First the grid is assembled: bend it round so that the fixing hooks go from outside to inside.

Similar documents
INSTRUCTIONS 360 Y-DROP HAGIE STS 2015

Kari-Tek. Kari-Tek. Hydro Skeg Retro-Fitting Instructions. Instructions for retro-fitting of Hydro Skeg

Installation Instructions - Electric Aluminum Drive Systems for Arm Sets to 22 Electric Arm Systems , ,

Installation Instructions - Electric Steel Drive Systems for Arm Sets to ,

Booster Pump PB4-60 Replacement Kits

UNITY 2. Uni-DAAMS Manual. Version 1.3 (Changes to Section 1.1) March 2010

SIMPLAIR PIPING TOOL. JXT Company

Model PSI Compressor with 3-Gallon Air Tank 12VDC

Installation Instructions - Steel 4 Spring Arm Kits , , , ,

INSTALLATION INSTRUCTIONS

G250/G250 HP Compatibility of Upgrade Kit

Encore PE 50-lb Feed Hopper

Installation Instructions MODEL VSTI-A020 Tank Indicator Installation Model: VSTI-A020, Stainless Reverse Read System Versa Steel Inc. Guide Cables No

MAINTENANCE PROCEDURE FOR X 650

FITTINGS THREAD LUBRICANTS. Fittings 20,000 PSI

BOYLE S / CHARLES LAW APPARATUS - 1m long

Overhead Irrigation Installation Guide DOM Copyright First Tunnels Ltd 2012.

RB70 Automatic Diluent Valve Maintenance Manual. Version 1.1 November 2006 Written by Tino de Rijk. Page 1 of 23

NHR-X-X Encore Feed Hoppers

Pressure Dump Valve Service Kit for Series 2300 Units

EZ-Mount 4 Spring Enclosed System to 22 (Low & High Mount Applications) Installation Instructions

Pressure Dump Valve Service Kit for Series 3000 Units

RZR 900 Hitch Mount Plate

RG1200 Service and Repair Manual

HP10168 & HP10169 KITS HP10152 / HP10154 / HP10156

RST INSTRUMENTS LTD.

Parts List. Description. Additional Considerations. Installation Instructions. Dual/Elite Hydraulic Treadmill Kit (supplied by EPI)

Jet Swim Installation instruction

THE KEENEY MANUFACTURING COMPANY

Rocky Mountain Element Technical Manual. Rev B

NHR Powder Feed Hopper

Tern Rapid Transit Rack

Ambient Pressure Diving Ltd. Back Mounted Counterlungs. User Instruction Manual

Pilot Assembly Replacement Manual Parts Needed: Phillips head screwdriver #2 Two Adjustable Crescent Wrenches Replacement Pilot Assembly

HPIC D Hydrostatic Test Pump PRODUCT INFORMATION AND OPERATING INSTRUCTIONS

Important Note: Tighten lock nuts so the support tubes still swing freely see figure 2. There must be 1 2 threads of bolt past end of lock nuts.

UltRo Dual Flow Reverse Osmosis Water System

Fontaine Fifth Wheel Ultra LT Rebuild Procedures

Chapter 9 Accessories

SCUBAPRO Repair Guide. S600-S550 Second Stages

SCOUT DECK ANCHOR 3 1/4" BONDING SCREW

42 inch Mower for TimeCutter Z Riding Mowers. Note: Determine the left and right sides of the machine from the normal operating position.

CRYOGENIC TANK SERVICES - CHART RECORDER MANUAL

Aquor House Hydrant V2

Troyer s Gourd Rack 8 unit F R H O P

Installation Instructions - Super Six Electric Arm Kits with Underbody Pivots , , ,

INSTRUCTION MANUAL. January 23, 2003, Revision 0

2012-June-12 SECOND DRAFT Hobie Getaway Spinnaker Installation Instructions

QUALITY ALUMINUM BOAT LIFTS, INC. INSTRUCTIONS. Dominator Lake Lift

Materials : Stainless steel ASTM A351 CF8M

Rock. ky Altit. ude. Rev B

Anderson Greenwood Series 93 Positive Pressure POSRV Installation and Maintenance Instructions

BASIN AND WALL MIXER INSTALLATION INSTRUCTIONS

Brass Tubular. P-Traps. Item # Description Qty

K Page 1 of 48 Air Intake - Pg. 17

Santa Fe Cycles Assembly Guide Introduction

ACCESSORY KIT INSTALLATION INSTRUCTIONS

CamRT Sun Top Bimini Installation Instructions

SPM INDOOR TRAINING CYCLE ASSEMBLY MANUAL MODEL: SPM

830 SureFlo Soap Systems Installation Instructions. Foam Soap Cabinet... Pages 2-9 Liquid Soap Cabinet... Pages 10-19

Air Saving Valve reduction in 40% air consumption 40% air consumption Air consumption reduction ratio (%) Flow valve Flow valv

SAFETY RULES WARNING: READ THESE SAFETY RULES & OPERATORS MANUAL BEFORE HANDLING YOUR FIREARM

BR-2444 ROWING MACHINE

TWO POST RAM PACKAGE 55 GALLON

Assembly Instructions. -Cantilever Boat Lifts

WIND CLIPPER KTS ILLUM SCALE INC DEC CLIPPER WIND SYSTEM

A. TO PREPARE THE MACHINE FOR USE.

Replacing the Reverse Osmosis ( RO ) Membranes

APPENDIX A MAIN ASSEMBLIES

SHEET 2: VERTICAL INSTALLATION

LNG Regulator Test Kit

Parts List Poseidon Discovery

CALCIFICATION ACCRETION UNIT (CAU) ASSEMBLY, DEPLOYMENT AND RECOVERY

Installation Instructions

PAPR Flow Tester. instructions. part no WARNING

ASSEMBLY MANUAL HOBIE CATSY

Rocky Mountain Instinct / Pipeline Alloy Frame Assembly Guide. Date: April 7, 2017

CentriFlow Meter Integrated Air Entrainment System

Final Assembly Instructions Bikes with 16 Wheel Size

INSTALLATION INSTRUCTIONS. CVS 67CFR Pressure Reducing Instrument Supply Regulator INTRODUCTION

Halsey Taylor Owners Manual

INSTALLATION INSTRUCTIONS

LINDGREN-PITMAN, INC. LS-3 / LS-4 Line Setter

SANTANA STOWAWAY TANDEM WITH AIRLINER SAFECASE AND FTS FOAM TRAY SYSTEM ASSEMBLY AND DISASSEMBLY

Rocky Mountain Instinct / Pipeline Frame Assembly Guide. Date: March 31, 2017

FRAME FEATURES TABLE OF CONTENTS INTRODUCTION. A guide to your Cervélo C Series frame.

12S 1st Stage. -Maintenance Procedure-

KERSPLASH POOL CLIMBING WALL INSTALLATION INSTRUCTIONS

SECTION 2 RING MOUNT

Paddle Bar Replacement

Bladerider X8 Assembly Help Notes

FOR INSTALLING CO 2 BLENDER KIT (P/N IN BEER SYSTEM

1. A proper preparation of the cone and other material is inevitable prior to a CPTU test.

DN 1/4" to 3" Female BSP - 10 C C Max Pressure : 25 Bars ( up to DN 1 ) Specifications : Anti blow-out stem With PTFE packing Full bore

Using Your Bike Friday : Folding Rear Rack

Keel-stepped and deck-stepped masts,

1805 Series Relief Valves

PO Box 370 Phone: Swansea NSW 2281 Fax: AUSTRALIA Mobile: Web:

M32 CATAMARAN ASSEMBLY MANUAL

SUMMITTM 400 & 600. Natural Gas Barbecues. Step-By-Step Guide

Transcription:

How to install the low WOB kit The kit contains: * 2 grids (white) that are fixed at the inside of the counter lungs, next to the P ports, to keep the counter lungs open so that gas can flow in and out easy * 2 straight connectors that replace the elbows in the breathing hoses * 4 spacers that are placed between the housing and the closing plate to increase the lung volume a bit, and to make an opening at the side/bottom of the housing to allow water flow in and out more easy when breathing * a stainless steel grid that keeps the counter lung away from the opening at the lower part of the housing, so that the opening is not blocked * washers that are placed around the screw on places where there are no spacers, to keep an opening between the closing plate and the housing * longer screws to mount the closing plate again * the necessary tye raps First the grid is assembled: bend it round so that the fixing hooks go from outside to inside.

Now clip the hooks inwards so that the grid stay s round and.. fix a small tye rap so that the grid can not unclick again: put the block of the tye rap on the inside of the grid, so that when cut off no sharp end can touch the counter lung.

This is the way the grid will be placed inside each counter lung. On the grid for the inhale lung, the anti collaps tube is fixed, far enough away from the inclined side of the grid (the side of the P plug): use a small tye rap for this.

This is the way the grid + anti collaps tube is fixed inside the inhale lung. In the exhale lung, only the white grid is mounted, the short black anti collaps tube (if it was there) is not used any more.

To fix the grid to the P port, use one of the holes on the outside of the grid, so that the inclination of the grid follows exactly the inclination of the top of the housing. Make sure that the grid comes OVER the threaded part of the P plug: the tye rap must go straight trough the hole of the P port straight into a hole of the grid. (Beware! The grid must of course be mounted when the P port is fit on the housing: do not remove the P port for mounting the grid) Put the grid inside the lung, go with your hand inside and hold it in place, while fixing the tyerap: this is not easy, but after some trying it will work ) Do this now for the exhale lung and the inhale lung.

This is what it looks after mounting both the grids, and putting the counterlungs back in the correct place. For the ease of showing, the internal wiring of the cells was removed: this is not necessary for just mounting the low WOB kit, you can just leave it where it is. After mounting the grids the opening on the P ports must look this way: clear open, no lung material in front of the opening. (the rest of the tye rap is cut away to clear the opening complete)

Now put the stainless grid in place: the bottom side is put between the housing and the black liner, so that the sharp edges from the stainless grid never touch the counter lung. On the left and the right side the black liner protects the lungs from the sharp edges. The top side of the grid is bend upwards, so the grid can not be mounted inverse, and the soft side of the grid is always on the side of the counter lungs. (soft side means: you feel that the grid has a sharp side and a soft side when you rub with your hand on the surface. The soft side is automatically the side touching the lungs) Put the 4 spacers over the nuts of the housing and

gently position the closing plate on the unit without moving the spacers. Now close the complete unit again with the new screws: at the places where there is no spacer and where a venting opening must be, washers are placed to keep the unit open. On units where the bottom side has the same height as the sides (picture above), 4 washers are placed. (do not over tighten the screws, no need to damage them!)

On units where the bottom part is lower than the side, use the washers that were already there for increased height. Fix now all the screws, except on the top side where there is no spacer: no screw is needed there.

Install the new connectors on the breathing hose, replacing the elbows: for this you use the longer tye rap. By replacing the elbow, the total length of the breathing hose comes a bit shorter, so it is necessary to fix the unit high on your back, as was shown during the course. Same for the exhale side: to identify easy the exhale connector, you can put some red tape around the connector before fixing the tye rap.