Douglas Call 4/11/2008 1/5. Ammonia Treatment

Similar documents
Ammonia Treatment Instructions Page 1 of 5

Birck Nanotechnology Center

How to use Solvent Purification System A brief manual

Superconducting Susceptometer (MPMS-5S) Quantum Design Room 296 (MPMS)

Instructions for Assembly, Installation, and Operation of the Gas Addition Kit Accessory with the CEM Discover Systems

JETFIRST 150 RTA SYSTEM OPERATING MANUAL Version: 2 Feb 2012

PXRF- Tracer Helium Flow Control System

MINIBRUTE ANNEAL TUBE STANDARD OPERATION PROCEDURE

Grade 7 Science Related Reading/Materials. Name: Materials Gr7. Class: Date: States of Matter

Cell Disruption System

Usage Policies Notebook for NanoFurnace Furnace (EasyTube 3000 System)

Equipment Operating Procedure Glove Box

Appendix: Simplified Instructions for Operating the HP 5890 GC/FID and Air Sampling Systems

UCI AMS Facility. Combustion Protocol Dec 26, 2011

Properties of Gases Observing Atom Pressure of a Gas Measuring Gas Products of Chemical Inferring Molecule Reactions

Rejuvenation Instructions

Pump out insert (condenser and still lines) overnight with turbo pump

Thermcraft Tube Furnace General Use

VOLUMETRIC TECHNIQUES

Updated: Variable Temperature

Manual Solvent Purification System. Innovative Technology, Inc.

Concentrate Distribution System (Stand Mounted) A-CDS-70-X & A-CDS-TANK-X-ST Industrial Drive, Orlinda, TN 37141

BASIC Z-STACK AND TIME SERIES SCAN ON THE ZEISS LIGHTSHEET Z. 1

Model 130M Pneumatic Controller

Glove Box Installation Manual

Leica TCS SP5 Confocal Live Cell Imaging Set Up User Guide

Student s Name: Date : Molar volume of butane

SUMMITTM 400 & 600. Natural Gas Barbecues. Step-By-Step Guide

Endo-Flush Order # ZUTR30004 OPERATION MANUAL. Zutron Medical, LLC W 98 th St #40-27 Lenexa, KS Phone Fax

Birck Nanotechnology Center

Table of Contents Want full page pictures with most important parts labeled in the beginning.

Lab Equipment ANALYTICAL BALANCE

THE UNIVENTOR 400 ANAESTHESIA UNIT

Revised: June 7, 2017

OPERATING INSTRUCTIONS FOR THE MODEL 85B

then the work done is, if the force and the displacement are in opposite directions, then the work done is.

Gas Laws. Introduction

Safety In the Science Lab. Safety First

Operation of the Perkin Elmer TGA-GC/MS

Usage Policies Notebook for Thermco Atmospheric Diffusion Furnace system

DEMONSTRATION 2.1 PROPERTIES OF CO 2. Chapter 2: Gases

ACV-10 Automatic Control Valve

PRESSURE-TEMPERATURE RELATIONSHIP IN GASES

Napa Technology Trouble Shooting. For Premier & Premier PLUS Models

Standard Operating Procedure #COE-SOP-0001 Chemical Fume Hood Operation

Pump Performance Testing

CLEANLINESS STANDARD NCPRE tool contamination classification

THE UNIVERSITY OF NEWCASTLE - DISCIPLINE OF MEDICAL BIOCHEMISTRY

LABORATORY TECHNIQUES. Pouring Liquids

Exploring the Properties of Gases

5890II GC Standard Operating Procedure 9/2/2005

March CS-1701F Reactive Ion Etcher

For accurate measurements and to prevent damage to the micropipets, follow these important guidelines:

Installation of Your SprayMaster System

For accurate measurements and to prevent damage to the micropipets, follow these important guidelines:

User s Guide. Vacuum Controller for liquid delivery systems

CHEMISTRY FACULTY LABORATORY SAFETY CONTRACT CENTRAL CAMPUS

System Overview. TCD Detector temperature setpoint Regulator

Name Class Date. What are some properties of gases? How do changes of pressure, temperature, or volume affect a gas?

TABLE OF CONTENTS SAFETY FIRST!...3 BASIC OPERATION...4 ADJUSTMENTS...5. Cocking Pressure...5. Three-Way Valve Adjustment...6

Emulsiflex C3 Homogenizer Protocol

Barrel Assembly. Field Stripping

Nanofabrication Facility: ECR Etcher SOP Rev. 01b, March 06. Standard Operating Procedure for PlasmaQuest ECR II Etching

Tactical Sniper air rifle & carbine

Inside Front cover This page will remain blank.

Introduction. Part one: Identify the Hydraulic Trainer Components

Operator: Save these instructions for future use!

Approved by Principal Investigator Date: Approved by Super User: Date:

OPERATION MANUAL RTI RHS650 RTI TECHNOLOGIES, INC East Market Street York, PA Manual P/N

Read this first. Zetasizer nano series Self installation and Quick start guide MRK825-02

Operator: Save these instructions for future use!

Compressed Gas Properties. Introduction. Compressed Gas Properties. Definition of a Compressed Gas

User Manual GRI- 1500Li

ABRASIVE REGULATOR II

TANK MANAGER FOR TWO TANKS OPERATING MANUAL. 10/31/11 C-More T6C L color touch panel

1. Cryogen Tanks. N2 Fill Tutorial for Vanderbilt Magnets. Contents: CSB NMR Facility

SSI Solaris 150 RTA Revision /27/2016 Page 1 of 9. SSI Solaris 150 RTA

ABRASIVE REGULATOR II

OPERATING MANUAL LO-CROSS-FLOW CF M

BIOSAFETY SELF AUDIT PRINCIPAL INVESTIGATOR/PERMIT HOLDER: CONTAINMENT LEVEL: 1 2 (Shaded) RISK GROUP: 1 2 AUDIT TO BE COMPLETED BY (DATE):

TFE-LINED VAREA-METER PVC-TUBE VAREA-METER

MB-SP Series Solvent Purification System

ABRASIVE SYSTEM ABRASIVE REGULATOR II 800# BULK ABRASIVE DELIVERY POT Abrasive Regulator II and 800# Pot Manual

For accurate measurements and to prevent damage to the micropipets, follow these important guidelines:

General remarks regarding ALS robot system:

OPERATING INSTRUCTIONS AND PARTS LIST AUTOMATIC FILLING MACHINE DE-401-GB-AUTO

Gas Absorption Draft Standard Operating Procedure

[USING THE VITROBOT April 9, Using the Vitrobot

Working correctly with gas

BASIC RULES OF USAGE, OLIS DSM-20 CD Management The instrument is currently managed by the Analytical Biophysics Core Facility.

Department of Physics Standard Operating Procedures (SOP) Approved by: Physics Safety Committee

PROPORTIONING VALVE. Model 150 INSTRUCTION MANUAL. March 2017 IMS Company Stafford Road

Before using or working with the Grab n Go Heliox system, please read and understand the usage and safety instructions provided in this booklet.

User s Guide. CO2 & O2 Controller for miniature incubators

3 GALLON, OILLESS PANCAKE COMPRESSOR INSTRUCTIONS. Item #31289

EE 432 Lab 3 PMOS source/drain lithography and diffusion

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

PREPARATION AND PROPERTIES OF ATMOSPHERIC GASES I: Carbon Dioxide and Oxygen

INSTRUCTIONS FOR USE - US RaplixaSpray (Raplixa Delivery Device)

Adsorption Unit Operating Procedures: CO2 Adsorption on to Activated Carbon

Transcription:

Douglas Call 4/11/2008 1/5 Ammonia Treatment Department: Chemical Engineering Location: Fenske 102 Contact: Zachary Pace Smith BillyPaul Matthew Holbrook zps5000@psu.edu 166 Fenske bmh200@psu.edu 5-9734 Getting Started: Call or e-mail one of the contacts to schedule a time to use the furnace. Logan s lab has a 150 ft 3 tank of 5% ammonia with helium carrier stored in the lab (102 Fenske). Use this mixture for the treatment. When this container is empty, contact Stephanie at the PSU General Store (3-8287). A 150 ft 3 container of this mixture costs ~$230. It requires about 7-10 days for delivery. The argon gas is for general use in the lab and we do not need to purchase a new tank when it is empty. Treatment Capacity: The furnace can only hold a few electrodes at a time, so you need to plan accordingly. To get an idea of how much can be treated at once: only 4 large brushes can fit into the furnace at one time, so if you need 8 brushes treated, you need to schedule two separate times to use the furnace. IMPORTANT: Check the amount of gases (Ammonia and Argon) in the cylinders before you begin. This treatment requires a lot of Argon, and you do not want to run out of Argon half way through the process. After you are done with your treatment, e-mail Doug (dfc134@psu.edu) and let him know how much Argon and how much Ammonia gas mix are remaining when you are done with your experiment. LEFT Furnace RIGHT Gas Flask

Douglas Call 4/11/2008 2/5 Instructions: When it is hooked up, it will look like this: 1. Before starting, make sure that the FUME HOOD located on the right side of the wall as your enter the lab is ON. Check by locating the fume hood switch which is below the bench level and to the right of the hood. If it is not on, turn the switch to on. 2. Locate and hook up the 5% ammonia gas mix. The cylinder label reads Ammonia 5% and Helium balance. It is SILVER and looks like this: 3. Hook up the Argon gas supply. Argon is the ORANGE cylinder. Before hooking it up, make sure that the gas supply is OFF and that the GREEN knobs connected to the tubing are closed. Green Knob Before hooking it up, make sure that the gas supply is OFF and that the GREEN knobs connected to the tubing are closed. To hook it up to the furnace, attach the tubing: ARGON 4. Locate a quartz boat and place your samples inside. DO NOT OVERFILL THE BOAT:

Douglas Call 4/11/2008 3/5 For large brushes do not use the boat, instead, tie them together using copper wire: assist. Lift up the lid on the furnace to ensure that the boat is centered: Tie ends together with copper wire 5. Locate the far left end of the glass extending from the furnace: Unravel the copper wire, and slide the lid off SLOWLY by twisting back and forth. You may need to rotate the lid back and forth in order for it to come off. Once the lid is off, wet a Kimwipe with acetone and wipe to remove the grease. When the lid is removed, insert your samples (boat or large brushes): Close the lid and lock when done. 6. Re-attach the glass lid. Use some of the grease lying on the bench to make a smooth contact as you twist the glass lid back on. Re-attach the copper wire as shown in the previous picture. Make sure that the WHITE tube is connected to the top of the glass lid. If a CLEAR tube is connected, you need to change it to the WHITE tube. 7. After ensuring that the glass lid is on securely, turn on the ARGON gas supply. Make sure that the ARGON is delivering around 40 psi by checking the ARGON regulator. Check the gas flow meter (see next picture) to ensure that the ARGON is and set to 150 cc. Make sure the silver ball is at the 150 cc mark: Slide the sample all the way until it is in the middle of the furnace. Use a wire rod to Also, check the Erlenmeyer flask that sits to the right of the machine and make sure that there are gas bubbles present in the liquid.

Douglas Call 4/11/2008 4/5 8. With the AMMONIA gas still closed, leave the ARGON gas supply on for 20 minutes. 9. During these 20 minutes, begin programming the furnace. The furnace control box is the BLUE box with a #2. Actual Temp. Set Temp. Press and hold the BLUE button on the RIGHT control box until the display changes. Press the UP arrow until the display reads 1. Furnace #2 10. Looking at FURNACE #2, you will see the following: Then use the BLUE button to scroll through the menu items. Scroll until you see SP1. This is the first temperature set point. Set it to 700 o C. you see tn1. This sets the rate at which you want to reach 700 o C. Using the UP or DOWN arrows enter 0.30, which means 30 minutes. LEFT MIDDLE RIGHT you see SP2. This sets the temperature for holding the furnace at 700 o C. Using the UP or DOWN arrows enter 700 o C. you see tn2. Set for 1.00 hour. The switch on the LEFT turns the furnace on and off. To set the program for ammonia treatment, use the RIGHT control box. The top number in RED is the actual temperature. The bottom number in GREEN is the set temperature. The RIGHT control box has a BLUE button, a DOWN arrow, and an UP arrow: you see SP3. This sets the turn-off temperature. Set it to 20 o C you see tn3, which is the turn off rate. Hold the DOWN arrow until it reads OFF. Scroll until you see A1, which stands for the alarm. Set this value to 710 o C using the UP or DOWN arrows. This function will shut down the furnace if it gets hotter than 710 o C.

Douglas Call 4/11/2008 5/5 The program is now set. Turn off the furnace using switch on LEFT. Turn it back on using the switch on the LEFT. Press RESET on the MIDDLE switch. You will see an orange light go off. Check to make sure that the ARGON gas is still on and that the AMMONIA gas is OFF. Press RUN on the RIGHT control box. An orange light will turn on and you will hear a click indicating that it has started. The temperature will begin rising. 11. It will take 30 minutes for the furnace to heat to 700 o C. 12. After 30 minutes, ensure that the temperature displays 700 o C. If it does, turn off the ARGON gas feed, and turn on the AMMONIA gas feed to a pressure around 10 psi. Check the flow by reading the flow meter as shown above and make sure the SILVER ball is at the 150 cc mark. Check the Erlenmeyer flask located to the right of the furnace to make sure that there are bubbles in the liquid. It will take a few minutes for the bubbles to appear because helium is much lighter than argon. Do not leave until you see the bubbles. 16. Only after ensuring that the FURNACE IS OFF, you can open the lid to allow the cooling process to speed up. 17. After about 30 to 45 minutes or when the exterior part of the glass tube feels comfortable to touch, turn off the ARGON gas. 18. Remove the lid on the glass tube following the instructions from above. Using a wire rod, reach inside the tube and remove your samples. Be careful not to push your samples in farther. If necessary, the RIGHT end of the glass tube can be removed in order to push samples toward the LEFT opening. 19. Remove your samples, and leave the quartz boat on the lab bench. 20. Re-attach the glass lid following the same procedures as described above. 21. Before leaving, make sure that all the gases are OFF. 22. E-mail Doug (dfc134@psu.edu) and tell him how much AMMONIA gas mix and how much ARGON gas is remaining when your experiment is over. 13. With the AMMONIA gas on, wait for one hour. 14. After one hour, turn off the AMMONIA gas and turn on the ARGON gas. 15. The temperature will start to decrease, and once it reaches 200 o C, turn the furnace completely OFF using the switch on the LEFT (see picture above).