Auckland Transport Monthly Indicators Report 2018/19

Similar documents
Auckland Transport Monthly Indicators Report 2018/19

Regional Bus Priority

Auckland Council Finance & Performance Committee Presentation

Regional Cycle Programme Update

95 Express Annual Operations Report: Fiscal Year

JULY 2013 RIDERSHIP REPORT MTA METRO-NORTH RAILROAD EXECUTIVE SUMMARY

AMETI PANMURE: A SUSTAINABLE TRANSPORT SOLUTION - OR NOT? Phil Harrison, Opus International Consultants

395 Express Lanes Extension

Encouraging Taxi Drivers to Behave: Grafton Bridge Taxi and Bus Lane Trial. Rob Douglas-Jones Tim Segedin, Edin Ltd.

Auckland Regional Land Transport Strategy Report on Progress 2007/09. February 2010

May 2018 FY Key Performance Report

Wilshire Boulevard Bus Rapid Transit Project

January 2019 FY Key Performance Report

2. Context. Existing framework. The context. The challenge. Transport Strategy

WIM #36 MN 36 MP 15.0 LAKE ELMO APRIL 2014 MONTHLY REPORT

A review of 2015 fatal collision statistics as of 31 December 2015

September 2018 FY Key Performance Report

RTC TRANSIT OPERATING STATISTICS RTC RIDE RTC RAPID RTC INTERCITY SIERRA SPIRIT

Calgary Transit Route 302 Southeast BRT Year One Review June

ENCOURAGING TAXI DRIVERS TO BEHAVE: GRAFTON BRIDGE TAXI AND BUS LANE TRIAL

Central Oregon Intergovernmental Council

REVENUE & RIDERSHIP REPORT SEPTEMBER 2018

CARTA East Cooper Transit Service Transportation Committee Town of Mount Pleasant. February 5, 2013

Update June 2018 OUR 2017 PUBLIC ENGAGEMENT

Short-Term Transit Ridership and Revenue Forecasting

TRANSIT RIDERSHIP IMPROVEMENT PROGRAM CAPITAL PROJECTS OPERATING PLANS - NEXT NETWORK TRANSIT INFORMATION TECHNOLOGY

REVENUE & RIDERSHIP REPORT NOVEMBER 2017

WIM #37 I-94, MP OTSEGO, MN APRIL 2012 MONTHLY REPORT

SWISS reports stable load factors

Hampton Roads Transit. Ridership Report for February 2014 Operations & Oversight Committee Meeting

Chapter 2 Current and Future Conditions

Northland Region road trauma for Northland Region. Road casualties Estimated social cost of crashes* Major road safety issues

2015 Victorian Road Trauma. Analysis of Fatalities and Serious Injuries. Updated 5 May Page 1 of 28. Commercial in Confidence

RTC TRANSIT OPERATING STATISTICS RTC RIDE RTC RAPID RTC INTERCITY SIERRA SPIRIT

Appendix ELP El Paso, Texas 2003 Annual Report on Freeway Mobility and Reliability

PROPOSAL FOR A REGIONAL FUEL TAX

Integrated Regional Traffic Management. Michael Aherne Technical Director POLIS Conference 2009

Introduction. Bus priority system. Objectives. Description. Measure title: City: Malmo Project: SMILE Measure number: 12.7

KC Scout Kansas City s Bi-State Transportation Management Center

National Transport Awards Cambridge Park & Ride

Wellington Public Transport Spine Study

Traffic Safety Plan Traffic Safety Plan 2015

land transport road assets

Purpose and Need. Chapter Introduction. 2.2 Project Purpose and Need Project Purpose Project Need

land transport road assets

SOLTRANS BOARD MEETING SUPPLEMENTAL REPORTS / HANDOUTS January 15, 2015 MEETING HANDOUTS

APPENDIX H EXISTING TRAFFIC CONDITIONS ANALYSIS

Performance Measures Year End 2015

Item 5.1 TRANSIT DAY 2018 BUDGET PRESENTATION. Public Works Department TRANSIT

Danish gambling market statistics Third quarter, 2017

City of Wilsonville 5 th Street to Kinsman Road Extension Project

SAS Quality Scorecard August 2011

Christchurch 3 years on: - growing resilience

RIVER CROSSINGS: EAST OF SILVERTOWN CROSSINGS

Anzac Street West Precinct Plan Change Integrated Transport Assessment - Appendices. National and Regional Strategic Assessment

Standing Committee on Policy and Strategic Priorities. Mount Pleasant Industrial Area Parking Strategy and Access Improvements

TORONTO TRANSIT COMMISSION REPORT NO.

May Canal Cordon Report 2017

Speed Limits in the Hoddle Grid

Hard Shoulder Running is a valuable tool July 14, Dean H. Gustafson, PE, PTOE State Operations Engineer VDOT Operations Division

9. Parking Supporting Statement

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

REGIONAL ARTERIAL ROAD PLAN FEBRUARY

City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015

EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY

KC Scout Kansas City s Bi-State Transportation Management Center

People killed and injured per million hours spent travelling, Motorcyclist Cyclist Driver Car / van passenger

3 ROADWAYS 3.1 CMS ROADWAY NETWORK 3.2 TRAVEL-TIME-BASED PERFORMANCE MEASURES Roadway Travel Time Measures

Tulsa Metropolitan Area LONG RANGE TRANSPORTATION PLAN

Department of Internal Affairs Mandatory Non-Financial Performance Measures 2013 Roads and Footpaths

Instances of 1 Minute or Less Between Buses 4 5% 55% 3.9% 3.5% 3.5% 3.5% 2.9% 2.8% Sep- Sep 07 Oct-07 Nov-07 Dec-07 Jan- Jan 08 Feb- Feb 08 Mar-08

Municipality of Sofia Traffic Master Plan. Intelligent Transport Systems Strategy Andrew Walsh

Child Road Safety in Great Britain,

TRANSPORT PUBLIC SAFETY SERVICES THAT SUPPORT COMMUNITIES. Provide access to, from and for emergency services

Active and Public Transport Plan

Appendices. Atkins SBL Forecasting Report 54

For Information Only. Pedestrian Collisions (2011 to 2015) Resolution. Presented: Monday, Apr 18, Report Date Tuesday, Apr 05, 2016

Amendments to Essex Highway Maintenance Strategy Maintenance Policy and Standards April 2008

VOLUME 5 Technology and Option Evaluation

Auranga B1 Proposed Plan Change, Bremner Road, Drury. Integrated Transportation Assessment Report

Bus Lanes Improving Travel Time or Reliability

Queensland s experience with speed limit reductions on Black Links

Transit boulevard: A new road type for Sydney s Growth Centres

ADDIS ABABA ROAD SAFETY STRATEGY

2009 Forecast for the Chicago CBD

Utility Debt Securitization Authority 2013 T/TE Billed Revenues Tracking Report

DEC DASHBOARD. Positive Response Compliance DEC. Compliant Tickets : On-Time Performance Analysis. December % Late.

Performance Measures Year End 2018

Regional Transportation Needs Within Southeastern Wisconsin

JAN DASHBOARD. Positive Response Compliance JAN. Compliant Tickets : On-Time Performance Analysis. January % Late.

BUS RAPID TRANSIT. A Canadian Perspective. McCormick Rankin International. John Bonsall P.Eng

WELCOME Mission-Geneva Transportation Study

ITS-NY ANNUAL MEETING Bus Rapid Transit in New York City: Bus Lane Operations on One-Way Arterial Streets

Wisconsin 511 Traveler Information Annual Usage Summary January 3, Wisconsin 511 Phone Usage ( )

Richmond Area MPO Regional Transportation and Land Use Performance Measures 2013

MEMORANDUM. City Constituents. Leilani Schwarcz, Vision Zero Surveillance Epidemiologist, SFDPH

Scope of the Transit Priority Project

Clackamas County Comprehensive Plan

Transit Operations in the I-95 Express Lanes

Classification Criteria

Transcription:

Attachment 1 Auckland Transport Monthly Indicators Report 218/19 October 218

Table of Contents Page 2. 1. Summary of indicators 1.1 SOI performance measures 1.2 AT Metro patronage breakdown 2. Monthly indicators by Key Priority 2.1 Deliver an efficient and effective transport system 2.2 Focus on the customer 2.3 Improve the safety of the transport system 2.4 Ensure value for money across AT's activities

Page 3. 1.1 SOI performance measures Key Priority Deliver an efficient and effective transport system Measure Total annual public transport boardings Total annual rail boardings (millions) Boardings on rapid or frequent network (rail, busway, FTN bus) New cycleways added to regional cycle network Number of cycle movements past selected count sites Active and sustainable transport mode share at schools where the Travelwise programme is implemented SOI 218/19 Year End Target 96.3 million 21.11 million Increase at faster rate than total boardings 1 km 3.644 million Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Current Performance Reference Page 12 month rolling total: 94,949,41 Page 8 12 month rolling total: 2,491,646 Page 9 17.8% growth in RTN + FTN vs 5.% growth in total boardings Page 8 YTD completion: 6.4 km Page 11 YTD: 1,121,693 YTD target: 1,51,279 Page 11 4% 217/18 result: 48% Page 11 Active and sustainable transport mode share for morning peak commuters, where the Travelwise Choices programme is implemented 4% 217/18 result: 69% Page 11 Focus on the customer Average AM peak arterial productivity Proportion of the freight network operating at Level of Service C or better during the interpeak Percentage of public transport passengers satisfied with their public transport service PT punctuality (weighted average across all modes) Percentage of local board members satisfied with AT engagement 21, YTD average: 29,819 Page 12 85% YTD average: 94% 94.5% Reporting to local board: 7% Consultation with local board: 7% YTD average: 97.5% Page 16 85% September 218 result: 91% Page 2 Page 22 217 result: 56% Page 24 217 result: 42% Page 24 Percentage of customer service requests relating to roads and footpaths which receive a response within specified time frames 85% 12 month total: 81.% Page 24

1.1 SOI performance measures Key Priority Measure SOI 218/19 Year End Target Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Current Performance Reference Page Page 4. Improve the safety of the transport system Number of high risk intersections addressed by the safety programme Change from the previous financial year in the number of fatalities and serious injury crashes on the local road network, expressed as a number. 1 Reduce by at least 9 218 year-end target: 681 New measure, first result in December 218 Page 26 12 month rolling total to July 218: 572 Note: 3-month lag Page 26 PT farebox recovery 46 5% October 218 result: 45.1% Page 27 Ensure value for money across AT's activities Percentage of the sealed local road network that is resurfaced Percentage of road assets in acceptable condition (as defined by AT's AMP) Percentage of footpaths in acceptable condition (as defined by AT's AMP) 6.% YTD result: 1.2% Page 27 95% New measure, first result in March 219 Page 28 95% 217/18 result: 99% Page 28 Road maintenance standards (ride quality) as measured by smooth travel exposure (STE) for all urban and rural roads Urban 81% 217/18 result: 84% Page 28 Rural 92% 217/18 result: 95% Page 28 On target to exceed performance measure (more than 2.5% above target) On target to meet performance measure (within +/- 2.5% of target) Not on target to meet performance measure (more than 2.5% below target) Data not available

1.2 AT Metro Boardings breakdown Page 5. October - 218/19 Actual v SOI Month YTD Projected Actual % Change SOI / SOI / Target % Change Forecast % Variance Actual SOI / Target % Variance 218/19 Target Prev Year 218/19 1. Bus Total: 6,226,199 13.8% 5,689, 9.4% 24,513,263 9.6% 23,36, 5.2% 68,89, 7,, 2. Train (Rapid) Total: 1,852,445 8.9% 1,814,112 2.1% 7,44,85 5.4% 7,91,812 4.4% 21,11, 21,11, 3. Ferry (Connector Local) Total: 527,675 1.7% 497,883 6.% 1,859,61 5.5% 1,86,87 2.9% 6,3, 6,3, Total Patronage 8,66,319 12.5% 8,,995 7.6% 33,777,129 8.4% 32,23,899 4.9% 96,3, 97,41, Rapid and Frequent 4,435,389 33.6% 3,18,135 47.% 16,82,879 25.4% 12,537,754 34.% 36,786, 42,8, October - 218/19 Month Patronage 12 Month Patronage YTD (from July) Previous Normalised % Change Change % Change Change Prev % Change This Year # Change % Change Patronage Patronage Year % Change Prev Month Prev Year Prev Year Year Prev Year 1. Bus Total: 6,226,199 5,471,57 755,9 13.8% 1.9% 68,317,394 1.1% 4,433,51 6.9% 24,513,263 2,149,458 9.6% Busway (Rapid) Bus 657,419 451,68 25,811 45.6% 5,797,21 3.7% 66,51 12.9% 2,168,615 338,832 18.5% Frequent Bus 1,925,525 1,166,611 758,913 65.1% 17,619,45 4.5% 5,864,817 49.9% 7,229,459 2,686,734 59.1% Connector Local Targeted Bus 3,643,255 3,852,838-29,634-5.4% 44,9,734 -.5% -2,91,817-4.5% 15,115,189-876,18-5.5% 2. Train (Rapid) Total: 1,852,445 1,71,342 151,5 8.9% 4.7% 2,491,646.7% 121,539.6% 7,44,85 377,892 5.4% Western Line 621,841 61,23 2,611 3.4% 7,35,481.3% -14,372-2.% 2,536,66 41,29 1.6% Eastern Line 549,751 483,85 66,568 13.8% 5,97,327 1.1% 257,363 4.5% 2,162,61 193,178 9.8% Onehunga Line 12,67 98,5 4,63 4.7% 1,121,891.4% -5,261-4.3% 41,29 3,16.8% Southern Line 531,362 485,428 45,934 9.5% 5,98,65.8% 6,293.1% 2,124,616 99,791 4.9% Pukekohe Line 46,883 33,595 13,288 39.6% 455,342 3.% 48,516 11.9% 179,639 4,733 29.3% 3. Ferry (Connector Local) Total: 527,675 476,556 51,119 1.7% 9.1% 6,14,37.8% 7,793.1% 1,859,61 97,44 5.5% - Contract 125,732 111,227 14,55 13.% 1,44,21 1.% 48,924 3.6% 483,556 35,784 8.% - Exempt Services 41,943 365,329 36,614 1.% 4,736,169.8% -41,131 -.9% 1,375,55 61,62 4.7% Total Patronage 8,66,319 7,648,955 957,214 12.5% 9.4% 94,949,41 1.% 4,562,833 5.% 33,777,129 2,624,754 8.4% Rapid and Frequent 4,435,389 3,319,561 1,115,729 33.6% 43,98,36 2.6% 6,646,857 17.8% 16,82,879 3,43,458 25.4% Connector Local Targeted 4,17,93 4,329,393-158,515-3.7% 51,41,13 -.3% -2,84,24-3.9% 16,974,25-778,74-4.4% Total Patronage 8,66,319 7,648,955 957,214 12.5% 9.4% 94,949,41 1.% 4,562,833 5.% 33,777,129 2,624,754 8.4% * Normalised % - Change is done at the mode level, as special events is not available at low er service layers. * Rapid calculation for busw ay amend from, NEX route plus Busw ay (4 locations Akoranga, Smales, Sunnynook, Constellation) Inbound Boardings & Outbound alighting to being all routes Inbound from Albany to Fanshaw e St & Outbound Akoranga to Albany in line w ith New Netw ork North.

Page 6. 1.2.2 Bus Patronage (12 month rolling total) Oct- 18 Jul- 18 Apr- 18 Jan- 18 Oct- 17 Jul- 17 Apr- 17 Jan- 17 Oct- 16 Jul- 16 Apr- 16 Jan- 16 Oct- 15 Jul- 15 Apr- 15 Jan- 15 Oct- 14 Jul- 14 Apr- 14 Jan- 14 Oct- 13 Jul- 13 Apr- 13 Jan- 13 Oct- 12 Jul- 12 Apr- 12 Jan- 12 Oct- 11 Jul- 11 Apr- 11 Jan- 11 Oct- 1 Jul- 1 Bus total Bus - connector, local, targeted Bus - FTN Bus - RTN 1.2.4 Ferry Patronage (12 month rolling total) Oct- 18 Jul- 18 Apr- 18 Jan- 18 Oct- 17 Jul- 17 Apr- 17 Jan- 17 Oct- 16 Jul- 16 Apr- 16 Jan- 16 Oct- 15 Jul- 15 Apr- 15 Jan- 15 Oct- 14 Jul- 14 Apr- 14 Jan- 14 Oct- 13 Jul- 13 Apr- 13 Jan- 13 Oct- 12 Jul- 12 Apr- 12 Jan- 12 Oct- 11 Jul- 11 Apr- 11 Jan- 11 Oct- 1 Jul- 1 7 6 5 4 Ferry - exempt services Ferry non-exempt services 3 6.5 6. 5.5 5. 4.5 4. 3.5 3. Millions Millions 1.2 AT Metro Boardings breakdown 1.2.1 Total Patronage (12 month rolling total) 1 9 8 7 6 Millions 5 4 Oct- 18 Jul- 18 Apr- 18 Jan- 18 Oct- 17 Jul- 17 Apr- 17 Jan- 17 Oct- 16 Jul- 16 Apr- 16 Jan- 16 Oct- 15 Jul- 15 Apr- 15 Jan- 15 Oct- 14 Jul- 14 Apr- 14 Jan- 14 Oct- 13 Jul- 13 Apr- 13 Jan- 13 Oct- 12 Jul- 12 Apr- 12 Jan- 12 Oct- 11 Jul- 11 Apr- 11 Jan- 11 Oct- 1 Jul- 1 Bus Rail Ferry 1.2.3 Train Patronage (12 month rolling total) 23 21 19 17 15 13 11 Millions 9 7 5 Oct- 18 Jul- 18 Apr- 18 Jan- 18 Oct- 17 Jul- 17 Apr- 17 Jan- 17 Oct- 16 Jul- 16 Apr- 16 Jan- 16 Oct- 15 Jul- 15 Apr- 15 Jan- 15 Oct- 14 Jul- 14 Apr- 14 Jan- 14 Oct- 13 Jul- 13 Apr- 13 Jan- 13 Oct- 12 Jul- 12 Apr- 12 Jan- 12 Oct- 11 Jul- 11 Apr- 11 Jan- 11 Oct- 1 Jul- 1 Rail

Table of Contents Page 7. 1. Summary of indicators 1.1 SOI performance measures 1.2 AT Metro patronage breakdown 2. Monthly indicators by Key Priority 2.1 Deliver an efficient and effective transport system 2.2 Focus on the customer 2.3 Improve the safety of the transport system 2.4 Ensure value for money across AT's activities

2.1 Deliver an efficient and effective transport system Page 8. 2.1.1 Total public transport boardings (millions) 2.1.2 Monthly public transport boardings (millions) 12 Millions 95 9 85 8 75 7 65 6 55 217/18 216/17 215/16 214/15 213/14 212/13 211/12 SOI Monthly trajectory to meet SOI Target Jun 19 May 19 Apr 19 Mar 19 Feb 19 Jan 19 Dec 18 Nov 18 Oct 18 Sep 18 Aug 18 Jul 18 Actual annual boardings 12 month rolling total PT patronage totalled 94,949,41 passenger boardings for the 12 months to October 218, an increase of 1.% on the 12 months to September 218 and an increase of 5.% on the 12 months to October 217. Millions 1 8 6 4 2 Aug-18 Oct-18 Feb-19 Apr-19 Previous year result (216/17) Monthly patronage to meet SOI target Actual result October 218 monthly patronage was 8,66,319, an increase of 12.5% (957,214) on October 217. The normalised change is an increase of ~9.4% once adjustments are made to take into account special events and the number of business and weekend days in the month. Boardings (millions) 1 9 8 7 6 5 4 3 2 1 2.1.3 Boardings on rapid or frequent network 15.% 1.% 5.% May 19 Mar 19 Jan 19 Nov 18 Sep 18 Jul 18 May 18 Mar 18 Jan 18 Nov 17 Sep 17 Jul 17.% Ferry connected, local, targeted Bus connector, local, targeted Bus FTN Bus RTN Rail RTN Total boardings growth rate RTN + FTN growth rate Growth rates (from 216/17 results) AT has an SOI target of increasing RTN and FTN boardings at a faster rate than total boardings. This figure shows the 12 month rolling patronage total for each PT service layer. Rates of growth are based on the 12 month rolling total to October 218 compared with the 12 month rolling total to October 217. RTN + FTN patronage increased by 17.8% for the 12 months to October 218, a faster rate than total patronage, which increased by 5.%.

2.1 Deliver an efficient and effective transport system Page 9. 2.1.4 Rail boardings (12 month rolling total) 2.1.5 Bus boardings (12 month rolling total) 25 8 Millions 2 15 1 5 211/12 212/13 213/14 214/15 215/16 216/17 217/18 Jun 19 May 19 Apr 19 Mar 19 Feb 19 Jan 19 Dec 18 Nov 18 Oct 18 Sep 18 Aug 18 Jul 18 Rail patronage totalled 2,491,646 passenger boardings for the 12 months to October 218, an increase of.7% on the 12 months to September 218 and an increase of.6% on the 12 months to October 217. Millions 7 6 5 4 3 2 1 211/12 212/13 213/14 214/15 215/16 216/17 217/18 Jun 19 May 19 Apr 19 Mar 19 Feb 19 Jan 19 Dec 18 Nov 18 Oct 18 Sep 18 Aug 18 Jul 18 Bus patronage totalled 68,317,394 passenger boardings for the 12 months to October 218, an increase of 1.1% on the 12 months to September 218 and an increase of 6.9% on the 12 months to October 217. SOI Monthly trajectory to meet SOI Target Actual annual boardings 12 month rolling total Actual Annual Boardings 12 Month Rolling Total 2.1.6 Ferry boardings (12 month rolling total) 7 6 Millions 5 4 3 2 1 211/12 212/13 213/14 214/15 215/16 216/17 217/18 Jun 19 May 19 Apr 19 Mar 19 Feb 19 Jan 19 Dec 18 Nov 18 Oct 18 Sep 18 Aug 18 Jul 18 Ferry patronage totalled 6,14,37 passenger boardings for the 12 months to October 218, an increase of.8% on the 12 months to September 218, and an increase of.1% on the 12 months to October 217. Actual Annual Boardings 12 Month Rolling Total

2.1 Deliver an efficient and effective transport system Page 1. 2.1.7 Rail business day average boardings 2.1.8 Bus business day average boardings 9, 3, Business day boardings 8, 7, 6, 5, 4, 3, 2, 1, Nov-16 May-17 Nov-17 May-18 Business day boardings on the rail network averaged 71,869 in the 12 months to October 218. This represents a 1.8% increase on the October 217 figure. Business day boardings 25, 2, 15, 1, 5, May-18 Nov-17 May-17 Nov-16 Business day boardings on the bus network averaged 234,41 in the 12 months to October 218. This represents a 6.7% increase on the October 217 figure. Monthly result 12 Month Rolling Average Monthly result 12 Month Rolling Average 2.1.9 Percentage of all PT trips using AT HOP 1% 9% 8% 7% 6% 5% 4% 3% 2% 1% % May-18 Nov-17 May-17 Nov-16 May-16 Jan-16 Nov-15 Jul-15 Total Bus Rail Ferry The proportion of all trips using AT HOP was 88.7% in October 218 (bus 93.3%, rail 86.1%, ferry 44.1%) down from 89.4% in September 218.

2.1 Deliver an efficient and effective transport system Kms 2.1.1 New cycleways added to regional cycle network (km) 12 1 8 6 4 2 Apr-19 Feb-19 Oct-18 Aug-18 SOI target (1 kms) Planned 218/19 monthly trajectory Cumulative kms added to regional cycle network YTD: 6.4 km The 218/19 target is to complete 1 km of new cycleways. Links to New Lynn (688 m) and Northcote Safe Routes main section (49 m) were completed in October 218. The monthly trajectory has been revised, reflecting that Northcote Safe Routes main section was completed in October 218. The remaining section (motorway bridge, 3 m) is still scheduled for June 219. 2.1.11 Annual number of cycle movements past selected sites 4,, 3,5, Number of cycling trips 3,, 2,5, 2,, 1,5, 1,, 5, Apr-19 Feb-19 Oct-18 Aug-18 SOI target Monthly trajectory to meet SOI target Cumulative Cycle Count in Auckland Page 11. Target exceeded. YTD: 1,121,693 (6.7% above target) YTD target: 1,51,279 329,34 cycle trips were recorded in October 218, against a target of 298,534. City centre and regional targets from previous years have been combined for the 218/19 SOI. 2.1.12 Active and sustainable transport mode share 7% % of active and sustainable mode share 6% 5% 4% 3% 2% 1% % 216/17 217/18 218/19 Schools with Travelwise Programme AM Commuters with Commute Programme SOI Target Target reported annually in June. The 217/18 active and sustainable transport mode share was 48% at schools with the Travelwise programme and 69% for AM peak commuters with a Travelwise Choices programme.

2.1 Deliver an efficient and effective transport system Page 12. 2.1.13 Average AM peak lane productivity 2.1.14 AM peak arterial road level of service 4, 35, 3, 25, 2, 15, 1, 5, In-Month Performance YTD Average SOI Target Target exceeded. In October 218, the average arterial road productivity was 33,244, exceeding the target of 21,. Year to date average productivity was 29,819. This indicates that the network continued to operate relatively efficiently in terms of people movement during the peak hour. The productivity is slightly better compared with September, largely attributable to the relatively higher operating speed across the network associated with school holidays in October. The key arterial routes included in this measure are shown in figure 2.1.9. Level of service % 1% 9% 8% 7% 6% 5% 4% 3% 2% 1% % Jun-18 Dec-17 Jun-17 Dec-16 Jun-16 Dec-15 Jun-15 A+B C D+E+F 12 month rolling total A+B+C In October 218, 83% of the network operated at good levels of service (LOS A-C). This is 7 percentage points higher (better) than last month, but 1 percentage point lower than October 217. In general, congestion levels were similar to 217, which suggests that the Waterview Connection has effectively offset the previous annual trend of a 2-3 percentage point increase in congestion levels. In the 12 months to October 218, 77% of the network was operating efficiently (LOS A C) during the AM Peak. Road productivity is a measure of the efficiency of the road in moving people during the peak hour. It is measured as the product of number of vehicles (including buses), their average journey speed and average vehicular occupancy. For urban arterials a value of 21, people-km/hour/lane is set as a target. This value is derived from the route productivity target of 55% included previously, and is equivalent to the movement of approximately 9 vehicles travelling at a constant speed of 2km/h along the length of the arterial. Level of service is measured by median speed as a % of the posted speed limit and categorised as follows: A: 9% and greater B: 7 9% C: 5 7% D: 4 5% E: 3 4% F: less than 3% Level of service D F broadly represent "congested" conditions.

2.1 Deliver an efficient and effective transport system Page 13. 2.1.15 Map showing arterial productivity routes 2.1.16 Congestion map AM peak This map shows the 3 monitored arterial routes used to determine the average AM peak period lane productivity (2.1.13). This map shows the typical level of service across the arterial and motorway networks during the AM peak hour (7.3 8.3) for October 218. See the AM peak arterial road level of service graph (2.1.14) for an explanation of the levels of service.

2.1 Deliver an efficient and effective transport system Page 14. 2.1.17 Congestion map inter-peak 2.1.18 Congestion map PM peak This map shows the typical level of service across the arterial and motorway networks during the interpeak period (9 am 4 pm) for October 218. See the AM peak arterial road level of service graph (2.1.14) for an explanation of the levels of service. This map shows the typical level of service across the arterial and motorway networks during the PM peak hour (4.3 5.3) for October 218. See the AM peak arterial road level of service graph (2.1.14) for an explanation of the levels of service.

2.1 Deliver an efficient and effective transport system 2.1.19 Median travel speed across arterial and motorway network 2.1.2 Reliability: additional travel time needed relative to typical travel time Page 15. Speed (km/h) 6 55 5 45 4 35 3 AM peak Inter-peak PM peak- 12m rolling average Free flow speed PM peak AM peak- 12m rolling average Inter-peak- 12m rolling average Additional time needed relative to typical peak travel time (%) 7% 6% 5% 4% 3% AM peak Inter-peak PM peak- 12m rolling average PM peak AM peak- 12m rolling average Inter-peak- 12m rolling average This figure shows median travel speed across the arterial and motorway networks during the AM peak, inter-peak and PM peak periods. The average free flow speed of 58.4 km/hr has been provided as a comparator. During October 218, the median travel speed during the AM peak was 44 km/hr, compared with 42 km/hr in September 218 and a 12 month rolling average of 42.1 km/hr. This figure shows the difference between the typical (median) and the 85th percentile* travel time, on the combined arterial and motorway network, for the AM peak, inter-peak and PM peak. This is a measure of reliability. Reliability is a measure in percentage of how much variation a driver would experience from their day to day journey time in addition to a typical experience (median travel time), the smaller the percentage the better the reliability. Less than 5% additional travel time needed relative to typical travel time is regarded reliable in view of a driver s experience, 5%-7% is considered unreliable but tolerable and above 7% is deemed totally unreliable. In the October 218 AM peak, the 85th percentile was 5% longer than the typical travel time. The rolling average illustrates that the reliability remains at a desirable level during inter-peak period, whereas AM and PM peaks are mostly showing unreliable travel times. However, a consistent down trend is picked up from July 217 onwards for both AM and PM peaks, indicating travel time reliability is gradually improving across the network. *85% of all trips will take less time than the 85th percentile.

2.1 Deliver an efficient and effective transport system Page 16. 2.1.21 Proportion of the freight network operating at Level of Service C or better during the inter-peak 2.1.22 Map showing key freight routes 1% Target exceeded. Level of service % 9% 8% 7% 6% 5% 4% 3% 2% 1% % Aug-18 Oct-18 Feb-19 A+B C D+E+F SOI Target: 85% YTD Average total A+B+C Apr-19 In October 218, 93% of the strategic freight network operated at good levels of service (LOS A-C), and 94% for the year to date. Broken down by arterial and Motorway components, 89% and 96% respectively operated efficiently, indicating that freight vehicles had a particularly good experience on the Motorway. Of the segments that experienced some congestion, most tended to be at Motorway interchanges or near busy activity centres such as near town centres. This is a new measure, as the SOI target for freight routes now measures the strategic freight network rather than five select routes. Level of service is measured by median speed as a % of the posted speed limit and categorised as follows: A: 9% and greater B: 7 9% C: 5 7% D: 4 5% E: 3 4% F: less than 3% Level of service D F broadly represent "congested" conditions. The freight network comprises key freight routes on key arterials and the Motorway network, as defined in the freight network map (above). The freight network Level of Service (LOS) is measured by average speed during the interpeak period as a percentage of the posted speed limit for the freight network routes. LOS A, B and C represents efficient and stable traffic conditions with average travel speeds of at least 5% of the posted speed limit. At least 85% of the freight network is to operate at efficient levels.

Page 17. 2.1 Deliver an efficient and effective transport system 2.1.23 Parking occupancy rates (peak 4-hour, on street) Non-reporting period. 2.1.24 Off-street parking occupancy rates On street peak occupancy % 1% 9% 8% 7% 6% 5% May-18 Nov-17 May-17 Nov-16 May-16 Jan-16 Nov-15 Jul-15 On Street Peak Occupancy 7 9% Target Range 12 month rolling average August on-street occupancy was 78.1%. The 12 month rolling average in August 218 is 77.3%. In obtaining its on street occupancy figure AT has moved from a consultant survey to an internal data driven method using transactional data from Pay by Plate machines and AT Park May results have included 5% factor as the noncompliant component (made up of the small group of people that do not pay for parking). Note: The four-hour peak period is defined as the top four busiest hours of the day. These hours are not often coincidental and can vary depending on contributing factors. On-street parking occupancy is surveyed in three central city parking zone precincts: Shortland/High Street, Karangahape Road and Wynyard Quarter. AT off-street peak occupancy % 1% 9% 8% 7% 6% 5% May-18 Nov-17 May-17 Nov-16 May-16 Jan-16 Nov-15 Jul-15 AT Off-Street Peak Occupancy 8% - 9% Target Range The off-street parking occupancy rate for October 218 of 85.3% is within the 8% to 9% occupancy target range. AT off-street car parks monitored are those at Civic, Downtown and Victoria Car Parking Buildings. 2.1.25 Heavy vehicle permits processed 2.1.26 ATOC managed incidents Number of permits 1 9 8 7 6 5 4 3 2 1 May-18 Nov-17 May-17 Nov-16 May-16 Jan-16 Number of HPMV permits processed Number of overweight permits processed % of permits processed within target timeframes 1% 95% 9% 85% 8% In October 218, 78 overweight permit applications and 49 HPMV permit applications were processed. In total, all 568 permits were processed within the KPI target timeframes (2 days for single and multi trip, 3 days for continuous trip and 4 days for HPMV permits). Number of road network incidents 35 3 25 2 15 1 5 Apr-19 Feb-19 Oct-18 Aug-18 Jun-18 May-18 Apr-18 Feb-18 Dec-17 Nov-17 Oct-17 Aug-17 Significant Serious Headline Catastrophic The figure shows the number of significant, serious, headline and catastrophic incidents managed by ATOC each month. ATOC managed 277 significant incidents, 43 serious incidents, and 1 headline incident during October 218. The Auckland Transport Operations Centre (ATOC) is a multi-agency initiative that manages incidents on both AT s local road and NZTA s state highway networks. The centre is responsible for managing incidents from Taupo to Cape Reinga.

2.1 Deliver an efficient and effective transport system Page 18. In vehicle Travel Time (minutes) In vehicle Travel Time (minutes) In vehicle Travel Time (minutes) 1 8 6 4 2 1 8 6 4 2 1 8 6 4 2 The following graphs demonstrate travel time reliability on six key arterial routes to and from the CBD. The median travel speed and 15th to 85th percentile range for car is shown for each route, and bus, train or bus and train where relevant. Albany to CBD Travel Time by Mode 6: 7: 8: 9: 1: 11: 12: 13: 14: 15: 16: 17: 18: 19: Hour Starting 6: 7: 8: 9: 1: 11: 12: 13: 14: 15: 16: 17: 18: 19: Hour Starting Weekdays Airport to CBD Travel Time by Mode Car (15% 85%) Bus (15% 85%) Car Median Bus Median Weekdays October 218 Howick to CBD Travel Time by Mode 6: 7: 8: 9: 1: 11: 12: 13: 14: 15: 16: 17: 18: 19: Hour Starting Car (15% 85%) Bus (15% 85%) Car Median Bus Median Weekdays Car (15% 85%) Bus (15% 85%) Train & Bus (15% 85%) In vehicle Travel Time (minutes) In vehicle Travel Time (minutes) In vehicle Travel Time (minutes) 1 8 6 4 2 1 8 6 4 2 1 8 6 4 2 CBD to Albany Travel Time by Mode 6: 7: 8: 9: 1: 11: 12: 13: 14: 15: 16: 17: 18: 19: Hour Starting 6: 7: 8: 9: 1: 11: 12: 13: 14: 15: 16: 17: 18: 19: Hour Starting Weekdays October 218 CBD to Airport Travel Time by Mode 6: 7: 8: 9: 1: 11: 12: 13: 14: 15: 16: 17: 18: 19: Car (15% 85%) Bus (15% 85%) Car Median Bus Median Weekdays CBD to Howick Travel Time by Mode Hour Starting Car (15% 85%) Bus (15% 85%) Car Median Bus Median Weekdays October 218 Car (15% 85%) Bus (15% 85%) Train & Bus (15% 85%) The Rapid Transit Network (Train and NEX travel) remains consistent through the day, and can provide significant travel time savings for commuters during the peak periods. In October 218, NEX represents a travel time saving of up to 3 minutes from Albany to CBD during AM peak relative to cars, and up to 1 minutes saving during PM peak. Train provides the most reliable travel time across all modes, and achieves significant travel time saving of up to 2 minutes or more across all routes available to a train option during peak periods. This is especially the case for the Panmure to CBD route there the train is up to 2 minutes quicker than both car and bus alternatives throughout the day. For the routes that lack continuous bus lane provision, bus travel times compare unfavourably relative to that for general traffic. Note: Due to the changes of the New Eastern Bus Network, only Express Buses are servicing directly between Howick and CBD which operate during peak hours only.

2.1 Deliver an efficient and effective transport system Page 19. In vehicle Travel Time (minutes) In vehicle Travel Time (minutes) In vehicle Travel Time (minutes) 1 8 6 4 2 1 8 6 4 2 1 8 6 4 2 The following graphs demonstrate travel time reliability on six key arterial routes to and from the CBD. The median travel speed and 15th to 85th percentile range for car is shown for each route, and bus, train or bus and train where relevant. Manukau to CBD Travel Time by Mode 6: 7: 8: 9: 1: 11: 12: 13: 14: 15: 16: 17: 18: 19: Hour Starting Panmure to CBD Travel Time by Mode 6: 7: 8: 9: 1: 11: 12: 13: 14: 15: 16: 17: 18: 19: Hour Starting Westgate to CBD Travel Time by Mode 6: 7: 8: 9: 1: 11: 12: 13: 14: 15: 16: 17: 18: 19: Hour Starting Weekdays October 218 Car (15% 85%) Train (15% 85%) Car Median Weekdays October 218 Car (15% 85%) Bus (15% 85%) Train (15% 85%) Car Median Bus Median Train Median Weekdays October 218 Car (15% 85%) Bus (15% 85%) Car Median Bus Median In vehicle Travel Time (minutes) In vehicle Travel Time (minutes) In vehicle Travel Time (minutes) 1 8 6 4 2 1 8 6 4 2 1 8 6 4 2 CBD to Manukau Travel Time by Mode 6: 7: 8: 9: 1: 11: 12: 13: 14: 15: 16: 17: 18: 19: Hour Starting CBD to Panmure Travel Time by Mode 6: 7: 8: 9: 1: 11: 12: 13: 14: 15: 16: 17: 18: 19: Hour Starting 6: 7: 8: 9: 1: 11: 12: 13: 14: 15: 16: 17: 18: 19: Hour Starting Weekdays October 218 Car (15% 85%) CBD to Westgate Travel Time by Mode Train (15% 85%) Car Median Weekdays October 218 Car (15% 85%) Bus (15% 85%) Train (15% 85%) Car Median Bus Median Train Median Weekdays October 218 Car (15% 85%) Bus (15% 85%) Car Median Bus Median The Rapid Transit Network (Train and NEX travel) remains consistent through the day, and can provide significant travel time savings for commuters during the peak periods. In October 218, NEX represents a travel time saving of up to 3 minutes from Albany to CBD during AM peak relative to cars, and up to 1 minutes saving during PM peak. Train provides the most reliable travel time across all modes, and achieves significant travel time saving of up to 2 minutes or more across all routes available to a train option during peak periods. This is especially the case for the Panmure to CBD route there the train is up to 2 minutes quicker than both car and bus alternatives throughout the day. For the routes that lack continuous bus lane provision, bus travel times compare unfavourably relative to that for general traffic.

2.2 Focus on the customer Page 2. 2.2.1 Percentage of public transport passengers satisfied with their public transport service 2.2.2 Percentage of passengers satisfied with their train service Satisfaction % 1% 9% 8% 7% 6% Non reporting period. In September 218, overall satisfaction with public transport services (91%) was unchanged compared with the June 218 result (91%). Satisfaction % 1% 9% 8% 7% 6% Non reporting period. In September 218, satisfaction with train services (93%) was up one percentage point compared with the June 218 result (92%). 5% 4% Dec-15 Jun-16 Jun-17 Dec-16 Dec-17 Jun-18 Overall PT Service SOI Target (85%) Satisfaction was unchanged compared with the September 217 result. 5% 4% Dec-15 Jun-16 Dec-16 Jun-17 Dec-17 Train Service Jun-18 Satisfaction was down one percentage point compared with the September 217 result. 2.2.3 Percentage of passengers satisfied with their bus service 2.2.4 Percentage of passengers satisfied with their ferry service 1% 1% 9% Non reporting period. 9% Non reporting period. Satisfaction % 8% 7% 6% 5% 4% Dec-15 Jun-16 Dec-16 Jun-17 Jun-18 Dec-17 Bus Service In September 218, satisfaction with bus services (91%) was unchanged compared with the June 218 result (91%). Satisfaction was unchanged compared with the September 217 result. Satisfaction % 8% 7% 6% 5% 4% Dec-15 Jun-16 Dec-16 Jun-17 Dec-17 Ferry Service Jun-18 In September 218, satisfaction with ferry services (89%) was unchanged compared with the June 218 result (89%). Satisfaction was down two percentage points compared with the September 217 result.

2.2 Focus on the customer Page 21. 2.2.5 Percentage of residents satisfied with the quality of roads in the Auckland region 2.2.6 Percentage of residents satisfied with the quality of footpaths in the Auckland region Satisfaction % 1% 9% 8% 7% 6% 5% 4% Dec-15 Jun-16 Dec-16 Jun-17 Dec-17 Jun-18 Non reporting period. In September 218, satisfaction with the quality of roads in Auckland (62%) was up one percentage point compared with the June 218 result (61%). Satisfaction was up one percentage point compared with the September 217 result. Satisfaction % 1% 9% 8% 7% 6% 5% 4% Dec-15 Jun-16 Dec-16 Jun-17 Dec-17 Jun-18 Non reporting period. In September 218, satisfaction with the quality of footpaths in Auckland (57%) was up one percentage point compared with the June 218 result (56%). Satisfaction was unchanged compared with the September 217 result. Quality of roads in the Auckland region Quality of footpaths in the Auckland region 2.2.7 Percentage of residents satisfied with the surface of all sealed roads in Auckland region Satisfaction % 1% 9% 8% 7% 6% 5% 4% Dec-15 Jun-16 Dec-16 Jun-17 Dec-17 Jun-18 Surface of all sealed roads in the Auckland region Non reporting period. In September 218, satisfaction with the surface of all sealed roads in Auckland (63%) was down up percentage point compared with the June 218 result (62%). Satisfaction was down one percentage point compared with the September 217 result. 2.2.8 Percentage of residents satisfied with road safety in the Auckland region Satisfaction % 1% 9% 8% 7% 6% 5% 4% Dec-15 Jun-16 Dec-16 Jun-17 Dec-17 Jun-18 Overall road safety in the Auckland region Non reporting period. In September 218, satisfaction with road safety in Auckland (59%) was unchanged compared with the June 218 result (59%). Satisfaction was down one percentage point compared with the September 217 result.

2.2 Focus on the customer Page 22. 2.2.9 PT punctuality (weighted average across all modes) 2.2.1 Rail services punctuality 1% 98% 96% 94% 92% 9% 88% 86% 84% 82% 8% Oct-16 Oct-17 Apr-17 Oct-18 Apr-18 Weighted Average Punctuality Actual YTD Average SOI Target (94.5%) Apr-19 Target exceeded (YTD average to October 218 = 97.5%; SOI target 94.5%). PT weighted average punctuality for the month of October 218 was 97.4%. Punctuality is measured by the percentage of total scheduled services leaving their origin stop no more than one minute early or five minutes late. 1% 98% 96% 94% 92% 9% 88% 86% 84% 82% 8% Oct-17 Apr-17 Oct-16 Rail Punctuality Actual Apr-19 Oct-18 Apr-18 12 Month Rolling Average Rail service punctuality in October 218 was 99.%, and 98.4% for the 12 months to October 218. Punctuality is measured by the percentage of total scheduled services leaving their origin stop no more than one minute early or five minutes late. 2.2.11 Bus services punctuality 2.2.12 Ferry services punctuality 1% 98% 96% 94% 92% 9% 88% 86% 84% 82% 8% Apr-17 Oct-16 Bus Punctuality Actual Oct-17 Apr-19 Oct-18 Apr-18 12 Month Rolling Average Bus service punctuality in October 218 was 97.%, and 96.3% for the 12 months to October 218. Punctuality is measured by the percentage of total scheduled services leaving their origin stop no more than one minute early or five minutes late. Punctuality statistics for bus services are based on the number of sighted scheduled bus journeys during the month. 1% 98% 96% 94% 92% 9% 88% 86% 84% 82% 8% Oct-16 Oct-17 Apr-17 Ferry Punctuality Actual Apr-19 Oct-18 Apr-18 12 Month Rolling Average Ferry service punctuality in October 218 was 96.7% and 95.9% for the 12 months to October 218. Punctuality is measured by the percentage of total scheduled services leaving their origin stop no more than one minute early or five minutes late.

2.2 Focus on the customer Page 23. 2.2.13 Rail service performance 2.2.14 Rail punctuality based on arrival at final destination 1% 95% 9% 85% 8% 75% 7% 65% 6% May-18 Nov-17 May-17 Nov-16 May-16 Jan-16 Nov-15 Jul-15 Rail Punctuality Actual Punctuality in this figure is based on the percentage of rail services that arrive within 5 minutes of schedule at their final destination. Using this measure, rail service punctuality for the month of October 218 was 96.5% and 96.1% for the 12 months to October 218. 12 Month Rolling Average 2.2.15 Rail service delivery based on arrival at final destination 1% 99% 98% 97% 96% 95% 94% 93% 92% 91% 9% May-18 Nov-17 May-17 Nov-16 May-16 Jan-16 Nov-15 Jul-15 Rail Service Delivery Actual This measure is based on the percentage of rail services that arrive at their final destination. Rail service delivery for the month of October 218 was 98.5% and 97.8% for the 12 months to October 218. 12 Month Rolling Average

Page 24. 2.2 Focus on the customer 2.2.16 Percentage of Local Board members satisfied with Auckland Transport engagement % of local board members satisfied with AT engagement 1% 9% 8% 7% 6% 5% 4% 3% 2% 1% % 214/15 215/16 217/18 218/19 AT reporting to local board AT consultation with local board SOI Target Non-reporting period. Local board satisfaction was 56% for AT reporting to local board, and 42% for AT consultation with local board in 217/18. 217/18 targets for local board satisfaction with AT engagement is 6% for both reporting to local boards and consultation with local boards. Local board satisfaction results, sourced from the Auckland Council Elected Members Survey, are not available every year as the survey is only undertaken every 18 months. % of requests that received response within specified timeframe 2.2.17 Percentage of customer service requests relating to roads and footpaths which receive a response within specified time frames 1% 95% 9% 85% 8% 75% Oct-16 Actual SOI Target (85%) Apr-17 Oct-17 Apr-18 Oct-18 Apr-19 12 Month Rolling Average Target not met (12 month rolling average = 81.%, SOI target of 85%). The October 218 result was 8%. These data relate to jobs dispatched to our maintenance contractors by the call centre. It does not include escalations or queries sent to the AT area engineer to resolve and then dispatch to the contractor. These data will become available when CRM15 allows for queuing and the measuring of individual response times in light of the organisation's 1 day customer response service level.

2.2 Focus on the customer Number of calls 12, 1, 8, 6, 4, 2, 2.2.18 Call centre incoming calls and service levels May-18 Nov-17 May-17 Nov-16 May-16 Jan-16 Nov-15 Jul-15 HOP call volumes AC (AT related) call volumes - 24 hours AT Metro call volumes HOP service level AC (AT-related) service level AT Metro service level 1% 9% 8% 7% 6% 5% 4% 3% 2% 1% % Service levels AT HOP Call volumes increased by 6% compared with September 218. The service level decreased by 8 percentage points compared with September 218. Auckland Council (AT-related calls) 24 Hours Call volumes increased by 1% compared with September 218. The service level decreased by 14 percentage points compared with September 218. AT Metro Call Centre Call volumes increased by 22% compared with September 218, a decrease of 35% compared with October 217. The service level was 3 percentage points lower compared with September 218. App user sessions (thousands) 1,4 1,2 1, 8 6 4 2 2.2.19 AT app user sessions May-18 Nov-17 May-17 Nov-16 AT Metro Track my Bus AT Park AT Mobile Page 25. AT Mobile App user sessions increased by 12.7% in October 218 compared with September 218, and increased by 69.1% compared with October 217. AT Park App user sessions increased by 7.9% in October 218 compared with September 218. Track my Bus App user sessions decreased by 2.8% in October 218 compared with September 218. AT Metro App user sessions increased by 1.1% in October 218 compared with September 218. Website visits (thousands) 2, 1,8 1,6 1,4 1,2 1, 8 6 4 2 Jul-15 May-16 Jan-16 Nov-15 2.2.2 Website visits May-17 Nov-16 May-18 Nov-17 Visits to the Auckland Transport website totalled 1,268,846 in October 218, an increase of 1.2% compared with September 218. AT Mobile was released in May 217, combining the functionality of AT Metro and Track my Bus into one application. Support for AT Metro on ios was terminated, indicating the sharp drop in AT Metro user sessions. Support for AT Metro (Android) and Track my Bus remains while users are still active. AT Website

2.3 Improve the safety of the transport system Number of intersections addressed 2.3.1. Number of high risk intersections and sections of road addressed by Auckland Transport's safety programme 12 1 8 6 4 2 Jul 18 Aug 18 Sep 18 Oct 18 Nov 18 SOI target (1) Dec 18 Jan 19 Feb 19 Planned 218/19 monthly trajectory Mar 19 Apr 19 Number of intersections or sections of road May 19 Jun 19 Non reporting period. The 218/19 target is to address ten high risk intersections or sections of road as part of the safety programme. No work is expected to be completed in the first quarter, as the first projects are expected to be complete by the second quarter. Number of deaths and serious injuries 2.3.2 Change from the previous financial year in the number of fatalities and serious injury crashes on the local road network 8 7 6 5 4 3 2 1 21 211 212 213 214 215 216 217 12mths to Dec18 12mths to Nov18 12mths to Oct18 12mths to Sep18 12mths to Aug18 12mths to Jul18 12mths to Jun18 12mths to May18 12mths to Apr18 12mths to Mar18 12mths to Feb18 12mths to Jan18 Serious Injuries Deaths 12 month rolling trajectory to meet SOI Target The Local Road DSI target for the 218 calendar year is 681, 9 less than the 217 total of 69. The 12 month rolling total to July 218 was 572, 16% lower than the target trajectory of 684.8, and 11% lower than for the 12 months to July 217. For the 12 months to the end of July 218, local road deaths have decreased by 19% (from 57 to 46) and local road serious injuries have decreased by 16% (from 623 to 526). Please note that there is a three month time lag for local road death and serious injuries information, and that monthly figures can vary over time due to Police investigation outcomes and reporting timelines. Page 26. 2.3.3 Local road deaths and serious injuries (DSI) per 1 million vehicle km travelled (VKT) 9 8 Reported annually in June. DSI per 1M VKT 8 7 6 5 4 3 2 1 212/13 213/14 214/15 215/16 216/17 217/18 218/19 7 6 5 4 3 2 1 Total DSI The Local Road DSI per 1 million VKT on local roads for the 217 calendar year was 8.4. This is 3.5 more than the 217/18 SOI target. *The rate of local road deaths and serious injuries per 1 million vehicle kilometres travelled is an estimate of the exposure to crash-risk on the local road network, relative to vehicle travel. DSI per 1M VKT (LHS) Total DSI (RHS)

Page 27. 2.4 Ensure value for money across Auckland Transport's activities Farebox recovery % 2.4.1 PT farebox recovery (combined result with SOI measure) 55% 5% 45% The farebox recovery percentage is calculated by dividing the revenue from passengers by the cost of providing PT services. The formula = (Fare Revenue + SuperGold Card Payment) / (Fare Revenue + Subsidy + SuperGold Card Payments + CFS Payments). Farebox recovery % 9% 8% 7% 6% 5% 4% 3% 2% 1% 2.4.2 PT farebox recovery (by mode) The farebox recovery percentage is calculated by dividing the revenue from passengers by the cost of providing PT services. The formula = (Fare Revenue + SuperGold Card Payment) / (Fare Revenue + Subsidy + SuperGold Card Payments + CFS Payments). 4% May-18 Nov-17 May-17 Nov-16 May-16 Jan-16 Nov-15 Jul-15 SOI Target 46-5% Combined farebox recovery Total PT farebox recovery ratio in October 218 was 45.1%, compared with 46.2% in October 217. % May-18 Nov-17 May-17 Nov-16 May-16 Jan-16 Nov-15 Jul-15 Ferry Rail Bus The farebox recovery ratios for October 218 (and comparable 217 results) were: - Ferry 78.1% (79.8%) - Bus 42.4% (43.7%) - Rail 39.3% (39.9%) 2.4.3 PT subsidy per passenger kilometre 2.4.4 Percentage of the sealed road network that is resurfaced Dollars ($) $.6 $.5 $.4 $.3 $.2 $.1 $. Jul-15 Apr-19 Oct-18 Apr-18 Oct-17 Apr-17 Oct-16 Apr-16 Jan-16 Oct-15 Ferry Rail Bus Total The net subsidy per passenger km is calculated by dividing the cost (less fare revenue) of providing PT services by the distance travelled by all passengers. The results for October 218 (and comparable 217 results) were: - Bus $.366 ($.347) - Rail $.38 ($.277) - Ferry $.127 ($.16) - Total $.324 ($.299) Length of resurfacing / rehabilitation completed each month (blue bars) 1 9 8 7 6 5 4 3 2 1 Aug-18 Oct-18 Feb-19 Apr-19 7% 6% 5% 4% 3% 2% 1% % Length of local roads resurfaced or rehabilitated each month SOI target (6.%) Trajectory to meet 218/19 target Cumulative proportion of sealed local roads that have been resurfaced / rehabilitated Target not met. In October 218, 45.1 km of the local road network was resurfaced / rehabilitated. The YTD completed length of 81.6 km is less than the forecasted YTD length of 95. km. The 218/19 YTD completed length of 81.6 km is 19.% of the 43 km 218/19 programme. Proportion of sealed local roads that have been resurfaced / rehabilitated

2.4 Ensure value for money across Auckland Transport's activities Page 28. 2.4.5 Proportion of road assets in acceptable condition 2.4.6 Percentage of footpaths in acceptable condition 1% 1% 95% 9% 85% 8% 218/19 219/2 22/21 Target reported annually in March. Proportion of road assets in acceptable condition is a new measure in the 218/19 SOI. 95% 9% 85% 8% 213/14 214/15 215/16 216/17 217/18 218/19 Target reported annually in March. The 217/18 result for the percentage of footpaths in acceptable condition was 99% (down half a percentage point from 216/17). Roads in acceptable condition SOI Target (95%) Footpaths in acceptable condition SOI Target (95%) 2.4.7 Road maintenance standards (ride quality) as measured by smooth travel exposure (STE) for all urban roads 1% 2.4.8 Road maintenance standards (ride quality) as measured by smooth travel exposure (STE) for all rural roads 1% Road Maintenance Standards % 95% 9% 85% 8% 75% 7% 213/14 214/15 215/16 216/17 217/18 218/19 Target reported annually in March. The 217/18 result for road maintenance standards (ride quality) as measured by smooth travel exposure (STE) for all urban roads was 84% (down three percentage points from 216/17). Road Maintenance Standards % 95% 9% 85% 8% 75% 7% 213/14 214/15 215/16 216/17 217/18 218/19 Target reported annually in March. The 217/18 result for road maintenance standards (ride quality) as measured by smooth travel exposure (STE) for all rural roads was 95% (up one percentage point from 216/17). Actual Urban SOI Target - Urban Actual Rural SOI Target - Rural