 1 1 Building Engineer's Office N/A Brick Wall Non Suspect ACM 600 SF 0 Combined with 101C N/A N/A N/A 1 1 Building Engineer's Office M Vibration Damper Cloth 6110/01/01/13 Assumed 4 SF 0 Combined with 101C 1 No 1/D 1 1 Building Engineer's Office N/A Concrete Ceiling Non Suspect ACM 300 SF 0 Combined with 101C N/A N/A N/A 1 1 Building Engineer's Office N/A Cement Floor Non Suspect ACM 300 SF 0 Combined with 101C N/A N/A N/A 1 1 Classroom across from Cafeteria closest to Washington Lane M Floor Tile VAT 12" x 12" 6110/01/01/PP Assumed 600 SF 0 White 1 No 1/D 1 1 Classroom across from Cafeteria closest to Washington Lane N/A Brick Wall Non Suspect ACM 1200 SF 0 N/A N/A N/A 1 1 Classroom across from Cafeteria closest to Washington Lane N/A Fiberglass Ceiling Tile 2' x 4' Non Suspect ACM 600 SF 0 N/A N/A N/A 1 1 Classroom across from Cafeteria closest to Washington Lane N/A Fiberglass Pipe Insulation Non Suspect ACM 10 LF 0 N/A N/A N/A 1 1 First Floor Hallways N/A Cement Floor Non Suspect ACM 10000 SF 0 Combined with H17, H19, H110 N/A N/A N/A 1 1 First Floor Hallways N/A Ceiling Tile 2' x 4' Non Suspect ACM 10000 SF 0 Combined with H17, H19, H110 Are these Tiles Fiberglass? N/A N/A N/A 1 1 First Floor Hallways N/A Plaster Walls NAD 20000 SF 0 Combined with H17, H19, H110 N/A N/A N/A 1 1 First Floor Hallways N/A Marble Walls Non Suspect ACM 10000 SF 0 Combined with H17, H19, H110 N/A N/A N/A 1 1 First Floor Hallways T Pipe Fitting Insulation 6110/01/01/12 Confirmed 1 EA 0 Combined with H17, H19, H110 1 No 1/D 1 1 First Floor Hallways T Pipe Insulation > 6 inch 6110/01/01/CLI/ML/1110 Assumed 2 LF 0 Combined with H17, H19, H110 1 No 1/D 1 1 First Floor Hallways N/A Fiberglass Pipe Insulation Non Suspect ACM 159 LF 33 LF Combined with H17, H19, H110 N/A N/A N/A Response Action (RA) 12

6110 Theodore Roosevelt ES 2015-2016 AHERA Three-Year Report.xls School District of Philadelphia AHERA Three-Year Reinspection 2015-2016 Reinspection Date: 12/10/2015-12/11/2015 Theodore Roosevelt Elementary School Room by Room Location Log Report Building Inspector: Mary Anne Lerro 430 Washington Lane Certificate Number: 740092 Philadelphia, PA 19144 Management Planner: Monique Causley ULCS# 6110 Certificate Number: ACC-0215-8-010 E le m en F l o o r On Site Room Name System Affected Material Description HID# Color required for VAT Comments/Description/Notes Inspector- please break out all Hallway during Spring 2017 inspection Confirmed, Assumed, NAD, Amount of SF LF Amount of SF LF Attic Crawlspace Damage Newly Friable t Non Suspect ACM Material EA Damage EA Ranking Potential (DP) (NF) 1 B Boiler Room Left Storage Area N/A Concrete Ceiling Non Suspect ACM 1700 SF 0 N/A N/A N/A 1 B Boiler Room Left Storage Area N/A Cement Floor Non Suspect ACM 1700 SF 0 N/A N/A N/A 1 B Boiler Room Left Storage Area N/A Concrete Block Wall Non Suspect ACM 3200 SF 0 N/A N/A N/A 1 B Boiler Room Left Storage Area N/A Fiberglass Pipe Insulation Non Suspect ACM 90 LF 0 N/A N/A N/A 1 B Boiler Room Left Storage Area N/A Fiberglass Pipe Fitting Insulation Non Suspect ACM 9 EA 0 N/A N/A N/A 1 B Boiler Room Storage N/A Concrete Ceiling Non Suspect ACM 1700 SF 45 SF Mold growth, DDC written during Summer Inspection N/A N/A N/A 1 B Boiler Room Storage N/A Cement Floor Non Suspect ACM 1700 SF 45 SF Mold growth, DDC written during Summer Inspection N/A N/A N/A 1 B Boiler Room Storage N/A Concrete Block Wall Non Suspect ACM 3200 SF 0 N/A N/A N/A 1 B Boiler Room N/A Concrete Ceiling Non Suspect ACM 2500 SF 0 N/A N/A N/A 1 B Boiler Room N/A Cement Floor Non Suspect ACM 2500 SF 0 N/A N/A N/A 1 B Boiler Room N/A Concrete Block Wall Non Suspect ACM 4400 SF 0 N/A N/A N/A 1 B Boiler Room N/A Fiberglass Pipe Insulation Non Suspect ACM 268 LF 22 LF Mold growth observed on one of pipes, DDC written during Summer inspection N/A N/A N/A 1 B Boiler Room N/A Fiberglass Pipe Fitting Insulation Non Suspect ACM 44 EA 4 EA N/A N/A N/A 1 B Boiler Room N/A Fiberglass Boiler Rope Non Suspect ACM 80 LF 0 N/A N/A N/A 1 B Boiler Room N/A Fiberglass Boiler Insulation Non Suspect ACM 180 SF 0 N/A N/A N/A 1 B Electrical Room N/A Concrete Ceiling Non Suspect ACM 1300 SF 0 Paint Chipping 300 sf walls N/A N/A N/A 1 B Electrical Room N/A Cement Floor Non Suspect ACM 1300 SF 0 N/A N/A N/A 1 B Electrical Room N/A Concrete Block Wall Non Suspect ACM 2500 SF 0 N/A N/A N/A 1 B Electrical Room N/A Fiberglass Pipe Insulation Non Suspect ACM 110 LF 0 N/A N/A N/A 1 B Electrical Room N/A Fiberglass Pipe Fitting Insulation Non Suspect ACM 7 EA 0 N/A N/A N/A 1 B Electrical Room M Transite Electrical Panel 6110/01/0B/CLI/ML/2350 Assumed 80 SF 0 1 No 1/D 1 B Fan Room N/A Fiberglass Pipe Insulation Non Suspect ACM 134 LF 0 N/A N/A N/A 1 B Fan Room N/A Fiberglass Pipe Fitting Insulation Non Suspect ACM 20 EA 0 N/A N/A N/A 1 B Fan Room M Vibration Damper Cloth 6110/01/0B/21 Assumed 16 SF 0 1 No 1/D 2 1 Hallway/Stairwell to Gymnasiums M Floor Tile VAT 12" x 12" 6110/02/01/TT Assumed 1200 SF 0 White 1 No 1/D 2 1 Hallway/Stairwell to Gymnasiums N/A Fiberglass Ceiling Tile 2' x 4' Non Suspect ACM 1200 SF 8 SF N/A N/A N/A 2 1 Hallway/Stairwell to Gymnasiums N/A Concrete Block Wall Non Suspect ACM 2400 SF 0 N/A N/A N/A 2 1 Hallway/Stairwell to Gymnasiums N/A Concrete Ceiling Non Suspect ACM 1200 SF 0 N/A N/A N/A 2 1 Hallway/Stairwell to Gymnasiums M Transite Electrical Panel 6110/02/01/MM Assumed 40 SF 0 1 No 1/D 2 1 Girl's Gymnasium N/A Wood Floor Non Suspect ACM 2800 SF 0 N/A N/A N/A 2 1 Girl's Gymnasium N/A Concrete Block Wall Non Suspect ACM 4900 SF 0 N/A N/A N/A 2 1 Girl's Gymnasium N/A Metal Ceiling Panels Non Suspect ACM 2800 SF 0 What size is the panel N/A N/A N/A 2 1 Girl's Gymnasium N/A Fiberglass Pipe Insulation Non Suspect ACM 65 LF 0 N/A N/A N/A 2 1 Girl's Gymnasium N/A Fiberglass Pipe Fitting Insulation Non Suspect ACM 10 EA 5 EA N/A N/A N/A 2 1 Girl's Gymnasium M Vibration Damper Cloth 6110/02/01/24 Assumed 10 SF 0 1 No 1/D 2 1 Girl's Gymnasium M Glue Dots 6110/02/01/CLI/ML/2610 Assumed 5 0 Black Glue Dots exposed behind gym wall padding 1 No 1/D 2 1 Girl's Gymnasium Locker Room M Floor Tile VAT 12" x 12" 6110/02/01/TT Assumed 800 SF 50 SF White 1 No 6/C 2 1 Girl's Gymnasium Locker Room N/A Concrete Block Wall Non Suspect ACM 1600 SF 0 N/A N/A N/A 2 1 Girl's Gymnasium Locker Room N/A Plaster Ceiling NAD 800 SF 0 N/A N/A N/A 2 1 Girl's Gymnasium Office M Floor Tile VAT 12" x 12" 6110/02/01/TT Assumed 350 SF 0 White 1 No 1/D 2 1 Girl's Gymnasium Office N/A Concrete Block Wall Non Suspect ACM 600 SF 0 N/A N/A N/A 2 1 Girl's Gymnasium Office N/A Ceiling Tile 2' x 4' Non Suspect ACM 350 SF 0 Are these Tiles Fiberglass? N/A N/A N/A 2 1 Girl's Restroom near Gymnasium M Floor Tile VAT 12" x 12" 6110/02/01/TT Assumed 150 SF 0 White 1 No 1/D 2 1 Girl's Restroom near Gymnasium N/A Concrete Block Wall Non Suspect ACM 300 SF 0 N/A N/A N/A 2 1 Girl's Restroom near Gymnasium N/A Plaster Ceiling NAD 150 SF 0 N/A N/A N/A 2 1 Boy's Gymnasium N/A Wood Floor Non Suspect ACM 2800 SF 0 N/A N/A N/A 2 1 Boy's Gymnasium N/A Concrete Block Wall Non Suspect ACM 4900 SF 0 N/A N/A N/A 2 1 Boy's Gymnasium N/A Metal Ceiling Panels Non Suspect ACM 2800 SF 0 What size is the panel N/A N/A N/A 2 1 Boy's Gymnasium N/A Fiberglass Pipe Insulation Non Suspect ACM 65 LF 2 LF N/A N/A N/A 2 1 Boy's Gymnasium N/A Fiberglass Pipe Fitting Insulation Non Suspect ACM 10 EA 4 EA N/A N/A N/A 2 1 Boy's Gymnasium M Vibration Damper Cloth 6110/02/01/24 Assumed 10 SF 0 1 No 1/D 2 1 Boy's Gymnasium M Glue Dots 6110/02/01/CLI/ML/2610 Assumed 5 0 Black 1 No 1/D 2 1 Boy's Gymnasium Locker Room M Floor Tile VAT 12" x 12" 6110/02/01/TT Assumed 800 SF 0 White 1 No 1/D 2 1 Boy's Gymnasium Locker Room N/A Concrete Block Wall Non Suspect ACM 1600 SF 0 N/A N/A N/A 2 1 Boy's Gymnasium Locker Room N/A Plaster Ceiling NAD 800 SF 0 N/A N/A N/A 2 1 Boy's Gymnasium Office M Floor Tile VAT 12" x 12" 6110/02/01/TT Assumed 350 SF 0 White 1 No 1/D 2 1 Boy's Gymnasium Office N/A Concrete Block Wall Non Suspect ACM 600 SF 0 N/A N/A N/A 2 1 Boy's Gymnasium Office N/A Ceiling Tile 2' x 4' Non Suspect ACM 350 SF 0 Are these Tiles Fiberglass? N/A N/A N/A 2 1 Boy's Restroom near Gymnasium M Floor Tile VAT 12" x 12" 6110/02/01/TT Assumed 150 SF 0 White 1 No 1/D 2 1 Boy's Restroom near Gymnasium N/A Concrete Block Wall Non Suspect ACM 300 SF 0 N/A N/A N/A 2 1 Boy's Restroom near Gymnasium N/A Plaster Ceiling NAD 150 SF 0 N/A N/A N/A 2 1 Classroom near Right side of Gymnasium M Floor Tile VAT 9" x 9" 6110/02/01/27 Confirmed 300 SF 0 Grey Unoccupied at time of inspection 1 No 1/D 2 1 Classroom near Right side of Gymnasium N/A Concrete Block Wall Non Suspect ACM 650 SF 0 N/A N/A N/A 2 1 Classroom near Right side of Gymnasium N/A Fiberglass Ceiling Tile 2' x 4' Non Suspect ACM 300 SF 0 N/A N/A N/A 2 1 Generator Room in Gym Hallway N/A Concrete Ceiling Non Suspect ACM 125 SF 0 N/A N/A N/A Response Action (RA) 13

6110 Theodore Roosevelt ES 2015-2016 AHERA Three-Year Report.xls School District of Philadelphia AHERA Three-Year Reinspection 2015-2016 Reinspection Date: 12/10/2015-12/11/2015 Theodore Roosevelt Elementary School Room by Room Location Log Report Building Inspector: Mary Anne Lerro 430 Washington Lane Certificate Number: 740092 Philadelphia, PA 19144 Management Planner: Monique Causley ULCS# 6110 Certificate Number: ACC-0215-8-010 E le m en F l o o r On Site Room Name System Affected Material Description HID# Color required for VAT Comments/Description/Notes Inspector- please break out all Hallway during Spring 2017 inspection Confirmed, Assumed, NAD, Amount of SF LF Amount of SF LF Attic Crawlspace Damage Newly Friable t Non Suspect ACM Material EA Damage EA Ranking Potential (DP) (NF) 2 1 Generator Room in Gym Hallway N/A Cement Floor Non Suspect ACM 125 SF 0 N/A N/A N/A 2 1 Generator Room in Gym Hallway N/A Concrete Block Wall Non Suspect ACM 375 SF 0 N/A N/A N/A 2 1 Generator Room in Gym Hallway T Pipe Fitting Insulation 6110/01/0B/25 Confirmed 10 EA 0 1 No 1/D 2 1 Generator Room in Gym Hallway N/A Fiberglass Pipe Insulation Non Suspect ACM 41 LF 0 N/A N/A N/A 1 A Auditorium Attic X X X X X X X X X A X X X 1 A Main Attic X X X X X X X X X A X X X 1 C Crawlspace X X X X X X X X X A X X X Response Action (RA) 14