Northern Indiana Public Service Company (NIPSCO) 2723 East 1500 North, Wheatfield, Indiana, USA Golder Associates Inc.

Similar documents
2018 INSPECTION REPORT

First Annual RCRA CCR Unit Inspection Report January 2016 RESTRICTED WASTE TYPE I LANDFILL OPERATING PERMIT NUMBER 37-01

Northern Indiana Public Service Company Michigan City Generating Station Primary Settling Pond Number Annual RCRA CCR Unit Inspection Report

CCR Landfill 2017 Annual Inspection Report NC1 Ash Disposal Area

CCR Landfill 2018 Annual Inspection Report North Omaha Ash Landfill

2016 Annual Landfill Inspection Report. SCE&G Wateree Station Class III Landfill

CCR Landfill 2015 Annual Inspection Report NC1 Ash Disposal Area

Annual CCR Landfill Inspection. Lansing Landfill. Interstate Power and Light Company. Prepared for:

Initial Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1

2018 Annual Inspection Report

Consulting Engineers and Scientists Annual Landfill Inspection Report. for the. Williams Station Highway 52 Class III Landfill

2016 Annual Inspection Report

Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1

Annual Inspection Report of CCR Impoundment and CCR Landfill Wenck Project # B

2016 Annual Inspection Report

2017 Annual Inspection Report

Whitewater Valley Station Surface Impoundment Coal Combustion Residual Annual Report

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

CCR Fugitive Dust Control Plan

CCR CLOSURE PLAN Sibley Slag Settling Impoundment Sibley Generating Station East Johnson Rd Sibley, Missouri

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

Written Closure Plan. Pawnee Station - Active CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016

CCR Certification: Fugitive Dust Control Plan (b) for the. West Ash Pond. at the. F. B. Culley Generating Station.

TABLE OF CONTENTS LEGAL NOTICE

D.B. Wilson Station CCR Landfill

Closure Plan for CCR Surface Impoundments

Written Closure Plan. Pawnee Station - North CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)

Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop San Antonio, Texas Project No

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)

CCR Closure Plan. CCR Certification: Written Closure Plan (b) & (c) for the. Landfill Sedimentation Pond. A. B. Brown Generating Station

Written Closure Plan. Cherokee Station - Active CCR Impoundments Public Service Company of Colorado Denver, Colorado.

Written Closure Plan. Comanche Station - Active CCR Surface Impoundment Public Service Company of Colorado Denver, Colorado

CLOSURE PLAN. CFR (b) GERS Bottom Ash Pond. Northeastern 3&4 Power Station Oologah, Oklahoma. October, 2016

ENGINEER S CERTIFICATION OF AQUIFER SEPARATION DEMONSTRATION (40 CFR )

CCR Closure Plan Ash Impoundment

October 16, GRDA CCR Landfill Compliance Report Grand River Dam Energy Center 8142 Hwy 412B PO Box 609 Chouteau, OK Dear Mr.

Green CCR Surface Impoundment

TABLE OF CONTENTS LEGAL NOTICE

FOUR CORNERS POWER PLANT CLOSURE PLAN (b) UPPER RETENTION SUMP FC_ClosPlan_011_

Holding Pond Annual Inspection Report

Coal Combustion Residuals Annual Fugitive Dust Control Report. Prepared for Montana-Dakota Utilities Company R.M. Heskett Station.

TABLE OF CONTENTS LEGAL NOTICE

TABLE OF CONTENTS 1.0 INTRODUCTION PLAN CERTIFICATION (B)(4) 1

COAL COMBUSTION RESIDUAL (CCR) FUGITIVE DUST CONTROL PLAN

COAL COMBUSTION RESIDUAL (CCR) FUGITIVE DUST CONTROL PLAN

FOUR CORNERS POWER PLANT CLOSURE PLAN (b) COMBINED WASTE TREATMENT POND (CWTP) FC_ClosPlan_012_

Coal Combustion Residuals Closure Plan

COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS. Prepared for:

CLOSURE PLAN. CCR (b) GERS East and West Bottom Ash Ponds. Pirkey Power Plant Hallsville, Texas. October, 2016

CHOLLA POWER PLANT CLOSURE PLAN (b) SEDIMENTATION POND CH_ClosPlan_004_

Holding Pond Annual Inspection Report

COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS. Prepared for:

Explosive gas migration monitoring for a sanitary landfill facility.

CLOSURE PLAN. CFR (b) Bottom Ash Pond Complex Cardinal Plant Brilliant, Ohio. September, 2016

CCR Fugitive Dust Control Plan

COAL COMBUSTION RESIDUALS FUGITIVE DUST CONTROL PLAN

Amended Written Closure Plan

LEGAL NOTICE. Report No. SL Revision: 0 Page No. i. Ottumwa Generating Station Notification of Intent to Initiate Closure

FUGITIVE DUST CONTROL PLAN

IDEM Indiana Department of Environmental Management Office of Land Quality P.O. Box 6015 Indianapolis, IN OLQ PH: (317)

Hazardous Waste Training Plan. Supersedes: 02/15/16 (Rev.02) Preparer: Owner: Approver: EHS Team Member EHS Team Member EHS Manager

CCR Unit Closure and Post-Closure Plan. The business of sustainability. Texas Municipal Power Agency Gibbons Creek Steam Electric Station

CLOSURE PLAN. CCR (b) GERS Landfill Area. Welsh Power Plant Pittsburg, Texas. October, 2016

CLOSURE PLAN. CFR (b) Document ID: GERS Bottom Ash Complex. Mountaineer Plant New Haven, West Virginia.

Cordova Harbor Page 2 of 9

Notice of Intent to Close Inactive CCR Surface Impoundments

Big Rivers Electric Corporation - Sebree Generating Station (R. A. Reid, R. D. Green and HMPL Station Two)

HISTORY OF CONSTRUCTION

New Castle County Guidelines for the Certified Construction Reviewer, Owner/Developer, Site Contractor and Professional Engineer

Big Rivers Electric Corporation - D.B. Wilson Generating Station. Fugitive Dust Control Plan for Coal Combustion Residuals

Statistical Method Certification, Coal Combustion Residuals Landfill, Reid Gardner Generating Station

AMEC010570_0001. Via . Mt. Polley Mine Tailings Facility Optimization Potential- Follow Up from Dam Safety Review 1.

FUGITIVE DUST CONTROL PLAN

Juneau Aurora Harbor

Subparts AA and BB - The Other RCRA Air Rules. Beginners aabb

AUDIT U.S. FISH AND WILDLIFE SERVICE WILDLIFE AND SPORT FISH RESTORATION PROGRAM GRANTS

III Code. TRACECA Maritime Safety and Security IMSAS workshop Kiev (Ukraine) III Code. Dr. Jens U. Schröder-Hinrichs

Update from Port Metro Vancouver Deltaport Third Berth Project Community Liaison Group. Meeting Date: August 28, Construction Update

What I ve Learned About Dam Safety Good, Bad and Ugly

Tiered Permitting Checklist Summary of Violations

Packwood Lake Intake Screen Velocity Test Report for Energy Northwest's Packwood Lake Hydroelectric Project FERC No Lewis County, Washington

Code(s) DOT 49 CFR 173.3:

HAZARDOUS WASTE OPERATIONS AND EMERGENCY RESPONSE (HAZWOPER)

Standards of Practice Emergency Shower/Eyewash Installation, Use, Testing & Maintenance

GAF Safety Data Sheet SDS # 2001 SDS Date: January 2016

September 9, Planning and Land Development Regulation Commission (PLDRC)

Ohio EPA. Division of Air Pollution Control. Engineering Guide #78. (also known as DSIWM Guidance Document #1001 and #1002)

PHASE 1 WIND STUDIES REPORT

Volume and Shoreline Changes along Pinellas County Beaches during Tropical Storm Debby

Advisory Circular. Legal Land Survey for AZR Clearance Attestation

12/22/ CHG 124 VOLUME 3 GENERAL TECHNICAL ADMINISTRATION

NSPS SUBPART Ka Check-off Form JULY 11, LAFAYETTE ROAD NO., ST. PAUL, MN

DEPARTMENT OF ENVIRONMENTAL PROTECTION Office of Oil and Gas Management

10-Hour OSHA Training

SECTION I: PRODUCT IDENTIFICATION (770) SECTION II - HAZARD IDENTIFICATION SECTION III - HAZARDOUS INGREDIENTS/IDENTITY INFORMATION

Figure 1 - Photo of Surveyed Area. Figure 2 - Void Survey Results

MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS

BROWNFIELD ASSESSMENT, REDEVELOPMENT & REMEDIATION

General Inspection Guidance for Waste Management Units Requiring Air Emission Controls Under RCRA Air Standard Subpart CC

Transcription:

Northern Indiana Public Service Company R.M. Schahfer Generating Station Fourth Annual RCRA CCR Unit Inspection Report Restricted Waste Type I Landfill - Operating Permit Number 37-01 Submitted to: Northern Indiana Public Service Company (NIPSCO) 2723 East 1500 North, Wheatfield, Indiana, USA 46392 Submitted by: 15851 South US 27, Suite 50 Lansing, Michigan, USA 48906 +1 517 482-2262 18102843 January 3, 2019

Table of Contents 1.0 INTRODUCTION... 1 2.0 FACILITY DESCRIPTION... 2 3.0 BACKGROUND AND DOCUMENT REVIEW SUMMARY... 2 4.0 2018 VISUAL INSPECTIONS... 4 5.0 CLOSING... 5 TABLES Table 1: Summary of Background Document Review... 2 ii

1.0 INTRODUCTION The United States Environmental Protection Agency (EPA) promulgated the Resource Conservation and Recovery Act (RCRA) Coal Combustion Residuals (CCR) Rule (Rule) on April 17, 2015, with an effective date of October 19, 2015. The Rule requires owners or operators of existing CCR landfills to have those units inspected on an annual basis by a qualified professional engineer in accordance with 40 CFR 257.84(b)(1). The annual qualified professional engineer inspections are required to be completed and the results documented in inspection reports (per 40 CFR 257.84(b)(2)) for CCR landfills. (Golder) was retained by Northern Indiana Public Service Company (NIPSCO) to perform the fourth annual inspection of the Restricted Waste Site Type I Landfill, permitted by the Indiana Department of Environmental Management (IDEM), per Permit Number 37-01, most recent approval dated May 23, 2018, a CCR landfill located at the R.M. Schahfer Generating Station (RMSGS, Site). The CCR Rule establishes national minimum criteria and new CCR management obligations for existing, new, and lateral expansions of CCR disposal units. One of the new obligations pertains to inspections, specifically; CCR unit owners/operators must initiate the following activities: weekly inspections and monthly instrument monitoring of CCR Units by October 19, 2015; and annual inspections of CCR units by January 18, 2016. This report presents the results of the fourth annual inspection of the CCR Landfill unit at the NIPSCO RMSGS, located in Wheatfield, Jasper County, Indiana. The inspection was conducted to comply with 257.84 of the CCR Rule. Per 40 CFR 257.84(b)(1), Golder reviewed available information regarding the status and condition of the CCR unit and performed an onsite visual inspection which was conducted on October 2, 2018. The objectives of the inspection included the following: Review of Operational Records (as applicable, see Section 3): Design and construction information. Results of previous structural stability assessments. Results of previous annual inspections. A visual inspection of the CCR unit to identify signs of distress or malfunction of the CCR unit. In accordance with 257.84(b)(2), this inspection report has been prepared by a qualified professional engineer documenting the operational records review, visual inspection, and identifying the following since the previous annual inspection. Any changes in geometry of the CCR Landfill since the previous annual inspection. The approximate volume of CCR contained in the CCR unit at the time of the inspection. Any appearances of an actual or potential structural weakness of the CCR unit, in addition to any existing conditions that are disrupting or have the potential to disrupt the operation and safety of the CCR unit. Any other change(s) which may have affected the stability or operation of the CCR unit since the previous annual inspection. 1

2.0 FACILITY DESCRIPTION NIPSCO was given approval for a minor modification to their operating permit from the Indiana Department of Environmental Management (IDEM) to operate a Type I, Restricted Waste Landfill (RWS I) at RMSGS on May 23, 2018 (Operating Permit 37-01). The active portions of the CCR Landfill take dry fly ash and other approved coal combustion wastes from the RMSGS Units and Michigan City Generating Station Units. The landfill is located east of the generating station and has a total permitted area (closed, active, and future) of waste placement of approximately 210 acres. The landfill footprint is divided into seven phases. Phases I, II, III, and IV were closed prior to the effective date of the CCR Rule. Phase V is lined and has been closed, and Phase VI is lined and currently active. Phase VII was under construction at the time of the October 2, 2018 inspection. Phase V and Phase VI have a soil/geosynthetics floor liner with a 3 horizontal to 1 vertical (3H:1V) perimeter containment berm with a crest elevation of approximately 667 feet above mean sea level (msl). The 3H:1V perimeter containment berm is currently approximately 13,000 feet long, measured along the crest. The maximum height of the closed portion of the landfill is approximately 726 feet msl. NIPSCO has determined that Phases V and VI of the landfill are subject to the CCR Rule. As such, this annual inspection pertains to Phases V and VI. Phase V is an approximately 18-acre phase located in the southwestern corner of the landfill footprint. At the writing of this report, Phase VI has nearly reached half capacity and Phase V was closed in 2017. Phase VI is an approximately 15-acre phase located directly to the north of Phase V. As of the timing of this report, waste placement activities were occurring within Phase VI. 3.0 BACKGROUND AND DOCUMENT REVIEW SUMMARY The existing reports reviewed for this assessment are summarized in Table 1 below. Table 1: Summary of Background Document Review Document Date Author NIPSCO Phase III FGD/Fly Ash Landfill Construction, R.M. Schahfer Generating Station, Wheatfield, Indiana, Contract Drawings NIPSCO Phase I FGD/Fly Ash Landfill Construction, R.M. Schahfer Generating Station, Wheatfield, Indiana, Phase I Landfill Reclosure, Intermediate Grading Plan NIPSCO Phase I FGD/Fly Ash Landfill Construction, R.M. Schahfer Generating Station, Wheatfield, Indiana, Phase I Landfill Reclosure, Details April 12, 1996 November 6, 1998 November 23, 1998 2

Document Date Author NIPSCO Phase I FGD/Fly Ash Landfill Construction, R.M. Schahfer Generating Station, Wheatfield, Indiana, Phase I Landfill Reclosure, Final Grading Plan NIPSCO Phase IV Fly Ash Landfill Closure, R.M. Schahfer Generating Station, Wheatfield, Indiana NIPSCO R.M. Schahfer Generating Station Specification. Front End Specifications for Phase IV Fly Ash Landfill Closure Construction Quality Assurance (CQA) (Includes CQA Plan) January 12, 1999 April 10, 2013 April 16, 2013 NIPSCO Phase VI Fly Ash Landfill Construction Contract Record Drawings, R.M. Schahfer Generating Station, Wheatfield, Indiana Northern Indiana Public Service Company R.M. Schahfer Generating Station First Annual RCRA CCR Unit Inspection Report January 2016 - Restricted Waste Type I Landfill - Operating Permit Number 37-01 November 25, 2014 January 2016 Sargent & Lundy NIPSCO R.M. Schahfer Generating Station, CCR Landfill Run-on and Run-off Control System Plan October 2016 Northern Indiana Public Service Company R.M. Schahfer Generating Station, Second Annual RCRA CCR Unit January 2017 3

Document Date Author Inspection Report, Restricted Waste Type I Landfill, Operating Permit Number 37-01 Weekly Inspection Reports 2017-2018 NIPSCO Minor Modification Request, Permit FP 37-01 NIPSCO R.M. Schahfer Generating Station Wheatfield, Indiana, Jasper County November 2017 NIPSCO and Weaver Consultants Group Northern Indiana Public Service Company R.M. Schahfer Generating Station, Third Annual RCRA CCR Unit Inspection Report, Restricted Waste Type I Landfill, Operating Permit Number 37-01 Solid Waste Land Disposal Facility - Minor Modification R.M. Schahfer Generating Station RWS 1, Jasper County, SW Program ID 37-01, Approval Letter January 2018 May 2018 IDEM 4.0 2018 VISUAL INSPECTIONS The 2018 onsite inspection of the active portions of the CCR Landfill (Phase VI) was performed by Ms. Tiffany Johnson, P.E. and Mr. Brian Brown of Golder on October 2, 2018. Ms. Johnson is a Professional Engineer licensed in the State of Indiana. Golder s inspectors were directed by Mr. Joe Kutch, Coal Combustion Residuals Program Manager with NIPSCO RMSGS. The inspection provides the following information as stipulated in 40 CFR 257.84(b): Any changes in geometry of the CCR Landfill since the previous annual inspection Phase VII was under construction at the time of the inspection. Other than active filling within Phase VI, there were no other changes noted to the landfill s geometry since the last inspection. The approximate volume of CCR contained in the CCR unit at the time of the inspection. Approximately 545,300 cubic yards (addition of 276,200 cubic yards since the previous inspection) in active Phases VI of the CCR Landfill. 4

Any appearances of an actual or potential structural weakness of the CCR unit, in addition to any existing conditions that are disrupting or have the potential to disrupt the operation and safety of the CCR unit. None were observed. Any other change(s) which may have affected the stability or operation of the CCR unit since the previous annual inspection. None were observed. Based on observations made on October 2, 2018, the overall condition of the active portions of the CCR Landfill is acceptable. No structural weaknesses or safety issues were observed within the berms, active areas or closed areas. Based on visual observations made on October 2, 2018, there were no visual conditions identified that would likely impact the operation of the active portions of the CCR Landfill. 5.0 CLOSING This report has been prepared in general accordance with normally accepted civil engineering practices to fulfill the Resource Conservation and Recovery Act (RCRA) reporting requirements in accordance with 40 CFR 257.84(b). Based on our review of the information provided by NIPSCO and on Golder s on-site visual inspection, the overall condition of the landfill is acceptable. Golder s assessment is limited to the information provided to us by NIPSCO and to the features that could be inspected visually in a safe manner. Golder cannot attest to the condition of subsurface or submerged structures. 5