Exercise (4): Open Channel Flow - Gradually Varied Flow

Similar documents
Exercise (3): Open Channel Flow Rapidly Varied Flow

OPEN CHANNEL FLOW WORKSHEET 3 WATER SURFACE PROFILES

EXAMPLES (OPEN-CHANNEL FLOW) AUTUMN 2018

Experiment (13): Flow channel

Hydraulic Engineering

19.1 Problem: Maximum Discharge

Advanced Hydraulics Prof. Dr. Suresh A. Kartha Department of Civil Engineering Indian Institute of Technology, Guwahati

ANSWERS TO QUESTIONS IN THE NOTES AUTUMN 2018

HY-8 Version 7.2 Build Date January 17, Federal Highway Administration.

Advanced Hydraulics Prof. Dr. Suresh A. Kartha Department of Civil Engineering Indian Institute of Technology, Guwahati

Hours / 100 Marks Seat No.

6.6 Gradually Varied Flow

3. GRADUALLY-VARIED FLOW (GVF) AUTUMN 2018

Components of a Barrage

Hours / 100 Marks Seat No.

FORMAT FOR SENDING COMMENTS. Title: CRITERIA FOR DESIGN OF CANAL HEAD REGULATORS (Second revision of IS 6531)

2. RAPIDLY-VARIED FLOW (RVF) AUTUMN 2018

Experiment 8: Minor Losses

Broadly speaking, there are four different types of structures, each with its own particular function:

HYDRAULIC JUMP AND WEIR FLOW

Ermenek Dam and HEPP: Spillway Test & 3D Numeric-Hydraulic Analysis of Jet Collision

BC Ministry of Forests. March Fish Stream Crossing Guidebook. Forest Practices Code of British Columbia.

1. In most economical rectangular section of a channel, depth is kept equal to

2O-2 Open Channel Flow

MEMO. Schedule 'B' Class Environmental Assessment and Preliminary Design Lakeview Boulevard Improvements Culvert Assessment.

COEFFICIENT OF DISCHARGE OF CHIMNEY WEIR UNDER FREE AND SUBMERGED FLOW CONDITIONS

CE 533 Hydraulic System Design I. Chapter 1 Gradually-Varied Flow

International Journal of Scientific & Engineering Research, Volume 5, Issue 1, January ISSN

CHAPTER 5 CULVERT DESIGN

Effect of channel slope on flow characteristics of undular hydraulic jumps

Transactions on Ecology and the Environment vol 12, 1996 WIT Press, ISSN

Module 4 Hydraulic Structures for Flow Diversion and Storage

MODELLING ANCILLARIES: WEIR COEFFICIENTS

Rock Ramp Design Guidelines. David Mooney MS Chris Holmquist-Johnson MS Drew Baird Ph.D. P.E. Kent Collins P.E.

Simple Flow Measurement Devices for Open Channels

SUBMERGED VENTURI FLUME. Tom Gill 1 Robert Einhellig 2 ABSTRACT

D emonstration of Possible F low Conditions in a Culvert

APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES

Modelling of Pressurised Pipes within InfoWorks ICM and CS

INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 3, No 1, 2012

HEC 26 Aquatic Organism Passage Design Manual Evolution & Application

7 Flumes. 7.1 Long-throated flumes Description

APPENDIX B HYDRAULIC DESIGN DATA FOR CULVERTS

Experimental Investigation on Changes of Water Surface Profile with Gaussian Shaped Bottom and Side Roughness

CEE 345, Part 2, Winter 2012, Final Exam Solutions (Open Channel Flow)

RBC flume. All it takes for environmental research. Contents. 1. Introduction. 2. The flumes of Eijkelkamp Agrisearch Equipment

Section 5: Pond Outlets

PENNDRAIN.rep. HEC-RAS Version May 2005 U.S. Army Corp of Engineers Hydrologic Engineering Center 609 Second Street Davis, California

Evaluating Surge Potential in CSO Tunnels

STRUCTURE S-65 PURPOSE SPILLWAY OPERATION

Chutes Part 2: Synthetic linings

Khosla's theory. After studying a lot of dam failure constructed based on Bligh s theory, Khosla came out with the following;

Technical Report Culvert A Hydraulic Analysis

FREE OVERFALL IN A HORIZONTAL SMOOTH RECTANGULAR CHANNEL

WMS 8.4 Tutorial Hydraulics and Floodplain Modeling HY-8 Modeling Wizard Learn how to model a culvert using HY-8 and WMS

EXPERIMENTAL STUDY ON THE DISCHARGE CHARACTERISTICS OF SLUICE FOR TIDAL POWER PLANT

Indiana LTAP Road Scholar Core Course #10 Culvert Drainage. Presented by Thomas T. Burke, Jr., PhD, PE Christopher B. Burke Engineering, Ltd.

CVEN 311 Fluid Dynamics Fall Semester 2011 Dr. Kelly Brumbelow, Texas A&M University. Final Exam

Steady State Gate Operation Model for Mun Bon Irrigation System

Experiment Instructions

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011

INCREASE METHODS OF DRAINAGE DISCHARGE OF INUNDATED WATER IN LOW FLAT LAND CONSIDERING BED DEFORMATION CHARACTERISTICS

Follow this and additional works at:

Plan B Dam Breach Assessment

Démocratisation des modèles hydrauliques CFD 3D : plusieurs exemples réalisés avec ANSYS CFX

Culvert Design for Low and High Gradient Streams in the Midwest. Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest

Hydraulic Structures. The late A R Thomas OBE, BSc(Eng), CEng, FICE, FASCE Formerly consultant, Binnie and Partners

A Comparative Study of Self-aerated Stepped Spillway and Smooth Invert Chute Flow: The effect of Step-induced Macro-roughness

MEMORANDUM. TNC Fisher Slough Final Design and Permitting Subject: DRAFT Technical Memorandum: Levee Emergency Spillway Design

The Basics of Culvert and Inlet Design

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications

Summary of HEC 18, Evaluating Scour at Bridges FHWA NHI Should really follow HEC 18, but this summary will get you the main points.

DESIGN OF BELL-MOUTH SPILLWAY AT BARVI DAM

OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 11 APPENDIX B TIDEROUT 2 USERS MANUAL

APPENDIX C ESTIMATING SCOUR IN BOTTOMLESS ARCH CULVERTS

Highway geometric design QUESTION PAPER

Design a grit chamber for population with water consumption of 135 LPCD.

Culvert Hydraulics: Comparison of Current Computer Models

TM /AFM 88-5, Chap Underground hydraulic design Inlets UFC - Drainage In Areas Other Than Airfields

Design, Operation and Maintenance of a Swimming Pool

Transition Submergence and Hysteresis Effects in Three-Foot Cutthroat Flumes

Spillway Design for Small Dams

HOW FAST/FAR DOES FLY LINE FALL? N. Perkins of the University of Michigan, March 2003

Lab Problems. Lab Problems for Chapter Fluid Characterization by Use of a Stormer Viscometer L-1

PKWeir and flap gate spillway for the Gage II Dam

2D Modelling Series. Modelling Structures in Floodplains

Fluid Mechanics-I Laboratory Manual

Lab. Manual. Fluid Mechanics. The Department of Civil and Architectural Engineering

The Hydraulic Design of an Arced Labyrinth Weir at Isabella Dam

Compare the scalar of speed and the vector of velocity.

Effect of Fluid Density and Temperature on Discharge Coefficient of Ogee Spillways Using Physical Models


Homework of chapter (3)

5.6 Flume Design Procedure

River Study Fieldwork Sheets

NUMERICAL INVESTIGATION ON WATER DISCHARGE CAPABILITY OF SLUICE CAISSON OF TIDAL POWER PLANT

Fremont Weir Fish Passage Proof of Concept. Final Engineering Report

Aquatic Organism Passage at Road-Stream Crossings CHUCK KEEPORTS FOREST HYDROLOGIST ALLEGHENY NATIONAL FOREST WARREN, PENNSYLVANIA

Time Dependent Wave Setup During Hurricanes on the Mississippi Coast. D. Slinn, A. Niedoroda,, R. Dean, R. Weaver, C. Reed, and J. Smith.

FL M FLUME FOR HYDRAULIC BENCH

Transcription:

Exercise (4): Open Channel Flow - Gradually Varied Flow 1) A wide channel consists of three long reaches and has two gates located midway of the first and last reaches. The bed slopes for the three reaches are S 1 = 0.008, S 2 = 0.00309, and S 3 = 0.0005. The water discharges to the channel from a lake where the water surface is higher than the normal depth at the inlet. If the discharge is 0.675 m 3 /sec/m, and n = 0.015, sketch the possible water surface profiles in the channel for the following cases: a) The last reach terminates in a sudden fall. b) The last reach discharges to a lake of water level higher than the normal depth at the exit. 2) Water flows with constant discharge q=1.0 m 3 /s/m into a wide rectangular channel that consists of two very long reaches where the bed slope changes from S o1 =6.87x10-3 to S o2 =3.24x10-4, Calculate: a) The depth of both uniform and critical flow in both reaches (take n=0.018) b) Draw a neat sketch of the water profile at the transition zone and calculate the water depths and the head losses wherever appropriate. 3) A barrage is constructed across a wide river whose discharge is 6 m 3 /sec/m, and bed slope is 10 cm/km. If the afflux produced at the site of the barrage is 3 m, find the length of the water surface profile produced from the site of the barrage till a point where the water depth is 6.25m. Use the approximate method considering 3 points, Chezy coefficient C = 50. 4) A trapezoidal channel of bed width of 7 m, side slopes 3:2, Manning coefficient n of 0.02 is laid on a slope of 0.001 and carries a discharge of 30m 3 /sec. The channel terminates to a free fall. It is required to compute and plot the water surface profile from downstream to a water depth of 0.9 the normal depth. Use the step by step method (use 3 steps) 5) A steep long channel takes its water from a lake. Prove that the discharge per unit width in the channel is given by: q = 8 27 Two lakes are joined by a wide concrete channel A-B as shown in the figure below, n = 0.02. The water levels in the lakes are constant. g H a) Find the flow rate into the channel for each of the following bed slopes: i. S o = 10 cm/km ii. S o = 0.003924 iii. S o = 0.01 Compare your results and explain how the flow depth at A affects the flowing discharge. b) Sketch the Water surface profile for the above cases and calculate the water depths wherever appropriate. 3 2-1 -

c) Does a hydraulic jump occur? If so, How far upstream point B does it occur? Use the step by step method, considering 5 points. 1.5m A 2.0m n = 0.02, Bed Slope = S o B 6) A 10 m wide, rectangular concrete-lined canal (n = 0.015) has a bottom slope of 0.01 and a constant level lake at the upstream end. The water level in the lake is 6m above the bottom of the canal at the entrance. If the entrance losses are negligible, determine: a) The flow depth 600 m downstream of the channel entrance, b) The distance from the lake where the flow depth is 3.0 m. Use the step by step method. 7) The figure below shows a longitudinal section in a channel of wide cross section. Manning s n = 0.02 and the bed slope is 0.001. q B A S o = 1/1000, n = 0.02 A gate is located at point A. The discharge equation for the gate in case of free outflow is given by: q = C d 2g( H C d) and for a submerged outflow is: q = Cd d 2g( H y) d c - 2 -

Where q is the discharge per unit width (m 2 /sec), C d is the discharge coefficient and is equal to 0.6, d is the height of the gate opening (m), H is the water depth just upstream of the gate (m), y is the water depth downstream the gate (m), and g is the gravitational acceleration (m/sec 2 ). The coefficient of contraction of the gate C c = 0.63. a) If q = 3 m 3 /sec/m, and H = 3m, find the gate opening d, and check if a free hydraulic jump will form downstream of the gate. Assume the channel downstream A is long enough to allow for uniform flow to develop. If a jump will form, how far downstream of A will it be? (Use an appropriate method to calculate the distance) b) Point B is located 600m upstream of the gate. Find the water depth at B. Use the step by step method considering two steps. If the bed level at A = 20.75m, find the water level at B. c) The gate at A is used to maintain a constant water level at B for different values of discharge. What is the required gate opening to keep the water level at B unchanged, for a low flow of 1 m 3 /sec/m? Use the approximate method with only one step. 8) A trapezoidal channel having bottom slope 0.001 is carrying a flow of 30m 3 /s. The bottom width is 10.0m and side slope 2H to 1V. A control structure is built at the downstream end which raises depth at the downstream end to 5.0m. Compute and draw the water surface profile. Manning n for the flow surfaces is 0.013. - 3 -

Model Answer - 4 -

- 5 -

- 6 -

- 7 -

- 8 -

- 9 -

- 10 -

- 11 -

- 12 -

- 13 -

- 14 -

- 15 -

- 16 -

- 17 -

- 18 -

- 19 -

- 20 -

- 21 -

- 22 -

- 23 -

- 24 -

- 25 -

- 26 -

- 27 -

- 28 -

- 29 -

- 30 -

- 31 -

- 32 -

- 33 -

- 34 -

- 35 -

- 36 -

- 37 -

- 38 -

- 39 -

- 40 -

- 41 -

- 42 -