Explosion of the Space Shuttle Challenger

Similar documents
It s Time to Launch into Space!

Controlling Cabin and Envelope Air Flows & Pressure Differentials

Annual Report on Liquefied Petroleum Gas (LPG) Related Accidents

RESULTS SUMMARY. APU risk reduction post STS-9 (re-design) Orbiter flight software using OI-7

Cansat 2016 Environmental Testing Requirements

Development of a New Mechanism Compressor Named "Helical

Load Responsive Multilayer Insulation Performance Testing

ADDRESSING UNIQUENESS AND UNISON OF RELIABILITY AND SAFETY FOR BETTER INTEGRATION

SERVICE INSTRUCTION INSPECTION OF CARBURETORS FOR ROTAX ENGINE TYPE 912 AND 914 (SERIES) AND 2-STROKE UL AIRCRAFT ENGINES SI SI

The evolution of the Ex-proof flame path

Welcome to your new Firepod It will only work properly on Propane Gas (Also known as LPG and Patio Gas) with the special regulator supplied

ESA Elbow Sealing Adapter Kit

MANUAL DIRECT PURGE OPTION. UNION Instruments GmbH CWD2005 PLUS. General information, safety standards and regulations for direct purge option

GENUINE CARGO NET INSTALLATION AND USER S INSTRUCTIONS

Bottle Rockets. The bottle rocket, like the squid, uses water as the driving agent and compressed air instead of heat to provide the energy.

Rocket Report By: Riley LeMont. Jefferson Starship. January 22, Name Nomiddlename Lastname

MUD 1. Vent check valves. Instruction and maintenance manual.

Figure 1: Hydrostatic Pressure Forces Are Perpendicular to the Surface

GAS BBQ 4 burner. instructions for. model no: BBQ10

LAUNCH IT. DESIGN CHALLENGE Design and build an air-powered rocket that can hit a target at least 5 feet away.

Annual Report on Liquefied Petroleum Gas (LPG) Related Accidents

Right-Angle Tube Roller Model

E. MENDOZA, C. KEMPEN, Y. ESTERKIN, S. SUN, K. SUSKO and J. GOGLIA

LVBT. Low Voltage, Heat-shrinkable Bus Insulation Tape. Product Installation Instructions

Development of Large Capacity CO2 Scroll Compressor

Internal Sealing of Masts

Unit 2 Primary Containment Vessel Internal Investigation

ANOTHER NON RESPONSE EXPLOSION, WHAT EXPLOSION! May 23, 2000

ULTRAMAGIC, S.A. MAINTENANCE MANUAL SUPPLEMENT NUMBER 14 INTRODUCTION OF A VAPOUR PILOT VALVE OPTION FOR THE ULTRAMAGIC MK 21 RANGE OF BURNERS

Between the Market and the Moon Requirements for Lunar Tourism

HUPF Series DESCRIPTION APPLICATION INSTRUCTION SHEET GAS PRESSURE REGULATOR WITH INCORPORATED FILTER EN1C-0003NL05 R1205.

User manual. ZX trolley.

NEW IGC CODE AND IGF CODE

SERVICE BULLETIN REPLACEMENT OF FUEL PRESSURE REGULATOR ASSY. PART NO FOR ROTAX ENGINE TYPE 914 (SERIES) SB UL

NANO-LAUNCH REACTION CONTROL SYSTEM 25% Report

Fusion and Explosion of Oxygen Gas Containers in The Filling Process

Structural Design and Analysis of the New Mobile Refuge Chamber

ETHOS Environmental and Thermal Operating Systems (ETHOS)

Installation, Operation and Maintenance Instructions for Pacific PA Non-Storage Heat Exchanger

Preliminary Cost Analysis MARYLAND. Cost Sources Vehicle-level Costing Heuristics Applications Learning Curves Program-Level Analysis

Basics on How a Gun Works - most guns work on the basic principle that an explosive pressure is applied behind a projectile to launch it down a barrel

RECOGNIZE UXO C H A P T E R 2

Mitsubishi Heavy Industries Technical Review Vol. 53 No. 4 (December 2016)

Roller Chain and Sprocket Troubleshooting Guide

for Cold-Formed Steel Framing Products

Wave Cyber (Shanghai) Co., Ltd. 8 Side Port Membrane Housing User s Guide

FIRE PREVENTION METHOD FOR 275KV OIL-FILLED CABLE IN TEPCO

Pneumatic proportional controller Types M Types FM Function tested for use of the float in Ex-zone 0

SERVICE BULLETIN REPLACEMENT OF THE PROPELLER GEARBOX FOR SOME ROTAX SB SB

CURI Pierside Stainless Diesel Tank

3-PIECE BALL VALVE, 3600 PSI/ PN 248, WITH ISO DIRECT MOUNTING PAD 306M SERIES/ PED Category II

15ME-014 INSTRUCTION MANUAL OF STERN TUBE SEALING TYPE EVK2RV. URL

Pure-Flo Handwheel Operated Valves (903, 913, 963) Instruction Manual

Science Museum Oklahoma presents Space Day Teacher s Resource Guide

The Distress Socket Signal Firing Station Locations Aboard Titanic

SANP ACTING RELAYS YT-520/525/530 SERIES

NOTICE. The above identified patent application is available for licensing. Requests for information should be addressed to:

for Cold-Formed Steel Framing Products

User Advisory Notice BE-10BR Hood Immediate Action Required

Pressure Relief Device Investigation Testing Lessons Learned

SIMULATION OF ENVIRONMENTAL FLIGHT CONDITIONS

MONTGOMERY COUNTY FIRE AND RESCUE SERVICE SWIFT WATER TEAM TRAINING PROGRAM CERTIFICATION TEST FOR SWIFT WATER BOAT OPERATOR

SERVICE MANUAL SALAMANDER BROILERS RADIANT AND INFRARED 36RB 36IRB VULCAN C36RB C36IRB WOLF

TAKEOFF & LANDING IN ICING CONDITIONS

Dry Gas Couplings. Service Instruction 3 Tank Unit. Subject to design changes Art. nr: PR Version:

Fig.1. September, 2017 An Äager Brand Storagetech tank equipment may saved the entire storage tank refinery of Grupsoil in Colombia.

Design Review Agenda

3. SPECIFICATION 4. ASSEMBLY

AGM 33 PIKE ALL FIBERGLASS. Specifications Length: 92 Diameter 5.5 Weight: 24 lbs Motor Mount: 75mm Fins: 6-3/16 G10 CP: 68 from nose tip Parts List

Outbound Progress Report

Automatic Non-freeze Valve NF6

APT Electrofusion Ducting

Assembly Instructions for STS-97 payload (P6 Truss)

Spilt body Flange ball valve. TC-205MFF-PN1640 User Manual English Version. Document No: TC-205MFF-PN1640.Ur-manual. Date: 2007/04/2617. Version: 1.

Aliphatic Resin Wood Glue. 18" Fabric Parachute Part #PNC50 Part # Part #11700 Part #J0016. Launch Lug

MAINTENANCE PROCEDURE FOR X 650

Risk Management Considerations of the SOFIA Aircraft

SailTrack Installation Instructions. External Track

Building a Rocket (Advanced) Before you build a rocket try the bottle on the launcher to test if it holds pressure and fits correctly.

Are Detonator Qualification and Lot Acceptance Test Requirements Rational?

OXYGEN ACETYLENE WELDING & CUTTING EQUIPMENT

Development Report. Walker Barrier 10 Ergoclean Gloveport Interface. And. Single Piece Gauntlet Performance Testing

S-COS-16 / S-COSR-16

Propane Conversion Kit Instruction

GAS FUEL VALVE FORM AGV5 OM 8-03

the annulus between the second casing string and the surface casing [must be] open to the atmosphere in the manner described in subsection (2).

SPUD OWNER S MANUAL ALWAYS WEAR A COAST GUARD APPROVED FLOTATION DEVICE WHEN OPERATING THE SPUD KAYAK.

INSTRUCTION MANUAL OF STERN TUBE SEALING TYPE EVK2RV

Investigation of Thermal Effects of CO 2 on Earth-Atmosphere System

Tightening Evaluation of New 400A Size Metal Gasket

PTB Ex PT Scheme. Procedure Instruction of program Explosion Pressure - Test Round 2017

VK41../VK81.. GAS CONTROLS FOR COMBINED VALVE AND IGNITION SYSTEM SPECIFICATIONS APPLICATION DESCRIPTION INSTRUCTION SHEET

Application of Simulation Technology to Mitsubishi Air Lubrication System

Variable Volume Chamber Cannon ( V²C² )

The Benefits Of Composite Materials In Deepwater Riser Applications. 26 th March 2015 Hassan Saleh Senior Engineer 2H Offshore Engineering Ltd

Pilot Assembly Replacement Manual Parts Needed: Phillips head screwdriver #2 Two Adjustable Crescent Wrenches Replacement Pilot Assembly

Instruction Manual. Model TC1-S TopSide Clamp. top side clamp. For your personal safety READ and UNDERSTAND instructions before using tools.

Propane Conversion Kit Instruction

INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS

Rhino Ready. Things to Know Before You Start Work

Transcription:

Explosion of the Space Shuttle Challenger [January 28, 1986, USA] by Masayuki Nakao (Tokyo University, Institute of Engineering Innovation) As people all over the world watched on TV, NASA s space shuttle Challenger (Fig. 1) exploded immediately after launch, and took lives of all 7 members of the crew. The causes were loss of elasticity in an o-ring due to low temperature and fuel leak due to faulty design. Orbiter Fuel tank Rocket booster The fuel tank between two rocket boosters is attached to the orbiter Fig. 1Overview of the space shuttle [2] Event As people all over the world watched on TV, the space shuttle Challenger of United States NASA (National Aeronautics and Space Administration) exploded shortly after the launch, and took lives of all 7 members of the crews. Course On January 28, 1986, the space shuttle Challenger developed flame on the side of the Solid Rocket Booster shown in Fig. 1 (Photo 1, arrowed) immediately after the launch, and exploded soon after. 1

Photo 1. Explosion [2] The above shows pictures of the Orbiter attached facing down. Here, the black smoke is spurting from the rocket booster in front due to the gas leak from the arrowed area, and the picture at the bottom shows white smoke coming out. Cause Feynman, a member of the PresidentialCommission headed by William Rogers, discovered the main cause of the explosion as follows: 1) There were two solid Rocket Boosters on this shuttle for shooting the shuttle into orbit. Some assembly was necessary for these Solid Rocket Boosters at the launch site and O-rings (as shown in Fig. 2) were used in the joint area. (1/4 inch thickness and 12 feet in diameter). The ambient temperature at the day of the launch was 1 to 2 degree Celsius (36 F), about 13 to 14 degrees colder than the 2

next coldest previous launch. Due to the cold weather, the o-rings stiffened and lost elasticity causing seal failure. It is presumed that fuel leaked from the gas leak inspection hole was ignited by flame from the aft field, and resulting in an explosion. Photo 2 shows black smoke puffing due to the gas leak from the booster before the launch (arrow at right-bottom corner of the photo). In order to prove this, Feynman did the experiment at a public meeting placing an o-ring in ice water to prove the loss of elasticity in the o-ring. Rocket Booster Secondary o-ring Joint area Enlarged Primary o -ring Insulation (liner) putty Fuel Inside Outside External wall Gas leak Inspection Hole Grease pin Fig. 2, Structure of the Joint area of the Rocket Booster [2] 3

Photo 2, Black smoke photographed from the launch pad [2] 2) The investigation has shown that the o-ring manufacturer and NASA knew the problem with o-ring elasticity at low temperature, and the launch continued in spite of the manufacturer s suggestion of canceling the launch. 3) The direct cause of the o-ring seal failure was loss of elasticity due to low temperature, but faulty design was also a contributing factor. When chamber pressure in the rocket booster increased during use, the external walls between joints expanded, called joint rotation phenomenon, because the walls of the joint area was thicker than the external walls between the joint areas. In this situation, (shown in Fig. 3) moment of inertia occurs to break the joint where the o-ring seals. In addition, there were some distortions from the previous use on the rocket boosters. Those distortions were corrected before re-use but there were still some problems which were not completely corrected and caused gaps in the seal area. They knew these possibilities, but no effective solutions took place. 4

joint Ext. wall moment O-rings Chamber pressure pin Cross-section of Rocket Booster Fig. 3, Joint Rotation [2] 4) The analysis showed that in addition to these technical problems, there were other problems such as insufficient communication between the management and engineers at the site within NASA. Another problem was pressure on NASA to ignore some technical issues in order to meet the following year s budget. Immediate Actions After this accident, the Presidential Committee was formed to investigate the cause of the accident and former Secretary of State, Rogers, was appointed as the chairman. Dr. Feynman, who is the author of this report s references, was also appointed as one of the commissioners and provided significant contribution to the investigation. In order to find the cause of the accident and to take necessary measures, the launch of shuttles were put on hold for two years. This delay had quite an impact on the United States Space Plan. Countermeasure: A. Countermeasures for fuel leaks (Fig. 4) 1) J-shape grooved adhesive seals replaced the previous putty seals. Even if the chamber pressure increased after launch, the pressure would go to the J-shape groove and improves the seal effect. 2) The seal area had an interference with the o-ring added in order to decrease gap against joint rotation phenomenon. 3) Heaters were installed to avoid loss of o-ring elasticity 4) Gas leak inspection holes were added to improve the confirmation of o-ring seal function. 5

Fig. 4, Fuel Leak Prevention after the explosion of Space Shuttle Challenger [5] B. Improvements in management aspects 1) Reconstruct shuttle project management system (Clarification of authorities and responsibilities) 2) Improve risk evaluation and risk analysis in order to secure safe flights 3) Improve communication between on-site engineers and management 4) Understanding and responding to the deterioration level associated with flight history. Summary In addition to the faulty design allowing gas leak from the joints, the o-ring lost its elasticity because of the cold temperature. These combined factors caused fuel gas to leak and the rocket booster exploded. In spite of the designers warning before the launch, the management continued the launch as scheduled. Knowledge 1) Cause of a big disaster may be a small problem on a mechanical element, such as the o-ring. 2) In a large project, an organization may get divided and information may not spread to the whole organization. Once an organization is formed, inappropriate decisions may be made in order to protect the existence of the organization, and often lead to 6

an accident. 3) Even if there was success in the past, condition and environment variation may cause an accident (in this case low temperature). Background NASA developed space shuttl es as space transportation systems. Space shuttles consist of an orbiter, rocket boosters, a fuel tank, and three main engines. In addition, a system to recover the orbiter for reuse was applied. At the time of the development, the goal was to save money by recycling the orbiter. This system leads NASA to reduce launching costs by using the same orbiter repeatedly. The first flight with this system was in 1982. Until this Challenger accident, they had completed 9 flights successfully. Up to the Colombia 3 disaster in 2003, they had 113 launches, and there were only two failures, Challenger and Columbia. In Columbia s disaster, insulation of the external fuel tank peeled off and hit the wing creating a hole. If they had reused the Apollo s disposed rocket, the crew would have been safe even when the insulation had fallen off since the crew was at the top part of the ship. References 1) What do you care what other people think?: Further Adventures of a Curious Character by Richard P. Feynman, and Ralph Leighton (Japanese version, translated by Masako Onuki) Published by Iwanami Shoten in 1988 2) Zoku-Zoku JISSAI NO SEKKEI (Practical Design Vol.3) by Yotaro Hatamura and Jissai no Sekkei Society, Published by Nikkan Kogyo shimbun LTD. (1996) 3) NATIONAL SPACE TRANSPORTATION SYSTEM a. http;//www.fas.org/spp/51l.html 4) The Challenger Accident a. http://www.me.utexas.edu/~uer/challenger/summary.html 5) SHIPPAI HYAKUSEN(100 failure cases) by Masayuki Nakao, published by Morikita Shuppan Co. 2005 7