1 Chapter 1 Paragraph 83 (Re: Correction promulgated in Monthly Edition No. 2/2012) Delete: a depth alongside of 7.9 m Replace by: a least depth alongside of 7.6 m (Q2014-018.1) (Monthly Edition No. 6/14) Chapter 2 Paragraph 4, after Pont Pierre-Laporte) or (Re: Correction promulgated in Monthly Edition No. 4/2010) Delete: *28 m Replace by: *35 m (Q2014-010.1) Chapter 2 Paragraph 4, after under severe icing conditions (Re: Correction promulgated in Monthly Edition No. 4/2010) Delete: (overhead cables situated 2.3 miles above Saint-Laurent d Orléans light (1924)) (Q2014-010.2) Make the following change in the Overhead clearance (on nautical charts) column. Location Overhead clearance (on nautical charts) Bridge / Bare cable Cable with ice Beaumont Upstream 50 m 35 m (Q2014-010.4) Delete all information relating to Chicoutimi and replace with the following: Table 2.2 Summary of air obstructions for this booklet Location Type Position (centroid) Overhead clearance (on nautical charts) Datum Datum Relative to C.D. Bridge / Bare cable Cable with ice Pont Sainte-Anne (Chicoutimi) Bridge 46 26.03'N; 71 04.1'W 2.7 m H.H.W.L.T. 6.1 m (Q2014-015.1) Make the following change in the Overhead clearance (on nautical charts) column. Location Type Overhead clearance (on nautical charts) Bridge / Bare cable Pont de Québec Bridge 47 m (Q2014-037.1)
2 Chapter 2 Paragraph 43, after with a clearance of (Re: Correction promulgated in Monthly Edition No. 11/2008) Delete: 51 m or of *28 m Replace by: 50 m or of *35 m (Q2014-010.3) Chapter 2 Paragraph 43, last line Insert: See Appendix for diagram of vertical clearances. Chapter 2 Paragraph 110, after the cliffs, there is the Delete: Ultramar Replace by: Valero Energy Chapter 2 In the vicinity of paragraph 110, photo title Delete: ULTRAMAR REFINERY PETROLEUM TERMINAL Replace by: VALERO ENERGY REFINERY PETROLEUM TERMINAL Chapter 2 Paragraph 112 Delete: Ultramar Replace by: Valero Energy (Q2014-027.1) (Q2014-022.1) (Q2014-022.2) (Q2014-022.3) Chapter 2 Paragraph 119 Delete: 46 m Replace by: 47 m (Q2014-037.2) Chapter 2 In the vicinity of paragraph 121, diagram PROFIL PONT DE QUÉBEC PROFILE Replace the PROFIL PONT DE QUÉBEC PROFILE diagram with the new one provided in Section 4 of this Monthly Edition. (Q2014-037.3) Chapter 2 Paragraph 121 Delete: where the vertical clearance 231 m apart. Replace by: ; the two lights are 231 m apart. In the middle of the central span, for a width of 175 m, the vertical clearance is 47 m. (Q2014-037.4)
3 Chapter 2 In the vicinity of paragraph 127, Table 2.4 Port of Québec: Private Berths Change the terminal name in the Berth column and make the following change in the Depth column. Berth Depth m Valero Energy Petroleum Terminal 86 12.5 (Q2014-022.4) Chapter 3 Paragraph 136 Delete: (2003) of 1.7 m Replace by: (2013) of 0.6 m Chapter 3 After paragraph 136 Insert: 136.1 Caution. Mariners are cautioned that depths may be less due to silting. The approach channel to the small craft basin is particularly subject to silting. Mariners should contact the marina clubhouse for the latest information about depths. Chapter 3 Adjacent to paragraph 136.1, add a caution pictograph. Chapter 4 Before paragraph 1 (Q2013-064.1) (Q2013-064.2) (Q2013-064.3) (Q2014-008.1) Chapter 4 Before paragraph 96 (Q2014-008.2) Chapter 4 Paragraph 108, after Cap de la Mer (Re: Correction promulgated in Monthly Edition No. 4/2008) Delete: and has a church with a spire visible only from upstream of the cape (Q2014-008.3)
4 Chapter 4 Paragraph 108, after An outfall pipe, (Re: Correction promulgated in Monthly Edition No. 4/2008) Delete: 820 feet (250 m) Replace by: 250 m (Q2014-008.4) Chapter 4 Paragraph 108, after A crib, drying at (Re: Correction promulgated in Monthly Edition No. 4/2008) Delete: 5 feet (1.4 m) Replace by: 1.4 m (Q2014-008.5) Chapter 4 Paragraph 111, after in depths of Delete: 20 fm (36.6 m) Replace by: 30 m Chapter 4 Before paragraph 112 Chapter 4 After paragraph 113 Insert: 113.1 There is a migratory bird sanctuary (Ministère du Développement durable, de l Environnement et des Parcs du Québec) in the area of Battures de Saint-Fulgence; access regulations apply to this protected area. Chapter 4 Paragraph 117, after Rivière Delete: au Caribou leading lights Rivière au Caribou Replace by: Caribou leading lights (1808, 1809) are in line bearing 283½. Each light is shown from a tower with a fluorescentorange daymark and black stripe, situated on the north shore, close east of the mouth of Rivière Caribou Chapter 4 Paragraph 120, after are in line bearing Delete: 256½ Replace by: 256 (Q2014-008.6) (Q2014-008.7) (Q2014-008.8) (Q2014-008.9) (Q2014-008.10)
5 Chapter 4 Paragraph 120, after Rivière Delete: au Caribou Replace by: Caribou Chapter 4 Paragraph 124, after A chimney is situated Delete: 2,575 feet (785 m) Replace by: 785 m Chapter 4 Paragraph 124, after a spire is situated Delete: 3,200 feet (975 m) Replace by: 975 m Chapter 4 Paragraph 129, after Approximately Delete: 800 feet (244 m) Replace by: 244 m Chapter 4 Paragraph 129, after a vertical clearance of Delete: 6 feet (1.8 m) Replace by: 2.4 m Chapter 4 Paragraph 130, after stands on six piers Delete: 240 feet (73 m) Replace by: 73 m (Q2014-008.11) (Q2014-008.12) (Q2014-008.13) (Q2014-008.14) (Q2014-008.15) (Q2014-008.16) Chapter 4 Paragraph 130, after of the bridge is Delete: 22 feet (6.7 m) Replace by: 7.4 m (Q2014-008.17) APPENDIX A-6 Add the UPSTREAM BEAUMONT CABLES VERTICAL CLEARANCES Diagram. (Q2014-027.2)