Cambridge Cycling Campaign The Bike Depot 140 Cowley Road Cambridge CB4 0DL.

Similar documents
CAMBOURNE TO CAMBRIDGE BETTER PUBLIC TRANSPORT PROJECT PHASE 2 PUBLIC CONSULTATION MADINGLEY MULCH ROUNDABOUT TO CAMBOURNE

Report from Embassy Visit to Copenhagen May David Arditti

Technical note. 1. Introduction

Cambridge Past, Present & Future Wandlebury Ring, Gog Magog Hills Babraham, Cambridge CB22 3AE Phone

High frequency bus services operating to Little Island; Creation of a new Park and Ride site and train station at North Esk;

Cabinet Member for Highways & Streetscene. Highway Infrastructure Manager

Dodder Greenway Emerging Preferred Route Consultation - October 2018

City Deal Public Consultation Response - Cambourne to Cambridge Better Bus Journeys A428/A1303 Improvements

E4 Cycle Route Exeter University to Redhayes Bridge. - Recommendations from Exeter Cycling Campaign

EXECUTIVE SUMMARY Callan Park accommodates travel from a wide range of transport modes, including walking, cycling, bus and light rail.

Keep on CYCLING THE NETWORK EFFECT STAYING SAFE IN WINTER CYCLING INTO PARENTHOOD CAMCYCLE IN 2019 WINTER 2018/19

London Cycle Network Annual Report 2000

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21

IAN WHITE ASSOCIATES. Crawley Station Gateway Public Realm

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

GETTING WHERE WE WANT TO BE

Classification Criteria

Cycle Traffic and The Strategic Road Network. John Parkin and Phil Jones Presenting on behalf of Highways England

DMURS - Practical Implications

Cambridge Cycling Campaign

Part 3: Active travel and public transport planning in new housing developments

Issues at T junctions:

Nottingham Cycle City Frequently Asked Questions

Phone: Ref No: 06/2018/0884

Douglas LUTS - Work Packages WP1, WP2 & WP11

MILTON ROAD LLF PROJECT UPDATE

Milton Road Bus Stop and Crossings Workshop WSP. 19th September 2017

Transport Workshop Dearbhla Lawson Head of Transport & Infrastructure Policy & Funding University of the Third Age.

CAMBOURNE TO CAMBRIDGE Better Bus Journeys: Phase One

A future cycle route network for North Staffordshire mb/08/16 Need for a strategy. Existing cycle route network

Transportation Master Plan Advisory Task Force

1.2. South Cambridgeshire Local Plan Proposed Submission, July 2013

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Chelmsford City Growth Package

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design

4. Guided Bus Explained

Submission on Clontarf to City Centre Cycle Route with signatures of 1,493 people

National Transport Awards Cambridge Park & Ride

Perne Rd / Radegund Rd Roundabout Cambridge

Oxford Street West. 21 December

North West Non-Technical Summary of the Transport Assessment September 2011

Active Transportation Facility Glossary

Design Workshops Summary of all Feedback January 2017

Pedestrians safety. ROAD SAFETY SEMINAR PIARC/AGEPAR/GRSP Lome, Togo October 2006 Lise Fournier, Canada-Qu

Economic and Social Council

Derby Cycling Group, c/o 126, Station road, Mickleover, Derby, DE3 9FN. Date: 20 th November, 2018.

21.07 TRANSPORT CONNECTIVITY AND INFRASTRUCTURE

Introduction. Prince Street Cycling Ambition Fund Public Realm Project

City of Perth Cycle Plan 2029

Comments on the Hailsham to Eastbourne Sustainable Transport Corridor

Living Streets Policy

Space for Cycling. A guide for decision makers

IMPACT OF THE BERMUDA CONNECTIVITY PROJECT ON CYCLING

Travel Planning WC & NWCD Cycling Group. Thursday 2 nd July Amanda Holden

Bristol City Council has produced a draft Bristol Transport Strategy document.

Appendix 1 Greenway Standards

Appendix 11 Barton Greenway Review

sessions. The opinions of local people will help decide which of these two options is taken forward to be built.

Devonport City Cycling Network Strategy

Tel: Karime Hassan Chief Executive Exeter City Council Civic Centre Paris Street Exeter EX1 1JN

HISTON ROAD Have your say on better public transport, cycling and walking journeys

The Cabinet Member for Highways & Streetscene. Aurang Zeb - Head of Highways & Transport

Loughborough University Travel Planning

Cycle Superhighway 4 from Tower Bridge to Greenwich

Frome Street Bicycle Route

How do we design for pedestrians? Case study: transforming the Walworth Road

Appendix 12 Parking on footways and verges

LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document

Launceston's Transport Futures. Greater travel options for the people of Launceston

Update June 2018 OUR 2017 PUBLIC ENGAGEMENT

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

CITY OF SASKATOON COUNCIL POLICY

The key to achievement of a sustainable, safe traffic system lies in the systematic and consistent application of safety principles.

Milton Road Project Update. Paul van de Bulk 30 January 2018

Maynooth Cycling Submission on North South Corridor

Living Streets response to the Draft London Plan

MARKHOUSE ROAD IMPROVEMENTS

Sixth Line Development - Transit Facilities Plan

Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR. Consultation open from 24 September to 5 November 2018 SAY

BYRES ROAD: PUBLIC REALM Public Consultation

Renaud Road Traffic, Mud Creek Ecological Damage, and unsafe access to Prescott-Russell Cycling Trail

Footpath design. A guide to creating footpaths that are safe, comfortable, and easy to use

2. Context. Existing framework. The context. The challenge. Transport Strategy

Welcome. If you have any questions or comments on the project, please contact:

12 RECOMMENDATIONS Road Improvements. Short Term (generally the next five years)

Strategy for Walking & Cycling Action Plan

Frascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation

Have your say on the transformation of Oxford Street West

Ormond & McKinnon Walks Response to Draft Glen Eira Community Plan

Broom Hill/Blackberry Hill Walking and Cycling Improvements

TRANSPORT AND MOVEMENT

Greater Cambridge City Deal. Initial consultation on better bus, cycling and walking trips. Milton Road

Response to further information request Ministry of Education Notice of Requirement (200 & 252 Park Estate Road)

MOBILITY CHALLENGES IN HILL CITIES

I write in response to the current consultation. I am copying this to Derrick Ashley and I will be posting this online.

ACTIVE TRANSPORTATION

SCHEME DESIGN AND ENGINEERING

ENFIELD TOWN THE REVISED DESIGN

Marcus Jones, TRL. Presented by Name Here Job Title - Date

Transcription:

Cambridge Cycling Campaign The Bike Depot 140 Cowley Road Cambridge CB4 0DL 01223 690718 contact@camcycle.org.uk www.camcycle.org.uk Subject: Application S/3440/18/OL Case Officer Mike Huntington South Cambridgeshire Hall Cambourne Business Park Cambourne CB23 6EA October 7, 2018 Dear Mr Huntington, Camcycle is a volunteer-led charity with over 1,250 members that works for more, better and safer cycling and walking for all ages and abilities in the Cambridge region. We are objecting to application S/3440/18/OL under policies HQ/1 and TI/2 of the South Cambridgeshire Local Plan because the development appears to prioritise motor traffic above walking and cycling, despite claims to the contrary. The walking and cycling routes appear to be frequently interrupted, peripheral to the site, and of poor quality. Before elaborating our objections, we will list a few things that we believe are positive about the application: (a) there are numerous walking/cycling-only access points shown on the parameter plan (although crucial details remain unknown); (b) there is a semblance of a walking/cycling grid (although it is missing some links, crossings appear to be poor-quality, and other crucial details remain unknown); (c) the western access across Broadway to Cambourne appears to be sound in concept (although there are unresolved difficulties with safe sight-lines at the crossing); (d) there is a more sensible dedicated bus route through the development compared to Cambourne (although it could stand to be more central and direct) and (e) there is a commitment to including readily available cycle parking (although the details remain vague). Regarding our objections: according to policy TI/2, planning permission for these types of developments will be granted only where the site has (or will attain) sufficient integration and accessibility by walking, cycling, or public and community transport. In Local Plan paragraph 10.16 it says that All development should strive to offer real travel choice for all people by non-car modes appropriate in scale and kind to the development. Development must be designed to promote road safety, and to create places where walking and cycling have priority over motorised traffic, so that people feel safe. National Planning Policy Framework Section 9 paragraph 110 states: Within this context, applications for development should: a) give priority first to pedestrian and cycle movements. Yet, when we examine the documents for this application, we find many cases where walkways and cycleways are interrupted and give way to motor traffic carriageways. For example, in drawing CP- BOURNACCESS(WESTERN).1 we see that cycleways are interrupted in one case by the primary road and in another case by a minor side road.

In the Illustrative Master Plan there are numerous cases of minor side roads interrupting footways and cycleways, giving priority to motor traffic over people walking and cycling. It also appears to be the case that all of the off-road walking and cycling routes are interrupted every time they encounter roads. Further confusion is caused because some documents refer to these off-road pathways as cycle routes, while some others refer to them simply as footpaths (e.g. on page 114 of the Design and Access Statement the diagram refers to a Footpath connecting the outdoor sports while indicating one of the walking and cycling links from the parameter plan). Even the strategic cycleway is broken: from the eastern edge of the site the strategic cycleway is interrupted twice by minor roads before it disappears entirely at a third minor road; all of this happens before it even reaches the eastern bus halt. Cycleways in green are interrupted by roads at the red Xs. West of the eastern bus halt the strategic cycleway does continue for a long, uninterrupted stretch. That portion may be useful for some people who are transiting the site. However it avoids nearly all of the destinations within the site, and it is a socially isolated route that will feel dangerous at night. Therefore it is much less useful than it could have been. People who need to access places within the site will find themselves on either the local cycle network or the shared-use pathways alongside the primary road. However, both of these types of paths are interrupted numerous times and forced to give way to minor side roads. Therefore many people will not want to use such pathways because of the constant stopping and starting, danger from turning vehicles, and conflicts with pedestrians. However that effectively means there is no cycle infrastructure in the site that is suitable for transport use at all times of day by people who are just trying to get from point A to point B, possibly with children along. The strategic cycleway is interrupted three times in this section alone. The primary school has been placed along the primary road, which ensures that children will be exposed to road danger and air pollution, and that the school run will take place by car instead of walking and cycling, leading to congested roads and anti-social parking. The Travel Plan appears to consist entirely of soft measures such as cycle training and vouchers to encourage people to cycle. Those types of measures can have only minor effect when the hard infrastructure does not support cycling for people of all ages and abilities. No amount of encouragement is going to help a person who is new to cycling when the roads are hostile and the environment scary. The experience in places where cycling is a common means of transport, like the Netherlands, shows that people who are concerned but interested in cycling will be most encouraged by having safe and accessible cycle infrastructure that enables everyone who wants to cycle to be able to do so in a safe,

convenient and dignified way. That infrastructure must be in place before people move into dwellings because travel habits are often hardened after first forming in a new neighbourhood; in order to ensure that sustainable travel habits have the best chance of forming the enabling infrastructure must be ready from day 1. Overall, it is quite clear from examining this plan that walking and cycling are held in very little regard, and have been included only as an afterthought in order to tick a box. We are disappointed that the opportunity was not taken to create a fresh design of the local transport network in a way that prioritises walking and cycling, puts walking and cycling routes front and centre, protects children from motor vehicle traffic and pollution, and integrates well with efficient public transport. Our recommendation for this (and other developments) is to adopt the lessons of Houten in the Netherlands by designing a perimeter roadway that keeps most motor traffic to the exterior of the site. Within the perimeter, walking and cycling routes should be protected from and have priority over motor traffic. The interior should be divided into sections with boundaries that prevent private motor traffic from rat-running, while remaining fully permeable to walking, cycling, emergency vehicles and where applicable, public transport. Private motor traffic should be directed outwards to the perimeter roadway, and around the outside of the built-up area. This ensures that walking, cycling and public transport enjoy a grid of simple and direct routes and become the preferable option for local transport, while internal motor traffic congestion is minimised. Bourn Airfield does not have a railway like Houten, but the dedicated strategic bus route can serve a similar purpose. Please see the ITDP study 1 of Houten for more information. Indicative plan of Houten showing perimeter roadway and internal walking/cycling network. Car access is divided into quadrants, and driving between quadrants must proceed indirectly via the ring road, while walking/cycling access is direct. (Diagram courtesy of Parkin (2018), full reference at end). We do see some evidence of partitioning within the current Illustrative Master Plan, in parts where open spaces and parks separate the built-up areas. However this proposed design is not like Houten because (a) the primary road ring of this application is too close to the centre of the site, which makes internal motor traffic trips more direct and attractive, and (b) the grid of walking/cycling routes are frequently interrupted, indirect, often socially isolated, pushed outwards, and sometimes missing entirely. Apart from the dedicated bus route, the applicants seem to be largely repeating the mistakes of Cambourne, a development that suffers from high car-dependency with very low levels of walking and cycling. 1 www.itdp.org/wp-content/uploads/2014/07/22.-092211_itdp_ned_desktop_houten.pdf

Outside the site, we do not understand how the applicants have managed to examine the entire A1303/St Neots Road corridor and yet have proposed only one highly questionable improvement to the socalled Cambridge Crossroads junction at Coton. It is true that a signalised crossing of Madingley Road may well be appropriate here, however the geometries of the pathways as they cross both of the Cambridge Roads remain inappropriate for cycling. In particular, the crossing of Cambridge Road (Coton) requires a person cycling outbound to turn back 180 degrees in order to see any approaching vehicles while also keeping an eye in front, a contortion that is nearly impossible for many people. The existing conditions also require this, but currently most people riding on the A1303/St Neots Road route are coming from the Coton Path, avoiding the crossing in question. If the applicant intends more people to use this crossing then the geometry should be corrected in line with IAN 195/16 section 2.4.11. The safe use of the Cambridge Road (Coton) crossing requires a person to have eyes in back of their head. Section 2.4.11 of IAN 195/16 describes a safe side-road crossing design. Any proposed improvements for cycling should be designed with geometry, sight-lines and parameters that are suitable for cycling, not by slapping blue signs on pavements. The A1303/St Neots Road between Bourn Airfield and Cambridge is a roadway with very poor provision for walking and cycling. If the applicants are seriously seeking to improve cycling connections to Cambridge, we can think of several additional proposals off the cuff and would welcome more. From west to east: (a) the crossing of Highfields Road just east of the site is extremely unfriendly and difficult because it is too close to a highspeed roundabout - it needs to be shifted further away with a proper refuge island as per IAN 195/16; (b) the shared-use pathway along St Neots Road is very narrow and too close to a fast road - it needs to be improved in line with IAN 195/16; (c) the cycle lanes on St Neots Road through Hardwick are too

narrow and unprotected; (d) east of Hardwick the transition from cycle lanes to shared-use path is improperly designed; (e) the shared-use path east of Hardwick is also extremely narrow and too close to a fast road; (f) the aforementioned problems with Cambridge Crossroads; (g) there is a litany of problems with Madingley Road in Cambridge, too numerous to include here. And this is not yet counting the needs of intervillage links or the future Greenway, which will both have major importance to the success of the Bourn Airfield development. We will be minded to withdraw our objection when the applicant uploads a revised plan showing a safe, protected and prioritised network for walking and cycling within the development, as well as serious and useful proposals for connecting to the surrounding villages, towns and Cambridge. Conditions must be agreed to ensure that all walking and cycling infrastructure is open and available prior to first occupation of any dwellings and the Travel Plan must be revised to include hard measures making physical changes to infrastructure that truly enable cycling for all ages and abilities. On any routes expected to have significant flow of people walking or cycling, the path should be segregated, providing ample, highquality and separate provision for walking and cycling. We recommend that cycleway design parameters be drawn from Parkin, J. (2018) Designing for Cycle Traffic: international principles and practice (Institute of Civil Engineers Publishing, London) 2 and Interim Advice Note (IAN) 195/16 by Highways England 3. Yours sincerely, On behalf of Camcycle Matthew Danish, Trustee Further comments on the text and images On page 17 of the Design and Access Statement the applicants claim that the Cambridge Science Park is only a 25-minute cycle ride away. We do not believe this claim. Realistically for a more average person, and choosing the two closest points to measure between, it would be closer to a 45-minute cycle ride electric-assisted or not. Should a high quality cycle route be delivered as part of this planning application and either the Cambourne Greenway or the Cambridge 2 Cambourne project, then it might be reasonable to forecast a 35-40 minute ride. This is respectable, and there is no reason to postulate unrealistic trip times. On page 98 of the Design and Access Statement there is a Figure 73 that purports to show an Attractive cycle route connecting the open space network but instead shows a cyclist whizzing along some grass behind a rock. We sincerely hope that the applicants do not believe that this is an example of an attractive cycle route and instead intend to provide appropriate, all-weather, all-year surfaces that are easy to maintain and will withstand normal usage. 2 https://www.icevirtuallibrary.com/doi/book/10.1680/dfct.63495 3 www.standardsforhighways.co.uk/ha/standards/ians/pdfs/ian195.pdf

Figure 73 on page 98: attractive cycle route? On page 119 of the Design and Access Statement there is a Figure 104 labeled Strategic Cycle Route showing a person riding along what appears to be a rural trail with unbound and dusty surface. This is not an appropriate surface for an all-weather, all-year cycleway because it will turn into mud whenever there is rain and become unusable for transport purposes. Figure 104 on page 119: strategic cycleway or unbound rural trail?