Regional Bicycle System Master Study. Preliminary Results Update

Similar documents
Twin Cities Regional Bicycle System Study

ACTION TRANSMITTAL No

ACTION TRANSMITTAL No

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

Metropolitan Council Transportation Committee. Twin Cities Regional Bicycle Barriers Study

Bicycling & Walking in the Twin Cities TPP Bike/Ped Chapter Overview. Land Use Advisory Committee September 21, 2017

Regional Bicycle Barriers Study

Chapter 7: Bicycle And Pedestrian Investment Direction

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

Update of the Master Transportation Plan s (MTP) Bicycle Element

Public Works and Infrastructure Committee. General Manager, Transportation Services

Bicycle Master Plan Goals, Strategies, and Policies

ACTION TRANSMITTAL No

Cecil County, Maryland. Bicycle Master Plan

Rochester Downtown Bicycle Study 2009

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Tulsa Metropolitan Area LONG RANGE TRANSPORTATION PLAN

3 FRAMEWORK FOR IMPLEMENTATION OF LAKE-TO-LAKE CYCLING ROUTE

Appendix C. Corridor Spacing Research

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

Bicycle and Pedestrian Investment Direction

Arterial Transitway Corridors Study. Ave

ACTIVE TRANSPORTATION

Goal 3: Foster an environment of partnerships and collaboration to connect our communities and regions to one another.

ADOT Statewide Bicycle and Pedestrian Program Summary of Phase IV Activities APPENDIX B PEDESTRIAN DEMAND INDEX

COASTAL RAIL TRAIL ROSE CREEK BIKEWAY PROJECT COMMUNITY WORKSHOP #2 AUGUST 15, 2013

Hennepin County Bicycle and Pedestrian Planning

Montgomery County Bicycle Master Plan

Transportation Master Plan Advisory Task Force

Solana Beach Comprehensive Active Transportation Strategy (CATS)

DRAFT for a State Policy for Healthy Spaces and Places

POLICY STATEMENT: VISION ZERO

Living Streets Policy

Kelowna On the Move. Pedestrian and Bicycle Master Plan

Chapter 7 Bicycle and Pedestrian Investment Direction

City of Charlottesville Bicycle and Pedestrian Master Plan Update

Perryville TOD and Greenway Plan

SR 693 (Pasadena Avenue) Corridor Study from Shore Drive South to 66 th Street

San Mateo County Comprehensive Bicycle and Pedestrian Plan

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Stakeholder Update. Agenda. Project update Needs Identification Strategy Proposed needs Safety Collectors/Arterials Greenways Local roads

1.0 INTRODUCTION 1.1 PURPOSE OF THIS REPORT

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

PEDESTRIAN ACTION PLAN

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY


BID Strategy Group and Stakeholders Meeting. April 17, 2018

Goals, Objectives, and Policies

Bicycle Master Plan for Greenville, SC Presentation to City Council June 13, 2011

MASTER BICYCLE AND PEDESTRIAN PLAN

BICYCLE PROGRAM IMPLEMENTATION UPDATE. Transportation and Trinity River Project Council Committee June 13, 2016

BIKE PLAN CONTENTS GATEWAY

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

SANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008

Complete Streets Workshop Follow-up. April 27, 2011 Rockledge City Hall

Welcome. Background. Goals. Vision

San Mateo County Comprehensive Bicycle and Pedestrian Plan Open House

The Pedestrian Safety Action Plan

Durham Region Long Term Transit Strategy

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

Bike/Multipurpose Trail Study for Glynn County, Georgia MAY 16, 2016

5. Pedestrian System. Accomplishments Over the Past Five Years

Twin Cities Bicycle Barriers Study Technical Advisory Work Group December 19, 2016

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Dowling/Beaty Cycling Route

21.07 TRANSPORT CONNECTIVITY AND INFRASTRUCTURE

Rail Station Fact Sheet CentrePort/DFW Airport Station

Rail Station Fact Sheet University of Dallas Station

Arlington County 10-Year Transit Development Plan & Premium Transit Network Briefing. May 2016

NOTES FROM JUNIOR COUNCIL ORIENTATION SESSION HELD ON MONDAY, JANUARY 22, 2018, AT 3:30 PM IN COUNCIL CHAMBERS, CITY HALL

Strategic Plan for Active Mobility Phase I: Bicycle Mobility

APPENDIX E BIKEWAY PRIORITIZATION METHODOLOGY

CITY OF MINNEAPOLIS 26 th St E/W & 28 th St E/W Protected Bikeway. Open House - February 2017

Bicycle and Pedestrian Planning in a Historically Car-Centric Culture: A Focus on Connectivity, Safety, & Accessibility

Bus Rapid Transit Plans

City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015

2014 Review/2015 Business Plan

CHAPTER 3: Vision Statement and Goals

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

Complete Streets implementation in Chicagoland

Ulster County Non-motorized Transportation Plan

2014 Bellingham Bicycle Master Plan

PROJECT BACKGROUND/DESCRIPTION

Madison Urban Area and Dane County. Bicycle Transportation Plan Summary. September Introduction. Bicycle Plan Scope and Planning Process

May 12, 2016 Metro Potential Ballot Measure Issue Brief: Local Return

Stakeholder Communication and Public Involvement Plan

(centre) Destination Ontario; and (right) Great Lakes Waterfront Trail (GLWT)/ Simon Wilson/ Waterfront Regeneration Trust..

TRANSPORTATION NEEDS ASSESSMENT

Zlatko Krstulich, P.Eng. City of O9awa

IBI Group November 5, 2012

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

THE CORPORATION OF THE DISTRICT OF CENTRAL SAANICH. COMMITTEES - 7:00 PM Monday, April 27, 2015 Council Chambers AGENDA

Ajax: The Road to Complete Streets

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

City of Novi Non-Motorized Master Plan 2011 Executive Summary

Tonight is for you. Learn everything you can. Share all your ideas.

Evolving Roadway Design Policies for Walking and Bicycling

Beach Cities Living Streets Design Manual and Aviation Boulevard Multimodal Corridor Plan

Chapter 9: Pedestrians and Bicyclists

Transcription:

Regional Bicycle System Master Study Preliminary Results Update Transportation Committee October 21, 2013

Introduction Study Goals Guiding Principles Bicycle Study System Elements Analysis Approach Proposed Regional Corridors & Network Next Steps October 21, 2013 2

Study Goals Improve knowledge base of regional bicycle transportation network Evaluate connectivity of existing network Define a set of proposed regional bicycle corridors Evaluate the relative importance of regional corridors Analyze regional barriers and missing links 3

Guiding Principles Regional Bicycle Corridors should.. 1. Overcome physical barriers & eliminate critical gaps 2. Facilitate safe and continuous trips to regional destinations 3. Function as arteries to connect regional destinations to the transit system 4. Accommodate a broad range of cyclist abilities/preferences 5. Integrate and/or supplement existing and planned infrastructure 6. Provide improved opportunities to increase the share of trips made by bicycle 4

Guiding Principles Regional Bicycle Corridors should.. Connect to local, state and national bikeway networks Consider opportunities to enhance economic development Be equitably distributed throughout the region Follow spacing guidelines to reflect established development and transportation patterns Consider regional priorities reflected in adopted bicycle plans 5

Bicycle Study System Elements Draft Regional Bicycle Transportation Network Overall regional coverage network Forms regional backbone system connecting county and local trail systems & regional destinations Consist of corridors for implementation Draft Priority Regional Bicycle Transportation Corridors Subset Regional Network overlay map Serves the region s developed and developing areas Will connect to major regional destinations and transit Will consist of high use or potentially high use corridors 6

Bike Study System Elements (Cont.) Draft Critical Bicycle Transportation Links Serve to close a gap in Regional Network Improve continuity & connections between jurisdictions Address a physical barrier (i.e., freeway, railroad corridor, or river) 7

Analysis Approach & Results Used Cyclopath/Cycloplan systems as background network Applied variety of data to analyze network: o 2010 U.S. Census data o Cycle Tracks origins and destinations o Regional job and activity centers o 2030 projected population density o Proximity to transitways/stations o Public input on regional destinations & bike trip routes o Land use plans and Met Council development planning areas 8

9 Regional Corridors for Analysis

10 Future Population Density Analysis

11 RCAP Analysis

12 Existing and Future Transitways Analysis

13 Regional Centers Analysis

14 Sub- Regional Centers Analysis

Insert Cum. Corridor Scores Map Regional Corridors Cumulative Scores 15

Regional Barriers and Critical Linkages Insert Regional Barriers & Missing Links Maps 16

Insert Draft Proposed Corridors Map Draft Proposed Regional Bicycle Corridors and Trans. Network 17

Regional Corridors vs. 2030 Pop. Density 18

Next Steps Regional Bicycle System Study Public Workshops o Saint Paul: Oct. 23 rd, 6:30 8:00 pm at Hallie Q. Brown Center o Minneapolis: Oct. 24 th 6:30 8:00 pm at U of M Urban Research and Outreach Center Final PAC meeting (November) Review study findings and recommendations Complete Final Study Report (late November) 19

Next Steps Transportation Policy Plan Update Refine Regional Network/Priority Corridors (Dec. 2013 to Mar. 2014) o Seek input from counties/park agencies Develop/write draft Trans. Policy Plan update Release draft TPP for public review (summer 2014) Host numerous public workshops and other public engagement forums (summer/fall 2014) Met Council adopts 2040 TPP (late 2014) 20