S/TIP LIST OF PROJECTS

Similar documents
PASER Road Survey. For Berrien County, Michigan

PASER Road Survey. For Berrien County, Michigan

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.

Driving Indiana s Economic Growth

Secondary Road Program

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

Regional Transportation Priorities Survey Results. Introduction

District 2 Projects Scheduled for award during the period from 06/19/18 to 06/18/19 Sorted by PID

OSHTEMO TOWNSHIP COMPLETE STREETS POLICY

Lake Waterford Community Association Meeting. November 15, 2016

New Mexico Transportation Funding Challenges

YAVAPAI COUNTY PUBLIC WORKS

2012 Capital Budget Capital Improvement Program

FY Regional Transportation Improvement Program

Pavement Management Program

Request for Authorization to Open Public Comment Period

Project Description Form 8EE

City of Lakewood. Public Works Transportation. Transportation Division Current and Future Projects Division Manager: Weston Ott, P.E.

Culpeper District. Albemarle County Monthly Report September, 2011

Multi Modal Transit Access Plan KIPDA ID # 239. Project Type: STUDY

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

HIGHWAY CAPITAL IMPROVEMENT PLAN

FDOT Treasure Coast Traffic Report

City of West Des Moines PAVEMENT MANAGEMENT SYSTEM

Culpeper District. Albemarle County Monthly Report October, 2011

Phone: Fax: Project Reference No. (to be filled out by MassHighway):

Chapter 10: Future Transportation System

Non-Motorized Transportation 7-1

OSHTEMO TOWNSHIP COMPLETE STREETS POLICY

2040 Long Range Plan Projects Draft October 2011

Basalt Creek Transportation Refinement Plan Recommendations

2016 FACT SHEET ENGINEERING STREET OPERATIONS. Engineering Street Operations net 2016 budget is $5,199,900 WHAT IS ENGINEERING STREET OPERATIONS?

Asphalt Recycling and Pavement Preservation in Hillsborough County, Florida

ADA Self Evaluation and Transition Plan for Public Rights-of-Way

WALKABLE COMMUNITIES COALITION

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016

C ITY OF B EDFORD H EIGHTS

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010)

Applications for Funding

CY2017 Summary of STP applications

Highway Construction

CTH M HIGHWAY PROJECT CTH Q to STH 113

2017 Temporary traffic control guidelines for pedestrians. v.2

Peterborough Council on Aging

2004 Traffic and Safety Notes. Cross Reference between the Old Note Number and the New Note Number

2017 (FY 21,22,23) Ohio CMAQ Project Selection

2008 REPORT OF THE HIGHWAY COMMISSIONER

Transportation Day at the Capitol. Charlie Zelle Commissioner, MnDOT Feb. 16, 2017

July 31, HIGHWAY CAPITAL IMPROVEMENT PLAN

Cottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. Project Type Capital Improvement

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

Kankakee County Transportation Initiatives

Active Transportation Facility Glossary

FY 2006 TRANSPORTATION CAPITAL PROGRAM

Duwamish Way-finding and CTR Report

Connectivity. Tier I (0-5 yrs) 44 Issues, Recommendations & Priorities. LENGTH (ft) APPROX COST NO. NAME & DESCRIPTION. Shared Use Path/ Urban Trail

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Five

Bluffdale/ UDOT South High-T Intersection Project Type Operations

City of Madison: 2017 Capital Budget Capital Improvement Plan

Implementing Agency Project Award. Pavement resurfacing and concrete repair of approximately 17 centerline miles throughout city

APPENDIX C. Systems Performance Report C-1

Terwillegar Drive Expressway Draft Concept Plan

MNDOT PAVEMENT DESIGN MANUAL

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

2.0 Existing Conditions

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

News Release Eastern Oregon Region 5

FY 2005 TRANSPORTATION CAPITAL PROGRAM

2017 (FY 21,22,23) Ohio CMAQ Prioritization

2012 PRIORITY TRANSPORTATION PROJECTS

FY 2017 FY 2021 PRIORITY PROJECT LIST ADOPTION. June 26, 2015

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013

West End Connectivity Master Plan

FDOT Treasure Coast Traffic Report

ITEM 3 ATTACHMENT A RESOLUTION NO

Parewanui Road (RP ) 1960 Prog. Mar-18 Prog. May-18

Replace Bridge 51 on Blackiston Mill Dr. over Silver Creek,

Status February Transportation Priority Projects in Chester County

The District Municipality of Muskoka 70 Pine Street Bracebridge ON P1L 1N3


FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

ANNUAL ROAD CONSTRUCTION PROGRAM 2018

ACTIA Programs Annual Compliance Report Reporting Year Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments

Regional Transportation Needs Within Southeastern Wisconsin

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

Keeping good roads good

TABLE OF CONTENTS. General... A. New Construction/Reconstruction (4R)...B. Resurfacing, Restoration and Rehabilitation (3R)...C

2.0 LANE WIDTHS GUIDELINE

APPENDIX M FOR THE JEFFERSON COUNTY PORTION OF THE VISION 2050 PLAN RECOMMENDATIONS MILWAUKEE URBANIZED AREA INTRODUCTION

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS

Sponsored by the Office of Traffic and Safety of the Iowa Department of Transportation NOVEMBER 2001 CTRE

SC 41/Joe Rouse Intersection Improvements

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

Transcription:

LI OF PROJECTS : October 04, 2018 Page: 1 of 5 Responsible GPA Type Name Limits Length Primary 2017 120683 Berrien Berrien Line Dayton Rd Multiple 2.448 Segments $69,210 $0 $24,742 $93,952 $93,952.00 U 10/03/2016 2017 120684 Berrien Berrien Line Niles Mutiple 6.941 Buchanan Rd Segments $69,210 $0 $24,742 $93,952 $93,952.00 U 10/03/2016 2017 130875 Berrien Berrien Line Red Bud Trail Blue Star 13.966 Traffic Safety Guardrail upgrades Highway north $600,000 $0 $100,000 $700,000 $599,277.00 12/09/2016 12/09/2016 of Hager Shore 2017 127563 Berrien MDOT Line M-139 M-63 in St. 2.209 Capital Joseph and M- HMA One Course $552,747 $121,335 $0 $674,082 $127,500.00 10/03/2016 139 in Niles 2017 120692 Berrien Niles Line Sycamore St 13th to 17th 0.826 cold mill and resurface $96,577 $0 $39,309 $135,885 $117,992.50 U 10/03/2016 2017 200996 Berrien Niles Dial-A- 5307 N 2nd St City of 0.000 SP02-Bus Conduct preventive Capital maintenance. $125,575 $31,394 $0 $156,969 $156,969.00 5307 07/22/2017 2017 200996 Berrien Niles Dial-A- 5307 N 2nd St City of 0.000 SP02-Bus Conduct preventive Capital maintenance. $0 $0 $0 $0 $0.00 5307 07/22/2017 2017 200997 Berrien Niles Dial-A- 5339 Wayne St City of 0.000 SP02-Bus Purchase a Capital replacement bus. $0 $0 $0 $0 $0.00 5339 07/22/2017 2017 200997 Berrien Niles Dial-A- 5339 Wayne St City of 0.000 SP02-Bus Purchase a Capital replacement bus. $57,000 $14,250 $0 $71,250 $71,250.00 5339 07/22/2017 2017 120691 Cass Cass Line Redfield St Brande Creek 1.071 Reconstruction Restore and to Oak Rehabilitate $276,300 $0 $98,700 $375,000 05/11/2016 10/03/2016 2017 128723 Cass MDOT Line US-12 West Village 0.910 Cold milling and Limits of multiple course ROW $28,648 $6,353 $0 $35,000 08/31/2017 08/31/2017 Edwarsburg to HMA M-62 2017 132395 MDOT Trunkline Wide Southwest 0.018 Traffic Safety Sign Upgrading in Traffic Southwest Re $146,667 $0 $0 $146,667 $440,000.00 09/21/2016 Operations And Safety 2018 130766 Berrien Buchanan Line Red at River St 0.001 Traffic Safety Signal replacement Bud/River and video detection $203,200 $0 $158,800 $362,000 $362,000.00 U 06/26/2018 09/04/2018 Cutoff equipment 2018 201758 Berrien Buchanan 5311 E Dewey St City of 0.000 3000- Dial-A- Assistance $18,535 $0 $0 $18,535 $18,535.00 5311 09/16/2017 Buchanan/Ber rien 2018 202314 Berrien Buchanan 5311 Red Bud Trl City of 0.000 Dial-A- Buchanan/Ber rien 2018 130675 Berrien Niles Line 17th St Broadway to 0.531 Main 2018 130866 Berrien Niles Line 17th Street Broadway to 0.568 Main 2018 201534 Berrien Niles Dial-A- CTF N 2nd St City of 0.000 2018 201534 Berrien Niles Dial-A- CTF N 2nd St City of 0.000 3000- Assistance SP05- Bus SP05- Bus Provide additional operating funds for public transportation services. assistance. Mill and Fill existing pavement Mill 1.5" deep and repave Formula Formula $8,825 $8,825 $0 $17,650 $17,650.00 $155,726 $29,199 $9,733 $194,657 $183,894 $0 $66,106 $250,000 $250,000.00 $0 $168,970 $0 $168,970 $168,970.00 $0 $0 $0 $0 $0.00 5311 BHT U CTF CTF 12/13/2017 02/23/2016 03/27/2018 08/23/2017 08/23/2017 03/14/2016 03/27/2018

LI OF PROJECTS : October 04, 2018 Page: 2 of 5 Responsible GPA Type Name Limits Length Primary 2018 203095 Berrien Niles Dial-A- 5307 N 2nd St Areawide 0.000 1110-Bus operations $0 $0 $159,000 $159,000 $159,000.00 5307 05/10/2018 2018 Niles Rolling Stock BE RRIEN Nil es Dial-A- Pu blic Operation s Cit y of Niles and Niles Township 2018 203098 Berrien Niles Dial-A- 5307 Areawide 0.000 Operations Niles Dial a 2018 203491 Berrien Niles Dial-A- 5307 N 2nd St Areawide/City 0.000 of 2018 203492 Berrien Niles Dial-A- 5339 N 2nd St Areawide/City 0.000 of 2018 127757 Cass Cass Line US-12 from Clair 0.429 Street westbound to ESC 2018 129844 Cass Cass Line Cassopolis Lost to 0.705 Bullhand 2018 129844 Cass Cass Line Cassopolis Lost to 0.705 Bullhand 1170-Other Capital Items (Bus) SP10- Match urban SP10- Match urban side Facilities - Preserve maintenance equipment and parts maintenance under the FY18 Section 5307 local program. Purchase a replacement bus under the FY18 Section 5339 local program. Edwardsburg ESC Connector Path $132,000 $33,000 $0 $165,000 $165,000.00 $117,000 $29,250 $0 $146,250 $146,250.00 $57,600 $14,400 $0 $72,000 $72,000.00 $148,260 $0 $37,065 $185,325 $185,325.00 $75,200 $0 $0 $75,200 $75,200.00 $0 $18,800 $0 $18,800 $18,800.00 5307 5307 5339 CM L EDD 05/10/2018 06/14/2018 06/14/2018 01/29/2016 01/29/2016 06/22/2018 02/11/2016 02/11/2016 Tra nsit operations Re gular Public s T- Ops 159 530 7 139 CT F 93 CIT Y 391 203 095 6/2 8/16 Ex empt 391

LI OF PROJECTS : October 04, 2018 Page: 3 of 5 Responsible GPA Type Name Limits Length Primary 2018 130776 Cass Cass Line Mason St Cassopolis 2.146 HMA overlay, 2020 $119,475 $0 $95,109 $214,584 U 02/23/2016 07/11/2016, signage, Partial to Calvin Center pavement markings 2018 200409 Cass Cass Line Gumwood Rd 0.37 miles 0.630 New Facilities Non-motorized north of multi use path Indiana to 0.60 miles north of Indiana state line 2018 128723 Cass MDOT Line US-12 West Village 0.910 Cold milling and Limits of multiple course Edwarsburg to HMA M-62 2018 132633 Cass MDOT Line M-60 M-60 near 0.740 Traffic Safety High Friction Pine Lake Surface Treatment 2018 132633 Cass MDOT Line M-60 M-60 near 0.740 Traffic Safety High Friction Pine Lake Surface Treatment 2018 202211 Cass MDOT Line US-12 CN (GTW) is 0.000 Railroad Re-alignment of Edwardsburg railroad crossing 2018 200709 St. Joseph MDOT Line M-60 Southwest 99.948 Capital 2019 Calendar Crack Seal 2019 130684 Berrien Berrien Line Main St City limits to 1.204 2" HMA overlay 2020 400 feet North of Reed 2019 130775 Berrien Berrien Line Bertrand Rd Portage to 1.514 2" HMA overlay Copp and gravel 2019 201224 Berrien MDOT Line US-12 US-12 over St. 0.000 Bridge CPM Epoxy Ovly, Full Joseph River, Pt, Steel Beam Berrien Repairs, Pin & Hanger Repl 2019 204201 Berrien MDOT Trunkline M-51 line to 2.200 Two Course HMA 2019 204201 Berrien MDOT Trunkline M-51 line to 2.200 Two Course HMA 2019 204201 Berrien MDOT Trunkline M-51 line to 2.200 Two Course HMA 2019 204423 Berrien MDOT Line Various Cantilevers 0.357 Traffic Safety Cantilevers W017-C, W023-C, W024-C, W029-C, W034-C, W043-C, W135-C, & W0136 Replacement ROW $80,514 $0 $17,854 $98,368 $98,368.00 $1,702,480 $377,520 $0 $2,080,000 $200,000.00 $301,119 $33,458 $0 $334,576 $58,875.00 $52,920 $5,880 $0 $58,800 $33,264 $3,696 $0 $36,960 $35,200.00 $2,309 $507 $0 $2,816 $120,000.00 $115,554 $0 $117,464 $233,018 $195,268.00 $191,000 $0 $43,000 $234,000 $234,000.00 $2,376,106 $526,895 $0 $2,903,000 $0 $3,622,500 $0 $3,622,500 $3,150,000.00 $0 $378,000 $0 $378,000 $378,000.00 $0 $25,000 $0 $25,000 $25,000.00 $50,000 $0 $0 $50,000 TAU RH 01/23/2018 05/10/2016 02/27/2018 02/27/2018 06/12/2018 03/27/2018 05/10/2016 03/27/2018 03/27/2018 01/03/2018 06/12/2018 08/20/2018 08/20/2018 08/14/2018 08/14/2018 08/14/2018 Construct; $28,081 being Construct ed. Convertin g in 2020. Partial Construct; $37,732 being converted. Converted in 2020

LI OF PROJECTS : October 04, 2018 Page: 4 of 5 Responsible GPA Type Name Limits Length Primary 2019 129851 Cass Cass Line Cassopolis Mason to Lost 0.800 $0 $18,800 $0 $18,800 2019 129851 Cass Cass Line Cassopolis Mason to Lost 0.800 $75,200 $0 $0 $75,200 $94,000.00 2019 130772 Cass Cass Line Redfield St Conrad 1.035 Mill and replace to M-62 HMA $174,341 $0 $38,659 $213,000 $213,000.00 2019 202885 Cass Cass Line Redfield Refield Street 1.005 Traffic Safety Tree Removal Street between Fir and Brush 2019 203014 Cass Cass Line Redfield St Redfield road 1.356 Capital hot mix asphalt Gumwood to resurfacing and Fir aggregate 2019 200366 Cass MDOT Line M-60 E Signal 0.000 Traffic Safety Traffic Signal Modernizations; connected vehicle installations. Corridors in and 2019 202018 Cass MDOT Trunkline M-62 M-62 at May 0.163 Minor Widening Offset Right Turn Traffic Street Lane Operations And Safety 2019 200693 MDOT Line E Kilgore Rd wide 0.000 Traffic Safety Installation of detection for actuation 2019 201991 MDOT Line E Kilgore Rd Various 0.000 Traffic Safety Dilemma zone detection at in the Southwest 2019 201991 MDOT Line E Kilgore Rd Various 0.000 Traffic Safety Dilemma zone detection at in the Southwest 2020 130769 Berrien Berrien Line 3rd St US-12 to 1.229 2" HMA overlay Fulkerson with gravel 2020 129876 Berrien MDOT Trunkline US-31 over US-12 0.000 Bridge Shallow, Bridge Full Paint, Pin and Hangers 2020 203698 Berrien MDOT Line M-139 Various in 22.114 Capital Overband Crack Fill and Van Buren 2020 203792 Berrien MDOT Trunkline M-51 Main Street to 1.368 Capital Mill and One North City Course Hot Mix Limits of Niles Asphalt 2020 202425 Berrien Niles Line Lake St Lake Street 0.000 Bridge CPM Capital over Amtrak Preventative RR, Str# 1059 2020 130763 Cass Cass Line Lake St port 1.514 Mill and Fill to Huntly ROW $21,870 $0 $2,430 $24,300 $24,300.00 $115,200 $0 $28,800 $144,000 $144,000.00 $1,667 $0 $0 $1,667 $53,100 $5,900 $0 $59,000 $59,000.00 $15,750 $1,750 $0 $17,500 $225,843 $25,094 $0 $250,937 $50,150.00 $28,800 $3,200 $0 $32,000 $231,800 $0 $51,401 $283,201 $283,201.00 $2,723,969 $604,032 $0 $3,328,001 $314,428.00 $80,524 $17,676 $0 $98,200 $642,199 $142,406 $0 $784,605 $84,065.00 $555,200 $104,100 $34,700 $694,000 $694,000.00 $220,995 $0 $49,005 $270,000 $270,000.00 EDD L U HRRR L BHT 02/23/2016 04/05/2018 01/24/2018 04/24/2018 05/25/2016 12/27/2017 10/03/2016 08/20/2018 02/05/2018 06/22/2018 09/27/2018 08/20/2018 07/11/2018 08/14/2018 08/20/2018 08/20/2018 ing from SouthBen d TMA

LI OF PROJECTS : October 04, 2018 Page: 5 of 5 Responsible GPA Type Name Limits Length Primary 2020 203032 Cass Cass Line Conrad Rd Conrad Rd & 1.241 Capital resurface $115,200 $0 $28,800 $144,000 $144,000.00 L 01/24/2018 08/20/2018 May St. US-12 to Brizandine Rd. 2020 200366 Cass MDOT Line M-60 E Signal 0.000 Traffic Safety Traffic Signal Corridors in and Jobs Reported: Preferences: 55 Report Type: PDF With Phase Line Items Modernizations; connected vehicle installations. 2020 202654 Cass MDOT Line M-40 Various 123.967 Traffic Safety Non-freeway Routes in signing Cass 2020 203694 Cass MDOT Line US-12 Various 23.669 Capital Locations in Cass Crack seal pretreatment with chip sealing : Niles-Buchanan-Cass Area Transportation Study (SWMPC) IP Cycle: 2017-2020 $713,467 $0 $0 $713,467 $1,940,400.00 $50,000 $0 $0 $50,000 $1,032,453 $226,636 $0 $1,259,089 $251,126.00 08/31/2017 08/31/2017