Draft Prioritization for STP, SNK, TA Applications in Ohio and Kentucky ICC Prioritization Subcommittee September 11, 2018
Type Funding Available March Estimate Funding Available September Estimate Funding Requested Ohio STP $20 m $26 m $57.9 m Ohio TA $2.6 m $4.2 m $8.0 m Kentucky SNK $7.5 m $7.8 m $12.1 m Kentucky TA $1.6m $1.8 m $1.8 m
Ohio STP Applications (15)
Butler County SR 129/Liberty Way Modification Phase 2 Construction of new ramps from the eastern terminus of SR 129 to local road network at Cox Road. New roundabout at Cox Road. Removal of nearby SR 129 connections to Liberty Way, eliminating weaving issues. Federal Funds $5,961,500 Local $5,961,500 Total Estimate$11,923,000
BCRTA-Chestnut Street Multimodal Shared Services Facility Facility will provide infrastructure for BCRTA, Talawanda School Disrict and Miami University. Bus maintenance facility, passenger waiting area and amenities for local and regional bus passengers. Federal Funds $4,531,250 Local $1,880,000 Total Estimate $6,411,250
City of Cincinnati-Hopple St. Viaduct Deck Rehabilitation Rehabilitate and preserve the deck and substructure of the existing Viaduct. Includes repairs to the concrete sidewalk and the addition of vandal protective fencing. Federal Funds $5,600,000 Local $1,400,000 Total Estimate $7,000,000
City of Fairfield South Gilmore Road Improvements Between Mack Road and Resor Road. New asphalt surface, curb and drainage improvements, pavement markings, retaining walls, guardrail and LED roadway lighting. Includes new 6 wide sidewalk. Federal Funds $2,451,717 Local $612,930 Total Estimate $3,064,647
Hamilton County Western Hills Viaduct Replacement Partial funding for project. Total construction costs = $283.5m Federal Funds $6,000,000 Local $1,500,000 Total Estimate $7,500,000
City of Lebanon-Glosser Road Improvements Between US 42 and SR 63. Widening to three-lane improved roadway with curbing and storm sewer. Realign Glosser and US 42 (Cincinnati Ave) to 90 degree intersection. Federal Funds $1,177,175 Local $1,154,504 Total Estimate $2,331,679
City of Mason-SR 741 Widen (Cox-Smith to Spy Glass Hill) Widen to two travel lanes each direction with left turn lanes. Includes new mulituse path and sidewalk. Federal Funds $3,967,917 Local $991,979 Total Estimate $4,959,896
City of Middletown-Central Avenue Reconstruction Between Verity Parkway and University Blvd. Reconstruction with upgraded pavement, curb, storm sewer and pedestrian lighting. Includes left turn lanes, street calming and bike racks. Federal Funds $4,405,621 Local $2,372,257 Total Estimate $6,777,878
City of Sharonville US 42 Shared Use Path Multi-use path along east side of US 42 (Lebanon Rd) between Reading Rd and Kemper Rd. Provides connection to Sharon Woods Park. Federal Funds $1,006,448 Local $670,965 Total Estimate $1,677,413
Village of Silverton-Montgomery Rd (US 22) Corridor Improvements Between Coleridge Ave and Stewart Rd. Rehabilitate existing areas of pavement failure. Includes resurfacing and restoration of curbs. Add concrete pavers 2 wide along curb line. Add sheltered benches, bike racks and extend concrete bus pads at bus stops. Federal Funds $3,379,952 Local $844,988 Total Estimate $4,224,940
SORTA Smart Technologies Advancing Regional Transportation (START) Replacement of 16 40 transit vehicles with clean diesel technology buses. Federal Funds $5,697,765 Local $2,441,889 Total Estimate $8,139,694
City of Springdale East Crescentville Road Improvements Between Transportation Way and Centerdale Road. Install new traffic signal and ped signal at the East Crescentville/ Chesterdale intersection with left turn lane, interconnect/coordination with existing International Blvd signal, TWLTL throughout, replace pavement with properly sized storm sewer. Federal Funds $3,992,874 Local $998,218 Total Estimate $4,991,092
Sycamore Township-East Kemper Rd Resurfacing/Sidewalk New sidewalk along East Kemper between Snider and Baen, then along Deerfield to Schuler Sports Complex. Additional segment along Salzman to McDaniel Park. Includes Kemper Road resurfacing. Federal Funds $2,447,128 Local $611,782 Total Estimate $3,058,910
Symmes Twp-Montgomery Rd (US 22) Signal Preemption Installation of emergency preemption at the nine existing traffic signals, from Cornell Road to Fields-Ertel Road. Federal Funds $276,430 Local $118,470 Total Estimate $394,900
Warren County-King Avenue Bridge over Little Miami River New 48-foot wide (two-lane), structure with shoulders and 11 wide dedicated pedestrian/bike way with barrier separation. Improved horizontal alignment and new vertical profile that will moderate the existing steep vertical grades on the King Avenue approach. New tunnel crossing of LMT under Grandin Road and relocated parking area for the trail. Federal Funds $6,000,000 Local $3,821,429 Total Estimate $9,821,429
OHIO STP TRANSPORTATION FACTORS FOR HIGHWAY PROJECTS LPA Sponsor Project Name SAFETY IMPACT ON SAFETY AVERAGE DAILY TRAFFIC (ADT) TRAVEL TIME INDEX (TTI) IMPACT ON TTI FREIGHT (% TRUCK) EXISTING CONDITIONS PAVEMENT OR BRIDGE COMPLETE STREETS STATUS OF PROJECT Butler County Engineer's Office S.R. 129 / Liberty Way Modification, Phase 2 5 1 3 0 1 4 3 1 2 Cincinnati Hopple Street Viaduct - Deck Rehabilitation 1 0 3 0 0 1 3 3 4 Fairfield South Gilmore Road Improvements - Resor 2 3 2 3 1 1 3 2 2 Road to Mack Road Hamilton County Engineer's Office Western Hills Viaduct Replacement Project 2 3 5 0 0 2 5 4 4 Lebanon Glosser Road Improvements 2 0 0 0 0 3 3 3 3 Mason SR 741 Widening (Cox-Smith Rd to Spy Glass 2 0 2 3 5 3 3 3 3 Hill) Middletown Central Avenue Reconstruction and 5 3 1 3 1 2 5 4 3 Improvements Silverton Montgomery Road Corridor Improvements 5 0 2 3 0 1 5 3 3 Springdale East Crescentville Road Improvements 3 3 1 5 5 3 5 3 3 Sycamore Township East Kemper Road Sidewalk Project 3 0 2 0 0 2 3 2 2 Symmes Township Montgomery Road (US-22) Signal Preemption - 3 1 3 3 1 1 5 3 3 Symmes Township, Ohio Warren County King Avenue Bridge over the Little Miami River 3 3 2 3 3 1 5 3 2
LPA Sponsor OHIO STP Project Name TYPE OF PROJECT TRANSPORTATION FACTORS FOR TRANSIT PROJECTS IMPACT ON RIDERSHIP IMPACT ON SAFETY & SECURITY TIME TO IMPLEMENTATION SYSTEM IMPACT EXISTING ASSET PHYSICAL CONDITION Butler County Regional Transit Authority Southwest Ohio Regional Transit Authority Butler County Connect - Chestnut Street Multimodal Shared Services Facility Smart Technologies Advancing Regional Transportation (START) 4 6 6 3 5 0 5 2 6 5 3 10
LPA Sponsor OHIO STP Project Name SAFETY TRANSPORTATION FACTORS FOR BIKE/PED PROJECTS IMPACT ON SAFETY NETWORK CONNECTIONS FEASIBILITY EXISTING SURFACE CONDITION COMPLETE STREETS STATUS OF PROJECT Sharonville US 42 - Shared Use Path 1 1 4 10 0 4 2
OHIO STP PLANNING FACTORS FOR ALL PROJECTS LPA Sponsor Project Name ENVIRONMENTAL JUSTICE ECONOMIC VITALITY INVESTMENT/ EMPLOYMENT BONUS AIR QUALITY INTERMODAL ELEMENTS REPLACEMENT/ EXPANSION SRPP LOCAL PLANNING LOCAL SHARE HISTORY OF PROJECT DELIVERY TECHNOLOGY Butler County Engineer's Office S.R. 129 / Liberty Way Modification, Phase 2 1 3 5 3 0 3 3 5 10 0 0 Butler County Regional Transit Butler County Connect - Chestnut Street 2 1 0 4 5 1 4 3 0 0 0 Authority Multimodal Shared Services Facility Cincinnati Hopple Street Viaduct - Deck Rehabilitation 3 3 0 0 0 5 3 5 0-5 0 Fairfield South Gilmore Road Improvements - Resor 3 4 5 1 0 4 2 3 0 0 0 Road to Mack Road Hamilton County Engineer's Office Western Hills Viaduct Replacement Project 4 4 0 3 3 4 3 3 0-3 3 Lebanon Glosser Road Improvements 0 1 0 1 0 3 2 3 2 0 3 Mason SR 741 Widening (Cox-Smith Rd to Spy Glass 1 1 0 2 0 3 1 3 0 0 0 Hill) Middletown Central Avenue Reconstruction and 4 3 5 2 0 5 4 5 4 0 0 Improvements Sharonville US 42 - Shared Use Path 2 4 0 1 3 1 2 3 6 0 3 Silverton Montgomery Road Corridor Improvements 3 3 0 1 0 5 3 3 0 0 3 Southwest Ohio Regional Transit Smart Technologies Advancing Regional 4 5 0 3 0 5 4 5 2 0 3 Authority Transportation (START) Springdale East Crescentville Road Improvements 2 5 5 3 3 4 3 3 0 0 3 Sycamore Township East Kemper Road Sidewalk Project 1 5 0 1 0 3 3 3 0 0 0 Symmes Township Montgomery Road (US-22) Signal Preemption - 0 5 0 0 0 1 3 3 2 0 3 Symmes Township, Ohio Warren County King Avenue Bridge over the Little Miami River 1 0 5 4 0 5 3 5 0 0 7
OHIO STP LPA Sponsor Project Name TOTAL POINTS FED $ REQUESTED FED $ Recommended RUNNING TOTAL OKI I-71 Interchange @ MLK SIB Loan Debt Service x $1,000,000 $1,000,000 $1,000,000 Southwest Ohio Regional Transit Smart Technologies Advancing Regional 62 $5,697,765 $5,347,765 $6,347,765 Authority Transportation (START) Springdale East Crescentville Road Improvements 62 $3,992,874 $3,793,230 $10,140,995 Middletown Central Avenue Reconstruction and 59 $4,405,621 $4,185,340 $14,326,335 Improvements Warren County King Avenue Bridge over the Little Miami River 55 $6,000,000 $5,700,000 $20,026,335 Butler County Engineer's Office S.R. 129 / Liberty Way Modification, Phase 2 53 $5,961,500 $5,663,425 $25,689,760 Hamilton County Engineer's Office Western Hills Viaduct Replacement Project 49 $6,000,000 $4,000,000 $29,689,760 $26 M Available Sharonville US 42 - Shared Use Path 47 $1,006,448 $0 $29,689,760 Butler County Regional Transit Butler County Connect - Chestnut Street 44 $4,531,250 $0 $29,689,760 Authority Multimodal Shared Services Facility Silverton Montgomery Road Corridor Improvements 43 $3,379,952 $0 $29,689,760 Fairfield South Gilmore Road Improvements - Resor 41 $2,451,717 $0 $29,689,760 Road to Mack Road Symmes Township Montgomery Road (US-22) Signal Preemption - 40 $276,430 $0 $29,689,760 Symmes Township, Ohio Mason SR 741 Widening (Cox-Smith Rd to Spy Glass 35 $3,967,917 $0 $29,689,760 Hill) Sycamore Township East Kemper Road Sidewalk Project 30 $2,447,128 $0 $29,689,760 Cincinnati Hopple Street Viaduct - Deck Rehabilitation 29 $5,600,000 $0 $29,689,760 Lebanon Glosser Road Improvements 29 $1,177,175 $0 $29,689,760
Kentucky SNK Applications (9)
Boone County Conner Road Multi-Use Path Construct a 10 wide multi-use path from KY237 (North Bend Road) to KY 20 (Petersburg Road), a distance of 1.35 miles. Includes a sidewalk connection on KY 20 from Merrie Drive to Conner Road, a distance of 730 feet. This path section is a segment of the overall regional CVG Trail Loop. Federal Funds $1,012,500 Local $1,012,500 Total Estimate $2,025,000
Boone County KY20 & Loomis Road Multi-Use Path Construct a 10' wide multi-use path along KY 20 (Petersburg Road) and Loomis Road from Conner Road to KY 236 (Donaldson Road). Total length is 2.4 miles. This path is a segment of the regional CVG Trail. Federal Funds $2,316,000 Local $579,000 Total Estimate $2,895,000
Campbell County Improved Access to NKU Mixed-Use Development The project is located near NKU's campus on KY SR 2238 (Louie B. Nunn Drive) and on US- 27. Includes transit super stop, turn lanes on Nunn, upgrade and reconstruction of old sidewalks and new pedestrian/bicycle path linking the NKU campus to the new development. Federal Funds $861,704 Local $369,302 Total Estimate $1,231,006
City of Covington Pike Street (Madison to Main) This project will include pavement and sidewalk restoration on and along Pike Street in Covington between Madison Avenue and Pike Street. Federal Funds $3,093,957 Local $773,489 Total Estimate $3,867,446
City of Covington West Covington Riverfront Commons Multi-Use Path Construct an 8 wide concrete multi-use path along the Ohio River using existing public right of way/city-owned property between River Road (city street) and the existing shared use path located on the north side of the floodwall, just west of the Brent Spence Bridge. Federal Funds $600,970 Local $150,242 Total Estimate $751,212
City of Dayton Riverfront Commons This phase of the overall 11.5-mile multi-use trail is 1 mile between Berry Street and Fourth Avenue (KY 8). Federal Funds $685,035 Local $171,259 Total Estimate $856,294
KYTC KY 1303 (Bristow Rd) Roadway Drainage Improvements The primary goal of this project is to improve safety along KY 1303 (Bristow Road) between Timber Lane Drive and KY 536 in Kenton County. This section of KY 1303 floods regularly and the flooding has caused the edges of the roadway to deteriorate. Federal Funds $468,000 Local $117,000 Total Estimate $585,000
City of Taylor Mill Taylor Mill Sidewalk Project Phase III Construction of a new sidewalk along the north/east side of Taylor Mill Road (KY 3716) between Saddlebrook Drive and Walnut Street. Federal Funds $621,168 Local $155,292 Total Estimate $776,460
TANK Bus Replacements Replacement of Four (4) Diesel Buses with Hybrid-Electric Buses Federal Funds $1,990,176 Local $497,544 Total Estimate $2,487,720
KY SNK Sponsor Covington KYTC Project Name Pike Street from Madison Avenue to Main Street KY 1303 (Bristow Road) Roadway/Drainage SAFETY IMPACT ON SAFETY TRANSPORTATION FACTORS FOR HIGHWAY PROJECTS AVERAGE DAILY TRAFFIC (ADT) TRAVEL TIME INDEX (TTI) IMPACT ON TTI FREIGHT (% TRUCK) EXISTING CONDITIONS PAVEMENT OR BRIDGE COMPLETE STREETS STATUS OF PROJECT 5 0 1 0 0 5 3 3 1 1 3 1 5 3 3 3 1 1
KY SNK Sponsor Project Name TYPE OF PROJECT TRANSPORTATION FACTORS FOR TRANSIT PROJECTS IMPACT ON RIDERSHIP IMPACT ON SAFETY & SECURITY TIME TO IMPLEMENTATION SYSTEM IMPACT EXISTING ASSET PHYSICAL CONDITION Campbell County Transit Authority of Northern Kentucky Improved Access to NKU Mixed- Use Development Replace 4 Diesel Buses with Hybrid-Electric Buses 4 6 6 5 5 0 5 2 6 5 3 6
KY SNK Sponsor Project Name SAFETY TRANSPORTATION FACTORS FOR BIKE/PED PROJECTS IMPACT ON SAFETY NETWORK CONNECTIONS FEASIBILITY EXISTING SURFACE CONDITION COMPLETE STREETS STATUS OF PROJECT Boone County Fiscal Court Boone County Fiscal Court Covington Dayton Taylor Mill Conner Road Multi-Use Path 0 1 4 10 0 3 1 KY 20 & Loomis Road Multi-Use Path West Covington Riverfront Commons - Shared Use Path Riverfront Commons: Dayton, KY Eastern Trail Taylor Mill Sidewalk Project Phase III 0 1 4 10 0 4 3 3 5 10 10 0 2 1 3 3 10 10 0 2 1 1 3 4 10 0 3 1
KY SNK Sponsor Project Name ENVIRONMENTAL JUSTICE PLANNING FACTORS FOR ALL PROJECTS ECONOMIC VITALITY INVESTMENT/ EMPLOYMENT BONUS AIR QUALITY INTERMODAL ELEMENTS REPLACEMENT/ EXPANSION SRPP LOCAL PLANNING LOCAL SHARE HISTORY OF PROJECT DELIVERY TECHNOLOGY Boone County Fiscal Court Boone County Fiscal Court Campbell County Covington Covington Dayton KYTC Taylor Mill Transit Authority of Northern Kentucky Conner Road Multi-Use Path 3 3 0 2 0 1 1 5 10-5 0 KY 20 & Loomis Road Multi-Use Path Improved Access to NKU Mixed- Use Development Pike Street from Madison Avenue to Main Street West Covington Riverfront Commons - Shared Use Path Riverfront Commons: Dayton, KY Eastern Trail KY 1303 (Bristow Road) Roadway/Drainage Taylor Mill Sidewalk Project Phase III Replace 4 Diesel Buses with Hybrid-Electric Buses 0 5 0 1 3 1 1 5 0-5 0 3 4 5 1 0 1 4 3 2 0 0 2 5 0 0 0 5 4 3 0-5 0 3 5 0 1 3 1 2 3 0-5 3 3 2 0 1 3 1 4 5 0 0 3 1 0 0 0 0 5 0 0 0 0 0 3 1 0 1 3 1 1 5 0-3 0 4 5 0 3 0 5 4 5 0 0 5
KY SNK Sponsor Project Name TOTAL POINTS FED $ REQUESTED RUNNING TOTAL Transit Authority of Replace 4 Diesel Buses with Northern Kentucky Hybrid-Electric Buses 58 $1,990,176 $1,990,176 Dayton Riverfront Commons: Dayton, 51 $810,665 $2,800,841 KY Eastern Trail Campbell County Improved Access to NKU Mixed- 49 $861,704 $3,662,545 Use Development Covington West Covington Riverfront 47 $714,530 $4,377,075 Commons - Shared Use Path Boone County Conner Road Multi-Use Path 39 $1,012,500 $5,389,575 Fiscal Court Taylor Mill Taylor Mill Sidewalk Project 34 $846,424 $6,235,999 Phase III Boone County Fiscal Court KY 20 & Loomis Road Multi-Use Path 33 $2,316,000 $8,551,999 Covington Pike Street from Madison 32 $3,093,957 $11,645,956 Avenue to Main Street KYTC KY 1303 (Bristow Road) Roadway/Drainage 27 $468,000 $12,113,956 $7.8 m available
Ohio TA Applications (14)
Anderson Township Paddison Road Sidewalk New sidewalks on Paddison Road from Bluecrest to Beechmont Federal Funds $723,000 Local $408,500 Total Estimate $1,131,500
Cincinnati Central Parkway Bikeway Phase 2 Extension of Central Parkway bikeway from Marshall Avenue in CUF to Ludlow Avenue in Clifton Federal Funds $500,000 Local $125,000 Total Estimate $625,000
Cincinnati Wasson Way Phase 2B Extend Wasson Way from Floral/Elsmere Avenue in Evanston to Montgomery Road in Evanston. Federal Funds $740,000 Local $185,000 Total Estimate $925,000
Cincy Bike Share Red Bike Expansion 20 new bike share stations and 200 additional bicycles, predominantly electric assist (e-bikes) Federal Funds $750,000 Local $187,500 Total Estimate $937,500
Fairfield Great Miami River Trail Extension Extend the Great Miami River Trail approximately 8,300 feet from Waterworks Park to the parking facilities at Marsh Lake Park Federal Funds $750,000 Local $325,000 Total Estimate $1,075,000
Green Township Colerain Avenue Sidewalks Install sidewalks on both sides of Colerain Avenue from Blue Rock Road to 200 north of Loretta Avenue Federal Funds $409,969 Local $175,701 Total Estimate $585,397
Green Township Bridgetown Rd Sidewalks Phase 4 Phase 4 of the sidewalk system along Bridgetown Road from Kuliga Park to Hammersmith Drive (.66 miles) Federal Funds $397,978 Local $170,562 Total Estimate $568,540
City of Hamilton Miami 2 Miami Multi-Use Path Canal cultural trail from Bilstein Boulevard to Gilmore Road (east-west connection) Federal Funds $510,064 Local $127,516 Total Estimate $637,580
Hamilton Township Rivercrest Trail 1600 path connecting local neighborhoods to the Little Miami Scenic Bike Trail Federal Funds $300,000 Local $60,000 Total Estimate $360,000
City of Harrison Campbell Rd Multi-Use Path 10 wide multi-use path along the north side of Campbell Road from Featherstone Drive to West Road Federal Funds $289,200 Local $72,300 Total Estimate $361,500
Butler County MetroParks M2M Connection-Bypass 4 to Bilstein Blvd Multi-use trail that will connect the western end of the existing Miami and Erie Canal to an existing trailhead at Bilstein Park. Federal Funds $750,000 Local $500,903 Total Estimate $1,250,903
City of Monroe Great Miami River Trail 10 multi-use path along the Great Miami River. From the Monroe Bicentennial Commons Park to the city limits north. Federal Funds $650,000 Local $650,000 Total Estimate $1,300,000
City of Oxford Oxford Area Trail Network West side connector multiuse trail from Talawanda Middle School to Oxford Community Park. Federal Funds $750,000 Local $1,785,750 Total Estimate $2,535,750
West Chester Township Smith Road Connector Multi-use path connecting the roundabout at Smith and Beckett Road to the existing trail on Smith Road, just west of Princeton-Glendale Road. Federal Funds $740,000 Local $185,000 Total Estimate $925,000
LPA Sponsor OHIO TA - $4.2 million available Project Name PROJECT TYPE TA INFRASTRUCTURE FACTORS SAFETY CONSISTENCY WITH PLAN RECOMMENDATIONS CONNECTIONS STATUS OF PROJECT Anderson Township Paddison Road Sidewalk 10 3 5 10 5 Butler County MetroParks M2M MUP - Bypass 4 to Bilstein Blvd. 10 1 5 6 5 Cincinnati Central Parkway Bikeway Phase 2 5 5 5 6 5 Cincinnati Wasson Way Phase 2B 10 1 10 6 5 Cincy Bike Share Red Bike Expansion Project 10 1 5 10 10 Fairfield Fairfield Great Miami River Trail Extension 10 1 5 6 5 Green Township Bridgetown Road Sidewalks Phase 4 10 5 10 6 2 Green Township Colerain Avenue Sidewalks 10 5 5 6 2 Hamilton M2M MUP: Canal Cultural Trail (Bilstein) to Gilmore Road 10 1 5 6 5 Hamilton Township Rivercrest Trail 10 3 5 6 10 Harrison Campbell Road Shared Use Path 10 5 5 6 2 Monroe Great Miami River Trail - Monroe Section 10 3 5 6 5 Oxford West Chester Township Oxford Area Trail Network-West Side Connector Smith Road Connector Trail - West Chester 10 3 5 6 5 10 3 5 6 5
LPA Sponsor OHIO TA - $4.2 million available Project Name PLANNING FACTORS FOR ALL PROJECTS ENVIRONMENTAL JUSTICE EXISTING EMPLOYMENT BONUS AIR QUALITY/ENERGY INTERMODAL ELEMENTS REPLACEMENT EXPANSION SRPP LOCAL PLANNING LOCAL SHARE HISTORY OF PROJECT DELIVERY Anderson Paddison Road Sidewalk 2 4 0 4 3 1 3 5 0 Township Butler County M2M MUP - Bypass 4 to Bilstein Blvd. 1 3 0 3 0 2 2 3 6 MetroParks Cincinnati Central Parkway Bikeway Phase 2 4 5 0 4 3 1 3 3 0-5 Cincinnati Wasson Way Phase 2B 2 4 0 5 0 1 3 3 0-5 Cincy Bike Share Red Bike Expansion Project 5 5 0 5 5 1 4 3 0 Fairfield Fairfield Great Miami River Trail 1 0 0 3 0 1 1 3 2 Extension Green Township Bridgetown Road Sidewalks Phase 4 2 0 0 4 0 1 3 5 2-10 Green Township Colerain Avenue Sidewalks 4 3 0 5 3 2 3 5 2-10 Hamilton M2M MUP: Canal Cultural Trail 1 2 5 3 0 2 3 3 0 (Bilstein) to Gilmore Road Hamilton Rivercrest Trail 2 0 0 2 0 1 1 3 0 Township Harrison Campbell Road Shared Use Path 3 3 0 3 0 1 1 5 0 Monroe Oxford West Chester Township Great Miami River Trail - Monroe Section Oxford Area Trail Network-West Side Connector Smith Road Connector Trail - West Chester 1 1 1 3 3 1 2 5 10 3 0 0 4 0 1 2 5 10 2 3 5 4 0 1 3 5 0
OHIO TA - $4.2 million available LPA Sponsor Project Name TOTAL POINTS FED $ REQUESTED FED $ RECOMMENDED RUNNING TOTAL Cincy Bike Share Red Bike Expansion Project 64 $750,000 $500,000 $500,000 Monroe Great Miami River Trail - Monroe Section 56 $650,000 $650,000 $1,150,000 Anderson Township Paddison Road Sidewalk 55 $723,000 $723,000 $1,873,000 Oxford West Chester Township Butler County MetroParks Hamilton Oxford Area Trail Network-West Side Connector Smith Road Connector Trail - West Chester 54 $750,000 $500,000 $2,373,000 52 $435,055 $435,055 $2,808,055 M2M MUP - Bypass 4 to Bilstein Blvd. 47 $750,000 $750,000 $3,558,055 M2M MUP: Canal Cultural Trail (Bilstein) to Gilmore Road 46 $510,064 $510,064 $4,068,119 Cincinnati Wasson Way Phase 2B 45 $740,000 $0 $4,068,119 Green Township Colerain Avenue Sidewalks 45 $409,969 $0 $4,068,119 Cincinnati Central Parkway Bikeway Phase 2 44 $500,000 $0 $4,068,119 Harrison Campbell Road Shared Use Path 44 $289,200 $0 $4,068,119 Hamilton Township Rivercrest Trail 43 $300,000 $0 $4,068,119 Green Township Bridgetown Road Sidewalks Phase 4 40 $397,978 $0 $4,068,119
Kentucky TA Applications (5)
Boone County Fiscal Court Burlington Sidewalks New sidewalks on the south side of KY18 from Ethan Drive to existing sidewalk east of Southpointe Drive and north side from Main Street to existing sidewalk west of Nicholas Street. Federal Funds $500,000 Local $128,000 Total Estimate $628,000
Boone County Fiscal Court Frogtown Connector Rd New sidewalk on the west side of Frogtown Connector Road from the end of the existing sidewalk north of Calle Luna Lane. Federal Funds $500,000 Local $140,000 Total Estimate $640,000
City of Erlanger Brightleaf & Narrows Rd Sidewalks New sidewalks on Brightleaf and Narrows Road from Turkeyfoot Road to Thorntree Road. Federal Funds $188,475 Local $47,119 Total Estimate $235,594
City of Florence Center and Russell Street Sidewalk New sidewalk along the south side of Center Street from Shelby Street to Liberty Court and the north-east side of Russell Street. Federal Funds $390,664 Local $97,666 Total Estimate $488,330
City of Silver Grove KY 8 Multi-Use Path, Phase 3 Multi-use path on the south side of KY 8 from the corner of KY 8 and Kay Wright Lane and the western entrance in Morschel Park. Federal Funds $186,163 Local $46,541 Total Estimate $232,704
LPA Sponsor KENTUCKY TA Project Name $1.8 million available TA INFRASTRUCTURE FACTORS PROJECT TYPE SAFETY CONSISTENCY WITH PLAN RECOMMENDATIONS CONNECTIONS STATUS OF PROJECT Boone County Fiscal Court Boone County Fiscal Court Burlington KY 18 Sidewalks 10 5 5 6 2 Frogtown Connector Road Sidewalk 10 1 5 6 2 Erlanger Brightleaf & Narrows Road Sidewalk Completion Grant 10 3 5 10 2 Florence Center and Russell Street Sidewalk 10 5 5 6 2 Silver Grove Silver Grove KY 8 Sidewalks Phase 3 10 5 5 6 2
KENTUCKY TA $1.8 million available PLANNING FACTORS FOR ALL PROJECTS LPA Sponsor Project Name ENVIRONMENTAL EXISTING BONUS AIR QUALITY/ENERGY INTERMODAL REPLACEMENT SRPP LOCAL PLANNING LOCAL SHARE HISTORY OF PROJECT DELIVERY Boone County Burlington KY 18 Sidewalks 4 3 0 5 3 1 2 5 0-5 Fiscal Court Boone County Frogtown Connector Road Sidewalk 0 3 0 1 0 1 1 3 0-5 Fiscal Court Erlanger Brightleaf & Narrows Road Sidewalk 1 0 0 3 0 1 1 0 0 Completion Grant Florence Center and Russell Street Sidewalk 3 4 0 5 3 1 1 0 0-3 Silver Grove Silver Grove KY 8 Sidewalks Phase 3 4 0 0 3 0 1 2 3 0
KENTUCKY TA $1.8 million available LPA Sponsor Project Name TOTAL POINTS FED $ REQUESTED RUNNING TOTAL Boone County Fiscal Court Burlington KY 18 Sidewalks 46 $512,000 $512,000 Florence Center and Russell Street Sidewalk 42 $390,664 $902,664 Silver Grove Silver Grove KY 8 Sidewalks Phase 3 41 $186,163 $1,088,828 Erlanger Brightleaf & Narrows Road Sidewalk Completion Grant 36 $188,475 $1,277,303 Boone County Fiscal Court Frogtown Connector Road Sidewalk 28 $560,000 $1,837,303
Next Steps September 18, 2018 October 9, 2018 October 11, 2018 By October 26, 2018 April 11, 2019 Prioritization Subcommittee (if needed) ICC Approval OKI Board Approval Award letters distributed Included in Final FY20-23 TIP