City of Baton Rouge and Parish of East Baton Rouge

Similar documents
Bike BR. A Tool for Baton Rouge, Louisiana by the City-Parish Planning Commission

Illustrated Principles of Good Planning

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

Frequently asked questions about how the Transport Walkability Index was calculated are answered below.

MASTER BICYCLE AND PEDESTRIAN PLAN

5. Pedestrian System. Accomplishments Over the Past Five Years

GIS Based Data Collection / Network Planning On a City Scale. Healthy Communities Active Transportation Workshop, Cleveland, Ohio May 10, 2011

Richmond Connects Visioning Update

The Pedestrian Safety Action Plan

GIS Based Non-Motorized Transportation Planning APA Ohio Statewide Planning Conference. GIS Assisted Non-Motorized Transportation Planning

Improving Pedestrian Access to Transit: The Sacramento Pedestrian Master Plan

Pedestrian Demand Modeling: Evaluating Pedestrian Risk Exposures

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

ACTIVE TRANSPORTATION

How to Develop a Pedestrian Safety Action Plan

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

THE PHILADELPHIA COMPLETE. an overview

Chapter 5. Complete Streets and Walkable Communities.

Ann Arbor Downtown Street Plan

The Impact of Placemaking Attributes on Home Prices in the Midwest United States

City of Lafayette Public Meeting Agenda Downtown Street Improvement Master Plan Implementation Committee Thursday, April 21, :00 PM

Living Streets Policy

Pedestrian Project List and Prioritization

A Road Forward for East Baton Rouge Parish COMPLETE STREETS VISION & POLICY STATEMENT 2014

ADA Transition Plan. City of Gainesville FY19-FY28. Date: November 5, Prepared by: City Of Gainesville Department of Mobility

Moving Towards Complete Streets MMLOS Applications

Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs

WELCOME. Traffic & Parking Commission Special Meeting May 30, Iteris, Inc. All rights reserved.

ADOT Statewide Bicycle and Pedestrian Program Summary of Phase IV Activities APPENDIX B PEDESTRIAN DEMAND INDEX

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

CITY OF GRAND JUNCTION URBAN TRAILS COMMITTEE 2017 ANNUAL REPORT

Designing for Pedestrian Safety

Presentation Summary Why Use GIS for Ped Planning? What Tools are Most Useful? How Can They be Applied? Pedestrian GIS Tools What are they good for?

University-Community Partnerships for Environmental Justice: An example from the San Fernando Valley

SCARBOROUGH CENTRE TRANSPORTATION MASTER PLAN (SCTMP)

Goal 3: Foster an environment of partnerships and collaboration to connect our communities and regions to one another.

Non-Motorized Transportation 7-1

Prince George s County plans, policies, and projects

2015 Florida Main Street Annual Conference. Complete Streets Equal Stronger Main Streets

A GIS APPROACH TO EVALUATE BUS STOP ACCESSIBILITY

Chapter Four NON-INFRASTRUCTURE RECOMMENDATIONS. 5 E s. 5 E s. Education. Encouragement. Enforcement. Engineering. Evaluation

About the Active Transportation Alliance

2010 Pedestrian and Bicyclist Special Districts Study Update

Methodology for Linking Greenways and Trails with Public Transportation in Florida

Environment and Public Works Committee Presentation

5/31/2016 VIA . Arwen Wacht City of Sacramento Community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811

COMPLETE STREETS POLICY Exhibit A to Ordinance

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Overview: Phase 3 Draft Development and Circulation Plans, White Bear Station

Bicycle and Pedestrian Plans and Improvements

City of Ottawa s Complete Streets Approach to Transportation Projects

Beach Cities Living Streets Design Manual and Aviation Boulevard Multimodal Corridor Plan

Table #6 VISION CHARACTERISTICS

A COMPREHENSIVE APPROACH TO TRANSPORTATION AT SUNTRUST PARK AND THE BATTERY ATLANTA

IBI Group November 5, 2012

Public Works AGENDA ITEM D-2 STAFF REPORT

How Policy Drives Mode Choice in Children s Transportation to School

Best Southwest Transportation Committee. North Central Texas Council of Governments Transportation Department

San Jose Transportation Policy

Complete Streets Successes, Opportunities, and Challenges

Ocean Park Boulevard Green Street Project Community Workshop

Transportation, Parking & Roads

Implementing Complete Streets in Ottawa. Project Delivery Process and Tools Complete Streets Forum 2015 October 1, 2015

Using GPS Data for Arterial Mobility Performance Measures

Perryville TOD and Greenway Plan

Blue Ribbon Commission Report Recommendations on Pedestrian and Bicycle Infrastructure Improvements

Mobileye Shield+ Collision Avoidance System Pilot Program

Progress Table GreenStep HIA Best Practices

DRAFT for a State Policy for Healthy Spaces and Places

10/8/2014 VIA . RE: CVS Pharmacy (P13-002) Revised August 2014

NACTO Designing Cities Conference Project Evaluation: Tools for Measuring Success and Building Support. October 29, 2015

CONNECTING PEOPLE TO PLACES

ASSESSING THE WALKING & BIKING ENVIRONMENT

Presentation Comments and Questions

VDOT BICYCLE & PEDESTRIAN IMPLEMENTATION GUIDE FOR LOCALITY INVOLVEMENT April 2017

South King County High-Capacity Transit Corridor Study

Arapahoe Square Zoning + Design Standards & Guidelines Task Force Meeting 9 January 27, 2016

METROPOLITAN TRANSPORTATION PLAN OUTREACH: INTERACTIVE MAP SUMMARY REPORT- 10/03/14

TRANSIT-ORIENTED DEVELOPMENT POLICY. City Planning and Development Department Kansas City, Missouri

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.

DALLAS MIDTOWN REDEVELOPMENT PLAN FOCUS NORTH TEXAS Peer Chacko, AICP, Assistant Director, City of Dallas

5 Circulation & Parking

What s Health Got to Do With It? Health and Land Use Planning

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

Journée d étude consacrée à la sécurité routière des deux roues. European Commission's view of cycling safety. Casto López Benítez

MEETING Agenda. Introductions. Project Overview. Key Study Components. Alternative Station Concepts. Preferred Station Concept. Next Steps.

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

Lynn Valley Town Centre Transportation Study 2013

Built Environment and Older Adults: Supporting Smooth Transitions Across the Life- Span. Dr. Lawrence Frank, Professor and Bombardier UBC

Project Status Report

Florida Coalition CTST COMMUNITY TRAFFIC SAFETY TEAMS COLLEGE OF MEDICINE

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

AND GUIDING PRINCIPLES. Boise, Idaho 1997

Executive Summary Route 30 Corridor Master Plan

Bicycle and Pedestrian Connectivity Study Phase 2

Non-motorized Transportation Planning Resource Book Mayor s Task Force on Walking and Bicycling City of Lansing, Michigan Spring 2007 pg.

Memorandum. Drive alone

A Walkability Study for Downtown Brunswick

Stakeholder Meeting Handouts. January 2013

Transcription:

City of Baton Rouge and Parish of East Baton Rouge An Analysis of Neighborhood Walkability Louisiana Remote Sensing and GIS Workshop April 22-25, 2013 Cajundome Convention Center Lafayette, Louisiana April 24, 2013 City-Parish Planning Commission 1100 Laurel Street, Suite 104 Baton Rouge, Louisiana (225) 389-3144 Slide 1

Presentation Outline Background Methodology Analysis Results Next steps Conclusion April 24, 2013 City-Parish Planning Commission 1100 Laurel Street, Suite 104 Baton Rouge, Louisiana (225) 389-3144 Slide 2

Background The EBR Parish Plan of Government mandates the development and implementation of a 20 Year Comprehensive Land Use and Development Plan The Horizon Plan was the first Comprehensive Plan, adopted in 1992 1992 2011 FUTUREBR was adopted as a Comprehensive Plan update in September 2011 April 24, 2013 City-Parish Planning Commission 1100 Laurel Street, Suite 104 Baton Rouge, Louisiana (225) 389-3144 Slide 3

FUTUREBR Neighborhood Planning Central principle of neighborhood planning for the FUTUREBR Plan is the walkable, 20 minute neighborhood Accommodates non-motorized and pedestrian travel modes Requires quantitative analysis performed by utilizing resources of the City-Parish Enterprise GIS database April 24, 2013 City-Parish Planning Commission 1100 Laurel Street, Suite 104 Baton Rouge, Louisiana (225) 389-3144 Slide 4

Methodology Walkability is considered, for analysis purposes, to be based on proximity to essential services including, but not limited to: Grocery Stores Retail Banks Restaurants and Coffee Shops Schools Parks Other Services GIS Analysts developed scoring methodology based on an algorithm utilized for Walkscore.com Web site April 24, 2013 City-Parish Planning Commission 1100 Laurel Street, Suite 104 Baton Rouge, Louisiana (225) 389-3144 Slide 5

Walkscore.com Walkscore.com is a Web site which utilizes a patent pending Street Smart algorithm to calculate walkability Created by Professor Larry Frank, Urban Design 4 Health, and The Walk Score Advisory Board The Street Smart Walk Score Algorithm is a combination of: 1) Walking routes and distances to amenities 2) Road connectivity metrics such as intersection density and block length 3) Scores for individual amenity categories The algorithm calculates a score based on the walking distance to amenities where shorter distances = higher scores April 24, 2013 City-Parish Planning Commission 1100 Laurel Street, Suite 104 Baton Rouge, Louisiana (225) 389-3144 Slide 6

Walkability in Baton Rouge The average Walk Score for Baton Rouge is 47, rating the city as auto dependent Some Baton Rouge neighborhoods score higher based on density and proximity to services April 24, 2013 City-Parish Planning Commission 1100 Laurel Street, Suite 104 Baton Rouge, Louisiana (225) 389-3144 Slide 7

Walk Score Shortcomings The Walk Score algorithm is useful for calculating overall community walkability, but the geographic scope used by walkscore.com is based on ZIP code areas, which are too large to determine walkability at the neighborhood level. April 24, 2013 City-Parish Planning Commission 1100 Laurel Street, Suite 104 Baton Rouge, Louisiana (225) 389-3144 Slide 8

Improvements to Analysis To rectify the scaling issue, this project adapted the Walk Score scoring algorithm to calculate walkability down to the 2010 U.S. Census block group level for the urbanized area A new personal services category was added to include essential businesses not measured by the algorithm The score calculation incorporated street and sidewalk data; a lack of sidewalks was treated as a penalty for scoring purposes For greater precision, Intergraph GeoMedia Professional Grid software was utilized to provide a proximity analysis for business locations by utilizing hotspot detection April 24, 2013 Slide 9

Block Group Analysis April 24, 2013 City-Parish Planning Commission 1100 Laurel Street, Suite 104 Baton Rouge, Louisiana (225) 389-3144 Slide 10

Grid Hotspot Analysis April 24, 2013 City-Parish Planning Commission 1100 Laurel Street, Suite 104 Baton Rouge, Louisiana (225) 389-3144 Slide 11

Improvement Opportunities Incorporate linear reference system (LRS) data to calculate intersection density Continue to improve the quality of base data (businesses) used to develop walkability model Integrate these changes into block group and Grid analyses April 24, 2013 City-Parish Planning Commission 1100 Laurel Street, Suite 104 Baton Rouge, Louisiana (225) 389-3144 Slide 12

Final Product Utilize results of analysis for additional planning work: Small Area/Neighborhood Planning Urban Design Complete Streets Implementation Develop policies to improve walkability in auto-oriented neighborhoods Develop policies to preserve and enhance walkability in pedestrian friendly neighborhoods April 24, 2013 City-Parish Planning Commission 1100 Laurel Street, Suite 104 Baton Rouge, Louisiana (225) 389-3144 Slide 13

Questions and Comments? City - Parish Planning Commission GIS Division Justin Priola Senior GIS Analyst Mapping and Analysis Section jpriola@brgov.com http://www.brgov.com/dept/planning http://ebrmap.brgov.com April 24, 2013 City-Parish Planning Commission 1100 Laurel Street, Suite 104 Baton Rouge, Louisiana (225) 389-3144 Slide 14