LESLIE BARNS & CONNECTION TRACK. Construction Liaison Group Meeting #2

Similar documents
Richmond-Adelaide Cycle Tracks

Hospital Link Project Project Update September 2017

Sebastopol Charter School Traffic Management Plan

Welcome and Purpose of Meeting

Guildwood Village Traffic Response Prepared by City of Toronto Transportation Department

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

Why invest in the 1 Street S.W. Corridor?

Traffic Management and Mitigation Study in the Leslieville Community Transportation Services Division & IBI Group IBI GROUP

Dowling/Beaty Cycling Route

Tonight is for you. Learn everything you can. Share all your ideas.

S T A T I O N A R E A P L A N

Hospital Link Project Project Update November 2017

Cincinnati Dayton Rd Widening

Orange County Rail-Highway Grade Crossing Safety Enhancement Program. City of San Juan Capistrano April 17, 2012

5. RUNNINGWAY GUIDELINES

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

Everyone is a Pedestrian

City of Margate, Florida. Neighborhood Traffic Management Manual

Welcome to the Sellwood Bridge Project Open House!

Niantic Center Elementary School

DATE: October 20, Planning Commission. Beth McKibben, Planner Community Development Department FILE NO.: CSP

Community Meeting February 27, 2007 Dorchester Avenue Transportation & Streetscape Improvements Action Plan February 27, 2007

Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns.

Memorandum. Sunday, July 13, Saturday, July 19, 2014

4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL

Traffic Control Inspection Checklist Segment:

West Capitol Avenue Road Rehabilitation and Safety Enhancement Project

10.0 CURB EXTENSIONS GUIDELINE

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Purpose: Financial Implications and Impact Statement: It is estimated that the cost to implement:

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Lower Jarvis Street Pedestrian Promenade Plan, Front Street East to Queens Quay East

Polk Streetscape Project

TRAFFIC ACTION PLAN. North Central Neighborhood CITY OF SAN MATEO

St. Francis Drive through the City of Santa Fe Corridor Study

Outreach Approach RENEW SF served as the primary liaison with the North Beach community; the Chinatown. Executive Summary

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

PUBLIC COMMENTS ITEMS FOR CONSIDERATION/ACTION

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

Replacement of N. Carlin Springs Road Bridge over George Mason Dr.

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Purpose + Need. Connect: Thrive: Develop: < Strengthen the spine of our regional transportation system

Existing Transportation System

Miami Health District

Public Works Committee Meeting Richard E. Mastrangelo Council Chamber November 20, 2017

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

MEMORANDUM. Earl Haugen and UND Transportation and Traffic Coordination Committee

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL

Legislative Update Williamsburg Residency

Table 1.0 Grade Crossing Enhancements PVL San Jacinto Branch Line

Attachment A: Traffic Mitigation Measures

5 Transit & Traffic. Overview

Borough of Danville, PA Traffic Calming Program Guidelines

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Board of Supervisors February 27, 2017

San Rafael School District. Task Force Meeting Notes. November 5, 2012

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Crystal City Potomac Yard Transitway. Enforcement Ordinance & Construction Update

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015

TOWN OF IRONDEQUOIT ACTIVE TRANSPORTATION PLAN

D.13 Transportation and Traffic

Swamp Road Residents Study

Chicago Safe Routes to School Safe Routes to High School (SRTS/SRTHS)

Make Lincoln Highway an economically vibrant corridor that is safe, efficient, and beautiful for local residents and visitors.

Truck Turning Study for Main Street Intersection, Orange

THE ALAMEDA CONCEPT DESIGN COMMUNITY MEETING 3. A Plan for The Beautiful Way JANUARY 28, 2010

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

Government of the District of Columbia Department of Transportation

Traffic Control Signals - Cosburn Avenue and Cedarvale Avenue

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street)

AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT

7 June 2018 OUR REF:

Kathy Dahl (Great Works Consulting), Mitch Riabko (Great Works Consulting) City of Saskatoon Representatives:

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

2017 Temporary traffic control guidelines for pedestrians. v.2

Mission Bay Loop (MBL) Public Meeting

Traffic Impact Memorandum. May 22, 2018

Addendum to Mitigated Negative Declaration

Forest Hills Improvement Initiative

Freeway ramp intersection study

Implementing Complete Streets in Ottawa. Project Delivery Process and Tools Complete Streets Forum 2015 October 1, 2015

2007 TRAFFIC SIGNAL PRIORITY LIST SUMMARY OF STAFF RECOMMENDATIONS TO PEDESTRIAN/BICYCLE/MOTOR VEHICLE COMMISSION.

Eglinton West/Allen Road Station Preliminary Design Online Consultation

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for:

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

IL Route 71 Construction Update

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN

CURBSIDE ACTIVITY DESIGN

Neighborhood Pedestrian Safety and Traffic Calming Study

Co-ordinator Transportation Committee. Director, Mobility Services and Corporate Fleet Services Environment and Transportation Department

Corporate. Report COUNCIL DATE: May 25, 1998 NO: R1500 REGULAR COUNCIL. TO: Mayor & Council DATE: April 27, 1998

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

Welcome to the Open House

Implementing the Three Es of School Zone Traffic Calming

Transcription:

LESLIE BARNS & CONNECTION TRACK Construction Liaison Group Meeting #2 July 23, 2013 1

UPDATE (SINCE LAST CLG) Cyclist safety walk (June 26) to review current construction configurations and discuss how to add or improve safety features Plaza Signage manufactured and ready for deployment in advance of northbound Leslie closure at Lake Shore July 23, 2013 2

WORK UPDATE COMPLETED WORKS Construction of temporary plaza entrances off Lakeshore including diversion of Martin Goodman Trail at entrances. (Opening date TBD) Ductbank construction and communications chambers on west side of Leslie between Commissioners and Mosley; on Mosley, just west of Leslie; and on Leslie just south of Commissioners July 23, 2013 3

UPDATE WORK IN PROGRESS Traffic light modification at Leslie and Commissioners intersection and Leslie/Lake Shore Removal of street light cables on Lake Shore medians in preparation for median removal Sheet piling activity on the east side of Leslie from Commissioners to Lake Shore July 23, 2013 4

CLG MEETING #1, JUNE 18, 2013 ACTION ITEM NO. 1: Paid Duty Officers (PDOs) need to be more active in traffic flow management to help direct traffic and maintain safe conditions during construction work (e.g. plaza driveway). RESPONSE: The TTC drafted Police Pay Duty Guidelines with Police input (55 Division). It has clear expectations of the role and responsibility of the paid-duty officers on site. 5

ACTION ITEM NO. 2: Paid Duty Officers (PDOs) should be placed in areas of anticipated traffic overflow (e.g. on Mosley Street and Eastern Avenue at the entrance to the Fresh Co/Tim-Wendy s plaza) in addition to the major intersections of the construction area. RESPONSE: The TTC, contractor and City Transportation Services will be monitoring traffic flow issues in the area and assigning PDOs to appropriate locations as needed. Follow-up has been made with Police Department (per action item 1) 6

ACTION ITEM NO. 3: Eastern Avenue and Leslie Street is a dangerous intersection for cyclists and pedestrians. Are there special features for pedestrian and cyclist safety being added in the streetscaping plans? RESPONSE: Yes. The northeast Eastern Avenue sidewalk will be widened and a planting has been added at the northeast corner that will prevent vehicles from mounting the sidewalk. Additionally, new pavement markings (zebra stripes) will be installed. 7

Existing Conditions Eastern & Leslie After Improvements Leslie Streetscape Improvement Plan: Leslie Street at Eastern Avenue June 14, 2013 The Leslie Barns 8

July 23, 2013 9

ACTION ITEM NO. 4: The NW corner of the intersection at Eastern Avenue & Leslie Street floods, will it be re-graded or improved? RESPONSE: Yes. There will be a new profile for Eastern Avenue with improved slopes. We are increasing catch basin capacity by installing a double catch basin located away from the crosswalk. Additionally, a new catch basin is under review for Eastern Avenue to the west, to further reduce flow towards the intersection. - Also cleaning out existing sewer and improving catch basin connection to sewer 10

ACTION ITEM NO.5: Will the replacement bus service offer the same capacity as the streetcar? RESPONSE: Service planning has confirmed that the 501 replacement bus service during the Leslie/Queen intersection construction in 2014, is planned every 10 minutes or better. The 83 Jones bus will receive more frequent service. Service on other bus routes in the area such as the 31 Greenwood will remain the same or be improved. ACTION ITEM NO. 6: Beach express should make a stop on Leslie during construction. RESPONSE: Service planning reviewed the request and indicated that this stop is not recommended at this time. 11

ACTION ITEM NO.7: Can parking restrictions be extended on Eastern Avenue and Carlaw Avenue and can right turns be allowed from Carlaw onto Lake Shore on a red light and any other improvements planned? RESPONSE: City Transportation Services indicated that both the proposed peak period parking prohibitions and allowance of right turns on the red light at Carlaw/Lake Shore are feasible but require further review. Parking on Carlaw adjacent to Morse Street Public School will not be affected at request of the school. Potential changes would focus south of Eastern Avenue. City Transportation will report back to the CLG. 12

ACTION ITEM NO. 8: Contractor to share dust-mitigation plan at next meeting. City and TTC will inquire about surrounding streets and additional street sweeping during construction. RESPONSE: Air and Dust monitoring and daily dust control measures are implemented. These include: Washing down of street within work site Watering of site roads as required Avoiding long term stockpiles, and if not possible, tarping stock piles that are not in use 10km/hr speed limit for trucks entering and exiting site for safety and dust control Additional proactive control measures, include but are not limited to: Truck Wheel Washing Tarping Trucks Wet cutting when cutting concrete 13

ACTION ITEM NO.9: Ongoing coordination with Wheel-Trans during road construction required in advance of each phased of construction RESPONSE: The Project Team is coordinating directly with Wheel-Trans to maintain access. Wheel Trans will contact individual customers in the project area to coordinate pickups in affected areas. 14

Action Item No. 10: TTC Community Liaisons to reach out to additional community groups/organizations for recruiting possibilities to the CLG. The Community Liaisons will also accept recommendations from the CLG. Response: Ongoing Recruitment. Have reached out to recreational groups in the Port Lands offering information regarding joining the CLG. 15

END THANK YOU July 23, 2013 16