INTERIM DIRECTIVE ID 94-2

Similar documents
Off-Target Well Requirements

Reclassification and Recompletion

OIL AND GAS CONSERVATION RULES

OIL AND GAS CONSERVATION RULES

Part 1 Interpretation and Application

PROCEDURE 1.0 PYRAMID FOR PLAY PROCEDURE 2.0 LEAGUE CATEGORIES

Petroleum Development

Policy Registry. C-01 Competitions Policy. Committee Responsible: Competition. Date Approved: June 3, 2012 Review Date: June 2017

USTA LEAGUE NEW ENGLAND CHAMPIONSHIP TOURNAMENT RULES OF PLAY (14)

!!! FFC National Competition Guide and Ranking Points System!!!!!! 2015!

Nomination Guidelines Canadian Para-Alpine Ski Team

2018 NEW ENGLAND USTA LEAGUE SECTIONAL REGULATIONS

2017 CPR INTERNATIONAL MEDIATION COMPETITION RULES SUMMARY

RULES OF THE COURT 2019 SUMMARY OF MODIFICATIONS

Disciplinary Procedures for Players in Scottish Women s Football Youth Leagues. Season 2018

+TABLE OF CONTENTS RULE # PAGE # SCHEDULE 3 2. PLAYER ELIGIBILITY CLUB RESPONSIBILITIES CLUB OPTIONS. 3

Interim Rowing NSW Heat Management Policy January 2018

Well Control Modeling Software Comparisons with Single Bubble Techniques in a Vertical Well

2017 FALL SEASON SCHEDULING INFORMATION BOYS/GIRLS U-14, AND GIRLS U-15 thru U-19 AGE GROUPS

Disciplinary Procedures For Players in Scottish Women s Football Youth Regional Leagues. Season 2016

USTA Missouri Valley USTA League Tennis 2014 Rules and Regulations 11/18/2013 (updated 12/7/2013)

Operating Regulations

ERCBH2S Frequently Asked Questions.

Canadian Tire Mitchell s Bay Open Bass Tournament. Official Tournament Rules. July 6 & 7, 2018

2017 Spring Season SCHEDULING INFORMATION U-15 thru U-19 AGE GROUPS

2.0 LANE WIDTHS GUIDELINE

Geraldton Hockey Association [Inc.] 2017 BY-LAWS

High Cost Gas Statewide Rule 101 (Tight Formations)

SECTION 1 EXTRA PROGRAM GUIDELINES Guidelines for a more competitive youth soccer program

Selection Criteria Changes April 14, 2016 The following was removed from section 5.2, then revised and added to section 6.1: NOTE: Failure to achieve

1 Suburban Friendship League 2 3 Procedures and Processes SFL Team Rosters 4 (Effective March 9, 2018) OVERVIEW 8 9 The SFL Team Roster and

the annulus between the second casing string and the surface casing [must be] open to the atmosphere in the manner described in subsection (2).

Policy #102 - Team Staff/Officials Certification

Grizzly Bear Management Plan for the Gwich in Settlement Area

Pedestrian Crosswalk Audit

Background Information. Project Instructions. Problem Statement. EXAM REVIEW PROJECT Microsoft Excel Review Baseball Hall of Fame Problem

I N T E R N A T I O N A L S K A T I N G U N I O N

Provincial Championships Technical Manual Version 5

WOOD BUFFALO HOCKEY LEAGUE RULES AND REGULATIONS SEASON

CORK INTERNATIONAL OPTIMIST REGATTA SAILING INSTRUCTIONS August 10-13, 2017 CORK/Sail Kingston Kingston, Ontario, Canada

THE CORPORATION OF THE CITY OF PENTICTON COUNCIL REPORT. DATE: 9 th January 2012 RES:

The University of Texas at Austin LONGHORN AQUATICS Longhorn Aquatics End of School Splash May 20-22, 2011

Audit Report. Department of the Interior Office of Inspector General

THE CORPORATION OF THE MUNICIPALITY OF STRATHROY-CARADOC BY-LAW NUMBER 24-09

FAQs about Directive PNG017: Measurement Requirements for Oil and Gas Operations

1.2 Important Dates DATE DESCRIPTION LOCATION January 1 st August 31 st, 2015 Final Declaration Deadline

Directive 059: Well Drilling and Completion Data Filing Requirements

7. Catch Balancing. 7.1 Catch Balancing

DARLINGTON MENS RECREATIONAL SOCCER LEAGUE OPERATING RULES AND REGULATIONS. Table of Contents

Fairview Minor Hockey New Parent Manual

Spring Soccer. Guidelines. Supporting Combined Soccer across AYSO Areas 11R, 11S & 11V. San Diego County AYSO

SSC 2018 OLYMPIC SELECTION POLICY & PROCEDURES SHORT TRACK

PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION

BC Well Testing & Reporting Requirements. Reservoir Engineering

THE CORPORATION OF THE TOWNSHIP OF PUSLINCH BY-LAW NUMBER A by-law to regulate enclosures for outdoor swimming pools

DEPARTMENT OF ENVIRONMENTAL QUALITY OFFICE OF OIL, GAS, AND MINERALS OIL AND GAS OPERATIONS

STATE OF NEW YORK PUBLIC SERVICE COMMISSION. At a session of the Public Service Commission held in the City of Albany on August 20, 2003

BOXING CANADA HIGH PERFORMANCE PROGRAM SELECTION POLICY 2018/2019 PROGRAM YEAR

AUSTRALIAN MEN S HANDICAPPING SYSTEM (Copyright)

SAILING INSTRUCTIONS

SAILING INSTRUCTIONS

GAMES OPERATING PROCEDURES FALL 2017

Interim Rowing Victoria Heat Management Policy August 2018

Forty-Third Annual Irving R. Kaufman Memorial Securities Law Moot Court Competition Kaufman Editor Ben Klein

CORPORATION OF THE MUNICIPALITY OF STRATHROY-CARADOC BYLAW NO

EUROPEAN BRIDGE LEAGUE SUPPLEMENTAL CONDITIONS OF CONTEST. 26th EUROPEAN YOUTH TEAMS CHAMPIONSHIPS HELD IN ŠAMORIN, SLOVAKIA JULY 8 th JULY 15th, 2017

Nomination Guidelines Canadian Alpine Development Team

MALTA JUNIOR GOLF OPEN 2017

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

WOMEN S CARDED ATHLETE PROGRAM

PANEL DECISION. newcastlepaintball.com.au. Panel: Andrew Robertson. Hunter Valley Paintball Pty Ltd. Delta Force Properties Pty Ltd

Anti-Doping Policy. As of Jan.1st, 2015 Cycling BC will be implementing a new Anti-Doping policy.

in the manner and way provided by law and the rules and

SOUTH BERKELEY SOCCER LEAGUE RULES AND REGULATIONS

Gas Interruptions. customer guide

IS A CONTINUOUS PLAY EVENT, ALL TIMES ARE APPROXIMATE AND TABLE ASSIGNMENTS MAY CHANGE.

ENGLAND TEAMS TRIAL FOR THE EUROPEAN WOMEN S TEAMS CHAMPIONSHIP 2018 SPECIFIC CONDITIONS OF CONTEST

THE FIELD RULES FOR THE EAGLEVILLE (EAGLE FORD-2) FIELD, DE WITT, KARNES, LAVACA AND LIVE OAK COUNTIES, TEXAS

RULES AND REGULATIONS FOR COMPETITIONS AND MATCHES ( RULES ) RULES AND REGULATIONS FOR COMPETITIONS AND MATCHES ( Rules ) Section 1 General

Date Effective 4/21/2008 Identification

Rules and By-laws of the Surrey Volleyball Association

2019 BSA SUMMER SPLASH RULES OF COMPETITION - VERSION 2.0

RULE BOOK DISCLAIMER 2018 TRACK RULES ALL DIVISIONS

Casing and Cementing Requirements

Racing Rules of Sailing

APPENDIX D OPEN WATER SWIMMING RULES

Occupational Safety and Health Administration

CONSTITUTION Revised September 2018

THE PAS MINOR HOCKEY ASSOCIATION DISCIPLINARY POLICIES

ADULT COMPETITION RULES AND REGULATIONS MEN AND WOMENS A CUP, B CUP, U21, AND MASTERS

2018 SOFTBALL--TOURNAMENT RULES

TABLE OF CONTENTS SECTION 16

Minimum Suspension Guidelines - Minor/Female (Update)

All time trial participants are required to provide their own lane timers for each entered event.

ON-FIELD REGULATIONS SECTION THREE: PROVISIONS APPLICABLE TO CATEGORY 5 GENERAL CHARGES. 2 Nothing in this Section Three shall preclude:

STURGEON PEMBINA HOCKEY LEAGUE CONSTITUTION & Policy Handbook

INSTRUCTIONS FOR COMPLETING FORM H-9 STATEWIDE RULE 36 CERTIFICATE OF COMPLIANCE

TENNIS COURT SESSIONS:

PROVINCIAL BERTH POLICY

Swimming Pool Fence By-law

Transcription:

INTERIM DIRECTIVE ID 94-2 TO: All Oil and Gas Operators 8 March 1994 REVISIONS TO OIL AND GAS WELL SPACING ADMINISTRATION BACKGROUND The oil and gas well spacing regulations and policy have received considerable review and some significant changes are appropriate. Extensive consultation with the Canadian Association of Petroleum Producers, the Small Explorers and Producers Association of Canada, and the Alberta Department of Energy has taken place. The Energy Resources Conservation Board (the Board) will implement the changes summarized in the following paragraphs and in Attachments 1 through 3 on 1 April 1994. "FIRST WELL" IN A POOL The optimum geologic location to drill the "first well" into a pool is often outside the existing target area. The Board receives many applications to change target areas for "first wells". Most operators apply prior to drilling to ensure on-target status and to avoid an off-target penalty that may result from subsequent pool development. These applications can alert competitors to the possible play and intervention may be filed resulting in long and costly delays. This, in effect, penalizes the company that takes the initiative to explore for a new pool. Accordingly, it is considered appropriate to establish a policy that recognizes those companies willing to take the risk associated with drilling exploratory wells. Effective 1 April 1994 the Board will not impose an off-target penalty on the 'first well" in a pool. This policy will be reviewed periodically to ensure that the benefits received by industry justify the administrative resources expended by the Board. Should it be evident that the policy is being abused or is unmanageable it may be rescinded or, alternately, a special charge may be introduced to deal with the resolution of such disputes. Details of the policy are described in Attachment 1 and apply to oil and gas wells. OFF-TARGET PENALTY SURVEILLANCE The change from prorated allowables in oil pools to an environment where rate controls are administered primarily for conservation purposes led the Board to conclude that its role in monitoring off-target wells and lease-line drainage requires revision. The current policy of automatically applying off-target penalties in Maximum Rate Limitation (MRL) administered oil pools can result in the imposition of penalties when protection of correlative rights is not an issue. Also, the increased use of holdings and miscellaneous orders to facilitate drilling of optimum geologic locations during pool development has resulted in fewer off-target wells. /2

Most oil wells do not have rate limitations because they are in pools subject to good production practice (GPP). The monitoring of off-target wells in GPP pools has been the responsibility of operators in the pools, with the onus on an affected party to bring equity concerns to the Board. With approximately 75 per cent of pools now on GPP, industry is presently responsible for much of the off-target surveillance. Under the revised policy, the Board will no longer automatically apply off-target penalties, but, will require industry to monitor its respective oil and gas pools for off-target wells and bring equity concerns to the Board using the procedures and policy outlined in Attachment 2. OFF-TARGET PENALTY DETERMINATION Off-target penalty factors are presently calculated using the formulas outlined in Part 4 of the Oil and Gas Conservation Regulations. Part 4 contains some nine pages of off-target penalty calculations and text which are complicated and confusing to the user. The Board has replaced the current penalty calculations with simplified figures that show specific off-target areas and the assigned penalty factors. The new method to determine an off-target penalty is shown in Attachment 3, Figures 1 through 4. It should be noted that the new method applies to wells spudded on or after 1 April 1994. Offtarget wells spudded before 1 April 1994 will continue to have their off-target penalties calculated in accordance with present regulations. The appropriate changes will be made to the Oil and Gas Conservation Regulations at a later date. Questions regarding this interim directive should be directed to the Board's Oil Department at 297-8547. [Original signed by] G. Berndtsson, P.Eng. Board Member Attachments

ATTACHMENT 1 TO ERCB ID 94-2 "FIRST WELL" IN A POOL POLICY The "first well" policy is effective 1 April 1994 and applies to a well spudded on or after this date. The "first well" in an oil pool is defined as the well with the earliest spud date that is capable of oil production and that commences oil production within 6 months 1 of the spud date. A capable oil well is a well that is placed on production. The "first well" in a gas pool is defined as the well with the earliest spud date that is capable of gas production. A gas well is considered to be capable when it is completed and a suitable test has demonstrated to the Board's satisfaction that the well has the ability to produce gas at a commercial rate on a sustained basis. The establishment of the "first well" designation will be initiated when a well of competitive ownership becomes capable and a request to apply the off-target penalty is made to the Board. Note that the request to apply an off-target penalty shall contain the information which justifies the application of the penalty. Until that occurs, the off-target well will produce without penalty in accordance with the off-target well policy presented on Attachment 2. Upon a request to apply an off-target penalty, the Board will review pool delineation utilizing all available relevant information such as geological and pressure data. Where the well in question is deemed to be the "first well" in the pool, the off-target penalty will not be applied. In the event that a well does not qualify for "first well" status, the well will be subject to an off-target penalty effective the first day of the month following the date a request is received by the Board to apply the penalty. Where pools containing a well with "first well" status are coalesced, only one well will retain its "first well" status. However, the new pool will not be reviewed for "first well" status until a request is made to apply an off-target penalty. Until then, all wells with "first well' status will produce without penalty. 1 Where a well is not capable, within 6 months because it is required to comply with unique or area specific regulations, an extension may be requested.

ATTACHMENT 2 TO ERCB ID 94-2 OFF-TARGET WELL SURVEILLANCE Effective 1 April 1994, industry will be responsible for off-target well surveillance. After this date, an off-target penalty factor will be applied to a new well being placed on production only upon successful request from a competitive operator. This shift to industry will require operators to monitor mineral leases offsetting their lands for off-target wells. Specifically, industry is required to make the initial assessment as to whether a well is off-target, and if off-target, whether application of an off-target penalty is warranted. To do this, an operator needs to know the following information: vertical well: the coordinates of the well's surface location, deviated or horizontal well: the coordinates of the well's surface and bottomhole locations, the well spacing for the area of interest, the general guidelines the Board will be following in applying an off-target penalty, and directional survey information, if applicable. Information on well coordinates, well spacing orders, spud date, and Pool status (MRL/GPP) is available from the Board's information Services. Also, a daily listing of new wells licensed is available at the main floor reception desk. PROCEDURE FOR INITIATING AN OFF-TARGET PENALTY Using the well's surface and bottomhole coordinates and applicable well spacing orders, determine if the well is outside its designated target area. Using the following general guidelines, determine whether an off-target penalty should be applied. If application of an off-target penalty is warranted, submit a letter to the Board, with a copy to the operator of the off-target well, requesting that an off-target penalty be applied. GUIDELINES FOR APPLYING OFF-TARGET PENALTY The Board will apply the following general guidelines in determining if an off-target penalty should be applied: 1. Where the well is off-target towards a competitor's land containing a well producing from the same pool, application of the off-target penalty would be automatic. 2. Where the well is off-target away from a competitor's lands containing a well producing from the same pool, the off-target penalty would not normally be applied. 3. An off-target penalty factor for a well would not normally be initiated by a operator who is in a second, third, or fourth line offset drilling spacing unit (DSU) without substantiating data proving inequitable drainage.

4. Notwithstanding points 2 and 3, the Board may apply the off-target penalty where a well has gained access to a reservoir as a result of its off-target location. 5. The base rate for an off-target oil well will take into account the allowable administration of the pool. Where the pool is on MRL administration, the penalty factor would be applied to the well's MRL. In GPP oil pools, the Board would consider the capabilities of the off-target well, wells in the immediate area, and possibly other wells in the pool. Both parties will be provided with an opportunity to table input regarding the appropriate well rate. 6. For a gas well, the off-target penalty will be applied against its Qmax, as defined in section 10.300 of the Oil and Gas Conservation Regulations. 7. Operators are reminded that normally only one well may be produced from each pool in a DSU. Failure to comply with this requirement will result in the assignment of overproduction plus any overproduction penalties to the DSU.

ATTACHMENT 3 TO ERCB ID 94-2 OFF-TARGET PENALTY DETERMINATION Wells spudded after 1 April 1994 shall have the off-target penalty factors determined in accordance with the attached figures. Please note that the numbers defining the width of the offtarget bands represent subsurface distances normally calculated at porosity top of the producing horizon, for vertical wells. For directionally drilled and horizontal wellbores the actual location of the wellbore in the producing horizon is considered. Please note, a DSU does not include the area of any provincial road allowance.