Gorgon - Pilotage - Passage Plan PBG to Materials Offloading Facility (MOF)

Similar documents
Gorgon - Pilotage - Passage Plan Materials Offloading Facility (MOF) to PBG

Gorgon Pilotage Passage Plan - PBG to Gorgon Marine Terminal Primary Route

Gorgon - Pilotage - Passage Plan - Gorgon Marine Terminal to PBG Alternative Route

Gorgon - Pilotage - Passage Plan - PBG to Gorgon Marine Terminal - Alternative Route

Wheatstone Marine Operations - Pilotage - Passage Plan - Onslow Port Limit to WMT

Port of Barrow Island - Local Knowledge Certificate Examination

PILOTAGE DIRECTIONS REVIEWED DECEMBER 2016

ABU - Port of Barrow Island Cyclone Procedure

Harbourmaster s Office Operation of Superyacht in the Auckland Region Navigation Safety Operating Requirements

Transport Infrastructure Act 1994 Gladstone Ports Corporation. Port Notice 04/17 LNG Vessel Operating Parameters

Pilotage Directions 2017

Harbourmaster s Office Tamaki River. Navigation Safety Operating Requirements 2014

Whitstable Harbour Pilotage Information

NAEST(M) training Course Structure and Session Objectives. Day Introduction and enrolment

APPROACH DEPTH(m) From East 15.0 From West From East 15.0 From West From East 15.0 From West ) ) From East 15.0 ) From West 16.

OPERATIONS SEAFARER CERTIFICATION GUIDANCE NOTE SA MARITIME QUALIFICATIONS CODE. Deck: Chart Work

Port Sections Guide Section 01

THE SYLLABUS FOR WRITTEN EXAMINATION PILOT'S FOURTH CLASS LICENCE (TEES AND HARTLEPOOL) AND

ADANI PORTS & SEZ LTD. ++ MUNDRA PORT ++ GENERAL INFORMATION


Forth Ports Limited. Port of Dundee. Rig Move Guidelines

Uncontrolled document if printed.

Oil Tanker - VLCC. Yosu Inward Transit Monitoring (Entering into the Port of Yosu on a Loaded VLCC) LEG 1: APPROACHING ANCHORAGE AND PILOT STATION

properly applied assessment in the use.1 landmarks.1 approved in-service of ECDIS is not experience The primary method of fixing required for those

Scientific Journal of Silesian University of Technology. Series Transport Zeszyty Naukowe Politechniki Śląskiej. Seria Transport

PASSENGER SHIP SAFETY. Review of Operational Safety Measures to Enhance the Safety of Passenger Ships. Submitted by ICS SUMMARY

Code Of Practice For Towage Operations In The Port of St Helier (Towage Guidelines)

Forth Ports Limited. Port of Dundee. Marine Guidelines and Port Information

IMO RESOLUTION A.960(23) Adopted 5 December 2003 (Agenda item 17)

Visiting Lake Macquarie

GUIDELINES FOR NAVIGATION UNDER THE CONFEDERATION BRIDGE

SAILING INSTRUCTIONS MORETON BAY BOAT CLUB PEARL CHALLENGE 2017

PORT INFO GENERAL BERTH INFO

River Tay. Passage Plan

WORK-REST REQUIREMENTS FOR PILOTS

iii) Satisfactory completion of approved training in the following:

Piloting commercial vessels and recreational sailing on shared waterways. Captain Andrew Shelverton Marine Pilot Tasmanian Ports Corporation Pty Ltd

U. S. Coast Guard Sector Boston Merrimack River Approach and Entrance, MA. Waterways Management Survey

GOVERNMENT OF RAS AL KHAIMAH RAK PORTS RAK PORTS INTEGRATED MANAGEMENT SYSTEM

A GUIDE TO HELICOPTER OPERATIONS FOR VESSELS EFFECTING PILOT TRANSFERS BY HELICOPTER IN THE

DUBLIN PORT COMPANY PILOTAGE BYE-LAWS. 1st July Dublin Port Company Pilotage Bye-Laws, 1 st July 2018 Page 1

MANAGEMENT SYSTEM MANUAL

Chittagong, Bangladesh (Asia Region)

ABP South Wales and River Usk Towage Guidelines

Movement and traffic procedures

Wexford Harbour. Yachting Guide. Navigation

Harbourmaster s Office Operation of Superyacht in the Auckland Region. Navigation Safety Operating Requirements Rev.1

PRE-ARRIVAL INFORMATION FOR VESSELS INTENDING TO ENTER THE PORT OF BLUFF

PILOTAGE INFORMATION

RESOLUTION MSC.161(78) (adopted on 17 May 2004) AMENDMENTS TO THE EXISTING MANDATORY SHIP REPORTING SYSTEM "THE TORRES STRAIT AND INNER ROUTE OF THE

Forth Ports Limited. Ruling Depths & Under Keel Clearances

Paper for consideration by ENC Working Group. Use of AU6 ENC cells as an option for Bathymetric ENCs (benc)

PRE-ARRIVAL INFORMATION FOR VESSELS INTENDING TO ENTER THE PORT OF BLUFF

GENERAL LIMITATIONS AND RESTRICTIONS. LNGC Temporary Exemption (Effective August 21, 2018)

NOTICE TO MARINERS. No 03 of Port of Southampton Precautionary Area (Thorn Channel)

Rule 5 - Look-out. 1

COMBINED OCEAN POINTSCORE SAILING INSTRUCTIONS 2018 / 2019

TICES TO MARINERS 1 TO 46 ANNUAL EDITION 2018 SECTION A AIDS TO NAVIGATION AND MARINE SAFETY

COXSWAIN NAVIGATION EXERCISES AUS197 NAME:

Port Melville Information Booklet

Marine Guide for Ship Masters Contents

GENERAL LIMITATIONS AND RESTRICTIONS. Draft Restrictions

MARINER S GUIDE TO THE FORTH

Local Notice to Mariners 02/2018

RECORD OF ASSESSMENT

This direction contains the requirements for the compulsory pilotage areas within the Auckland region. This

Terrestrial Observations Chart Plot - Chesapeake Bay Entrance - Operational Level

PORT OF PORT HEDLAND PORT USER GUIDELINES AND PROCEDURES

Preventing Damage to Harbour Facilities and. Ship Handling in Harbours PART 2 INDEX

WEEKLY NAVIGATIONAL BULLETIN NO.26 FOR THE RIVER TEES, HARTLEPOOL AND TEES BAY. Issued by the Harbour Master on 02 November

Delaware River Vessel Reporting System Mariners Advisory Committee For

Port of Port Elizabeth Information

MARINE SAFETY REGULATION 2016 EXEMPTION ORDER. Clause 140(1)

COAST GUARD ADVISORY NOTICE (CGAN ) To: Distribution Date: September 1, 2017

International regulations and guidelines for maritime spatial planning related to safe distances to multiple offshore structures (e.g.

Incident Report. Close Quarters Pegasus II & Distraction. 26 April 2006 Class B

LOCAL NOTICE TO MARINERS

DEVELOPING PILOTAGE PLANS ON BRIDGE SIMULATORS: METHODOLOGY, BENEFITS AND CHALLENGES

HELSINKI COMMISSION HELCOM SAFE NAV 4/2014 Group of Experts on Safety of Navigation Fourth Meeting Helsinki, Finland, 4 February 2014

Port of Burnie. Port Map. Burnie TASPORTS PORT INFORMATION. 5 Toll Shipping

2005 ABC. Chapter 3 Part 2. Navigating with ATON's. Revision to D-13 Local Notes. Instructor Notes for Mike Brough. Mike Brough

ROUTEING MEASURES OTHER THAN TRAFFIC SEPARATION SCHEMES

What s Up in Navigation Displays?

LOCAL NOTICE TO MARINERS

Firth of Forth. Passage Plans

Quarterly SMS Report Q2, July 2018

RESOLUTION A.817(19) adopted on 23 November 1995 PERFORMANCE STANDARDS FOR ELECTRONIC CHART DISPLAY AND INFORMATION SYSTEMS (ECDIS)

05 Boat Handling. Captain

MORETON BAY BOAT CLUB Queen s Birthday Short Course Event Monday 3 rd October 2016

MARINE NOTICE MARINE NOTICE. Marine Notice 7/2012. Guidance on ECDIS for ships calling at Australian ports 7/2012

SAILING INSTRUCTIONS BILLY RUN. Saturday 28 April The organising authority (OA) is the South of Perth Yacht Club

Port of Burnie. Port Map TASPORTS PORT INFORMATION. West Beach. Island Breakwater. No.4 Berth. No.5 Berth. No.6 Berth. No.7 Berth

Information for Merchant Ships

CONTENTS. Page REFERENCES 15. ANNEX International Marine Pilots Association Required Boarding Arrangements for Pilots 16

PORT OF PORT HEDLAND PORT USER GUIDELINES AND PROCEDURES

Master <24m Near Coastal

National Maritime Center

BMA INFORMATION BULLETIN No. 96

Nautical sub-committee

Incident Report. Close Quarters Situations Challenger, Aratere & Lotus. 21 February 2006

Transcription:

1.0 Introduction Vessels transiting within port limits from the Barrow Island Pilot Boarding Ground (PBG) to the require an approved passage plan which can be shared between Pilots and vessel Masters. This work instruction has been compiled in accordance with documents GOR-COP-0187 - Pilot Passage Plan Guideline and approved according to GOR-COP-0186 - Passage Plan Approval Procedure. 1.1 Purpose This work instruction details the navigation route between the PBG and the MOF, providing Pilots, Masters and Bridge Navigation Teams sufficient information to conduct a vessel along the route in a safe and controlled manner whilst minimising risk to personnel, environment and property. 1.2 Scope This Work Instruction begins when a vessel arrives at the PBG and concludes when it reaches an assigned berth within the MOF. CAUTION: 1.3 Target Audience This passage plan is tidally restricted for vessels with drafts greater than 4.5m. All vessels must maintain a UKC of at least 1.0m or 15% of maximum draft (whichever is the greater). Caution must be taken when using buoys for navigation, particularly post severe storm/cyclone activity. The vessel may not have the controlling draft and therefore the drafts of assist vessels must be considered. This work instruction is primarily intended for use by ABU Marine Pilots, vessel Masters and vessel Bridge Navigation Teams. 1.4 Acronyms and Abbreviations The below table defines the acronyms and abbreviations used in this document Acronym/Abbreviation AMSA BWI CBM CD ECDIS JHA kts m Meaning Australian Maritime Safety Authority Barrow Island Conventional Buoy Mooring Clearing Distance Electronic Chart Display and Information System Job Hazard Analysis knots metres Document Approvals Signature/Date Revision ID: 1.0 Revision Date: 27 April 2016 Author ECUO ecuo, Cameron Crampton Approver NVWQ nvwq, Michael Birchall Owner BXVD bxvd, Brad Ryman Digitally signed by ecuo, Cameron Crampton DN: ou=chevron PKI, cn=ecuo, cn=cameron Crampton, email=cameron.crampton@chevron.com Date: 2016.04.28 06:16:04 +08'00' Digitally signed by nvwq, Michael Birchall DN: ou=chevron PKI, cn=nvwq, cn=michael Birchall, email=michael.birchall@chevron.com Date: 2016.04.28 13:22:02 +08'00' Digitally signed by bxvd, Brad Ryman DN: ou=chevron PKI, cn=bxvd, cn=brad Ryman, email=brad.ryman@chevron.com Date: 2016.04.29 06:10:24 +08'00' Page 1 of 9

Acronym/Abbreviation MOF MPX nm OOW PBG Pilot PI PPU SOLAS UKC XTE Meaning Materials Offloading Facility Master Pilot Exchange Nautical miles Officer of the Watch Pilot Board Ground ABU Marine Pilot Parallel index Portable Pilotage Unit International Convention for Safety Of Life At Sea Under Keel Clearance Cross Track Error 2.0 Waypoint Bank Waypoint Reference Latitude Longitude WP001 PBG 20 o 48.60 S 115 o 36.00 E WP002 SE CBM 20 o 49.74 S 115 o 33.72 E WP003 Outer Leads 20 o 48.00 S 115 o 30.25 E WP004 Inner Leads 20 o 47.70 S 115 o 28.81 E WP005 Berth Various Various 3.0 Route Bank Route Waypoint Sequence 4.0 Passage Plan - PBG to WP001, WP002, WP003, WP004, WP005 Revision ID: 1.0 Revision Date: 27 April 2016 Page 2 of 9

Materials Offloading Facility (MOF) 4.0 Passage Plan - PBG to Waypoint WP001 (PBG) Pilot will board at the PBG as shown on AUS 62. Latitude Vessel and Pilot Boat are to discuss and agree on vessel speed and heading prior to transfer, 20 o 48.60 S ensuring a good lee is provided for boarding. The pilot ladder will be rigged as per SOLAS 2010 Longitude 115 o 36.00 E Chapter V Reg 23 as amended and secured to a height above the waterline as requested by the Pilot Boat. Course Pilot will setup and use PPU for the passage as an independent means of position fixing. 242 o T Speed ~6 to 10kts Leg Distance 2.4nm Minimum Depth at CD Maximum Cross Track Error 10.0m 200m Primary Fixing Visual/PPU Secondary Fixing GPS/RADAR Parallel Index Pilot, Master and Bridge team will conduct MPX fully explaining No Go Zones, abort points and other relevant information. The Pilot will detail the manoeuvring of the vessel to the berth, including mooring arrangements and tug configurations as part of the MPX. Anchors are to be cleared away and ready for letting go prior to entering port limits. Call the Port of Barrow on VHF Ch10 when crossing Port Limits. Parallel indexing to be setup and utilised throughout passage. Extra caution to be taken in vicinity of the PBG due to the potential for converging traffic. At the PBG, the Flood tide sets to the South West. The Ebb tide sets to the North East. Environmental data, including tidal flow and wind conditions for the passage will be available to the Pilot and communicated to vessel Master. In the event of any failure, the vessel will (if possible) return to port limits or anchor (being aware of any obstructions). Night operations may require additional or alternate position fixing due to backscatter and masking of lights due to shore lights. Revision ID: 1.0 Revision Date: 27 April 2016 Page 3 of 9

Materials Offloading Facility (MOF) Waypoint WP002 (SE CBM) The CBM to the North of the track is considered a No Go Zone. Latitude 20 o 49.74 S No Go Zones exist to the North of the track until clear of the Lowendal Shoal. When vessel is on a steady heading/speed ~6kts, tugs can be made fast in vicinity of CBM. Longitude 115 o 33.70 E Beware of converging traffic in the vicinity of the South Cardinal Mark. Course The Flood tide sets to the South West. The Ebb tide sets to the North East. 298 o T Speed ~6kts Leg Distance 3.7nm When abeam of the South Cardinal Mark, report to the Port of Barrow on VHF Ch10 and gain permission to enter the MOF (also close the MOF and associated channel to other traffic). In the event of any failure, the vessel will (if possible) return to port limits or anchor (being aware of the oil pipeline and other obstructions). Minimum Depth at CD 6.0m Maximum Cross Track Error 50m Primary Fixing Visual/PPU Secondary Fixing GPS/RADAR Parallel Index LNG 1 at 0.4nm Revision ID: 1.0 Revision Date: 27 April 2016 Page 4 of 9

Materials Offloading Facility (MOF) Waypoint WP003 (Outer Leads) Final planned abort position is abeam of H5. Latitude 20 o 48.00 S MOF leading lights and sector lights can be utilised if transiting the main channel. Be aware of traffic departing the MOF. Longitude 115 o 30.25 E Be aware of potential backscatter on this leg due to shore lights. Course 282 o T Call the Port of Barrow on VHF Ch10 when passing MOF1/2 inbound. The Flood tide sets to the South. The Ebb tide sets to the North. Speed ~3 to 6kts Leg Distance 1.4nm Minimum Depth at CD Maximum Cross Track Error 5.5m 50m Primary Fixing Visual/PPU When transiting the main channel, the Flood tide is generally strongest in the vicinity of HB5 and the Ebb tide is generally strongest when close to the breakwater. Caution must be used in determining tidal flow due to variations. When tide and vessel s draft permits, an emergency escape route to the North between MOF1/3 or to the South between MOF2/4 can be considered for the main channel. Effect of tide diminishes when entering the MOF basin. Test communications with tugs and ensure they are all aligned with the planned manoeuvre. In the event of any failure, the vessel will continue to the swing basin or proceed to anchor, clearing any obstructions with tug assistance. Secondary Fixing GPS/RADAR Parallel Index Breakwater at 0.05nm Revision ID: 1.0 Revision Date: 27 April 2016 Page 5 of 9

Materials Offloading Facility (MOF) Waypoint WP004 (Inner Leads) At night, visual references ahead of the vessel are limited. As such, a greater reliance on radar fixing and PI methods may be required. Latitude 20 o 47.70 S The swing basin is 320m in diameter. Longitude 115 o 28.81 E Course Speed <1kts Leg Distance Various Minimum Depth at CD Maximum Cross Track Error Various 6.5m N/A Primary Fixing Visual/PPU Secondary Fixing GPS/RADAR Parallel Index N/A If necessary, reconfigure tugs in the swing basin. Rate of turn shall be monitored. Ensure adequate clearing distances between the vessel (and her tugs) and any obstructions, such as other vessels, navigational marks and mooring dolphins. Manoeuvring on approaches to the berth to be done at slow speed (less than 1 knot over the ground). Depths outside of MOF basin are generally too shallow and, as such, the area outside of the MOF is considered a No Go Zone. In the event of a failure, and depending on the situation, the vessel will hold position in the swing basin, proceed to a safe berth or proceed to anchor, clearing any obstructions with tug assistance. Call Port of Barrow on VHF Ch10 once first line is ashore and again when all fast. Release and dismiss the tugs. Pilot will normally disembark by Pilot Boat. The vessel is to follow any instruction from the Pilot Boat in regards to the rigging of the ladder. The pilot ladder will be rigged as per SOLAS 2010 Chapter V Reg 23 as amended and secured to a height above the waterline as requested by the Pilot Boat. Revision ID: 1.0 Revision Date: 27 April 2016 Page 6 of 9

5.0 Execution of Passage Plan Expectations 5.1 Notes for Master and Bridge Team Prior to commencing the passage inbound, the Master is to review the passage plan and plot the plan onto the appropriate charts or ECDIS system, briefing his/her Bridge teams accordingly. Any concerns or questions are to be raised with the Pilot prior to commencing the passage. In accordance with AMSA regulations, all charts (paper and electronic) and navigational publications must be corrected to the latest edition of the Australian and Western Australian Notices to Mariners, including any applicable Temporary Notices to Mariners that may be in force. Additionally, the vessel it to have available and understand the BWI Marine Notices that are in force. BWI Marine Notices and other relevant port information are located on the Port of Barrow Island website. https://www.chevronaustralia.com/our-businesses/barrow-island/barrow-island-port Charts required for the passage are the latest editions of Australian Hydrographic charts AUS 62, AUS 65, and AUS 66. Any deficiencies that may affect the vessel s operating performance are to be reported to the Pilot at the first available opportunity prior to commencing the passage inbound. All bridge navigational equipment must be switched on and functioning correctly prior to the Pilot boarding. All navigation systems, including paper charts, are to be arranged and displayed so that the Pilot can quickly determine the vessel s position, course and speed at any time during the passage. Anchors are to be cleared away and ready for letting go prior to the Pilot boarding. A MPX involving the Pilot, Master, and Bridge team will be conducted after the Pilot has arrived on the bridge. The Pilot will take conduct of the vessel at the conclusion of the MPX. To ensure an appropriate level of BRM, Pilots utilise a Closed Loop system of communications for the relay of orders. The Master/OOW is to ensure the bridge is managed such that all orders can be clearly heard, understood and responded to. The Master/OOW is to monitor course, helm orders and engine settings to ensure compliance with the Pilot s directions. Pilotage is compulsory for the Port of BWI and the Pilot will have the conduct of the vessel at all times whilst manoeuvring within port limits. It is acknowledged however, that the Master always remains in overall command of his vessel. Adhering to good BRM principles, Pilots actively encourage a Challenge and Response environment. If at any time the Master/OOW is unsure of the actions being taken, they are to challenge the Pilot and vice versa. Ship s position, proximity to dangers and UKC should be continuously monitored by the Master/OOW and cross-referenced with the passage plan. If the Master leaves the bridge, the OOW must always seek clarification from the Pilot when in any doubt as to the Pilot s actions or intentions. It is important to keep formal records of all navigational activities and any incidents in the appropriate Bridge Movement Logbook. Information recorded should be of an Revision ID: 1.0 Revision Date: 27 April 2016 Page 7 of 9

appropriate standard so that the vessel s progress in to the Port can be reconstructed at a later date. 5.2 Notes for the Pilot Conduct of the vessel will be assumed by the Pilot in an unambiguous manner. The Pilot will assist the Bridge team to ensure radar conspicuous points, parallel indexing and any clearing bearings/ranges are properly understood. For each leg of the passage the Pilot is to brief the Master on the required fixing interval and methods used to determine ship s position. In determining the most appropriate fixing method and interval the following will be taken into consideration: The state of wind, sea and weather Proximity to navigational dangers Traffic density Manoeuvring characteristics of the vessel Navigational equipment available, and How position data is displayed, i.e. ECDIS or paper charts The Pilot is to ensure all navigation hazards (e.g. No Go Zones) are clearly marked on the chartlet. The Pilot will ensure tug and communication protocols are explained fully. If for any reason prior to commencing the passage plan, there is a need to deviate from the standard passage plan, a revised passage plan will be formulated and agreed between the Pilot and Master; any additional hazards will be identified and any mitigations/controls shall be detailed in an appropriate JHA. When manoeuvring vessels such that they are closing to within 50 metres of a fixed jetty, wharf or other moored vessel, approach speeds are to be less than 1.0 knot in order that all way can be taken off the vessel quickly and in a controlled manner, preventing any unplanned close quarters contact with said shore facilities or vessels. If there is a need to deviate from the passage plan for any reason, the Bridge team must be fully briefed as to the Pilot s intentions, and the Pilot should make every opportunity to return to the passage plan as soon as possible. Revision ID: 1.0 Revision Date: 27 April 2016 Page 8 of 9

6.0 Document Control 6.1 Ownership Document Author Cameron Crampton Owner Brad Ryman Reviewer List Michael Birchall 6.2 Revision History Rev Description Date Prepared By Approved By 1.0 Approved for Use 27 April 2016 Cameron Crampton Brad Ryman Revision ID: 1.0 Revision Date: 27 April 2016 Page 9 of 9