SNCC Demographic Trends

Similar documents
TRANSPORTATION & MOBILITY

Plant City Walk-Bike Plan

Update on Regional Bicycle, Pedestrian, & Trail Planning. Presented to TCC November 21, 2014

SANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008

Multimodal Through Corridors and Placemaking Corridors

Planning Guidance in the 2012 AASHTO Bike Guide

Rail Station Fact Sheet DFW Airport North Station* (*station under construction with anticipated start of service in late 2018)

El Paso County 2040 Major Transportation Corridors Plan

Clackamas County Comprehensive Plan

New Castle County Intersection Crash Analysis

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

TRAFFIC IMPACT ANALYSIS

Rochester Downtown Bicycle Study 2009

Chapter 5 Future Transportation

Executive Summary Route 30 Corridor Master Plan

Bridgewater Complete Streets Prioritization Plan and Pedestrian Safety Assessment

CONNECTING PEOPLE TO PLACES

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A

2.0 Existing Conditions

Agency Advisory Group Meeting #3 and Walk Audit Anchorage Non-Motorized Plan

Rail Station Fact Sheet University of Dallas Station

Eliminate on-street parking where it will allow for a dedicated bus only lane %

5 CIRCULATION AND STREET DESIGN

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Performance Criteria for 2035 Long Range Transportation Plan

Washington County, Oregon

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Town of Bethlehem. Planning Assessment. Bethlehem Town Board

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

MASTER BICYCLE AND PEDESTRIAN PLAN

Kentucky s Surface Transportation System

PBIC Webinar. How to Create a Bicycle Safety Action Plan: Planning for Safety [IMAGE] Oct. 2, 2014, 2 pm

Providing an Efficient and Multi-modal Transportation System

Chapter 14 PARLIER RELATIONSHIP TO CITY PLANS AND POLICIES. Recommendations to Improve Pedestrian Safety in the City of Parlier (2014)

Planning Study SR 976. Project Advisory Team Meeting May 24, 2017

State Highway 44/State Street High Capacity Corridor

Appendix 3 Roadway and Bike/Ped Design Standards

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

MCTC 2018 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV13.xlsx

ACTIVE TRANSPORTATION

Recommended Roadway Plan Section 2 - Land Development and Roadway Access

EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives

Rail Station Fact Sheet Buckner Station

Tulsa Metropolitan Area LONG RANGE TRANSPORTATION PLAN

CONTRA COSTA. Countywide Bicycle and Pedestrian Plan. Executive Summary. July Contra Costa Countywide Bicycle & Pedestrian Plan

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

Prince George s County plans, policies, and projects

ADOT Statewide Bicycle and Pedestrian Program Summary of Phase IV Activities APPENDIX B PEDESTRIAN DEMAND INDEX

Living Streets Policy

Proposed White Flint Separated Bike Lane Network September 2015

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

A Matter of Fairness: ROCOG s Environmental Justice Protocol. What is Mobility Limitation?

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.

Rail Station Fact Sheet CentrePort/DFW Airport Station

Solana Beach Comprehensive Active Transportation Strategy (CATS)

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

This page intentionally left blank.

TRASBURG RANSPORTATION

Rail Station Fact Sheet UNT Dallas Station

9/25/2018. Multi-Modal Level of Service (MMLOS) Bianca Popescu, Transportation Planner

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

This page intentionally left blank.

Transportation Master Plan Advisory Task Force

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

Creating Complete Streets to Accommodate All Users

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

San Mateo County Comprehensive Bicycle and Pedestrian Plan Open House

What Is a Complete Street?

Vision. Goals and Objectives. Walking

Non-Motorized Transportation 7-1

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

NJDOT Complete Streets Checklist

Classification Criteria

NEWMARKET CENTRE Mobility Hub Profile

CITY OF ELKO BICYCLE AND PATHWAY PLAN

Perryville TOD and Greenway Plan

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

Rail Station Fact Sheet Downtown Carrollton Station

Safety & Convenience for All Users, in All Modes. Barbara McCann NCSL December 3, 2013

Multi Modal Transit Access Plan KIPDA ID # 239. Project Type: STUDY

3.0 Future Conditions

Community Bicycle Planning

WILMAPCO Public Opinion Survey Summary of Results

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

Madison Urban Area and Dane County. Bicycle Transportation Plan Summary. September Introduction. Bicycle Plan Scope and Planning Process

TABLE OF CONTENTS. Executive Summary

Regional Bicycle Barriers Study

FM 1092/Murphy Road Access Management Study Pulic Meeting #1. Wednesday, August 31, :00 p.m. 8:00 p.m.

Rail Station Fact Sheet CityLine/Bush Station

WELCOME TO OPEN HOUSE # 1 June 14, 2017

State Highway 16 Kuna-Mora Road to Ada/Gem County Line

Project Description Form 8EE

MASTER BICYCLE AND PEDESTRIAN PLAN

Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns.

EXECUTIVE SUMMARY. Vision

Transcription:

Employment Population SNCC Demographic Trends In 1970 the SNCC population was 10,040, accounting for roughly 3% of the County population In 2015, SNCC grew to 60,567 people, roughly 11% of the County population By 2050, SNCC population is forecast to be 92,322, or 15% of the County population Share of SNCC Population vs. Rest of New Castle County; 1970-2050 3% of County population 11% of County population 15% of County population Northern NCC Population 1970: 375,800 2000: 470,600 2015: 495,500 2050: 517,200 SNCC Population 1970: 10,050 2000: 29,700 2015: 60,600 2050: 92,300 Total NCC Population 1970: 385,900 2000: 500,300 2015: 556,100 2050: 609,500 U.S Census Estimates WILMAPCO/DPC Projections Share of SNCC Employment vs. Rest of New Castle County; 1990-2050 Between 1990 and 2015, SNCC added over 7,000 new jobs SNCC is adding over 10,000 jobs from 1970 to 2050, and the share of the jobs will grow from1.2% in 1970 to 4.6% in 2050 1.2% of County Employment 3.5% of County employment 4.6% of County employment Northern NCC Employment 1990: 242,500 2000: 277,700 2015: 275,200 2050: 272,650 Total NCC Employment 1990: 245,400 2000: 284,300 2015: 285,200 2050: 285,850 SNCC Employment 1990: 2,950 2000: 6,550 2015: 10,000 2050: 13,200 U.S Census/BLS Estimates Bottom Line: Since 1990 population growth is outpacing employment growth more than 6 to 1 WILMAPCO/DPC Projections Sources: US Census, American Community Survey, DPC, WILMAPCO

Population SNCC Demographic Trends Changes in SNCC Population Age Structure: 2000 vs. 2016 Since 2000, the SNCC area has increased by more than 27,000 people All age groups have seen gains growing most, with the 45-54 age group, adding more than 5,400 people 2000 population: 29,682 2016 population: 56,976* Population Age Group Changes in SNCC Mode Share to Work: 2000 vs. 2016 2000 2016* 2000-2016 Changes Total Workers 14,225 26,699 12,474 Drove alone 11,851 22,717 10,866 Carpool 1,412 1,675 263 Public transportation: 148 225 77 Walked 165 85-80 Other means 117 140 23 Worked at home 532 1,857 1,325 2000 2016* Total Workers: 14,225 Total Workers: 26,699 Bottom Line: The 45-54 age group has been the largest growing age group since 2000, but as a result it will begin to increase the 65+ population beginning around 2025. Sources: US Census, American Community Survey * ACS figure from 2012-2016 ACS 5-year estimate

Crash Analysis 2013-2017 Crash Trends: A total of 6,171 crashes were reported from 2013-2017 Nearly a third were rear-end collisions Crash totals have increased steadily over the 5 year period Just over 21% of the crashes occur at signalized intersections 25% of the crashes results in injuries 35 crashes were fatal 24 crashes involved bicycles and 30 involved pedestrians Crashes by Road Segment 2013-2017 Annual Crashes by Type: 2013-2017 Year Total Crashes Single Car Rearend Headon Angle Side swipe Other 2013 957 310 337 22 150 96 42 2014 1091 334 375 46 167 111 58 2015 1307 419 438 50 219 113 68 2016 1349 439 461 34 204 154 57 2017 1467 435 523 36 251 168 54 Total 6,171 1,937 2,134 188 991 642 279 % 31.4% 34.6% 3.0% 16.1% 10.4% 4.5% Source: Delaware State Police. DelDOT

SNCC Existing Road Network Road Functional Classifications According to the FHWA, functional classification is the process by which roads and highways are grouped into classes, or systems, according to the character of service they are intended to provide. Functional classification defines the nature of this channelization process by defining the part that any particular road should play in serving the flow of trips through a highway network. Road Functional Classification: 2015 There is a basic relationship between functionally classified highway network in serving traffic mobility and land access. Arterials provide a high level of mobility and a greater degree of access control, while local facilities provide a high level of access to adjacent properties but a low level of mobility. Collector roadways provide a balance between mobility and land access. The figure below illustrates the relationship of access and mobility between the functional classes. Mobility vs. Land Access Source: FHWA Source: DelDOT, FHWA

SNCC Programmed Improvements Transportation Improvement Program (TIP) The TIP is the regionally agreed upon 4-year list of priority transportation projects, as required by federal law (FAST). The TIP must list all projects that intend to use federal funds, along with all non-federally funded projects that are regionally significant. We also include other State funded capital projects. The projects include bicycle, pedestrian, ITS, and freight related projects, as well as the more traditional highway and public transit projects. ID Project Description 1 US 301: Maryland Line to SR 1 Limited access expressway construction. 2 3 Projects Currently in the WILMAPCO FY2019-2022 TIP Lorewood Grove Rd: Hyatts Corner - Lorewood Grove Boyds Corner Rd: Cedar Lane to US 13 Improve Lorewood Grove Road to two 12-foot lanes with 8-foot shoulders, open ditch drainage system, and a 10-foot multi-use path on one side of the roadway, from Road 412A to SR 1. improve Boyds Corner Road to four 12-foot lanes with 10-foot shoulders and a 20-foot median, using a combination of open and closed drainage system, and building a 10-foot multi-use path on each side of the roadway. FY 2019-22 TIP Projects in SNCC 2 10 4 3 8 11 7 1 5 4 Jamison Corner Rd: Relocated to Boyds Corner Rd Relocate Jamison Corner Road to the west connecting with Cedar Lane Road at the southern limits. Proposed improvements include12 ft. travel lanes with an eight foot shoulder and a 10ft. multi-use path on each side of the roadway. 9 5 SR 299: SR 1 to Catherine Street SR 299 widened to two lanes in each direction from SR 1 to Cleaver Farm Road, and a two way center lane turn lane will be added from Cleaver Farm Road to Catherine Street, along with pedestrian and bicycle improvements. 6 US 13: Duck Creek - SR 1 7 Cedar Ln: Marl Pit Rd - Boyds Corner Rd Improvements include controlled access, sidewalk, bike access, and other amenities. Rd improve Cedar Lane Road to two 12-foot lanes with 8-foot shoulders, open ditch drainage system, 10-foot multi-use path on west side of the roadway, replacement of Bridge 1-401 and Bridge 1-402, and the construction of a roundabout at the intersection of Cedar Lane Road and Marl Pit Road. 8 Middletown Park and Ride Development of new park and ride lot near Armstrong Corner. 9 Middletown Park and Ride Development of new park and ride lot near Middletown. 6 10 11 SR 896 / Bethel Church Interchange Shallcross Lake Rd: Graylag Rd - Boyds Corner Rd improve highway safety by removing thru traffic, especially heavy truck traffic, from local roads, while minimizing environmental impacts and accommodating existing and planned development. Relocate Shallcross Lake Road between Graylag Road and Boyds Corner Road. Numbers on map correspond with project descriptions on chart to the left For more details on all TIP projects, please visit www.wilmapco.org/tip Source: DelDOT, WILMAPCO

Existing Transit Facilities Transit Routes Within Study Area Transit Stop Usage Within Study Area Currently the corridor is served by six transit routes. Route 301 is the most popular. Route 47 is the most recent addition. Transit stop usage is classified as the total number of riders who board and depart the bus at each stop Ridership data provided by DART, sampling ridership data from May 2018 of Weekday Inbound riders Source: Delaware State Police. Intersection data and boundaries developed by WILMAPCO Source: Delaware Transit Corporation

Demographic DelDOT Level changes of Traffic Stress (LTS) Analysis The Delaware Department of Transportation (DelDOT) has implemented a tool called Level of Traffic Stress (LTS) Analysis to help plan effective, safe, and well-connected bikeway networks in Delaware that can used by a wide variety of people. Ideally, a person will eventually be able to comfortably ride a bike to most of their daily destinations on a network of low-stress streets and trails. Level of Traffic Stress (LTS) Analysis LTS is a way to evaluate the stress a bicyclist will experience while riding on the road. It is used to categorize roads by the type of riders who will be using them based on several conditions like: Number of Travel Lanes Speed of Traffic Number of Vehicles Presence of Bike Lanes Width of Bike Lanes Presence of a Physical Barrier Level of Traffic Stress Definitions: LTS Level LTS Lev el 1 LTS Level 2 LTS Level 3 LTS Level 4 Description Most children can feel safe on these streets The mainstream "interested but concerned" adult population will feel safe on these streets Streets that are acceptable to the "enthused and confident" riders who still prefer having their own dedicated space High-stress streets with high speed limits, multiple travel lanes, limited or non-existent bikeways and long intersection crossing distances Source: Delaware Department of Transportation

Demographic Economic changes Development/Employment SNCC has seen a 67% increase in employment between 2005 and 2015, growing from 5,936 to 9,927 jobs in the SNCC area Distribution of Jobs by Type: 2015 Total Worker Inflow/Outflow of SNCC 2015 Over half of the jobs fall within four employment types: Retail Trade, Health Care, Food Service and Education Most of the jobs (approx. 55%) are located within the Town of Middletown 3,595 Live and Work within SNCC Employment Locations: 2015 Changes in Employment by Job Type 2005-2015 Employment Type 2005 2015 Change 2005-2015 % Change Retail Trade 972 1,854 882 91% Health Care and Social Assistance 241 1,044 803 333% Accommodation and Food Services 419 1,044 625 149% Educational Serv ices 951 1,542 591 62% Professional/ Business Sv cs. 535 872 337 63% Other Serv ices 160 386 226 141% Manufacturing 586 792 206 35% Other 290 439 149 51% Arts, Entertainment, and Recreation 107 246 139 130% Public Administration 106 207 101 95% Transportation and Warehousing 260 345 85 33% Construction 856 910 54 6% Wholesale Trade 453 246-207 -46% Total Employment 5,936 9,927 3,991 67% Employment & Worker Flows - 2015 EMPLOYMENT within SNCC Count Share Employed in SNCC 9,927 100.0% Employed in SNCC but Living Outside 6,332 63.8% Employed and Living in SNCC 3,595 36.2% WORKERS living within SNCC Living in SNCC 26,485 100.0% Living in SNCC but Employed Outside 22,890 86.4% Living and Employed in SNCC 3,595 13.6% Of the 9,927 total jobs within SNCC, 3,595 are filled by residents (36%) 6,332 are filled by those living OUTSIDE of SNCC (63%) 22,890 (86%) of the 26,485 working residents work OUTSIDE of SNCC Source: US Census Longitudinal Employer-Household Dynamics

Demographic changes US 301 Before/After Data Collection Purpose and Need for Data Collection Efforts: To complete the US 301 Toll Diversion Working Group monitoring efforts Data has been collected several times 2006-2011 Recommends collecting data at specific locations before/after US 301 opens Additional locations added recently near state line to study possible traffic diversions onto Sassafras and Edgar Price Roads To continue with US 301 Spur Monitoring Reports Data has been collected at specific locations 6 different times (2010-2015) Required by DE Legislature Prepare a comprehensive before/after traffic study of the US 301 project Develop a ongoing ITS-based traffic monitoring data collection system

Demographic US 301 Before/After changes Data Collection Traffic Data collection- Volume and Intersections Collect data on three (3) different occasions: October/November 2018 Before US 301 opens Full data collection plan February/March 2019 2-months after US 301 opens Partial data collection plan (to assess immediate changes) NOTE: This data will serve as key traffic data for the master plan! October/November 2019 10 months after US 301 opens Full data collection plan Volume/Class Count Locations Counts should occur when schools are in session Counts should not occur during summer (seasonal) months Effort satisfies all requirements of Spur Monitoring Program and Toll Diversion Working Group Recommendations Intersection Count Locations

US 301 Before/After Data Collection Traffic Data collection- Travel Times Regional Travel Time Runs Travel Time Studies on I-95 and US 301 from DC to Wilmington, DE Collect Oct/Nov 2018 & 2019 Local Travel Time Runs Travel Time Studies in DE and on MD 213 Collect Oct/Nov 2018 & 2019 Travel Times - Bluetooth Data to be obtained by Rybinski Engineering for DelDOT Traffic Collect Oct/Nov 2018 & 2019, and Spring 2019 Existing and Planned Travel Time Device Coverage

US 301 Before/After Data Collection Traffic Data collection- Continuous Monitoring US 301 and other roads within Southern New Castle County will have numerous traffic data collection devices permanently installed for current and ongoing future traffic monitoring Devices will measure: - Traffic Volumes - Travel Times/Speeds - Vehicles classification and length