Installation, operation & maintenance manual - original version

Similar documents
SEries 29 Hydrant valves installation, operation & maintenance manual

AVK SERIES 601, 602, 603 & 605 UNIVERSAL COUPLINGS, ADAPTORS & END CAPS INSTALLATION, OPERATION & MAINTENANCE MANUAL

Engineering Data Sheet

MODEL 200 KNIFE GATE VALVES INSTALLATION & MAINTENANCE MANUAL

Manual Actuated Boiler Blowdown Valves

BSA6T and BSA64T Stainless Steel Bellows Sealed Stop Valves Installation and Maintenance Instructions

641/01 AVK SWING CHECK VALVE OPERATION & MAINTENANCE MANUAL. AVK UK Limited OM270710

KBV21i and KBV40i Key Operated Boiler Blowdown Valves Installation and Maintenance Instructions

INSTRUCTIONS AND MAINTENANCE MANUAL SERIES: K

BUTTERFLY VALVES Series 800

KBV21i and KBV40i Air Actuated Boiler Blowdown Valves

Installation, Operation and Maintenance Manual for Back Pressure Regulator

WHEATLEY WHEATLEY SERIES 500 SWING CHECK VALVE. Installation, Operation and Maintenance Manual

Overview of types. T5-R B2/R B2 en v Subject to changes 1 / 4. k vs (Sequence 2)

WHEATLEY Series 500 Swing Check Valve

Pressure Reducing Valve DMV 750 set range: bar

PV4 and PV6 Piston Valves

Installation & Operation Manual Proven Quality since 1892

INSTRUCTIONS AND MAINTENANCE MANUAL SERIES: FK

MUELLER. Mega-Lite Drilling Machine. Reliable Connections. table of contents PAGE. Equipment 2. Operating Instructions 3-4. Parts Information 5

INSTRUCTIONS AND MAINTENANCE MANUAL SERIES: RT

Spirax SafeBloc TM DBB3 Double Block and Bleed Bellows Sealed Stop Valve. 1. Safety information. 2. General product information. 3.

A3S Bellows Sealed Stop Valve Installation and Maintenance Instructions

Differential Pressure Regulator Type Type 45-6 (0.1 to 1 bar, DN 15) Mounting and Operating Instructions EB 3226 EN

Telefon (+45) Telefax (+45)

MSC-P and MSC-N Manifolds for Steam Distribution and Condensate Collection

3-PIECE BALL VALVE, 3600 PSI/ PN 248, WITH ISO DIRECT MOUNTING PAD 306M SERIES/ PED Category II

Spilt body Flange ball valve. TC-205MFF-PN1640 User Manual English Version. Document No: TC-205MFF-PN1640.Ur-manual. Date: 2007/04/2617. Version: 1.

Water. VAG DUOJET Automatic Air Valve Single-chamber type PN 10/16/25/40 - DN KAT-A 1912

Eaton Filtration, LLC

Reduce pressure zone device suitable for high and medium hazard rated applications Flanged end connections

Pressure relief valve DHV 712 DN 65-80: 0,5-10 bar, DN : 0,3-4 bar, DN 100: 0,5-6 bar

M10HTi ISO Tobacco Ball Valve Screwed, SW, BW and Flanged versions

WHEATLEY Series 822/820 Swing Check Valve

Description. Functions. Technical data. Applications. Tests. On-Off 2 levels float control valve, closing at high level and opening at low level.

Translation of the original Operating Instructions for HKS rubber compensators

VALVCHEQ BACKFLOW PREVENTERS FIGURE RP03

Operating instruction

Spiratec ST14, ST16 and ST17 Sensor Chambers and sensors

Needle valve. Contents. User s Manual. (1) Be sure to read the following warranty clauses of our product 1. (2) General operating instructions 2

M45 ISO Ball Valve DN25 to 150 Installation and Maintenance Instructions

Operating and Maintenance Instructions. VAG BETA 200 Gate Valve

Wafer Check Valve. Contents. User s Manual. (1) Be sure to read the following description of our product warranty 1

Mounting and Operating Instructions EB 3007 EN. Self-operated Pressure Regulators. Differential Pressure Regulators (opening) Type Type 42-25

Installation, Operation, and Maintenance Manual

INSTALLATION & MAINTENANCE INSTRUCTIONS - ORIGINAL VERSION AVK KNIFE GATE VALVES

Team Insert Valve Sample Specification The Insert Valve shall conform to the following:

AVK LARGE DIAMETER WEDGE GATE VALVES

APT14, APT14HC and APT14SHC Spares 2

AVS32 Stainless Steel Air Vent for Steam Systems Installation and Maintenance Instructions

INSTALLATION, OPERATION AND MAINTENANCE GUIDE

HM and HM34 Inverted Bucket Steam Traps Installation and Maintenance Instructions

SECTION BUTTERFLY VALVES

TP1 and TP2 Temporary Cone Shaped Strainers

Mounting and Operating Instructions EB 8546 EN. Type 4708 Supply Pressure Regulators. Translation of original instructions. Type Type

MUELLER A A Non-Adjustable. Vertical Indicator Posts. Reliable Connections. General Information 2. Technical Data 3.

Pressure Relief Valve DHV 718

TA-FUSION-P. Combined control & balancing valves Pressure independent combined balancing and control valves with independent EQM characteristics

CYL KNIFE GATE VALVES San Sebastian Spain

DelVal Flow Controls Private limited

MUELLER. A Wall Type. Indicator Post. Reliable Connections. General Information 2. Technical Data/ Dimensions 3. Installation 4-5.

CAST IRON SAFETY VALVE TYPE 6301

Contents. 1. General information BROEN BALLOMAX Steel Ball Valves Approvals Quality Management...2

TA10A and TA10P Steam Tracing Temperature Control Valves Installation and Maintenance Instructions

Mounting and Operating Instructions EB EN. Type Supply Pressure Regulator. with increased air capacity

TBV OPERATION AND MAINTENANCE MANUAL SERIES 2800: FLANGED BALL VALVE. For technical questions, please contact the following:

KTM 50 (DN ) Installation, maintenance and operating instructions

MST21 Stainless Steel Balanced Pressure Thermostatic Steam Trap

INSTALLATION COMMISSIONING, OPERATION & MAINTENANCE MANUAL

CRP INSTALLATION, OPERATING AND MAINTENANCE INFORMATION FOR INLINE SAMPLING VALVES

ATS430 turbidity sensor Retractable insertion assembly

Declaration of Conformity as per Directive 97/23/EC

MUELLER. Xp, & Lineseal 350 Butterfly Valves

MUELLER. A A Adjustable. Vertical Indicator Posts. Reliable Connections. General Information 2. Technical Data 3.

Steam Trap BK 15 (DN40, DN 50) Original Installation Instructions English

Rp [ ] Sv min. [ ] C215QP-B 15 1/ C215QP-D 15 1/ C220QP-F 20 3/ [ ]

Pressure Reducing Valve DMV 755 set range: 1,0-9,0 bar

Mounting and Operating Instructions EB 3017 EN. Self-operated Regulators

Section GATE VALVES

LARGE R/W GATE VALVES

INSTALLATION, OPERATION & MAINTENANCE MANUAL

RS(H)10,15 USER MANUAL. Read the complete manual before installing and using the regulator.

THE HF-300 SERIES. Operating and Service Manual. Series includes all variants of HF-300/301

Eaton Filtration, LLC

lead water to the next level NEEDLE VALVES

S1, S2, S3, S5, S6, S7, S8, S12 and S13 Separators Installation and Maintenance Instructions

THE BP-301 SERIES. Operating and Service Manual. Series includes all variants of BP-301 (LF 0.1Cv / MF 0.5Cv)

KTM OM-2 SPLIT BODY FLOATING BALL VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

Fig 1, Fig 12, Fig 13, Fig 14HP, Fig 16, Fig 16HP and Fig 16L Strainers

Pure-Flo Handwheel Operated Valves (903, 913, 963) Instruction Manual

Pressure relief valve

Differential pressure controller (PN 25) AVP - return and flow mounting, adjustable setting

Ball Float Steam Trap UNA 43 PN 16/CL 125/JIS 10K UNA 46 PN 40/CL 150/CL 300/JIS 10K/JIS 20K DN 80, 100, 150, 3", 4", 6"

FTGS14 Ball Float Steam Trap DN15 (½") to DN25 (1")

USER MANUAL. 1. Principle of operation. 2. Delivery condition. SPRING-LOADED SAFETY VALVES zarmak. Edition: 07/2016 Date: V (ex.

Fig 12, Fig 14HP, Fig 16, Fig 16HP and Fig 16L Strainers

FLANGED TWO-PIECE BALL VALVES

SCA Series Inverted Bucket Steam Traps

PC3_ and PC4_ Pipeline Connectors

Model PIV UL/FM Post Indicator Valve. Maintenance and Operation Manual UL/FM Post Indicator Valve Configuration AWWA C515

Transcription:

Installation, operation & maintenance manual - original version AVK gate valves for water and wastewater Series 01, 02, 06, 12, 15, 18, 20, 26, 32, 33, 36, 38, 50, 55 and 636 COPYRIGHT AVK GROUP A/S 2018 - AVK INTERNATIONAL A/S 1/11 rev. J, August 2018

1. AVK series 06/30 exploded view 2/11

2. AVK series 06/30 parts list Item Description Material 1 Wiper ring NBR rubber 2 Bearing Polyamide 3 O-ring NBR rubber 4 O-ring NBR rubber 5 Thrust collar Brass, DZR CW602N 6 Manchette EPDM rubber 7 Stop ring Stainless steel 8 Stem Stainless steel 1.4104 (430F) 9 Bonnet bolts Stainless steel A2, sealed with hot melt 10 Bonnet Ductile iron GJS-500-7 (GGG-50) 11 Bonnet gasket EPDM rubber 12 Wedge Ductile iron, EPDM encapsulated 13 Body Ductile iron GJS-500-7 (GGG-50) 3/11

3. Table of contents 1. AVK series 06/30 exploded view...2 2. AVK series 06/30 parts list...3 3. Table of contents...4 4. Principle of operation...5 5. Health and safety at work...5 6. Receiving and storage...6 6.1 Product marking...6 6.1.1 New generation of gate valves...6 6.1.2 Other gate valves...7 7. Installation and commissioning...8 7.1 Pressure testing...9 8. Operation and maintenance...9 8.1 Operation...9 8.2 Maintenance...10 8.3 Replacement of stem seal nut...10 9. Recommended spare parts...11 4/11

4. Principle of operation AVK gate valves are designed for fully open or fully closed service installed in pipelines as isolating valves, and should not be used as control or regulating valves. The valves can be used for installation in potable water, wastewater, or neutral liquids depending on the specified application stated in the datasheet for the relevant product. Working conditions must be limited by temperature and pressure as stated in the datasheet. Normally work conditions are temperatures between -20 C and +70 C, flow velocity at maximum 5 m/s and up to 16 bar differential pressure. AVK gate valves may not be installed and used as anchor points, and should at all times be kept free from stress arising from the pipeline or installation. Operation of the gate valve is performed doing an either clockwise to close (CTC) or clockwise to open (CTO) rotating motion of the stem. When operating the valve stem the wedge moves up- or downwards on the threaded part of the stem. AVK gate valves are designed to be selfcleaning due to the full and straight bore. To get the full benefit of this AVK recommends to install the valve in upright position or in a 45 degree angle. Upside down installation is not recommended. Specific operation conditions may apply for valves equipped with an ISO flange for mounting gearbox or actuator. Please refer to the instructions from actuator manufacturer. 5. Health and safety at work Make sure all relevant health and safety issues and regulations are adhered to prior to and during installation or maintenance work carried out on this product. It is the end users responsibility to ensure that safe working practices are followed at all times. Whenever AVK s products are installed, operated or maintained the inherent dangers of pressurised liquids and gasses must be addressed. Before work on a valve or other piping component is undertaken, that may involve the release of internal pressure, the valve or line must be fully isolated, depressurised and drained prior to commencing the work. FAILURE TO COMPLY WITH THIS MAY RESULT IN SEVERE INJURY OR DEATH. All workers handling the product must be aware of the weight of the components or assemblies to be handled and manipulated during installation and maintenance. It is essential that staff undertaking these operations are adequately trained and it is the responsibility of the end user that only trained and competent staff undertake these duties. This manual has been designed to assist, but it cannot replace quality training in the workplace. However, AVK s technical staff are always available to answer questions related to specific problems that may not be covered by this manual. AVK s products are designed to be fit for purpose and to a high reliability standard. This provides a safe, low risk product when used correctly for the purpose for which it has been designed. However, this assumes that the equipment is used and maintained in accordance with this manual, and the user is advised to study it and to make it available to all staff that may need to refer to it. AVK cannot be held responsible for incidents arising from incorrect installation, operation or maintenance. The responsibility for this rests entirely with the end user. 5/11

6. Receiving and storage Unloading must be carried out carefully. The load must be put gently to the ground without dropping. Lift only by means of shackles in the flange bolt holes or slings around the body casting. If a forklift is used it shall have sufficient capacity to lift the required weight and have a valid inspection certificate. All workers involved in the unloading shall be able to perform their functions. They shall wear safety boots, safety vest, safety goggles and hard hat. All slings used for the lifting shall be of sufficient strength. A record shall document that they have been stored under cool, dry conditions away from sunlight and chemical atmosphere, and that they still perform according to their marked strength. Immediately after unloading the item should be inspected for compliance with specifications and damage in shipment. Compliance with specification check shall as a minimum comprise size, pressure class, etc. Damage in shipment check shall as a minimum comprise: coating, seating and sealing surfaces etc. or accessories or any other evidence of mishandling during shipment. Each item should be operated through one complete open-close cycle in the position in which it is to be installed. Storage shall be under dry, cool conditions, away from direct sunlight and corrosive or otherwise chemically active atmosphere. The valves must be stored in upright position and in an almost closed position to prevent long-term compression of the wedge rubber. Valves stored in cold storage must be protected against freezing. Series 36 gate valves with PE pipe connection have to be stored and handled carefully to avoid damage of the pipe. According to EN12007-2 the storage time for PE pipes is maximum 2 years from the production date (printed on the pipe). Therefore, the first in, first out principle is recommended. 6.1 Product marking 6.1.1 New generation of gate valves and series 636 Casting - valve side 1 Product dimension (DN) / pressure class (PN) Material / design standard Part number Label - valve side 1 AVK logo Item number Dimension / pressure class / coating Standard Casting material / rubber material Stem material Closing direction / application / temperature QR code 6/11

Casting - valve side 2 AVK logo Date / year of production Supplier number Label - valve side 2 AVK logo Series number Item number EAN number and barcode Internal production order number Serial number 6.1.2 Other gate valves Casting - valve side 1 Body series number AVK logo Product dimension (DN) Pressure class (PN) Casting material Supplier number Casting - valve side 2 Casting material Casting date Label - valve side 2 AVK logo EAN number Item number Dimension / pressure class / coating Standard Casting material / stem material / rubber material Closing direction / application / temperature Year of production Internal production order number Serial number 7/11

7. Installation and commissioning WARNING: Prior to installation make sure that all pressurised lines involved in the installation are isolated, depressurised and drained before starting any work. Failure to do so may result in sudden pressure release and subsequent severe injury or death. AVK gate valves must be protected from damage during transportation, loading and handling. Lifting by means of a crane or any other lifting device should only be done using the flange holes, lifting eyes or appropriate straps. Never suspend the valve in a handwheel, gearbox or actuator. Before installation, a visual check must be performed. Special attention should be paid to checking the stem, valve seat area, flanges and coating. Look for defects, bended or out of place parts, dents, scratches and other damages. Actions should be taken to repair or replace the valves if any defects are detected. AVK gate valves are supplied with a number of different connections to the pipeline. The use of flanges, sockets or spigot pipes depends on customers specifications. For all connection types correct craftsmanship must be applied. Gate valves with flanges must be installed using suitable gaskets, bolts, washers and nuts. Maiden flanges must be designed to adapt standard flange drillings appropriate to the specific flange drilling on the valve. Bolts must be tightening in a criss/cross pattern and bolt torques must be applied according to the flange gasket manufacturer s recommendations. Actions should be taken to ensure that the valve flanges are aligned to ensure an even pressure on the gasket surface. See table 1 for bolt sizes. Table 1 Figure 1 Bolt sizes DN Working pressure (bar) Quantity mm PN 10 PN 16 PN 10 PN 16 40 M16 M16 4 4 50 M16 M16 4 4 65 M16 M16 4 4 80 M16 M16 8 8 100 M16 M16 8 8 150 M20 M20 8 8 200 M20 M20 8 12 250 M20 M24 12 12 300 M20 M24 12 12 350 M24 M24 16 16 400 M24 M27 16 16 450 M24 M27 20 20 500 M24 M30 20 20 600 M27 M30 20 20 800 M30-24 - 900 M30 M36 28 28 1000 M33 M39 28 28 During installation in the pipeline system care must be taken to ensure that the connecting flanges of the pipeline getting in contact with the gate valve are arranged parallel to each other and are exactly aligned to avoid any tension loads acting upon the valve body. For the same reason, and to achieve a regular mounting of the flange sealings, it is also necessary to tighten the connecting bolts regularly in a cross pattern (see figure 1). The bolt tightening torques are to be informed by the gasket supplier. 8/11

Gate valves with sockets must be installed according to pipe manufacturers recommendations. Check that the outside diameter of the pipe corresponds to the inside diameter of the valve socket before installation. If gaskets are mounted in the valve, secure that the gasket is placed correct and is adequately lubricated. Gate valves with spigot pipe ends are to be installed either by means of appropriate welding or the use of a suitable coupling. For welding procedures please refer to the pipe manufacturers specifications. For choice of coupling please consult an AVK representative. For Supa Maxi gate valves please also refer to separate mounting instruction for Supa Maxi. 7.1 Pressure testing After installation, perform a pressure test before the trench is closed. Secure the pipe and gate valve against movement. If the pipeline and valve are tested with water prior to gas/air tests, ensure that the pipeline and valve are drained to prevent frost damage. AVK valves are designed to resist a test pressure of 1.5 x PN. 8. Operation and maintenance 8.1 Operation Gate valves in below ground installations are typically operated with an extension spindle. In manholes or in above ground installations handwheels or electric actuators may be used. Ensure proper sizing of the handwheel and/or operating keys, extension spindles and actuators. Please refer to AVK datasheets for further information. When installing gate valves mounted with electric actuators, please observe closing torques and number of turns from the datasheet. When the valve is installed in a chamber with an extension spindle going to above ground level, ensure that no vertical force from the extension spindle presses down directly on the valve stem top. The extension spindle must be supported by wall mounts or similar to prevent vertical forces and thereby supporting the weight of the extension spindle. For gate valves in sizes larger than DN350, installed in pipelines with a maximum flow according. to EN1074-1 and a differential operating/test pressure exceeding 10 bars, the opening torque needed to release the wedge from the valve seat may exceed the closing torque by around 30%. This should be taken into account when installing and sizing the actuation of the valve. Please contact AVK for further information regarding options/solutions to reduce or eliminate excessive opening torques. Once the valve has reached its fully open position, it is recommended to turn the stem slightly towards the closing position in order to release any stress on the stem thread. When closing the gate valve ensure that the appropriate torque and number of turns are applied to the valve. See table 2. 9/11

Table 2 Max. torques Max. torques new generation of gate valves and series 636 Valve Valve dimension Closing Free running Rupture Turns to dimension Closing Free running Rupture Turns to DN torque torque torque open DN torque torque torque open mm Nm Nm Nm mm Nm Nm Nm 40 40 6 400 11 40 25 3 250 12 50 40 6 400 11 50 25 3 250 12 65 60 6 400 14 65 25 3 250 17 80 60 6 400 17 80 35 3 400 17 100 80 6 400 21 100 35 3 400 21 125 80 6 500 26 125 40 3 500 26 150 80 12 600 26 150 40 3 600 26 200 120/100 5) 12 800 33/35 5) 200 80 3 800 33 250 180 12 1000 37 300 200 16 1200 44 350 300 24 1400 59 400 300 24 1600 59/50 4) 450 300 1) /450 2) /500 3) 25 1600 59 1) /39 2) /39 3) 500 300 1) /450 2) /500 3) 25 1600 59 1) /43 2) /43 3) 600 500 2) /700 3) 25 3200 53 1) /52 2) /53 3) 800 850 60 1720 70 6 bar/10 bar/16 bar 900 800/800/1100 300 2500 85 1000 800/800/1100 300 2500 85 1) series 02 and 20 2) series 06 and 26 3) series 55 4) series 36 5) series 15 To maintain full functionality of the valve throughout the expected life time frequent operation of the valve is recommended. Depending on the media flowing through the valve, the frequency of operation may vary from once a year to several times per month. 8.2 Maintenance WARNING: Prior to any maintenance work that requires disassembly make sure that the pressurised line involved is isolated, depressurised and drained before starting any disassembly. Failure to do so may result in sudden pressure release and subsequent severe injury or death. 8.3 Replacement of stem seal nut Gate valves designed with a replaceable stem sealing is part of the AVK product range. The stem sealing can be replaced regardless of the position of the valve. If it is necessary to replace the stem sealing under pressure, the following procedure must be followed: 10/11

1. Unscrew the stem seal nut in counterclock direction. 2. Take off the stem seal nut 3. Replace the stem seal nut unit including O-rings with a new one ordered from AVK International 4. Lubricate the nut threads with locking liquid medium strength 5. Mount the new stem seal nut by tightening it firmly clockwise with a torque of approx. 80 Nm This goes for gate valves up to DN400. For larger dimensions please refer to separate maintenance instruction. 9. Recommended spare parts As the gate valve is designed for installation directly in the ground, it is designed to be maintenance-free throughout the expected life time of the valve. Thus spare parts are not needed and repair of the valve in case of malfunction is not intended. In cases where spare parts are needed for maintenance or repair, only genuine AVK spare parts should be used. AVK accepts no responsibility for damage caused by failing non-avk parts. 11/11